Lightning Protection Risk Assessment Study - Write Up
Lightning Protection Risk Assessment Study - Write Up
Surge Protection:
CMSRSL would address the surge protection issues as part of the LP Risk assessment
study. If Cairn Energy is interested, a surge protection survey by a reputed
manufacturer can be arranged.
Salient features of the study:
(a) Assessment of lightning protection requirement for all plant blocks based.
(b) Verification of installation compliance against standards and to suggest
corrective measures
(c) Review of the maintenance standards and procedures of the existing lightning
protection system
(d) Plotting of lightning protection zones in the plant layout.
Software Used:
CMSRSL would use Lightning Protection Risk Assessment software (conforming
to BS 6651 standard) for assessing the lightning risk value for each plant block.
4.0 Methodology
Our approach differs from that offered by many other companies, we focus on the
management systems that make sure your risks are properly controlled. In this
way we can make sure you have designed-in good safety management. This
approach can be compared to Total Quality Management methods that are widely
recognized as being the most effective way to provide high quality.
Other approaches rely on inspecting out problems and generally offer only a
short-term solution. When compared with other approaches total management
approaches are very cost effective. They do not rely on expensive additional
resources or controls but ensure that safety management is part of the normal
business processes.
Lightning Protection Study is conducted in four principal phases
Preparation
On-site audit
Reporting
Follow-up
After the objectives and scope of the study are accepted next step would be
collection of information. A detailed description of type of data that need to be
collected is sent on acceptance of this proposal.
After analysing the information by the audit team members a schedule is prepared
after discussing with the factory management. Site study will be undertaken on
mutual convenience.
5.0
Reporting Format:
The detailed report would provide recommendations for each of the individual
plant block. The recommendations would be provided in the form of table as
shown below:
Structure
/ Existing LP
Recommended LP System Elements
Comments
Air
Down
Earth
Pits
Building
System
Termination
Conductor &
Test Links
Specific Recommendations:
Also the each structure would be ranked High, Medium or Low for
implementation of the recommendations as per the following criterion:
Priority
High
Medium
Low
6.0
Criterion
Structure where lightning protection is REQUIRED
Structure where lightning protection is RECOMMENDED
Structure where lightning protection is NOT REQUIRED
Personnel
CMSRSL will use personnel who are experienced and have carried out similar
work for other companies. A senior CMSRSL consultant who is trained by
National Lightning Safety Institute, USA and well versed with carrying out
Lightning Protection Studies will head the audit team. The team will contain
two senior engineers who are well versed with lightning protection assessment of
major chemical & petro-chemical plants.
CMSRSL has carried out Lightning Risk Assessment Studies for the following
clients:
1.
2.
3.
4.
5.
6.
7.
While projects 1,2 and 3 mentioned above are specific LP Risk Assessment studies 4,5,6 and 7
were Electrical Safety Studies where Lightning Protection was addressed as part of the project.
In addition to the above, CMSRSL executed safety related projects for major
petrochemical / process industries like