Introducing.
Standards
for
AIR
COOLED
CONDENSERS
By
Dave
Sanderlin
President
-
SPIG
USA
2014 ACCUG
1
First Traditional ACC
Install
in
1939
DRY
COOLING
is
75
Years
Old
in
2014
Courtesy
of
GEA
2
Developing the Standards
STEAM
SURFACE
CONDENSERS
AIR
COOLED
CONDENSERS
3rd
EdiLon
1952
11th
EdiLon
-
2012
1st
EdiLon
-
2011
Scope of the ACC Standard
1. Basic
Design
ConsideraLons
process
parameters,
velocity
limits
and
corrosion
allowances
airow
and
air
moving
systems
2. Performance
and
OperaLon
fouling
and
performance
margins
cold
weather
and
low
load
wind
eects
and
tesLng
3. InstrumentaLon
&
Controls
freeze
protecLon
and
controls
drainpot
and
condensate
tank
capaciLes
4. Process
ConnecLons
bypass
and
drain
energy
limitaLons
5. Ven&ng
Capaci&es
6. TesLng,
Commissioning
and
TroubleshooLng
SSC vs ACC
400
MW
Example
SSC
ACC
28,000
135,000
5x
Surface
Exposed
to
Air
Inleakage,
]2
1800
135,000
75x
Field
Welds,
]
700
18,000
26x
Total
Internal
Surface,
]2
SSC vs ACC Vent Capacity Comparison
35
HEI
Vent
Capacity,
SCFM
30
25
20
ACC
1st
EdiLon
15
SSC
10th
EdiLon
10
5
200
MW
130%
increase
500
MW
150%
increase
0
0
500
1000
1500
2000
2500
3000
3500
Primary
Exhaust
Flow,
PPH
(x
1000)
4000
4500
Vacuum Decay Testing
1. Performed
at
least
annually
(or
as
required)
2. Acceptance
criteria
is
project
and
condiLon
specic
IniLal
install
<
25%
of
installed
capacity
(per
HEI)
Performance
tesLng
<
50%
of
installed
capacity
(per
ASME)
3. Ask
OEM
for
specic
acceptance
criteria
generic
standards
do
not
apply
to
large
ACCs
(e.g.
0.02
HgA/min)
4. Consider
installing
ow
transmikers
on
Air
Removal
Systems
and
monitor
via
data
historian
QUESTIONS?
2014 ACCUG
THANK
YOU