Method Statement
Method Statement
PROPOSED ADDITIONS
AND ALTERNATIONS FOR
THE EXISTING OFFICE
BUILDING FOR
SINHAPUTHRA OFFICE
BUILDING
1. INTRODUCTION
This Method Statement details the procedures and safety measures to
be adopted for the demolishing of Roof slab, Beams, and Walls of the
existing building of Sinhaputhra finance building, 11-A, Hill Street,
Kandy.
Prior to demolition of the existing building, all necessary fittings and
equipments required by the client to be removed before 15 th of
December 2006.
The work procedure is divided into following major works, which
includes machinery and equipment mobilization, transportation and
dumping. All related works to be carried out as stated below.
Safety Plan
Method statement for demolition of existing building of Sinhaputhra Finance (Pvt) Ltd.
1
3. MANPOWER
The general demolition work will be managed and directed by the sub
contractor .The safety officer nominated by the sub contractor is fully
responsible for the overall implementation of safety measures at the
site. The demolition work will consist of the following personnel.
Skilled Labourers -
07 Nos
Method statement for demolition of existing building of Sinhaputhra Finance (Pvt) Ltd.
2
4. PROCEDURE
4.1.The items to be removed by the client.
Method statement for demolition of existing building of Sinhaputhra Finance (Pvt) Ltd.
3
Method statement for demolition of existing building of Sinhaputhra Finance (Pvt) Ltd.
4
Special Note:
All temporary Electrical Connection , Water Facilities and Telephone
Cables to be disconnected by the client , before handing over the
building., without fail.
All workmen engaged in demolishing work, should maintain good
discipline , at the work site.
Always maintain the rules and regulation as per the instruction given
by Kandy Ready Mix, in accordance with environmental pollution.
All Temporary Facilities provided by KRM should not be damaged or
misused by the sub-contractor.
Method statement for demolition of existing building of Sinhaputhra Finance (Pvt) Ltd.
5