Project Management - Final Report
Project Management - Final Report
Contents
1.
2.
Introduction .......................................................................................................................................... 2
3.
4.
5.
5.1.
5.2.
5.3.
5.4.
6.
7.
8.
9.
9.1.
9.2.
9.3.
9.4.
9.5.
Assumptions .................................................................................................................................... 11
9.6.
10.
Social costs, Risks and Expected Benefits of the Proposed Project ................................................ 11
10.1.
10.2.
11.
12.
13.
Lessons Learnt and key difficulties faced while preparing the project plan ................................... 14
13.1.
13.2.
14.
Annexures ....................................................................................................................................... 16
Page | 1
1. Executive Summary
This project report summarizes in detail the planning behind the construction of a new hostel block with
an indoor sport complex within the existing IIM Shillong Campus in 18 months to accommodate 84
students within a budget of 2.5 crores.
The project is proposed to be completed in three phases namely, planning, site development and
construction. In the planning phase the major deliverables will be the construction blueprint and
completion of legal formalities which would include permission for erecting a new building within the
campus. In the site development stage, we need to lay a foundation for the building at the proposed
site. The major and final phase of construction will have deliverables such as the completed hostel and
the indoor sports complex on the ground floor.
Once the blueprint was prepared and approved through consultation with the client, the cost estimate
was prepared and scheduling was done consequently. The social costs and risks involved in the project
were accounted for. The benefits of undertaking the construction were outlined with special focus on
the critical success factors. Finally at the end of the report, the limitations are enlisted and learnings
derived from this project are outlined.
The current hostel facility in the institute is operating under overcapacity and the number of
students being inducted every year is on the rise
The sports facility present also needs to be improved to provide the right infrastructure for
students in a premium management institute
The project deals with identification and scheduling of resources to complete the task in a given
time and resource frame
To determine the various types of risks, costs and constraints that could be associated with
managing a project as well as how to mitigate and manage the same
Page | 2
It is an opportunity to apply the principles of project management learnt in class as well as the
tools for the same
Scope
Providing basic amenities like provision for lights/ fans/ heaters, fully-equipped bathrooms,
drinking water facility, common room with LCD television, gym, squash facility, indoor
badminton court, table tennis etc. to the students of IIM Shillong
After the construction of the facilities it is important to regularly perform maintenance
activities on all the facilities. Understanding the maintenance requirements from the builder
and accordingly allocate resources for maintenance activities
Providing good quality fresh basic eatables and energy drinks through an automatic vending
machine that requires only limited space for installation
Keeping the sports facility open 24 hours at the hostel on all the days, as required by the
Institute
3.2.
3.3.
Page | 3
The legal and other approvals for hostel block will be taken by the college
administration and not by us
The location of the hostel block will be in the space where TV room, gym, badminton
court are currently located. The space adjacent to the guest house can also be used
We will construct the hostel block and hand it over to the college administration. Day to
day operations post completion will not be our responsibility
Technical Specifications
The intake of students at IIM Shillong is set to increase in the next few years and hence
there is a need for new hostel block to accommodate the increasing strength
Creation of EOI in a standard format so as to invite qualified builders and contractors
Associate with the most renowned construction player in the region and establish final
deal with them
Location Specification:
A room which has the potential for setting up required technical infrastructure
i.e. plumbing, electricity supply and other basic infrastructure
Room should be big enough to accommodate 1 student
Contractor Specification:
Contractor should have minimum work experience in similar domain in
Meghalaya for at least 2 years
The major specifications that we propose for this hostel building and indoor sports complex are:
Deliverables
Technical Specifications
Page | 4
Ground Floor + 4 floors + one-mess on each floor for cooking and dining
Standard building format (Brick & Mortar)
Ground floor consists of Table Tennis, Indoor Badminton Court, Gymnasium
and Squash Room
84 rooms
Cement Flooring + Provision for 2 tube-lights + 1 fan. The room size and
design will be same as the existing new boys hostel rooms.
Tiled-flooring in the corridors
One bathroom for every 2 rooms
Connecting the entire building to the main power grid of the campus +
Earthing + Drainage Facility + Automatic vending machine in sports complex
CDEF concept
5.1.
5.2.
5.3.
5.4.
Financial Difficulties
The funds for construction of new buildings within the campus have to come through the
Central govt. It may not be obtained on time and might delay the start of the project.
As a government organization we need to follow the tender process which may lead to change
in the proposed budget if the parties are not ready to work at the amount specified in the
tender.
Political difficulties
The whole of Meghalaya is suffering from strikes and bandhs because of the current political
scenario and the demand for ILP. This may lead to laborers not reporting on time or unable to
work freely.
The schedule might get hampered and it might take more number of days to finish the project.
Also if ILP issue comes into effect, getting manpower from outside might be a problem
Construction difficulties
Timely procurement of raw materials due to location of Shillong
Risk of non-compliance from suppliers end may pose a problem for the timely finish of the
project
Other difficulties
Design variations after the initiation of the project
Price inflation of construction materials
Page | 5
Various difficulties and constrains mentioned above may pose following problems in the proposed
project:
6. Risk Register
It acts as a central repository for all risks identified by the project or organization and, for each risk,
includes information such as risk probability, impact, counter-measures, and risk owner and so on.
Post identification of the risk, risk register has been created to know the exact probability and their
impact on the project
Risk Event
Likelihood
Impact
2
2
1
4
3
1
Detection
Difficulty
2
2
1
Construction
During construction
Page | 6
All the 4 of the milestones along with the expected timeline is shown in the images below:
Page | 7
Project Milestones
Milestones
Day of Completion
Construction Blueprint
Completion of Legal formalities
Excavation of site
Laying of Foundation and surface drainage
Completion of indoor sports complex ( ground floor )
Completion of First floor
Completion of Second floor
Completion of Third floor
Completion of Fourth floor
Completion of additional infrastructure
Project Handover
Day 45
Day 60
Day 100
Day 150
Day 280
Day 330
Day 380
Day 430
Day 480
Day 520
Day 540
9.2.
Resource Requirements
Resource
Purpose
Procurement
Cost
unit/resource
Human
Resource
Six
people
for
working
on
the
project design and
handling interaction
with the client
Internal to the
organization 5
External consultant
-1
For
the
internal 180000
workforce the salary
per month is Rs.30000
per person. External
consultant
charges
Rs.5000 per design
sanctioned
Page | 8
Human
Resource
9.3.
This phase consists of calculating the cost required for acquiring material (raw material and finished
goods).
Resource
Purpose
Procurement
Cost
per
unit/resource
Steel Frames & Construction
From supplier
Rs. 44200 per unit
Rods
available
Cement
Construction
From supplier
50 kg sacks @
RS.275 per sack
Sand
Construction
From supplier
RS.43 per cubic
feet of river sand
Bricks
Construction
From supplier
Rs.19000 for 3000
bricks
Plaster
Construction
Contract given to Rs.50 per sq.m of
vendor
wall area
Paint
Internal
and Contract given to
external
vendor
Sanitary fixtures
Internal
to From supplier
building
Plumbing
and Internal
and Contract given
sewage facility
external
to
building
PVC Pipes
Construction
From supplier
Electrical System Internal
Contract given
(Excluding
Lighting,
including HVAC)
Total
cost
project
442000
in
144375
303709
660739
42017
300000
150000
1200000
20000
5800000
Page | 9
Generators
(Diesel Operated)
Manpower
Requirement
Back Up Power
system
Labor
work,
plumbing,
electrical fixing
and carpentry
From
supplier1000kVA x 4
Daily workforce for
masonry : 25
Workforce
for
plumbing : 15
Workforce
for
electrical System: 7
Workforce
for
painting : 12
$95000
per 2470000
generator
Masonry @ Rs.300 220300
per person per day
Plumbing @ Rs.450
per person per day
Electrical @ Rs.450
per person per day
Painting @ Rs.250
per person per day
Flooring and other
internal civil works
@ Rs.350 per
person per day
Kajaria tiles @ 225000
Rs.95 for 1x1sq.ft
tiles
9.4.
The completion phase includes the final touches required for the completion of the building including,
internal decorations like standardized lighting and fixtures and glass fixtures.
Resource
Electrical
lighting fixtures
Purpose
Standardized
lighting in the
shopping complex
Glass fixtures to Both internal and
provide
the external to the
aesthetic look
shopping complex
As directed by
Fire-fighting
system
government
to
installation
get certified for
safe operation
Procurement
Cost
per Total cost
unit/resource
project
From supplier
in
700000
--
Procured
from
2000000
supplier but fixed
-by contractor
Procured
from Fire extinguishers 100000
supplier
@ Rs.2000 per
unit and other
equipment
Page | 10
9.5.
Assumptions
The salary of permanently hired employees has not been considered in the budget calculation as the
organization has separate salary account to handle the same and this cost is taken care of in the overall
company expenses and is not specific to the project alone.
9.6.
The total project cost comes out to be approximately Rs. 2.25 crores
Considering contingency cost of 10%, and rounding off the value obtained, the cost of the project stands
to be Rs. 25000000. (Rs. 2.5 Crores)
10.
Direct effects are the costs and benefits that can be directly linked to the owners/users of the
project properties (e.g., the users and the owner of stadium).
Indirect effects are the costs and benefits that are passed on to the producers and consumers
outside the market with which the project is involved (e.g., the owner of shops outside the campus )
External effects are the costs and benefits that cannot be passed on to any existing markets because
they relate to issues like the environment (noise, emission of CO2, etc.), safety (traffic, external
security) and nature (biodiversity, dehydration, etc.).
The noise level would increase during construction phase and might disturb the nearby residents.
Risk Identification
Firstly, the funds for construction of new
buildings within the campus have to come
from the Central govt. It may not be
obtained on time and might delay the start
of the project.
Risk Mitigation
Project should be initiated with the IIM
Shillong corpus after a written
confirmation by the central govt. that the
funds will be moved to IIM Shillong in
due course of time.
Political Risk
Risks associated The two major risks identified under this Enter into strictly defined contracts with
with
supply head are: Non-availability of resources and the suppliers
chain
risk of non-compliance from suppliers end
Page | 12
Safety
risks
related
11.
Schedule: It is important for the project to meet the schedule and the proposed timelines. So
the critical success factor is to meet or beat established project milestones
Safety: It is important that all the safety guidelines are followed and thus the success factor in
this case will be- no recordable or lost time injuries and reportable injuries lower than the
industry average
Budget: There are a lot of risks involved in this project. It is imperative that we manage risks to
contain costs within the estimated budget
Quality: Conform to project requirements and quality without adverse effects on milestones or
budget. None of the above success factors should be achieved at the cost of quality
Environmental & Regulation Compliance: Complete project without any violations conforming
to the standards and regulations
12.
The proposed hostel block will not include any changes in the plan/design at a later stage due to the
strict timelines. The design of the block and the room specifications will be similar to the existing new
hostel blocks.
There will be just cement flooring (cement) to ensure timely completion. There will be no additional
classrooms or study rooms in this hostel.
Page | 13
We have not taken into account risks associated with the external factors like weather, terrain and
natural disasters. With Shillong being an area affected by extreme climate and prone to natural disasters
like mild earthquakes etc., the ideal project plan should also have strategies to mitigate these risks and
have contingencies planned to meet the success factors.
Taking into account all the above factors are out the scope of the current project plan and are topics for
future scope of research.
13.
Importance of minutes of meetings was established while working on the project. It was
observed that referring past decisions and the discussions becomes important for taking future
decisions and hence for future reference minutes of meetings play a very crucial role. Keeping
track of allocated tasks and responsibilities became much easier with the help of minutes of
meetings.
While managing a project, preparing timeline and budget are not the only key areas. There are
many other important things, like work breakdown structure, know-how of the domain to some
extent for efficient scheduling budget management, social cost-benefit analysis, anticipation of
possible risks and measures to mitigate them etc., which needs to be considered while planning
for any project.
Importance of consensus and discussions between client and project management team is
another key area which was observed. The discussions brought out many new ideas on table but
at the same time it was realized that unnecessary discussions may be time consuming without
adding value to the project. Similarly, agreeing to a point is very important for the project to
proceed further effectively. All of this is accomplished through clear and consistent
communication.
Good project management involves no shortage of dialogue between team members, clients,
and anyone else that should be in the loop. Constructive criticism pushes your team to do their
best and makes expectations clear. If someone is already producing phenomenal work, be sure
to recognize it and let them know. It is important to cultivate creativity whenever possible.
Another aspect to bear in mind throughout the life of a project is that changes will be made.
Turning change into an opportunity is important; re-evaluation of the state of project and using
it to motivate the team should be the step forward. That way, even if drastic changes come up
your project will end a success.
Also a key learning is that good project management doesnt end when a project is completed.
Evaluating the results of the teams hard work is an integral step in the process. Obviously the
Page | 14
views of client about teams efforts will be communicated by them but a personal introspection
becomes important for future improvement.
Without clear knowledge about the actual resources and schedule involved in a construction
project it was difficult to figure out things at many points in time. With the help of online
resources and batch mates with prior experience in this field, this difficulty was tackled to some
extent.
The team involved people with varied backgrounds who have their own understanding about
various topics. Hence, it became difficult in certain discussions to reach on consensus timely.
Thus meetings sometimes became a time consuming affair but this has its own positives and
negatives. Also dividing the roles as project manager, HR manager, communications manager
etc. helped in dealing with this issue to some extent as the concerned person was the one who
led the discussion of his/her domain, brining everyone on same page and helping in reaching a
consensus.
Lack of proper communication sometimes in the initial phase proved to be bottleneck hindering
the project. But gradually as the project planning continued the team developed a co-ordination
and this issue was addressed soon.
Timely follow-up, which is an important step in project management, was in some points not
adequate and hence revising the points discussed in the past meetings consumed a lot of time
but minutes of meetings came to rescue to a large extent.
Page | 15
Annexure
Annexure 1: Expression of Interest
Sl. No.
Particulars
Profile of Builder
Name
Address in full
Fax, Email
10
11
12
employed,
Details
No. of offices/branches
16
Place:
Date:
Signature of the
Caterer/Hotelier
To
Type of
Contract
undertaken
Number
Parties
serviced
of
Value
contract
(annual)
of
To
of Value
contract
(annual)
of
Page | 17