Data Sheet
Data Sheet
Applicable to
FOR
SITE
SERVICE
DRIVERS
MOTOR MAKE AS PER *( Kirloskar / ABB/ GEC
IS-325
/Siemens/ Bharat Bijlee/
Greaves)
TYPE
FRAME NO
SPEED
KW
VOLTS
PHASE
Hz
PROTECTION
ENCLOSURE
MOTOR RATING
INSULATION
STARTING METHOD
MOUNTING
TERMINAL BOX
EARTHING
Painting
Inspection Notes
Documentation
Commissioning
Assistance
Additional Comments
SC INDUCTION MOTOR
*
*(MAX 1500 RPM)
*
415 +/- 10%
3
50 +/- 5%
TEFC IP-55 (IS:4691)
FLP (as per IS 2148
suitable for Class II,
Div I for Group IIA & IIB
gases
125%
OF
RATED
CAPACITY
CLASS F
STAR-DELTA
HORIZONTAL
FOOT
MOUNTED
IP 55 WITH CABLE
ENTRY
FOR
SP.
HEATER/ 2 RUNS OF
POWER CABLES WITH
DC FLP GLAND
2 NOS BOLTED TYPE
YES (IS-325)
AS PER IS-325/4029
AS PER IS-325/4029
AS PER IS-325/4029
AS PER IS-325/4029
REDUCED VOLT
AS PER IS-325/4029
RUNNING UP TEST
All pumps shall be painted with two coats of anti corrosive paint and three
coats with glossy finish as per the approved colour code.
Inspection Note, MTC and Type Test Certificate to be certified by TPIA before
Despatch. Acceptance of shop tests does shall not relieve the vendor of his
responsibilities whatsoever.
a. PERFORMANCE CURVES shall indicate efficiency, NPSHr and BHP as
functions of Head at various speeds and viscosities.
b. PRELIMINARY Outline & Arrangement drawings, schematic diagrams.
c. CROSS SECTIONAL DRAWING and literature (TWO sets of each pump)
d. Drawings for Installation
e Drawings showing dimensions and position of mechanical seal.
f Foundation plan.
g. Outline dimensional drawing with general arrangement.
h. Manual for Installation /operating /maintenance and overhauling.
i. Spare Parts book
Required. Refer Terms and Conditions
Matching flange for Suction and discharge to be supplied by the vendor along
with the pump. FLP Cable glands/plugs to be supplied with Terminal Box
DRIVERS
MOTOR MAKE AS PER *( Kirloskar / ABB/ GEC
IS-325
/Siemens/ Bharat Bijlee/
Greaves)
TYPE
FRAME NO
SPEED
KW
VOLTS
PHASE
Hz
PROTECTION
ENCLOSURE
MOTOR RATING
INSULATION
STARTING METHOD
MOUNTING
TERMINAL BOX
EARTHING
Painting
Inspection Notes
Documentation
Commissioning
Assistance
Additional Comments
SC INDUCTION MOTOR
*
*(MAX 1500 RPM)
*
415 +/- 10%
3
50 +/- 5%
TEFC IP-55 (IS:4691)
FLP (as per IS 2148
suitable for Class II,
Div I for Group IIA & IIB
gases
125%
OF
RATED
CAPACITY
CLASS F
STAR-DELTA
HORIZONTAL
FOOT
MOUNTED
IP 55 WITH CABLE
ENTRY
FOR
SP.
HEATER/ 2 RUNS OF
POWER CABLES WITH
DC FLP GLAND
2 NOS BOLTED TYPE
YES (IS-325)
AS PER IS-325/4029
AS PER IS-325/4029
AS PER IS-325/4029
AS PER IS-325/4029
REDUCED VOLT
AS PER IS-325/4029
RUNNING UP TEST
All pumps shall be painted with two coats of anti corrosive paint and three
coats with glossy finish as per the approved colour code.
Inspection Note, MTC and Type Test Certificate to be certified by TPIA before
Despatch. Acceptance of shop tests does shall not relieve the vendor of his
responsibilities whatsoever.
a. PERFORMANCE CURVES shall indicate efficiency, NPSHr and BHP as
functions of Head at various speeds and viscosities.
b. PRELIMINARY Outline & Arrangement drawings, schematic diagrams.
c. CROSS SECTIONAL DRAWING and literature (TWO sets of each pump)
d. Drawings for Installation
e Drawings showing dimensions and position of mechanical seal.
f Foundation plan.
g. Outline dimensional drawing with general arrangement.
h. Manual for Installation /operating /maintenance and overhauling.
i. Spare Parts book
Required. Refer Terms and Conditions
Matching flange for Suction and discharge to be supplied by the vendor along
with the pump. FLP Cable glands/plugs to be supplied with Terminal Box
DRIVERS
MOTOR MAKE AS PER *( Kirloskar / ABB/ GEC
IS-325
/Siemens/ Bharat Bijlee/
Greaves)
TYPE
FRAME NO
SPEED
KW
VOLTS
PHASE
Hz
PROTECTION
ENCLOSURE
MOTOR RATING
INSULATION
STARTING METHOD
MOUNTING
TERMINAL BOX
EARTHING
Painting
Inspection Notes
Documentation
Commissioning
Assistance
Additional Comments
SC INDUCTION MOTOR
*
*(MAX 1500 RPM)
*
415 +/- 10%
3
50 +/- 5%
TEFC IP-55 (IS:4691)
FLP (as per IS 2148
suitable for Class II,
Div I for Group IIA & IIB
gases
125%
OF
RATED
CAPACITY
CLASS F
STAR-DELTA
HORIZONTAL
FOOT
MOUNTED
IP 55 WITH CABLE
ENTRY
FOR
SP.
HEATER/ 2 RUNS OF
POWER CABLES WITH
DC FLP GLAND
2 NOS BOLTED TYPE
YES (IS-325)
AS PER IS-325/4029
AS PER IS-325/4029
AS PER IS-325/4029
AS PER IS-325/4029
REDUCED VOLT
AS PER IS-325/4029
RUNNING UP TEST
All pumps shall be painted with two coats of anti corrosive paint and three
coats with glossy finish as per the approved colour code.
Inspection Note, MTC and Type Test Certificate to be certified by TPIA before
Despatch. Acceptance of shop tests does shall not relieve the vendor of his
responsibilities whatsoever.
a. PERFORMANCE CURVES shall indicate efficiency, NPSHr and BHP as
functions of Head at various speeds and viscosities.
b. PRELIMINARY Outline & Arrangement drawings, schematic diagrams.
c. CROSS SECTIONAL DRAWING and literature (TWO sets of each pump)
d. Drawings for Installation
e Drawings showing dimensions and position of mechanical seal.
f Foundation plan.
g. Outline dimensional drawing with general arrangement.
h. Manual for Installation /operating /maintenance and overhauling.
i. Spare Parts book
Required. Refer Terms and Conditions
Matching flange for Suction and discharge to be supplied by the vendor along
with the pump. FLP Cable glands/plugs to be supplied with Terminal Box