HPSR 2009 Road Schedule

This document provides rates for various activities related to loading, unloading, transporting, and crushing construction materials. It lists 18 activities in total, with descriptions of the work, units of measurement, and labor and throughput rates in Indian Rupees (Rs.) for each. The activities include loading and unloading materials like lime, aggregate, bricks, cement, steel, and pipes manually or mechanically by various means and distances. It also provides rates for haulage of materials by tipper or truck over different road surfaces, supplying and crushing stone into aggregates of various sizes using stone crushing units, and setting out construction blocks and pipes. The rates are intended to serve as references for cost estimation based on the Ministry of Road Transport and

Uploaded by

rajinder kutaal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
70% found this document useful (20 votes)
10K views214 pages

HPSR 2009 Road Schedule

This document provides rates for various activities related to loading, unloading, transporting, and crushing construction materials. It lists 18 activities in total, with descriptions of the work, units of measurement, and labor and throughput rates in Indian Rupees (Rs.) for each. The activities include loading and unloading materials like lime, aggregate, bricks, cement, steel, and pipes manually or mechanically by various means and distances. It also provides rates for haulage of materials by tipper or truck over different road surfaces, supplying and crushing stone into aggregates of various sizes using stone crushing units, and setting out construction blocks and pipes. The rates are intended to serve as references for cost estimation based on the Ministry of Road Transport and

Uploaded by

rajinder kutaal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 214

Chapter 1

LOADING, UNLOADING, CARRIAGE CRUSHING OF MATERIALS AND SETTING


OUT
Sr.
No.

1.1

Reference to
MORD
Description
Specifications

Labour
Rate
(Rs.)

Through
Rate
(Rs.)

Loading and Unloading of Lime,


Aggregate, Stone Boulder, Brick
Aggregate,
Kankar,
Building
Rubbish, Crushed Slag, Stone for
Masonry Work by Manual Means
(i)

1.2

Unit

Loading of Lime, Aggregate,


Stone Boulder, Brick Aggregate,
Kankar,
Building
Rubbish,
Crushed Slag, Stone for
Masonry Work by manual
means including a lead upto 30
m

Cum

--

43.60

(ii) Loading
of
Earth,
Sand,
Moorum, Manure, Flyash by
manual means including a lead
upto 30 m

Cum

--

21.80

(iii) Unloading of Lime, Aggregate,


Stone Boulder, Brick Aggregate,
Kankar,
Building
Rubbish,
Crushed Slag, Stone for
Masonry Work by manual
means including a lead upto 30
m

Cum

--

21.80

(iv) Unloading of Earth, Sand,


Moorum, Manure, Flyash by
manual means including a lead
upto 30 m

Cum

--

13.40

Cum

--

31.50

Loading and Unloading of Lime,


Aggregate, Stone Boulder, Brick
Aggregate,
Kankar,
Building
Rubbish, Crushed Slag, Stone for
Masonry Work by
Mechanical
Means
(i)

Loading of Lime, Aggregate,


Stone Boulder, Brick Aggregate,
Kankar,
Building
Rubbish,
Crushed Slag, Stone for
Masonry Work by

20

Sr.
No.

Reference to
MORD
Description
Specifications

Unit

Labour
Rate
(Rs.)

Through
Rate
(Rs.)

mechanical means including a


lead upto 30 m Placing tipper at
loading point, loading with front
end loader excluding time for
haulage and return trip.

1.3

(ii) Loading
of
Earth,
Sand,
Moorum, Manure, Flyash by
mechanical means including a
lead upto 30 m.Placing tipper at
loading point, loading with front
end loader excluding time for
haulage and return trip.

Cum

--

15.90

(iii) Unloading of Earth, Sand, Lime


moorum, Aggregate, Stone
Boulder,
Brick
Aggregate,
Kankar,
Building
Rubbish,
Manure, Crushed Slag, Flyash,
Stone for Masonry Work by
mechanical means.

Cum

--

4.85

Loading of Bricks by manual


means including a lead upto 30
m

1000 Nos

--

73.30

(ii) Unloading and Stacking of


Bricks by manual means
including a lead upto 30 m

1000 Nos

--

73.30

Tonne

--

55.30

Tonne

--

55.30

Tonne

--

59.70

Tonne

--

59.70

Loading, Unloading and Stacking


of Bricks by Manual Means
(i)

1.4

Loading and Unloading of Cement


by Manual Means
(i) Loading of Cement by manual
means including a lead upto 30
m
(ii) Unloading of Cement by
manual means including a lead
upto 30 m

1.5

Loading
and
Unloading
of
Structural Steel and Steel Bars by
manual means
(i)

Loading of Structural Steel,


Steel Bars by manual means
including a lead upto 30 m
(ii) Unloading of Structural Steel,
Steel Bars by manual means
including a lead upto 30 m

21

Sr.
No.
1.6

Reference to
MORD
Description
Specifications

Unit

Labour
Rate
(Rs.)

Through
Rate
(Rs.)

Loading
and
Unloading
of
Bitumen Drums by Manual Means
(i)

Loading of Bitumen Drums by


manual means including a lead
upto 30 m

Tonne

--

65.05

(ii) Unloading of Bitumen Drums by


Manual Means including a lead
upto 30 m

Tonne

--

59.25

--

95.90

Tonne

--

95.90

Cum

--

144.15

Cum

--

144.15

RCC P/Pipe --

42.55

Note: The rate is inclusive of the self weight of drum


1.7
100
Loading and Unloading of Timber
by Manual Means
(i)

Unloading of Timber by manual


means including a lead upto 30
m

(ii) Unloading of Timber by manual


means including a lead upto 30
m
Note :Density of wood has been assumed as 900 kg per
cum. If the density is less the output may be reduced
proportionately
1.8

Loading and Unloading of C.C.


Blocks, Kerb, etc.
(i) Loading with care C.C. Blocks,
km Stone, 200 m Stone,
Boundary Pillar, Kerb, Channel,
Bond Stone, etc. by manual
means including a lead upto 30
m
(ii) Unloading with care C.C.
Blocks, km Stone, 200 m
Stone, Boundary Pillar, Kerb,
Channel, Bond Stone, etc. by
manual means including a lead
upto 30 m

1.9

Loading and Unloading of Hume


Pipes
(i) Loading of RCC Hume pipes by
mechanical means including a
lead upto 30 m
A

900/1000/1200mm
Hume pipe

dia

22

Sr.
No.

Reference to
MORD
Description
Specifications

Unit

Labour
Rate
(Rs.)

Through
Rate
(Rs.)

750mm dia RCC Hume pipe

P/Pipe --

25.50

600/500/300mm dia Hume pipe

P/Pipe --

18.25

(ii) Unloading of RCC Hume Pipe


by manual means including a
lead upto 30m
A 900/1000/1200 mm dia RCC P/Pipe -Hume pipes
B 750mm dia Hume pipe
P/Pipe --

175.05

P/Pipe --

109.40

900/1000/1200 mm dia Hume P/Pipe -pipe

29.00

750 mm dia Hume pipe

P/Pipe --

17.40

600/500/300 mm dia Hume P/Pipe -pipe

12.45

600/500/300mm dia Hume pipe

145.9

(ii)
(iii) Unloading of RCC Hume Pipe
by manual means including a
lead upto 30m

1.10

Haulage excluding
Unloading

Loading

&

Haulage of materials by tipper


excluding cost of loading, unloading
and stacking.
(i)

Surface road.

T/Km.

--

2.30

(ii)

Unsurfaced Gravel road

T/Km.

--

2.80

T/Km.

--

5.60

P/Pipe --

25.50

(iii) Katcha track and track in River


Bed/Nallah bed & Choe bed
1.11

Haulage excluding
Unloading

Loading

&

Haulage of materials by truck


excluding cost of loading, unloading
and stacking.
I) Hume pipe 900/1000/1200 mm
dia
Case-I
(i)

Surface road.

23

Sr.
No.

Reference to
MORD
Description
Specifications

Unit

Labour
Rate
(Rs.)

Through
Rate
(Rs.)

Case-II
(ii)

Unsurfaced Gravel road

P/Pipe --

30.70

(iii) Katcha track and track in River P/Pipe -Bed/Nallah bed & Choe bed

61.75

Case-III

II) Hume pipe 750 mm dia


Case-I
(i)

Surface road.

P/Pipe --

15.30

P/Pipe --

18.40

(iii) Katcha track and track in River P/Pipe -Bed/Nallah bed & Choe bed

37.05

Case-II
(ii)

Unsurfaced Gravel road

Case-III

III) Hume pipe 600/500/300 mm dia


Case-I
(i)

Surface road.

P/Pipe --

10.95

P/Pipe --

13.15

(iii) Katcha track and track in River P/Pipe -Bed/Nallah bed & Choe bed

24.5

Case-II
(ii)

Unsurfaced Gravel road

Case-III

1.12

Supply of Quarried stone and


hand breaking
(i)

Supply of quarried stone and


hand breaking into coarse
aggregate to Grading 1 (90 mm
to 45 mm) as per Table 400.8 of
Technical Specifications.

24

Cum

--

575.50

Sr.
No.

Reference to
MORD
Description
Specifications

1.13

Unit

Through
Rate
(Rs.)

(ii) Supply of quarried stone and


hand breaking into coarse
aggregate to Grading 2 (63 mm
to 45 mm) as per Table 400.8 of
Technical Specifications.

Cum

--

619.55

(iii) Supply of quarried stone and


hand breaking into coarse
aggregate to Grading 3 (53 mm
to 22.4 mm) as per Table 400.8
of Technical Specifications.

Cum

--

663.60

(IV) Supplying and stacking at site


hard stone for soling

Cum

--

363.00

(V) Supplying and stacking course


sand at site of work.

Cum

--

363.00

Cum

--

379.50

Crushing of Stone Aggregates 100


per cent passing through 53 mm
sieve as per Table 500.6 of
Technical Specifications.
Crushing of stone boulders of 150
mm size in an integrated stone
crushing unit of 200 t/h capacity
comprising
of
primary
and
secondary crushing units, belt
conveyor and vibrating screens to
obtain stone aggregates 100 per
cent passing through 53 mm sieve
as per Table 500.6 of Technical
Specifications including the cost of
stone.

Note:

Labour
Rate
(Rs.)

800 cum of stone boulders are


needed to get 750 cum of stone
aggregates.

85 per cent of above cost will be


attributed to the production of 750
cum of stone aggregates of 40 mm
size and balance 15 per cent will be
for smaller size aggregates and
stone dust which comes out as a byproduct.

The integrated stone crusher


includes primary and secondary
crushing units.

25

Sr.
No.

Reference to
MORD
Description
Specifications

1.14

Unit

1.15

Through
Rate
(Rs.)

Crushing of Stone Aggregates 100


per cent passing through 22.4 mm
sieve as per Table 500.6 of
Technical Specifications.
Crushing of stone boulders of 150
mm size in an integrated stone
crushing unit of 200 t/h capacity
comprising
of
primary
and
secondary crushing units, belt
conveyor and vibrating screens to
obtain stone aggregates 100 per
cent passing through 22.4 mm sieve
as per Table 500.6 of Technical
Specifications including the cost of
stone.

Note:

Labour
Rate
(Rs.)

800 cum of stone boulders are


needed to get 670 cum of stone
chips of required size.

90 per cent of above cost will be


attributed to the production of 670
cum of stone aggregate and balance
10 per cent will be for smaller size
aggregates and stone dust which
comes out as a by-product.

The integrated stone crusher


includes primary and secondary
crushing units.
Crushing of Stone Aggregates
Nominal Size 13.2/11.2 mm as per
Table
500.9
of
Technical
Specifications.

26

Cum

--

432.55

Sr.
No.

Note:

1.16

Reference to
MORD
Description
Specifications

Unit

Labour
Rate
(Rs.)

Through
Rate
(Rs.)

Crushing of stone boulders of


150 mm size in an integrated
stone crushing unit of 200 t/h
capacity comprising of primary
and secondary crushing units,
belt conveyor and vibrating
screens
to
obtain
stone
aggregates of 13.2 mm nominal
size as per Table 500.9 of
Technical
Specifications
including the cost of stone.

Cum

--

484.40

II

Crushing of stone boulders of


150 mm size in an integrated
stone crushing unit of 200 t/h
capacity comprising of primary
and secondary crushing units,
belt conveyor and vibrating
screens
to
obtain
stone
aggregates of 11.2 mm nominal
size as per Table 500.9 of
Technical
Specifications
including the cost of stone.

Cum

--

484.40

800 cum of stone boulders are


needed to get 600 cum of stone
chips of size 13.2 mm and 125 cum
stone dust.

95 per cent of above cost will be


attributed to the production of 600
cum of stone chips of 13.2 mm size
and balance 5 per cent to the
production of stone dust which
comes out as a by-product.

The integrated stone crusher


includes primary and secondary
crushing units.
Crushing of Stone Aggregates 9.5
mm Nominal Size as per Table
500.9 of Technical Specifications.

27

Sr.
No.

Note:

1.17

Reference to
MORD
Description
Specifications

Unit

Through
Rate
(Rs.)

Crushing of stone boulders of 150


mm size in an integrated stone
crushing unit of 200 t/h capacity
comprising
of
primary
and
secondary crushing units, belt
conveyor and vibrating screens to
obtain stone aggregates of 9.5 mm
nominal size as per Table 500.9 of
Technical Specifications including
the cost of stone.

Cum

--

509.85

Crushing of stone boulders of


150mm size in an intergrated stone
crushing unit of 200t/h capacity
comprising
of
primary
and
secondary crushing units, belt
conveyor and vibrating screens to
obtain stone aggregates of 9.5mm
nominal size as per table 500.9 of
Technical specifications including
the cost of stones.

Cum

--

514.50

800 cum of stone boulders are


needed to get 600 cum of stone
chips of size 6.7 mm and 125 cum
stone dust.

95 per cent of above cost will be


attributed to the production of 600
cum of stone chips of 9.5 mm size
and balance 5 per cent to the
production of stone dust which
comes out as a by-product.

The integrated stone crusher


includes primary and secondary
crushing units.

100

Labour
Rate
(Rs.)

Setting Out
(i)

Typical benchmark as per


drawing 200.1 and as per
Technical Specification clause
108.

Km.

485.60

2346.4

(ii) Typical reference pillar as per


drawing 200.2 and as per
Technical specification clause
108

Km.

233.80

1068.25

28

Sr.
No.

Reference to
MORD
Description
Specifications

Unit

29

Labour
Rate
(Rs.)

Through
Rate
(Rs.)

Sr.
No.

Reference to
MORD
Description
Specifications

Unit

30

Labour
Rate
(Rs.)

Through
Rate
(Rs.)

MATERIALS AND SETTING

Remarks

31

Remarks

32

Remarks

33

Remarks

34

Remarks

35

Remarks

36

Remarks

37

Remarks

38

Remarks

39

Remarks

40

Remarks

41

Chapter 2
SITE CLEARANCE
Sr.
No.

Reference to
MORD
Specification

2.1

201

Description

Unit

201

(II)

201

Hectare 5,872.70 --

Clearing and Grubbing Road


Land
Clearing and grubbing road land
including uprooting wild vegetation,
grass, bushes, shrubs, saplings
and trees of girth upto 300 mm,
removal of stumps of such trees cut
earlier
and
disposal
of
unserviceable
materials
and
stacking of serviceable material to
be used or auctioned, upto a lead
of 1000 m including removal and
disposal of top organic soil not
exceeding 150 mm in thickness as
per Technical Specification Clause
201.
(I)

2.3

Through Remarks
Rate

Clearing Grass and Removal of


Rubbish
Clearing grass and removal of
rubbish up to a distance of 30 m
outside the periphery of the area as
per Technical Specification Clause
201.
By Manual Means

2.2

Labour
Rate

By Manual Means
(A)

In area of non-thorny Hectare -jungle

22,440.10

(B)

In area of thorny jungle

Hectare --

30,198.40

(A)

In area of non-thorny Hectare -jungle

45,774.70

(B)

In area of thorny jungle

55,231.10

By Mechanical Means

Cutting of Trees including


Cutting of Trunks, Branches and
Removal of Stumps

31

Hectare --

Sr.
No.

Reference to
MORD
Specification

Description

Unit

Labour
Rate

Through Remarks
Rate

Cutting of trees, including cutting of


trunks, branches and removal of
stumps
&
roots,
refilling,
compaction of backfilling and
stacking of serviceable material by
manual means with all lifts as per
Technical Specification Clause 201.
A.

Lead upto 100 m


(i)

Girth above 300 mm to


600 mm

Each

--

117.30

(ii)

Girth above 600 mm to


900 mm

Each

--

219.80

(iii)

Girth above 900 mm to


1800 mm

Each

--

410.50

(iv)

Girth above 1800 mm to


2700 mm
Girth above 2700 mm to
4500 mm
Girth above 4500 mm

Each

--

762.60

Each

--

1,592.00

Each

--

4,505.35

to

Each

--

129.85

to

Each

--

257.40

to

Each

--

460.60

to

Each

--

837.75

to

Each

--

1,675.50

Each

--

4,714.05

(v)
(vi)
B.

Lead upto 1000 m


(i) Girth above 300 mm
600 mm
(ii) Girth above 600 mm
900 mm
(iii) Girth above 900 mm
1800 mm
(iv) Girth above 1800 mm
2700 mm
(v) Girth above 2700 mm
4500 mm
(vi)

2.4

201

Girth above 4500 mm

Uprooting and Removing Stumps


& Roots
Uprooting and Removing Stumps &
roots, compaction of backfilling and
stacking of servicable material by
manual means as per Technical
Specification Clause 201.

32

Sr.
No.

Reference to
MORD
Specification

Description
A.

Girth above 300 mm to


600 mm

Each

--

66.25

(ii)

Girth above 600 mm to


900 mm
Girth above 900 mm to
1800 mm

Each

--

108.95

Each

--

224.45

Girth above 1800 mm to


2700 mm
Girth above 2700 mm to
4500 mm
Girth above 4500 mm

Each

--

436.95

Each

--

886.45

Each

--

2,515.35

(v)
(vi)

Lead upto 1000 m

(i)

Girth above 300 mm to


600 mm

Each

--

69.15

(ii)

Girth above 600 mm to


900 mm
Girth above 900 mm to
1800 mm

Each

--

119.40

Each

--

237.00

(iv)

Girth above 1800 mm to


2700 mm

Each

--

453.70

(v)

Girth above 2700 mm to


4500 mm

Each

--

907.30

(vi)

Girth above 4500 mm

Each

--

2,619.70

(iii)

202

Through Remarks
Rate

(i)

(iv)

2.5

Labour
Rate

Lead upto 100 m

(iii)

B.

Unit

Dismantling of Structures
Dismantling of existing structures
like culverts, bridges, retaining
walls
and
other
structure
comprising of masonry, cement
concrete, wood work, steel work,
including T&P and scaffolding
wherever necessary, sorting the
dismantled material, disposal of
unserviceable
material
and
stacking the serviceable material
with all lifts and lead of 1000 m as
per Technical Specification Clause
202.
(I) By Manual Means

33

Sr.
No.

Reference to
MORD
Specification

Unit

Labour
Rate

(A)

Lime Concrete

Cum

--

207.60

(B)

Cement Concrete

Cum

--

237.00

Cum

--

538.25

Cum

--

369.85

Cum

--

567.20

(C) Reinforced Cement


Concrete
(II) By Mechanical Means
(A)

Cement Concrete

(B)

2.6

202

Through Remarks
Rate

Description

Reinforced Cement
Concrete
Dismantling Brick/Tile Work
Dismantling of existing structures
like culverts, bridges, retaining
walls
and
other
structures
comprising of brick masonry,
including disposal of unserviceable
material
and
stacking
the
serviceable material with all lift and
lead of 1000 m as per Technical
Specification Clause 202.

2.7

202

(A)

Lime mortar

Cum

--

148.90

(B)

Cement mortar

Cum

--

178.25

(C)

Mud Mortar

Cum

--

137.15

(D)

Dry Brick Pitching or Brick


Soling

Cum

--

131.30

Cum

--

160.65

Dismantling Stone Masonry as


per
Technical
Specification
Clause 202.
Dismantling of existing structures
like culverts, bridges, retaining
walls
and
other
structure
comprising of stone masonry,
including disposal of unserviceable
material
and
stacking
the
serviceable material with all lift and
lead of 1000 m as per Technical
Specification Clause 202.
(A)

Rubble Stone Masonry in


Lime Mortar

34

Sr.
No.

Reference to
MORD
Specification

Description

Cum

--

178.25

(C)

Rubble Stone Masonry in


Mud Mortar

Cum

--

148.90

(D)

Dry Rubble Masonry

Cum

--

143.00

(E)

Dismantling Stone Pitching /


Dry Stone Spalls

Cum

--

137.15

(F)

Dismantling boulders laid in


wire crates including opening
of crates and stacking
dismantled materials

Cum

--

148.90

Cum

--

312.10

Dismentling Wood work wrought


and planed fixed in Frames of
Trusses upto a height of 5 m
above plinth level as per
Technical Specification clause
202.

2.9

202

DismentlingSteel work in all


types of sections upto a height
of 5 m above plinth level
excluding cutting of rivet as
technical specification clause
202.
(A)

Including dismembering

Tonne

--

636.75

(B)

Excluding dismembering

Tonne

--

466.70

(C)

Extra over items(A) and(B) for Each


cutting rivets

202

4.30 --

Scraping of bricks dismantled


from brick
work
including
stacking
as
per
Technical
Specification Clause 202.
In Lime/ Cement Mortar

2.11

Through Remarks
Rate

Rubble Stone Masonry in


Cement Mortar

202

202

Labour
Rate

(B)

2.8

2.10

Unit

1000Nos

513.85 --

Cum

206.10 --

Scraping of Stone from


Dismantled Stone Masonry as
per Technical Specification
Clause 202.
In Cement or Lime Mortar

35

Sr.
No.

Reference to
MORD
Specification

2.12

2.13

Note:

2.14

Description

Unit

Labour
Rate

202

Scraping Plaster in Lime or


Cement Mortar from Brick /
Stone Masonry as per Technical
Specification Clause 202.

Sqm

--

202

Removing all types of Hume


pipes and stacking within a lead
of 1000 m including Earthwork
and Dismantling of Masonry
Works
as
per
Technical
Specification Clause 202.

Through Remarks
Rate
7.20

(A)

Upto 600 mm dia Hume pipe

Mtre

76.23 --

(B)

Above 600 mm to 900 mm


dia Hume pipe

Mtre

103.05 --

(C)

Above 900 mm dia Hume


pipe

Mtre

176.50 --

The
excavation
of
earth,
dismantling of stone masonry work
in head walls and protection works
is not included which is to be
measured and paid separately.

Credit for retrieved stone from


masonry work may be taken as per
actual availability.

202

Dismantling
of
Flexible
Pavements
Dismantling of flexible pavements
and
disposal
of
dismantled
materials upto a lead of 100 m,
stacking
serviceable
and
unserviceable materials separately
as per Technical Specification
Clause 202
(I)

By Manual Means
(A)

(II)

Bituminous Courses

Cum

--

378.85

(B) Granular Courses


By Mechanical Means

Cum

--

284.60

(A)

Cum

--

209.30

Bituminous Courses

36

Sr.
No.

Reference to
MORD
Specification

2.15

202

Through Remarks
Rate

Unit

Labour
Rate

Cum

--

1,516.35

Dismantling guard rails by manual Running -means and disposal of dismantled metre
material with all lifts and upto a lead
of 1000 m, stacking serviceable
materials
and
unserviceable
materials
separately
as
per
Technical Specification Clause 202.

42.90

Description
Dismantling of Cement Concrete
Pavements as per Technical
Specification Clause 202.
Dismantling of cement concrete
pavements by mechanical means
using pneumatic tools breaking to
pieces not exceeding 0.02 cum in
volume and stock piling at
designated locations and disposal
of dismantled materials upto a lead
of 1000 m, stacking serviceable
and
unserviceable
materials
separately

Note: The above analysis is for removal of complete


pavement.
In case full depth repair work is
required to be done after dismantling, provision of a
concrete saw cutter may be added for 0.25h.
2.16

2.17

202

202

Dismantling Guard Rails

Dismantling Kerb Stones


Dismantling kerb stones by manual Running -means and disposal of dismantled
metre
material with all lifts and upto a lead
of 1000 m as per Technical
Specification Clause 202.

2.18

2.19

202

202

Dismantling Kerb Stone


Channels
Dismantling kerb stone channels by Running -manual means and disposal of metre
dismantled material with all lifts and
upto a lead of 1000 m as per
Technical Specification Clause 202.
Dismantling Kilometre Stones

37

10.55

15.90

Sr.
No.

Reference to
MORD
Specification

Description

Unit

Labour
Rate

Through Remarks
Rate

Dismantling of kilometre stones


including
cutting
of
earth,
foundation
and
disposal
of
dismantled material with all lifts and
lead upto 1000 m and backfilling of
pit as per Technical Specification
Clause 202.

2.20

2.21

202

202

(A)

5th km Stone

Each

--

172.75

(B)

Ordinary km Stones

Each

--

106.80

(C)

200 m Stones

Each

--

23.05

(D)

Boundary Pillar

Cum

--

23.05

Dismantling
of
barbed
wire Running -fencing / wire mesh fencing metre
including
posts,
foundation
concrete, backfilling of pit by
manual means including disposal of
dismantled material with all lifts and
upto a lead of 1000 m, stacking
serviceable
material
and
unserviceable material separately
as per Technical Specification
Clause 202.

21.40

Dismantling of Fencing

Dismantling of CI Water Pipe


Line
Dismantling of CI water pipe line Running -600 mm dia including disposal with metre
all lifts and lead upto 1000 m and
stacking of serviceable material
and
unserviceable
material
separately under supervision of
concerned department as per
Technical Specification Clause 202.

Note: The rate analysis does not include any excavation


in earth or dismantling of masonry works which are
to be measured and paid separately.
2.22

202

Removal of Cement Concrete


Pipe of Sewer Gutter

38

72.55

Sr.
No.

Reference to
MORD
Specification

Description

Unit

Labour
Rate

Removal of cement concrete pipe Running -of sewer gutter 1500 mm dia under metre
the supervision of concerned
department including disposal with
all lifts and upto a lead of 1000 m
and stacking of serviceable and
unserviceable material separately
but excluding earth excavation and
dismantling of masonry works as
per Technical Specification Clause
202.

Through Remarks
Rate
88.15

Note: The rate analysis does not include any excavation


in earth or dismantling of masonry works which are
to be measured and paid separately.
2.23

202

Removal of Telephone/Electric
Poles and Lines
Removal of telephone/electric poles
with wires including excavation and
dismantling of foundation concrete
and lines under the supervision of
concerned department, disposal
with all lifts and upto a lead of 1000
m and stacking the serviceable and
unserviceable material separately
as per Technical Specification
Clause 202.

39

Each

--

85.25

Chapter 3
EARTHWORK, EROSION CONTROL AND DRAINAGE
Sr.
No.

Reference to
MORD
Description
Specification

3.1

Unit

Labour Through
Rate
Rate

Preparation of Foundation for


Embankment
301.4

Scarifying Existing Granular


Surface to a Depth of 50 mm by
Manual Means
Scarifying existing granular surface
to a depth of 50 mm and disposal
of scarified material with a lift upto
3 m and leads upto 1000 m as per
Technical Specification Clause
301.4.

Sqm.

--

12.15

Sqm

--

6.60

Cum

--

56.65

Note: In case material is to be reused at site,


transportation cost catered above (Sub-item b) for
disposal shall be deleted.
3.2

Preparation of Foundation for


Embankment
301.4

Scarifying Existing Bituminous


Surface to a Depth of 150 mm by
Mechanical Means
Scarifying the existing bituminous
road surface to a depth of 150 mm
and disposal of scarified material
with a lift upto 3 m and lead upto
1000 m as per Technical
Specification Clause 301.4.

3.3

301.5

Construction of Embankment
with Material Obtained from
Roadway Cutting
Construction of embankment with
approved materials deposited at
site from roadway cutting and
excavation
from
drain
and
foundation of other structures
graded and compacted to meet
requirement of Tables 300.1 and
300.2
as
per
Technical
Specification Clause 301.5

41

Sr.
No.

Reference to
MORD
Description
Specification

Unit

Labour Through
Rate
Rate

Note: In case the earth cutting is done by dozer and


pushed for filling in the embankment, the input of
dozer in the cost of embankment shall be deleted
as the same is already provided in the cost of
excavation. However, if the earth is dumped by
tippers from roadway cutting, the input of dozer for
spreading is required to be provided.
3.4

301.5

Construction of Embankment
with Material Obtained from
Borrow Pits
Construction of embankment with
approved material obtained from
borrow pits with a lift upto 1.5 m,
transporting to site, spreading,
grading to required slope and
compacting to meet requirement of
Tables 300.1 and 300.2 with a lead
upto 1000 m as per Technical
Specification Clause 301.5

3.5

302

(i)

--

178.10

Excavation in Cutting in
Soil by manual means with
lead upto 50 m
Excavation for roadway in
soil using manual means for
carrying of cut earth to
embankment site with a lift
upto 1.5 m and lead upto 50
m
as
per
Technical
Specification Clause 302.3

(ii)

Cum

Cum

55.10 --

Excavation in Soil with


Dozer with lead upto 100 m
Excavation for roadway in
soil by mechanical means
including cutting and pushing
the
earth
to
site
of
embankment upto a distance
of 100 m, including trimming
bottom and side slopes in
accordance
with
requirements of lines, grades
and cross-sections.

42

Cum

--

46.40

Sr.
No.

Reference to
MORD
Description
Specification
(iii)

Unit

Excavation in Soil using


Hydraulic Excavator and
Tippers with disposal upto
1000 m
Excavation for roadwork in
soil with hydraulic excavator
of 0.9 cum bucket capacity
including cutting and loading
in tippers, trimming bottom
and
side
slopes,
in
accordance
with
requirements of lines, grades
and cross-sections, and
transporting
to
the
embankment location with a
lift upto 1.5 m and lead upto
1000 m as per Technical
Specification Clause 302.3

3.6

302.3.6

302.3.11

Cum

--

28.00

Cum

--

41.50

Cum

--

28.00

Excavation in Marshy Soil


Excavation for roadway in marshy
soil with hydraulic excavator 0.9
cum bucket capacity including
cutting and loading in tippers and
disposal with a lift upto 1.5 m and
lead upto 1000 m, trimming of
bottom and side slopes in
accordance with requirements of
lines, grades and cross- sections
as per Technical Specification
Clause 302.3.6.

3.7

Labour Through
Rate
Rate

Removal of Unsuitable Soil with


Disposal upto 1000 m
Removal
of
unsuitable
soil
including excavation, loading and
disposal upto 1000 m lead but
excluding compaction
ground
supporting embankment subgrade
replacement by suitable soil, which
shall be paid separately as per
Clause 303.5.2 as per Technical
Specification Clause 302.3.11

43

Sr.
No.

Reference to
MORD
Description
Specification

Unit

Labour Through
Rate
Rate

Note: This item does not include replacement of


unsuitable soil by suitable soil. Replacement,
where required, is to be provided and paid
separately under Clause 303.5.2.
3.8

302.3.5

(i)

(ii)

(iii)

Excavation in ordinary
Rock by manual means
Excavation in ordinary rock
using
manual
means
including loading in a truck
and carrying of excavated
material to embankment site
with a lift upto 1.5 m and
lead upto 50 m as per
Technical
Excavation
inSpecification
Ordinary
Clausewith
302.3.5.
Rock
Dozer with lead
upto 100 m

Cum

Excavation for roadway in


ordinary rock by deploying a
dozer D-50 including cutting
and pushing the cut earth to
site of embankment upto a
distance of 100 m (average
lead 50 m), trimming bottom
and
side
slopes
in
accordance
with
the
requirements of lines, grades
and cross-sections with lift
upto 1.5 m.as per technical
specification clause 302.3.5.

Cum

Excavation in Ordinary
Rock
using Hydraulic
Excavator
and Tippers
with disposal upto 1000 m

44

85.65

--

--

48.85

Sr.
No.

Reference to
MORD
Description
Specification

Unit

Excavation for roadway in


ordinary rock with hydraulic
excavator of 0.9 cum bucket
capacity including cutting
and loading in tippers,
transporting to embankment
site with a lift upto 1.5 m and
lead upto 1000 m, trimming
bottom and side slopes in
accordance
with
requirements of lines, grades
and cross-sections as per
Technical
Specification
Clause 302.3.5

3.9

302.3.5

(i)

Cum

--

49.75

Cum

--

198.50

Excavation in Hard Rock


(requiring blasting) with
disposal upto 1000 m
Excavation for roadway in
hard rock (requiring blasting)
by drilling, blasting and
breaking, trimming of bottom
and
side
slopes
in
accordance
with
requirements of lines, grades
and cross-sections, loading
and disposal of cut rock with
a lift upto 1.5 m and leads
upto 1000 m as per
Technical
Specification
Clause 302.3.5

Note:

Labour Through
Rate
Rate

The quality and availability of rock


shall be checked before affording
credit.

In case some rock is issued to the


contractor at site, the item of
carriage
shall
be
reduced/restricted to that extent.

Credit for useful material received


as per site conditions shall be
taken into account. This has been
assumed to be 50 per cent for the
purpose of analysis.

45

Sr.
No.

Reference to
MORD
Description
Specification
(ii)

Unit

Labour Through
Rate
Rate

Excavation in Hard Rock


(blasting prohibited)
Excavation for roadway in
hard
rock
(blasting
prohibited)
with
rock
breakers including breaking
rock, loading in tippers and
disposal with a lift upto 1.5 m
and lead upto 1000 metres,
trimming bottom and side
slopes in accordance with
requirements of lines, grades
and cross- sections as per
Technical
Specification
Clause 302.3.5

(A)
Note:

Manual Means

Credit is considered for 50 per


cent of quantity of work.

Loading for disposal will be done


manually, being small quantity.

In case some rock is issued to


contractor at site, the item of
carriage shall be omitted to the
extent of quantity issued to the
Contractor.
(B) Mechanical Means

Note:

The quality and availability of rock


shall be checked before affording
credit.

In case some rock is issued to the


contractor at site, the item of
carriage shall be restricted/
reduced to that extent.

Being small quantity, manual


loading will be economical in this
case and has been provided
accordingly.
(iii)

Excavation in Hard Rock


(controlled blasting) with
disposal upto 1000 m

46

Cum

--

515.15

Cum

--

322.70

Sr.
No.

Reference to
MORD
Description
Specification

Unit

Excavation for roadway in


hard rock with controlled
blasting by drilling, blasting
and breaking, trimming of
bottom and side slopes in
accordance
with
requirements of lines, grades
and cross-sections, loading
and disposal of cut rock with
a lift upto 1.5 m and leads
upto 1000 m
as per
Technical
Specification
Clause 302.3.5
Note:

3.10

Credit is considered for 50 per cent of


quantity of blasted rock, if found
suitable for construction.

In case some rock is issued to the


Contractor at site, the item of carriage
shall be reduced to that extent.

302.3.2

Stripping, Storing and Relaying


Top Soil from Right-of-Way
(R.O.W)
Stripping, storing and preservation
of top soil by keeping it damp in
stock piles and keep wet till it is
used by road side at 15 m internal
and re-application on embankment
slopes, cut slopes and other areas
in localities where the available
embankment material is not
conducive to plant growth as per
Technical Specification Clause
302.3.2

3.11

302.3.2

Stripping, Storing and Relaying


Top Soil from Borrow Areas in
Agricultural Fields

47

Labour Through
Rate
Rate

Cum

--

219.90

Cum

--

95.80

Sr.
No.

Reference to
MORD
Description
Specification

Unit

Stripping of top soil from borrow


areas located in agriculture fields,
storing at a suitable place,
spreading and relaying after taking
the borrow earth to maintain
fertility of the agricultural field,
finishing it to the required levels to
the satisfaction of the farmer/land
owner
as
per
Technical
Specification Clause 302.3.2.

3.12

309

310

3.15

303.1

301.4

--

93.70

Sqm

--

50.30

Sqm

--

144.60

Cum

--

170.10

Seeding and Mulching


Preparation of seed bed on
previously laid top soil, furnishing
and placing of seeds, fertilizer,
mulching
material,
applying
bituminous emulsion @ 0.23 litre
per sqm and laying and fixing jute
netting, including watering for 3
months all as per Technical
Specification Clause 310.

3.14

Cum

Turfing with Sods


Furnishing and laying of the live
sods of perennial turf forming
grass on embankment slope,
verges or other locations shown
on the drawing or as directed by
the Engineer including preparation
of ground, fetching of sods and
watering
as
per
Technical
Specification Clause 309.

3.13

Labour Through
Rate
Rate

Construction of Subgrade and


Earthen Shoulders
Construction of subgrade and
earthen shoulders with approved
material obtained from borrow pits
with all lifts and leads, transporting
to site, spreading, grading to
required slope and compacted to
meet requirement of Table 300.2
with lead upto 1000 m as per
Technical Specification Clause
303.1.
Compacting Original Ground

48

Sr.
No.

Reference to
MORD
Description
Specification
(i)

Unit

Compacting
ground
embankment

original
supporting

Loosening, Levelling and


Compacting original ground
supporting embankment to
facilitate placement of first
layer
of
embankment,
scarified to a depth of 150
mm, mixed with water at
OMC and then compacted
by rolling so as to achieve
minimum dry density as
given in Tables 300.1 and
300.2
for
embankment
construction as per Technical
Specification Clause 301.4

303

(ii)

Compacting
ground
subgrade

3.17

301.5.5.1

304.3

Repairs of damages caused by


rain/spillage of water
Preparation and surface treatment
of formation by removing mud and
slurry, watering to the extent
needed to maintain the desired
moisture content, trimming to the
required line, grade, profile and
rolling with three wheel 80-100 kN
static roller, complete as per
Technical Specification Clause
301.5.5.1
Presplitting
Slopes

Rock

Cum

--

15.70

Cum

--

47.45

original
supporting

Loosening of the ground


upto a level of 300 mm
below the subgrade level,
watered,
graded
and
compacted in layers to meet
requirement of Tables 300.1
and 300.2 for subgrade
construction as per Technical
Specification
Clause
303.5.2.
3.16

Labour Through
Rate
Rate

Excavation

49

Sqm

1.10

Sr.
No.

Reference to
MORD
Description
Specification

Unit

Carrying out excavation in hard


rock to achive a specified slope of
the rock face by controlled use of
explosives
and
blasting
accessories in properly aligned
and spaced drill holes, collection of
the excavated rock by a D-50
dozer, loading in tipper by a front
end loader and disposing of the
material with a lift upto 1.5 m and
lead upto 1000 m as per Technical
Specification Clause 304.3

Labour Through
Rate
Rate

Sqm

--

124.85

Cum

--

133.10

Note: In case blasted rock is issued to the Contractor


against payment for construction work, the cost of
carriage shall be reduced to that extent.
3.18

306

Construction of Embankment
with Flyash/Pond ash available
from Coal or Lignite Burning
Thermal
Plants
as
Waste
Material
Construction of embankment with
flyash conforming to Table 1 of
IRC:SP:58 obtained from coal or
lignite burning thermal power
stations as waste material, spread
and compacted in layer of 200 mm
thickness each at OMC, all as
specified in IRC:SP:58 and as per
approved plans with lead upto
1000 m as per Technical
Specification Clause 306.

Note:

As flyash is available free of cost


as waste material from Thermal
Plants, cost of material has not
been added.

The earthcover on sides and


intermediate layers of earth
sandwiching the flyash have not
been included in this analysis.
The same are required to be
provided as per approved design
and
priced
seperately
as
embankment construction.

50

Sr.
No.
3.19

Reference to
MORD
Description
Specification
307

(i)

Unit

Labour Through
Rate
Rate

Surface Drains in Soil


Construction of
unlined
surface drains of average
cross-sectional area 0.40
sqm in soil to specified lines,
grades,
levels
and
dimensions.
Excavated
material to be used in
embankment with a lift upto
3m and lead of 50 m
(average lead 25 m) as per
Technical
Specification
Clause 307.
(A)

Manual Means

Metre

29.40

--

Note: Where lining of drain is provided, quantity shall be


worked out based on approved design and
drawing and priced on rate of cement concrete of
approved grade or stone/brick masonary as the
case may be.
(B) Mechanical Means
(ii)

--

9.00

Surface Drains in Ordinary


Rock
Construction of
unlined
surface drain of average
cross-sectional area 0.4 sqm
in ordinary rock to specified
lines, grades, levels and
dimensions as per approved
design
and
Technical
Specification Clause 307.
Excavated material to be
used in embankment at site.

(A)

(iii)

Metre

Manual Means

Metre

(B) Mechanical Means

Metre

Surface
Rock
(A)

Drains

in

--

20.65

Hard

Manual Means

Metre

(B) Mechanical Means

Metre

51

44.05 --

31.20 ---

50.00

Sr.
No.
3.20

Reference to
MORD
Description
Specification
307

Unit

Labour Through
Rate
Rate

Chute Drains
A.

Providing
chute
drains
across embankment slopes
in approches of bridges and
on horizontal curves as per
drawings.

Metre

1,132.70 6,894.40

Providing
chute
drains
across embankment slopes
in approches of bridges and
on horizontal curves as per
drawings.

Metre

1,347.25 6,080.90

Note: Quantities are to be taken as per the designs and


drawings.

52

ND DRAINAGE
Remarks

53

Remarks

54

Remarks

55

Remarks

56

Remarks

57

Remarks

58

Remarks

59

Remarks

60

Remarks

61

Remarks

62

Remarks

63

Remarks

64

Chapter 4
GRANULAR SUB-BASES, BASES (NON-BITUMINOUS) AND SHOULDERS
Sr.
No.

Reference to
MORD
Specifications

4.1

401

Description

Unit

Labour Through
Rate
Rate

Granular Sub-base with Well Graded Material (Table 400.1)


(A)

By Mix in Place Method


Construction of granular subbase by providing well graded
material, spreading in uniform
layers with Tractor mount grader
on prepared surface, mixing by
mix in place method with
rotavator
at OMC, and
compacting with smooth wheel
roller to achieve the
desired
density,
complete
as
per
Technical Specification Clause
401.
(i)

For Grading I Material

Cum --

824.60

(ii)

For Grading II Material

Cum --

802.80

Cum --

781.00

(iii) For Grading III Material


401

(B)

Plant Mix Method


Construction of granular subbase by providing well graded
material, mixing in a mechanical
mix plant at OMC, carriage of
mixed material to work site upto
lead of 1000 m spreading in
uniform layers with motor grader
on
prepared
surface
and
compacting with smooth wheel
roller to achieve the
desired
density,
complete
as
per
Technical Specification Clause
401
(i)

For Grading I Material

Cum --

847.00

(ii)

For Grading II Material

Cum --

831.15

(iii) For Grading III Material

Cum --

797.70

53

Sr.
No.

Reference to
MORD
Specifications

4.2

402

Description
i)

Unit

Labour Through
Rate
Rate

Gravel/Soil-Aggregate Base
(Table 400.2) Grading A
Construction
of
gravel/soil- Cum -aggregate base by providing
well graded material, spreading
in uniform layers with Tractor
mount grader on prepared
surface, mixing by mix in place
method with rotavator at OMC,
and compacting with three wheel
80-100 kN static roller to achieve
the desired density, complete as
per
Technical
Specifications
Clause 402

ii)

Gravel/Soil-Aggregate Base
(Table 400.2) Grading B
Construction of granular sub- Cum -base by providing well graded
material, spreading in uniform
layers with Tractor mount grader
on prepared surface, mixing by
mix in place method with
rotavator
at OMC, and
compacting with three wheel 80100 kN static roller capacity to
achieve the
desired density,
complete as per Technical
Specification Clause 402

iii)

830.90

823.60

Gravel/Soil-Aggregate Base
(Table 400.2) Grading C
Construction of granular sub- Cum -base by providing well graded
material, spreading in uniform
layers with Tractor mount grader
on prepared surface, mixing by
mix in place method with
rotavator
at OMC, and
compacting with three wheel 80100 kN static roller capacity to
achieve the
desired density,
complete as per Technical
Specification Clause 402

54

816.35

Sr.
No.

Reference to
MORD
Specifications

Description

Unit

Labour Through
Rate
Rate

iv)

Gravel/Soil Aggregate Sub-base


Nominal Maximum size Grading 80
mm (Table of
2.3
of IRC SPAggregate
77-2008)
Construction
gravel/Soil
Sub-base/Base by providing well
graded material of nominal maximum
size grading 80 mm as per Table 2.3 of
IRC SP 77-2008, spreading in uniform
layers with tractor nount approprate
grading arrangements on prepared
surface, mixing by mix in place method
at OMC with tractor mount appropriate
rotavator attachment and compaction
with three wheel 80-100 kN static roller
capacity to achieve the desired density
complete as per specifications
contained in Para 2.2, 3.6 and 3.7 of
IRC SP 77-2008.

Cum

729.20

v)

Gravel/Soil Aggregate Sub-base


Nominal Maximum size Grading 40
mm (Table 2.3 of IRC SP 77-2008)

Cum

758.30

Cum

787.30

Construction of gravel/Soil Aggregate


Sub-base/Base by providing well
graded material of nominal maximum
size grading 40 mm as per Table 2.3 of
IRC SP 77-2008, spreading in uniform
layers with tractor nount approprate
grading arrangements on prepared
surface, mixing by mix in place method
at OMC with tractor mount appropriate
rotavator attachment and compaction
with three wheel 80-100 kN static roller
capacity to achieve the desired density
complete as per specifications
contained in Para 2.2, 3.6 and 3.7 of
IRC SP 77-2008.

vi)

Gravel/Soil Aggregate Sub-base


Nominal Maximum size Grading 20
mm (Table 2.3 of IRC SP 77-2008)

55

Sr.
No.

Reference to
MORD
Specifications

Description

Unit

Labour Through
Rate
Rate

Construction of gravel/Soil Aggregate


Sub-base/Base by providing well
graded material of nominal maximum
size grading 20 mm as per Table 2.3 of
IRC SP 77-2008, spreading in uniform
layers with tractor nount approprate
grading arrangements on prepared
surface, mixing by mix in place method
at OMC with tractor mount appropriate
rotavator attachment and compaction
with three wheel 80-100 kN static roller
capacity to achieve the desired density
complete as per specifications
contained in Para 2.2, 3.6 and 3.7 of
IRC SP 77-2008.

4.3

403 (i)

Gravel/Soil-Aggregate
Course (Table 400.3)

Surface

Construction of granular surface course Cum -by providing well graded material,
spreading in uniform layers with Tractor
mount grader on prepared surface,
mixing by mix in place method with
rotavator at OMC, and compacting
with three wheel 80-100 kN static roller
capacity to achieve the
desired
density, complete as per Technical
Specification Clause 402
ii)

Gravel/Soil Aggregate Sub-base


Nominal Maximum size Grading 10
mm (Table 2.3 of IRC SP 77-2008)
Construction of gravel/Soil Aggregate
Sub-base/Base by providing well
graded material of nominal maximum
size grading 10 mm as per Table 2.3 of
IRC SP 77-2008, spreading in uniform
layers with tractor nount approprate
grading arrangements on prepared
surface, mixing by mix in place method
at OMC with tractor mount appropriate
rotavator attachment and compaction
with three wheel 80-100 kN static roller
capacity to achieve the desired density
complete as per specifications
contained in Para 2.2, 3.6 and 3.7 of
IRC SP 77-2008.

56

Cum

794.60

816.35

Sr.
No.

Reference to
MORD
Specifications
iii)

Description

Unit

Labour Through
Rate
Rate

Gravel/Soil Aggregate Sub-base


Nominal Maximum size Grading 5
mm (Table 2.3 of IRC SP 77-2008)

Cum

830.90

Construction of gravel/Soil Aggregate


Sub-base/Base by providing well
graded material of nominal maximum
size grading 5 mm as per Table 2.3 of
IRC SP 77-2008, spreading in uniform
layers with tractor nount approprate
grading arrangements on prepared
surface, mixing by mix in place method
at OMC with tractor mount appropriate
rotavator attachment and compaction
with three wheel 80-100 kN static roller
capacity to achieve the desired density
complete as per specifications
contained in Para 2.2, 3.6 and 3.7 of
IRC SP 77-2008.

4.4

402

Lime Stabilisation
Subgrade

for

Improving

Laying and spreading available soil in


the subgrade on a prepared surface,
pulverising, mixing the spread soil in
place with rotavator with 2 per cent
slaked lime having minimum 70 per
cent of contents of CaO, grading with
Tractor mount grader and compacting
with the smooth wheel road roller at
OMC to the desired density to form a
layer of improved Sub-grade as per
Technical Specification Cluase 403.
(A)

By Manual Means

Cum --

310.80

(B)

By Mechanical Means

Cum --

327.05

Note: The exact quantity of lime shall be as per design.

57

Sr.
No.

Reference to
MORD
Specifications

4.5

403

Description

Unit

Labour Through
Rate
Rate

Lime Treated Soil for Sub-Base


Providing, laying and spreading soil on Cum -a prepared sub-grade, pulverising,
mixing the spread soil in place with
rotavator with 4 per cent slaked lime
with minimum content of 70 per cent of
CaO, grading with motor grader and
compacting with the road roller at
OMC to achieve atleast 98 per cent of
the max dry density to form a layer of
sub-base
as
per
Technical
Specification Clause 403.

622.00

Note: The exact quantity of lime shall be as per design.


4.6

404

Cement Treated Soil Sub-Base/Base

Providing, laying and spreading soil on Cum -a prepared sub-grade, pulverising,


adding the designed quantity of cement
to the spread soil, mixing in place with
rotavator, grading with the motor grader
and compacting with the road roller at
OMC
to
achieve
the
desired
unconfined compressive strength and
to of
form
a layer
of sub-base/base
as per
Note: The exact quantity
cement
shall
be as per design.
Technical Specification Clause 404.
4.7

405

Water Bound
base/base
1)

Macadam

528.85

Sub-

WBM Grading 1
Providing, laying, spreading and
compacting stone aggregates of
specific sizes to water bound
macadam specification including
spreading in uniform thickness,
hand packing, rolling with three
wheel 80-100 kN static roller in
stages to proper grade and
camber, applying and brooming,
stone screening/binding materials
to fill-up the interstices of coarse
aggregate,
watering
and
compacting to the required
density Grading 1 as per
Technical Specification Clause
405.
(A)

By Manual Means

58

Cum --

957.75

Sr.
No.

Reference to
MORD
Specifications

Description

Unit

(B) By Mechanical Means


2)

Labour Through
Rate
Rate

Cum --

894.55

By Manual Means

Cum --

1,015.70

(B) By Mechanical Means

Cum --

952.50

By Manual Means

Cum --

995.50

(B) By Mechanical Means

Cum --

932.30

WBM Grading 2
Providing, laying, spreading and
compacting stone aggregates of
specific sizes to water bound
macadam specification including
spreading in uniform thickness,
hand packing, rolling with smooth
wheel roller 80-100 kN in stages
to proper grade and camber,
applying and brooming, stone
screening/binding materials to fillup the interstices of coarse
aggregate,
watering
and
compacting to the required
density grading 2 as per
Technical Specification Clause
405.

(A)

Note: Type A Screening can be used in Grading 2


3)

WBM Grading 3
Providing, laying, spreading and
compacting stone aggregates of
specific sizes to water bound
macadam specification including
spreading in uniform thickness,
hand packing, rolling with smooth
wheel roller 80-100 kN in stages
to proper grade and camber,
applying and brooming, stone
screening to fill-up the interstices
of coarse aggregate, watering
and compacting to the required
density Grading 3 as per
Technical Specification Clause
405.
(A)

4.8

405

Water
Bound
Macadam
Crushable Screenings

59

with

Sr.
No.

Reference to
MORD
Specifications

Description
1)

Unit

Labour Through
Rate
Rate

WBM Grading 1
Providing, laying, spreading and
compacting stone aggregates of
specific sizes to water bound
macadam specification including
spreading in uniform thickness,
hand packing, rolling with three
wheel 80-100 kN static roller in
stages to proper grade and
camber, applying and brooming,
crushable screening to fill-up the
interstices of coarse aggregate,
watering and compacting to the
required density Grading 1 as per
Technical Specification Clause
405.
(A)

2)

By Manual Means

Cum --

893.70

(B) By Mechanical Means

Cum --

830.55

By Manual Means

Cum --

947.90

(B) By Mechanical Means

Cum --

884.75

WBM Grading 2
Providing, laying, spreading and
compacting stone aggregates of
specific sizes to water bound
macadam specification including
spreading in uniform thickness,
hand packing, rolling with three
wheel 80-100 kN static roller in
stages to proper grade and
camber, applying and brooming,
crushable screening to fill-up the
interstices of coarse aggregate,
watering and compacting to the
required density Grading 2 as per
Technical Specification Clause
405.

(A)

3)

WBM Grading 3

60

Sr.
No.

Reference to
MORD
Specifications

Description

Unit

Labour Through
Rate
Rate

Providing, laying, spreading and


compacting stone aggregates of
specific sizes to water bound
macadam specification including
spreading in uniform thickness,
hand packing, rolling with three
wheel 80-100 kN static roller in
stages to proper grade and
camber, applying and brooming,
crushable screening to fill-up the
interstices of coarse aggregate,
watering and compacting to the
required density Grading 3 as per
Technical Specification Clause
405.

(A)

4.9

406

By Manual Means

Cum --

962.55

(B) By Mechanical Means

Cum --

899.40

By Mechanical Means with 1 km lead Cum --

861.65

Wet Mix Macadam


Providing, laying, spreading and
compacting graded stone aggregate to
wet
mix macadam
specification
including premixing the material with
water at OMC in mechanical mixer
(Pug Mill), carriage of mixed material
by tipper to site, laying in uniform
layers in sub-base/base course on a
well
prepared
sub-base
and
compacting with smooth wheel roller of
80 to 100kN weight to achieve the
desired density including lighting,
barricading and maintenance of
diversion, etc as per Tables 400.11 &
400.12 and Technical Specification
Clause 406.

4.10

407

Construction of Shoulders as per


Technical Specification Clause 407.
A.

Earthen Shoulders

61

Sr.
No.

4.11

4.12

Reference to
MORD
Specifications

408

408

Description
B.

Hard Shoulders

C.

Paved Shoulders

Unit

Labour Through
Rate
Rate

Granular
sub-base/base/surface
course with local materials (Table
400.13) by mix in place method
normal Construction of granular
sub-base by providing local material
spreading in uniform layers with
motor grader on prepared surface,
mixing by mix in place method with
rotavator at once and compacting
with smooth wheel roller to achieve
the desired density complete as per
Clause 401.4 as per Technical
Specification Clause 408.

(i)

Using naturally occuring gravel

Cum --

429.40

(ii)

Using Gravel mix soil using

Cum --

428.40

Construction
of
Water
Bound
Macadam
using locally available
material (Table 400.13)

62

Sr.
No.

Reference to
MORD
Specifications

Description

Unit

Labour Through
Rate
Rate

Providing, laying spreading and Cum -compacting local material in block or


large discrete particles, such as kankar,
Laterite, Dhandla etc. as per Table
400.13 to water bound macadam
specification including spreading in
uniform thickness, hand packing, rolling
with three wheel 80-100 kN static roller
in stages to proper grade and camber,
applying and brooming requisite type
of screening /binding materials to fill-up
the interstices of laid material watering
and compacting to the required density
as per Clause 405.3 and Technical
Specification Cluase 408.

4.13

409

Lime-Flyash Stablised Soil Sub-base


Construction of sub-base using lime- Cum -flyash admixture with granular soil, free
from
organic
matter/deleterious
material or clayey silts and low
plasticity clays having PI between 5
and 20 and liquid limit less than 25 and
commercial dry lime, slaked at site or
pre-slaked with CaO content not less
than 50 per cent, flyash to conform to
gradation as per Clause 4.3 of
IRC:SP:20, lime+flyash content ranging
between 10 to 30 per cent, the
minimum un-confined compressive
strength and CBR value after 28-days
curing and 4-days soaking to be 0.75
MPa and 25 per cent respectively, all
as specified in IRC:88 including a lead
upto 1000 m as per Technical
Specification Cluase 409.

Note:

441.50

Compensation for earth will vary from


place to place and will have to be
assessed realistically as per particular
ground situation. In case earth is
available from Govt. land,
compensation for earth will not be
required. The position is required to be
clearly stated in the cost estimate.

63

593.00

Sr.
No.

4.14

Reference to
MORD
Specifications

Description

Unit

Cost of flyash has not been considered


as same will be available free of cost.
Only carriage of flyash has been
provided.

Lime + Flyash has been taken as 20


per cent of total mass and ratio of lime
and flyash as 1:4 for estimating
purposes. Total quantities will be as per
approved design.

410

Construction of Sub-base/Course
Using Crushed Slag as per Table
400.19

Labour Through
Rate
Rate

Construction of Sub-base by providing Cum -crushed slag spreading in uniform layer


with motor grader on prepared surface
mixing by mix-in-place method with
Rotavator @ OMC, and compacting
with three wheel 80-100 kN static roller
to achieve the desired density
complete
as
per
Technical
Specifications Cluase 402.4 and
410.3.2
4.15

4.16

410

410

Water Bound Macadam using


crushed slag
Providing, laying, spreading and Cum -compacting crushed slag to water
Bound
Macadam
specification
including
spreading
in
uniform
thickness, hand packing rolling with
smooth wheel roller 80-100 kN in
stages to proper grade and camber,
applying and brooming requisite type of
screening/binding materials to fill up
the interstees of crushed slag watering
and compacting to the required density
as per Clause 405.3 and Technical
Specification Cluase 410.3.2.

Cement Bound Granular Material


sub-base/base

64

461.60

589.00

Sr.
No.

Reference to
MORD
Specifications

Description

Unit

Labour Through
Rate
Rate

Providing
laying
and
spreading Cum -granulated blast furnace slag on a
prepared sub-grade pulverising adding
the designed quantitity of cement to the
spread granulated blast furnace slag
mixing in place with rotavator grading
with the mortar grader and compacting
with smooth wheel roller 80-100 kN at
OMC
to
achieve
the
desired
unconfined compressive strength and
to form a layer of sub-base/base as per
Technical Specification Clauses 404.3
and 410.4.2.

Note: (i)

The exact quantity of cement shall be


as per design

(ii)

Granulated ballast slag will be available


free of cost

4.17

411

512.30

Crusher Run Macadam Base


Providing crushed run stone aggregate
greading conforming to table 400.20
depositing on a prepared surface by
hauling vehicles, spreading and mixing
with a motor grader, watering and
compacting with a three wheel 80-100
kN static roller as per Technical
Specification Clause 411 to form a
layer of sub-base/base
A)

By mix-in-place method
(i)
(ii)

B)

4.18

412

With 53mm maximum size Cum -of aggregates


With 37.5 mm maximum Cum -size of aggregates

804.05
910.55

By mixing plant method


(i)

With 53 mm maximum size Cum -of aggregates

998.10

(ii)

With 37.5 mm maximum Cum -size of aggregates

1,011.10

Brick Soling

65

Sr.
No.

Reference to
MORD
Specifications

Description

Unit

Labour Through
Rate
Rate

Laying brick soling layer on prepared Sqm -sub-grade with brick on end edging
according to lines, graded and crosssection shown on the drawing filling
joints with sand and earth, spreading
25 mm thick layer of earth over brick
soling, watering and rolliing the same
with three wheel road roller 80-100 kN
as per Technical Specification Clause
412
4.19

413

260.75

Stone Set Pavement


Providing and laying stone set Sqm -pavement on prepared surface with
sub-base 100 mm thick compacted
Granular Sub-base as per Clause
401.4 and base 75 mm thick
compacted water bound macadam
grading 2 as per Clause 405.3. The
150 mm thick hammer desired stones
are laid in the herring one or stretched
bond pattern.
The stones are
compacted into the bedding sand of 40
mm over the WBM base bounded by
edge stone using suitable compacting
device. The gaps are filled with fine
sand stone dust as per Technical
Specification Clause 413.4

66

218.30

MINOUS) AND SHOULDERS


Remarks

67

Remarks

68

Remarks

69

Remarks

70

Remarks

71

Remarks

72

Remarks

73

Remarks

74

Remarks

The rate as
applicable for
sub-grade
construction
may
be
adopted.

75

Remarks
Rate
as
applicable for
sub-base
and/or
base
may
be
adopted as per
approved
design.

The
rates
may
be
adopted
as
applicable for
different
layers
of
pavement
depending
upon
approved
design
of
paved
shoulders.

76

Remarks

77

Remarks

78

Remarks

79

Remarks

80

Chapter 5
BASES AND SURFACE COURSES (BITUMINOUS)
Sr.
No.

Reference of
MORD
Specifications

5.1

502

Description

Unit

Labour Through
Rate
Rate

Prime Coat
(i)

Low porosity
Providing and applying primer coat with Sqm. -bitumen emulsion (SS-1) on prepared
surface of granular base including
cleaning of road surface and spraying
primer at the rate of 0.70-1.0 kg/sqm
using mechanical means as per
Technical Specification Clause 502

(ii)

Medium porosity
Providing and applying primer coat with Sqm. -Bitumen emulsion (SS-1) on prepared
surface of granular base including
cleaning of road surface and spraying
primer at the rate of 0.90- 1.2 kg/sqm
using mechanical means as per
Technical Specification Clause 502.

(iii)

503

42.10

High porosity
Providing and applying primer coat with Sqm. -Bitumen emulsion (SS-1) on prepared
surface of granular base including
cleaning of road surface and spraying
primer at the rate of 1.2-1.5 kg/sqm
using mechanical means as per
Technical Specification Clause 502.

5.2

34.25

53.90

Tack Coat
(i)

(ii)

Providing and applying tack coat with Sqm. -Bitumen emulsion (RS-1) using emulsion
distributor at the rate of 0.20 to 0.25 kg
per sqm on the prepared bituminous
surface cleaned with Hydraulic broom as
per Technical Specification Clause 503.

10.20

Providing and applying tack coat with Sqm. -Bitumen emulsion (RS-1)
using
emulsion distributor at the rate of 0.25 to
0.30 kg per sqm on the prepared dry and
hungry bituminous surface cleaned with
Hydraulic broom as per Technical
Specification Clause 503.

12.25

68

Remarks

Sr.
No.

Reference of
MORD
Specifications

Description

Unit

(iii)

Providing and applying tack coat with Sqm. -Bitumen emulsion (RS-1)
using
emulsion distributor at the rate of 0.25 to
0.30 kg per sqm on the prepared
granular surfaces treated with primer &
cleaned with Hydraulic broom as per
Technical Specification Clause 503.

12.25

(iv)

Providing and applying tack coat with Sqm. -Bitumen emulsion (RS-1)
using
emulsion pressure distributor at the rate
of 0.30 to 0.35 kg per sqm on the
prepared
non-bituminous
surfaces
(cement concrete pavement) cleaned
with Hydraulic broom as per Technical
Specification Clause 503.

14.30

Note: (i)

An output of 1750 sqm has been considered in


case of tack coat which can be covered by
bituminous courses on the same day.

(ii)

The use of cutback bitumen (Medium Curing


grade) as per IS:217 shall be restricted only for
sites at sub-zero temperature or for emergency
applications as directed by the Engineer.

5.3

504

Labour Through
Rate
Rate

Bituminous Macadam
Providing and laying bituminous macadam with Cum -hot mix plant using crushed aggregates of
grading as per Table 500.4 premixed with
bituminous binder, transported to site upto a
lead of 1000 m laid over a previously prepared
surface with paver finisher to the required
grade, level and alignment and rolled to
achieve the desired compaction as per
Technical Specification Clause 504.

Note:

Although the rollers are required only for 3


hours as per norms of output, but the same
have to be available at site for six hours as the
hot mix plant and paver will take six hours for
mixing and paving the output of 225 t
considered in these analysis. To cater for the
idle period of these rollers, their usage rates
may be multiplied by a factor of 0.65.

Quantity of bitumen has been taken for


analysis purpose. The actual quantity will
depend upon job mix formula.

Labour for traffic control, watch and ward and


other miscellaneous duties at site, including
sundries have been included in administrative
overheads of the contractor.

69

5,882.75

Remarks

Sr.
No.

5.4

Reference of
MORD
Specifications

Description

Unit

In case BM is laid over freshly laid tack coat,


provision of Hydraulic broom and 2 mazdoor
for the same shall be detected as the same
has been included in the cost of tack coat.

Analysis is based on 1000 m lead of mixed


material. Cost of additional cartage may be
added as per site requirements.

505

Labour Through
Rate
Rate

Built-Up Spray Grout


Providing, laying and rolling of built-up spray
grout layer over prepared base consisting of a
two layer composite construction of crushed
coarse aggregates using motor grader for
aggregates. Key stone chips spreader may be
used with application of bituminous binder
after each layer, and with key aggregates
placed on top of the second layer to serve as a
base, conforming to the line, grades and
cross-section specified, the compacted layer
thickness being 75 mm as per Technical
Specification Clause 505.
(A)

(B)

By Manual Means
(I) Bitumen (S-90)

Sqm --

259.90

(II) Bitumen (S-65)

Sqm --

263.30

By Mechanical Means

Sqm --

236.80

Sqm --

138.10

(I) Bitumen (S-90)

Sqm --

165.50

(II) Bitumen (S-65)

Sqm --

167.70

Note: 2 tippers will be needed to match the capacity of hydraulic chip


spreader and front end loader.
5.5

506

Modified Penetration Macadam


Construction of penetration macadam over
prepared base by providing a layer of
compacted crushed coarse aggregate using
chips spreader with alternate applications of
bituminous binder and key aggregates and
rolling with a three wheel 80-100 kN static
roller to achieve the desired degree of
compaction as per Technical Specification
Clause 506.

5.6

507

(A)

50 mm thick

(B)

75 mm thick

Surface
Dressing
using
Bituminous
(Penetrations grade / modified bitumen)
Binder

70

Remarks

Sr.
No.

Reference of
MORD
Specifications

Description

Unit

Labour Through
Rate
Rate

Providing and laying surface dressing as


wearing course consisting of a layer of
bituminous binder laid on the prepared
surface, followed by a cover of crushed stone
aggregates of specified size and rolling with
three wheel 80-100 kN static roller including
cleaning the road surface as per Technical
Specification Clause 507.
(A)

By Manual Means

(i)

Nominal chipping size 13.2mm


(I)

Bitumen (S-90)

Sqm --

73.35

(II)

Bitumen (S-65)

Sqm --

74.50

(III) Polymer Modified Bitumen

Sqm --

77.05

(IV) Crumb Rubber Modified Bitumen

Sqm --

76.90

(V)

Sqm --

76.90

(ii)

Natural Rubber Modified Bitumen


Nominal chipping size 9.5mm

(I)

Bitumen (S-90)

Sqm --

65.10

(II)

Bitumen (S-65)

Sqm --

66.10

(III) Polymer Modified Bitumen

Sqm --

68.45

(IV) Crumb Rubber Modified Bitumen

Sqm --

68.30

(V)

Sqm --

68.30

Natural Rubber Modified Bitumen

(B)

By Mechanical Means

(i)

Nominal chipping size 13.2mm

(ii)

(I)

Bitumen (S-90)

Sqm --

65.25

(II)

Bitumen (S-65)

Sqm --

66.40

(III) Polymer Modified Bitumen

Sqm --

69.00

(IV) Crumb Rubber Modified Bitumen

Sqm --

68.80

(V)

Sqm --

68.80

Sqm --

58.60

Natural Rubber Modified Bitumen

Nominal chipping size 9.5mm


(I)

Bitumen (S-90)

71

Remarks

Sr.
No.

Reference of
MORD
Specifications

Description
(II)

5.7

507

Unit

Bitumen (S-65)

Labour Through
Rate
Rate

Sqm --

59.65

(III) Polymer Modified Bitumen

Sqm --

62.00

(IV) Crumb Rubber Modified Bitumen

Sqm --

61.80

(V)

Sqm --

61.90

I: Nominal aggregate size 13.2 mm

Sqm --

79.25

II: Nominal chipping size 9.5 mm

Sqm --

72.40

I: Nominal chipping size 13.2 mm

Sqm --

71.95

II: Nominal chipping size 9.5 mm

Sqm --

66.55

Natural Rubber Modified Bitumen

Surface Dressing using Bitumen Emulsion


Providing and laying surface dressing as
wearing course consisting of a layer of bitumen
emulsion laid on the prepared surface,
followed by a cover of crushed stone chippings
of specified size and rolling with 80-100 kN
roller including cleaning the road surface as
per Technical Specification Clause 507.

(A)

(B)

By Manual Means

By Mechanical Means

Note: Where the proposed aggregate fails to pass the stripping value
test, an approved adhesion agent may be added to the binder
as per Clause 507.24. Alternatively, chips may be pre-coated as
per Clause 507.25.
5.8

507.2.5

Pre-coating Chips
Pre-coating of chips with 1 per cent of paving
bitumen by weight of chips in a suitable mixer
duly heated to 160 degree C as per Technical
Specification Clause 507.2.5

5.9

508

(I)

Bitumen (S-90)

Cum --

1,479.50

(II)

Bitumen (S-65)

Cum --

1,497.60

20mm thick Open-Graded Premix Carpet


using
Bituminous
(penetration
grade/modified bitumen) Binder

72

Remarks

Sr.
No.

Reference of
MORD
Specifications

Description

Unit

Labour Through
Rate
Rate

Providing, laying and rolling of open-graded


premix carpet of 20 mm thickness composed
of 13.2 mm to 5.6 mm aggregates either using
penetration grade bitumen or emulsion to
required line, grade and level to serve as
wearing course on a previously prepared base,
including mixing in a suitable plant, laying and
rolling with a three wheel 80-100 kN static
roller capacity, finished to required level and
grades to be followed by seal coat of either
Type A or Type B or Type C as per Technical
Specification Clause 508.
By Manual Means
(I)

Bitumen (S-90)

Sqm --

125.20

(II)

Bitumen (S-65)

Sqm --

126.80

(III)

Polymer Modified Bitumen

Sqm --

130.60

(IV)

Crumb Rubber Modified Bitumen

Sqm --

130.30

(V)

Natural Rubber Modified Bitumen

Sqm --

130.40

By Mechanical Means

5.10

508.2

5.11

509

(I)

Bitumen (S-90)

Sqm --

118.20

(II)

Bitumen (S-65)

Sqm --

119.85

(III)

Polymer Modified Bitumen

Sqm --

123.60

(IV)

Crumb Rubber Modified Bitumen

Sqm --

123.30

(V)

Natural Rubber Modified Bitumen

Sqm --

123.40

20 mm thick Open Graded Premix Carpet Sqm -using Bitumen Emulsion as per Technical
Specification Clause 508.2

108.10

Mix Seal Surfacing

73

Remarks

Sr.
No.

Reference of
MORD
Specifications

Description

Unit

Labour Through
Rate
Rate

Providing, laying and rolling of close-graded


premix surfacing material of 20 mm thickness
composed of 11.2 mm to 0.9 mm (Type-A) or
13.2 mm to 0.9 mm (Type-B) aggregates using
penetration grade bitumen to required line,
grade and level to serve as wearing course on
a previously prepared base, including mixing in
a suitable plant, laying and rolling with a three
wheel 8-10 kN static roller and finishing to
required level and grades as per Technical
Specification Clause 509

(A)

By Manual Means

(i)

Type A

(I)

Bitumen (S-90)

Sqm --

180.05

(II)

Bitumen (S-65)

Sqm --

182.55

(III)

Polymer Modified Bitumen

Sqm --

188.20

(IV)

Crumb Rubber Modified Bitumen

Sqm --

187.80

(V)

Natural Rubber Modified Bitumen

Sqm --

187.95

(ii)

Type B

(I)

Bitumen (S-90)

Sqm --

164.10

(II)

Bitumen (S-65)

Sqm --

166.25

(III)

Polymer Modified Bitumen

Sqm --

171.15

(IV)

Crumb Rubber Modified Bitumen

Sqm --

170.80

(V)

Natural Rubber Modified Bitumen

Sqm --

170.90

(B)

By Mechanical Means

(i)

Type A

(I)

Bitumen (S-90)

Sqm --

161.20

(II)

Bitumen (S-65)

Sqm --

163.70

(III)

Polymer Modified Bitumen

Sqm --

169.40

(IV)

Crumb Rubber Modified Bitumen

Sqm --

169.00

(V)

Natural Rubber Modified Bitumen

Sqm --

169.10

74

Remarks

Sr.
No.

Reference of
MORD
Specifications

Description
(ii)

5.12

510

Unit

Labour Through
Rate
Rate

Type B

(I)

Bitumen (S-90)

Sqm --

145.30

(II)

Bitumen (S-65)

Sqm --

147.45

(III)

Polymer Modified Bitumen

Sqm --

152.30

(IV)

Crumb Rubber Modified Bitumen

Sqm --

152.00

(V)

Natural Rubber Modified Bitumen

Sqm --

153.00

Seal Coat
Providing and laying seal coat sealing the
voids in a bituminous surface laid to the
specified levels, grade and cross fall using
Type A, Type B and Type C as per Technical
Specification Clause 510
A.

By Manual Means

I : Type A
(I)

Bitumen (S-90)

Sqm --

62.90

(II)

Bitumen (S-65)

Sqm --

64.00

(III)

Polymer Modified Bitumen

Sqm --

66.55

(IV)

Crumb Rubber Modified Bitumen

Sqm --

66.55

(V)

Natural Rubber Modified Bitumen

Sqm --

66.40

II : Type B
(I)

Bitumen (S-90)

Sqm --

47.30

(II)

Bitumen (S-65)

Sqm --

48.10

(III)

Polymer Modified Bitumen

Sqm --

49.80

(IV)

Crumb Rubber Modified Bitumen

Sqm --

49.70

(V)

Natural Rubber Modified Bitumen

Sqm --

49.70

III : Type C
(I)
(II)

Bitumen (S-90)
Bitumen (S-65)

Sqm -Sqm --

46.70
47.45

(III)

Polymer Modified Bitumen

Sqm --

49.10

(IV)

Crumb Rubber Modified Bitumen

Sqm --

49.00

(V)

Natural Rubber Modified Bitumen

Sqm --

49.00

75

Remarks

Sr.
No.

Reference of
MORD
Specifications

Description

Unit

Labour Through
Rate
Rate

Note: Since seal coat is provided immediately over the bituminous


layers, hydraulic broom for cleaning has not been catered.
B.

By Mechanical Means

I : Type A
(I)

Bitumen (S-90)

Sqm --

62.90

(II)

Bitumen (S-65)

Sqm --

64.00

(III)

Polymer Modified Bitumen

Sqm --

66.55

(IV)

Crumb Rubber Modified Bitumen

Sqm --

66.35

(V)

Natural Rubber Modified Bitumen

Sqm --

66.40

Note: Since seal coat is provided immediately over the bituminous


layers, Hydraulic broom for cleaning has not been catered.
510

II : Type B
(I)

Bitumen (S-90)

Sqm --

45.90

(II)

Bitumen (S-65)

Sqm --

46.70

(III)

Polymer Modified Bitumen

Sqm --

48.40

(IV)

Crumb Rubber Modified Bitumen

Sqm --

48.30

(V)

Natural Rubber Modified Bitumen

Sqm --

48.30

Note: Since seal coat is required to be provided over the premix carpet
on the same day, out of the 6 working hours of the HMP, 4.00
hours are proposed to be utilised for the premix carpet and the
balance 2.00 hours have been considered for this case.
III : Type C
(I)
(II)

Bitumen (S-90)
Bitumen (S-65)

Sqm -Sqm --

45.30
46.10

(III)

Polymer Modified Bitumen

Sqm --

47.75

(IV) Crumb Rubber Modified Bitumen


Sqm -(V) Natural Rubber Modified Bitumen
Sqm -Note: Since seal coat is provided immediately over the bituminous
layers, Hydraulic broom for cleaning has not been catered.

47.60
47.65

5.13

511

(i)

Supply of Stone Aggregates for Pavement


Courses
Supply of stone aggregates from approved
sources
conforming
to
the
physical
requirement, specified in the respective
clauses, including royalties, fees rents,
collection, transportation, stacking and testing
and measured in cum as per Clause 511.5.

Supply of quarried stone and hand breaking Cum


into coarse aggregate to Grading 1 (90 mm to
45 mm) as per Table 400.8 of Technical
Specifications.

76

176.20

575.50

Remarks

Sr.
No.

Reference of
MORD
Specifications

Description

Unit

Labour Through
Rate
Rate

(ii)

Supply of quarried stone and hand breaking Cum


into coarse aggregate to Grading 2 (63 mm to
45 mm) as per Table 400.8 of Technical
Specifications.

220.25

619.55

(iii)

Supply of quarried stone and hand breaking Cum


into coarse aggregate to Grading 3 (53 mm to
22.4 mm) as per Table 400.8 of Technical
Specifications.

264.30

663.60

Note: In case for supply of aggregates at site are not available,


nearest crusher site may be ascertained. Loading and unloading
charges and cost of carriage may be added to these rates to
arrive at the cost at site.

77

Remarks

Chapter 6
CEMENT CONCRETE PAVEMENT
Sr.
No.

Reference to
MORD
Specifications

6.1

400

Description

6.3

400

1500 & 400

824.60

Rate as per item No.4.5 of


Cum -Chapter 4
Water Bound Macadam (WBM) Sub-base

622.00

Lime Treated Soil

By Manual Means
As per item
Chapter 4

(B)

No.4.7

of Cum --

957.75

of Cum --

894.55

By Mechnical Means
As per item
Chapter 4

1500

Through
Rate

Cum --

(A)

6.4

Labour
Rate

Granual Sub-base
As item No.4.1 of Chapter 4

6.2

Unit

No.4.7

Cement Concrete Pavement

78

Sr.
No.

Reference to
MORD
Specifications

Description
(A)

6.5

1500

Unit

Construction
of
un- Cum
reinforced, dowel jointed at
expansion and construction
joint only, plain cement
concrete
pavement,
thickness as per design,
over a prepared sub base,
with 43 grade cement or any
other type as per Clause
1501.2.2
M30
(Grade),
coarse and fine aggregates
conforming
to
IS:383,
maximum size of coarse
aggregate not exceeding 25
mm, mixed in a concrete
mixer of not less than 0.2
cum
capacity
and
appropriate weigh batcher
using approved mix design,
laid in approved fixed side
formwork (steel channel,
laying and fixing of 125
micron thick polythene film,
wedges,
steel
plates
including
levelling
the
formwork as per drawing),
spreading the concrete with
shovels, rakes, compacted
needle,Concrete
screed Pavement
and
Rollerusing
Compacted
plate vibrators and finished
in continuous operation
including
provision
of
contraction and expansion,
construction joints, applying
debonding strips, primer,
sealant, dowel bars, near
approaches to bridge/culvert
and
construction
joints,
admixtures as approved,
curing of concrete slabs for
14days
using
curing
compound (where specified)
and water finishing lines and
grade as per drawing and
Technical
specification
clause 1501

79

Labour
Rate
353.50

Through
Rate
4,526.40

Sr.
No.

Reference to
MORD
Specifications

Description

Unit

Construction of Roller Compacted Cum


Concrete Pavement (RCCP) with
coarse and fine aggregates
conforming to IS:383, the size of
coarse aggregate not exceeding
25 mm with minimum aggregate
cement ratio of 5:1 mm and with
minimum cemnt content of 310
kg per cum, aggregate gradation
to be as per Table 602.2 after
blending, mixing in concrete mixer
at optimum moisture content,
transporting to site, laying with
wheel barrows or steel pans or
with
mechanical
paver,
compacting with 80-100 kN
smooth wheel, tandem vibratory
roller, to achieve, the designed
flexural strength, finishing and
curing as per drawings and
Technical Specification Clause
1502

Labour
Rate

Through
Rate

322.30

3,441.45

67.55

363.35

Note: When curing compound is used 4-days water curing


will be done
6.6

1500

Rectangular
Pavement

Concrete

Block

Manufacturing, laying of cement Sqm


concrete blocks of size 0.450 m x
0.300 m x 0.15 m of Cement
Concrete (C.C.) M30 garde and
spreading 25 mm thick sand
under neath and filling joints with
sand on existing W.B.M. base as
per Technical Specification Clause
1503.
Note:

i.

In case curing compound is used


in places where there is scarcity of
water, the water curing will be
used for 4-days and rate analysis
will be amended accordingly

ii.

Carriage of C.C. block to site of is


payable seperately as per Chapter
of carriage of material from
manufacturing site to the site of
work.

80

Sr.
No.

Reference to
MORD
Specifications

6.7

1500

Description

Unit

Labour
Rate

Interlocking Concrete Block


Pavement
(1) Providing and Laying of Sqm
Interlocking Concrete Block
Pavements having thickness
80 mm as per drawings and
Technical
Specification
Clause 1504.
(2) Providing and Laying of Sqm
Interlocking Concrete Blcok
Pavements having thickness
60 mm as per drawing and
Technical
Specification
Clause 1504

Note:

6.8

i.

Carriage of interlocking blocks is


payable seperately as per Chapter
of carriage of material from
manufacturing site to the site of
work.

ii.

Edge blocks may be cast-in-situ.


Brick masonry toe wall or CC
block 300 mm x 300 mm x 150
mm or any other shape can also
be used and their cost shall be
analysed/included accordingly

iii.

The rates for sub-grade, sub-base


and base course can be taken
from Chapters 3 and 4
Add extra over item of cement cum
concrete flooring/ payments for
supply and application of
synthetic fibre (Polyetster 12
mmRecron 3 S or equivalent)
properly mixed with sand /
cement /aggregates / admixture
including
laying
of
floor
trowelling and finishing (in
dose of 125 gms per 50 kg of
cement i.e. 0.25 per cent by
weight of cement in ration as
specified by manufacturer's
specification or as directed by
the Engineer-in- Charge

81

--

Through
Rate

18.10

589.10

15.95

493.25

341.70

MENT

Remarks

82

Remarks

83

Remarks

84

Remarks

85

Chapter 7
CAUSEWAY AND SUBMERSIBLE BRIDGES
Sr.
No.

Reference to
MORD
Specification

Description

Unit

Labour
Rate

Through
Rate
Remarks

7.1 1400, 300, 600 Construction of Cut-off Walls/Head Walls


700 & 800
(i)

(ii)

Earthwork in excavation for


structures as per drawing and
technical specification Clause
305.
Rate as per item No.11.1 of cum
Chapter 11

(v)

300

Rate as per item No.11.6 (ii) of cum


Chapter 11
Providing P.C.C M20 architectural
coping on top of wall

400

400

1500

822.55

2,503.00

23.80

223.00

cum --

47.45

cum --

765.65

cum --

894.55

W.B.M. Base Course


Rate as per item No.4.7 of Chapter 4

7.5

3,221.45

Granular Sub-base
Rate as per item No.4.1 of Chapter 4

7.4

551.80

Preparation of Subgrade
Rate as per item No.3.15(ii) of Chapter
3

7.3

2,997.70

Stone masonry in cement mortar


1:4

Rate as per item No.12.17 of


Chapter 12
7.2

346.10

Brick masonry in cement mortar


1:4
Rate as per item No.11.5 (ii) of cum
Chapter 11

(iv)

128.15

Plain cement concrete M15 grade


Rate as per item No.11.4 (ii) of cum
Chapter 11

(iii)

128.15

Cement Concrete Slab

83

Sr.
No.

Reference to
MORD
Specification

Unit

Labour
Rate

cum

353.50

4,525.70

Rate as per item No.14.1 of cum


Chapter 14

210.10

665.50

125.15

1,458.40

353.00

3,057.65

Cum

128.15

128.15

Cum

346.10

2,997.70

Description

Rate as per item No.6.4 of Chapter 6


7.6

1400 & 1300 (i)

(ii)

Providing and Laying Apron


with Stone Boulders as per
Drawings
&
Technical
Specification Clause 1301

Providing
and
Laying
of
Boulder Apron Laid in Wire
Crates as per Drawing and
Technnical
Specification
Clause 1301
Rate as per item No.14.2 of cum
Chapter 14

(iii)

Providing and Laying of Apron


with Cement Concrete Blocks
as per Drawing and Technical
Specification Clause 1301
Rate as per item No.14.3 of cum
Chapter 14

7.7

Through
Rate
Remarks

1400 & 1600 Guide Posts


Construction of R.C.C. guide posts of
250 mm dia, M25 grade as per drawing
and technical specification Clause
1401.6
(i)

Earth work in Excavation for


structure
Rate as on item No.11.1(I)

(ii)

RCC M-15 grade


Rate as item No.11.4(ii)(I)

(iii)

HYSD Steel bars

Tonne 1,444.60 64,210.60

(iv)

Painting two coats i/c prime


coat on new concrete surface
Rate as item No.10.5

Sqm

84

21.40

60.45

Sr.
No.
7.8

Reference to
MORD
Specification

Description

Labour
Rate

Through
Rate
Remarks

cum

346.10

2,997.70

cum

47.75

522.95

47.90

3,703.50

47.90

3,945.50

47.90

2,275.65

1400, 1100 & Bedding for Causeway


800
(i)

Type A (concrete cradle)


Bedding Clause 1402.5
As per item No.9.2 of Chapter 9

(ii)

Type B (first class) Bedding


Clause 1402.5
As per item No.9.2 of Chapter 9

7.9

Unit

1400 & 1100 Laying Reinforced Cement Concrete


Pipe NP3 as per drawing and
technical
specification
Clause
1402.6
As per item No.9.5 (B) of Chapter 9

7.10 1400 & 1100 Laying Reinforced Cement Concrete


Pipe
NP4
as
per
technical
specification Clause 1402.6
As per item No. 9.6 (B) of Chapter 9
7.11 1400 & 1100 Laying Reinforced Cement Concrete
Pipe
NP2
as
per
technical
specification Clause 1402.6
As per item No.9.3 (B) of Chapter 9

85

Chapter 8
HILL ROADS
Sr.
No.

Reference to
MORD
Specifications

8.1

200

Site Clearance

8.2

1600

Setting Out

Description

Unit

(1)

Construction of reference Each


pillars as per Fig. 1600.1 (b)
as
per
drawing
and
Technical
Specification
Clause 1602.1

1,346.15

3,753.10

(2)

Construction of back piller Each


as per Fig. 1600.1( c) as per
drawing
and
Technical
Specification Clause 1602.3

5,261.60

14,871.60

(3)

Construction of Job pillers Each


as per Fig. 1600.1 (d) and
Technical
Specification
Clause 1602.4

131.40

370.30

The dimensions of reference


pillars, back pillars and job pillars
are as per figure/site conditions.
The above items are covered
under different Chapters of MORD
Specifications for payment.

(ii)

The marking of centre line, setting


out, curves, recording of levels,
etc. by the surveyor will be
incidental to work and no extra
payment shall be made for the
same.

1600 & 300

Through
Rate
Remarks
Rate
taken
from
Chapter
2

Note: (i)

8.3

Labour
Rate

Earth work in Hill Road


(i)

Excavation in Hilly Areas


in Soil by manual means.

87

Sr.
No.

Reference to
MORD
Specifications

Description

(ii)

(iii)

Unit

Labour
Rate

A)

Excavation in soil in Cum


Hilly Area by manual
means
including
cutting and trimming of
side
slopes
and
disposing of excavated
earth with a lift upto
1.5 m and a lead upto
20 m as per drawing
and
Technical
Specification
Clause
1603.1

73.40 --

B)

Extra
for
Every Cum
Additional Lift of 1.5 m
or Part thereof

7.80 --

Through
Rate
Remarks

Excavation in Hilly Areas


in Soil by mechanical
means
A)

Excavation in soil in Cum


Hilly
Area
by
mechanical
means
including cutting and
trimming of side slopes
and
disposing
of
excavated earth with a
lift upto 1.5 m and a
lead upto 20 m as per
Technical Specification
Clause 1603.1

B)

Extra
for
Every Cum
Additional Lift of 1.5 m
or Part thereof

Excavation in Hilly Area in


Ordinary Rock by manual
means

88

11.30

7.80 --

84.95

Sr.
No.

Reference to
MORD
Specifications

Description

Unit

A)

Excavation in ordinary Cum


rock using manual
means
including
loading in a truck and
carrying of excavated
material
to
embankment site with
a lift upto 1.5 m and
lead upto 20 m as per
Clause 1603.2.

161.50 --

B)

Extra
for
Every Cum
Additional Lift of 1.5 m
or Part thereof

12.15 --

Note: (i)

In case the land on the valley side


is barren and there is no objection
for disposing of excavated earth
on the valley side, the provision of
front end loader and tipper shall
be deleted as excavated earth
shall be disposed off on the valley
side.

(ii)

For disposal of excavated surplus


earth beyond 20 m, the relevant
items of carriage be followed

(iii)

In case, alternative machine like


hydraulic excavator 0.9 cum
bucket capacity is necessited
because of site conditions, the
same can be used.
(iv)

Labour
Rate

Through
Rate
Remarks

Excavation in Hilly Areas


in Ordinary Rock by
mechanical means not
requiring blasting
Excavation in hilly area in Cum
ordinary rock not requiring
blasting
by
mechanical
means including cutting and
trimming of slopes and
disposal of cut material with
a lift upto 1.5 m and lead
upto 20 m as per Clause
1603.2.

89

22.20

134.45

Sr.
No.

Reference to
MORD
Specifications

Description

Unit

Note: (i)

In case the land on the valley side


is barren and there is no objection
for disposing of excavated earth
on the valley side, the provision of
front end loader and tipper shall
be deleted as excavated earth
shall be disposed off on the valley
side.

(ii)

In case, alternative machine like


hydraulic excavator 0.9 cum
bucket capacity is necessited
because of site conditions, the
same can be used.
(v)

Note:

Labour
Rate

Through
Rate
Remarks

Excavation in Hilly Areas


in Hard Rock requiring
blasting
A)

Excavation
in
hilly Cum
areas in hard rock
requiring blasting, by
mechanical means, lift
upto
1.5
m
and
disposal of excavated
rock upto a lead of 20
m as per Clause
1603.2.

31.60

B)

Extra
for
Every Cum
Additional Lift of 1.5 m
or Part thereof

15.25 --

(1)

In case the land on the valley side


is barren and there is no objection
for disposing of excavated earth
on the valley side, the provision of
front end loader and tipper shall
be deleted as excavated earth
shall be disposed off on the valley
side.

(2)

In case of hill roads, the altitude


effect comes into play. The output
of men and machines decreases
progressively after 2100 m
elevation leading to increase in
cost. High altitude effect has been
explained in the basic approach.

90

212.55

Sr.
No.

Reference to
MORD
Specifications
(3)

8.4

1600, 600 &


700

Description

Unit

Labour
Rate

Through
Rate
Remarks

The arrangement for igniting the


detonator is covered under
overheads
Retaining Walls / Breast Walls
Construction
of
retaining
walls/breast walls in cement
mortar 1:5 as per drawing and
technical specifications Clause
1604
(i)

(ii)

(iii)

Earthwork in excavation
for structures
Rate as per item No.11.1 of cum
Chapter 11
Plain cement concrete M
10 grade

128.15

128.15

Rate as per item No.11.4 of cum


Chapter 11

346.10

2,928.35

729.05

2,219.30

25.80

36.95

23.80

223.00

167.90

563.90

Stone masonry in cement


mortar 1:5
Rate as per item No.12.7 (i) Cum
(III)of Chapter 12

(iv)

Pointing
with
mortar 1:3

cement

Rate as per item No.12.2 of sqm


Chapter 12
(v)

Providing P.C.C. M 20
architectural coping on
top
of
retaining
wall/breast wall
Rate as per item No.12.17 Metre
of Chapter 12

(vi)

Filter
material
behind
retaining wall / breast wall
as
per
Specification
1204.3.8 in a width of 600
m
Rate as per item No. 12.15 cum
of Chapter 12

91

Sr.
No.

Reference to
MORD
Specifications

Description

Unit

Labour
Rate

Through
Rate
Remarks

(vii) Back
filling
behind
retaining wall/breast wall
Rate as per item No. 12.14 cum
of Chapter 12
Note:

8.5

Quantities of material/work shall


be as per design and drawings

Earth work in excavation may be


taken as per site conditions. It
may comprise of a number of subitems depending upon the type of
soil/rock encountered.

164.50

481.30

128.15

128.15

346.10

2,928.35

729.05

2,219.30

346.10

2,997.70

1600, 700, 300 Construction of Hill Side Drain


& 800
Construction of hill side drain in
accordance with the requirement
of specifications true to lines and
grades. Dimesions and other
particulars as per drawing and
Technical Specification Clause
1606.1
(i)

Earthwork in excavation
for structures as per
drawing and technical
specification
Rate as per item No.11.1 of Cum
Chapter 11

(ii)

Plain cement
M10 grade

concrete

Rate as per item No.11.4 (I) Cum


(ii) of Chapter 11
(iii)

Stone masonry in cement


mortar 1:5
Rate as per item No.12.7 Cum
(III) (iii) of Chapter 12

(iv)

Plain cement
M15 grade

concrete

Rate as per item No.11.4 (II) Cum


(i) of Chapter 11

92

Sr.
No.

Reference to
MORD
Specifications

Description
(v)

Unit

Note:

8.6

Through
Rate
Remarks

Cement plaster 15 mm
thick
1:4
on
stone
masonry
Rate as per item No.12.3 of Sqm
Chapter 12

(vi)

Labour
Rate

Providing
P.C.C.
M20
architectural coping on
top of wall
Rate as per item No.12.17
Metre
of Chapter 12

Quantities of material/work shall


be as per design and drawings

Earth work in excavation may be


taken as per site conditions. It
may comprise of a number of subitems depending upon the type of
soil/rock encountered.

1600, 300,
700 & 800

Construction of Catch Water /


Intercepting Drain

35.30

104.25

23.80

223.00

128.15

128.15

346.10

2,928.35

729.05

2,219.30

Construction
of
catch
water/intercepting drain in random
rubble masonry in 1:5 cement
mortar true to the specified lines
grades levels and dimensions as
per the requirement of the
specifications Clause 1606.2

(i)

Earthwork in excavation
for structures as per
drawing and technical
specification
Rate as per item No.11.1 of Cum
Chapter 11

(ii)

Plain cement
M10 grade

concrete

Rate as per item No.11.4 (I) Cum


(ii) of Chapter 11
(iii)

Stone masonry in cement


mortor 1:5
Rate as per item No.12.7 Cum
(III) (iii) of Chapter 12

(iv)

Plain cement
M15 grade

concrete

93

Sr.
No.

Reference to
MORD
Specifications

Description

Unit

Rate as per item No.11.4 (II) Cum


(i) of Chapter 11
(v)

Providing P.C.C. M
architectural coping
top of wall

346.10

2,997.70

35.30

104.25

23.80

223.00

20
on

Rate as per item No.12.17 Metre


of Chapter 12
Note:

Through
Rate
Remarks

Cement plaster 15 mm
thick
1:4
on
stone
masonry
Rate as per item No. 12.3 of Sqm
Chapter 12

(vi)

Labour
Rate

Quantities of material/work shall


be as per design and drawings

Earth work in excavation may be


taken as per site conditions. It
may comprise of a number of subitems depending upon the type of
soil/rock encountered.
8.7 1600, 300 & 700 Construction of Scupper
Construction of scupper with dry
stone masonry as per drawing
and technical specifications as per
Clause 1606.5.

Note:

(i)

Earthwork in excavation for Metre


structures as per drawing
and technical specifications

2,456.20

2,456.20

(ii)

Random rubble dry stone Metre


masonry

3,048.80

6,650.60

(iii)

Random course rubble dry Metre


stone masonry in corbelling

491.30

24,721.50

(iv)

Stone filling in foundation Metre


trenches as per drawing and
technical specification

73.40

799.40

Quantities of parapet are not


included in the quantities of
scupper.

The above analysis is based on


plate No.7.27 of Rural Roads
Manual.

94

Sr.
No.

Reference to
MORD
Specifications
3

8.8

Description

Unit

Labour
Rate

Through
Rate
Remarks

Rates for earth work are to be


taken appropriate to the type of
soil/rock

1400, 1700 & Construction of RCC guide


800
posts of 250 mm dia M15 grade
cast-in-situ with 20 mm nominal
size aggregate, true to line and
grade, tolerance of vertical RCC
posts not to exceed 1 in 500 as
per drawing and Technical
Specification Clause 1608.2

(i)

Earth work in excavation


for structures
Rate
as
per
item Cum
No.11.1(I)or(II)or(III)or(IV)or(
V)

128.15

128.15

346.10

2,997.70

1,444.60

64,210.60

Sqm

21.40

60.45

Providing edge stones on valley Metre


side of formation as per
drawing
and
Technical
Specification Clause 1608.2.6

27.10

113.80

(ii)

RCC M15 grade


Rate as per item No.11.4- Cum
II(I)or(II)

(iii)

HYSD steel bars


Rate as per item No.12.9

(iv)

Tonne

Painting
two
coats
including prime coat on
new concrete surface
Rate as per item No.10.5

Note: Quantities are to be taken as per drawing


8.9

1600

8.10

1600 & 309

Turfing with Sods

95

Sr.
No.

Reference to
MORD
Specifications

Description

Unit

Furnishing and laying of the live Sqm


sods of perennial turf forming
grass on embankment slope,
verges or other locations shown
on the drawing or as directed by
the Engineer including preparation
of ground, stacking the sods and
watering as per Clause 309

Labour
Rate

Through
Rate
Remarks

5.90

38.10

Preparation of seed bed on Sqm


previously laid top soil, furnishing
and placing of seeds, fertilizer,
multching
material,
applying
bituminous emulsion at the rate of
0.23 l per sqm and laying and
fixing jute netting, including
watering for 3 months all as per
Clause 310.

9.20

146.65

8.12

Preparation of sub grade by Sqm


dressing to combor (Earth work
for the cutting involved for subgrade to be paid for separately
depending
upon
the
classification of soil completed
as per HP.PWD specifications.

0.45

0.45

8.13

Consolidation of sub grade with Sqm -road roller including making


good the undulation etc. with
earth or quarry soil etc. and
rerolling
the
sub-grade
completed as per HP.PWD
specifications

8.11

1600 & 300

Seeding and Mulching

96

0.55

Sr.
No.

Reference to
MORD
Specifications

Description

Unit

Labour
Rate

Through
Rate
Remarks

8.14

Stone soling properly hand- Cum


packed filling interstices with
spalls and consolidating with
power road roller to the
requested gradient and comber
including spreading watering
and rolling of binding materials
moorum or earth etc. complete
as per HP.PWD specification.
100 mm spread thickness
(finished
work
including
materials and labour)

71.80

484.20

8.15

Stone soling properly hand- Cum


packed filling interstices with
Kharanja
stone
and
consolidating with power road
roller to the requested gradient
and
comber
including
spreading watering and rolling
of binding materials moorum or
earth etc. complete as per
HP.PWD specification. 100 mm
spread thickness (finished work
including materials and labour)

71.80

478.00

8.16

Providing dry stone Kharanja Per


drain 45 cm wide complete with Runni
25 cm side stone complete as ng
per HP.PWD specification
Metre

9.70

61.60

8.17

Providing dry stone Kharanja Per


drain 45 cm wide including 25 Runni
cm side stone laid in cement ng
morrte 1:6 (1 cement: 6 sand) Metre
complete as per HP.PWD
specification

15.70

86.90

8.18

Providing dry stone Kharanja Per


drain 60 cm wide complete with Runni
25 cm side as per HP.PWD ng
specification
Metre

18.70

78.60

97

Sr.
No.
8.19

Reference to
MORD
Specifications

Description

Unit

Providing dry stone Kharanja Per


drain 60 cm wide including 25 Runni
cm side stone laid in cement ng
morrte 1:6 (1 cement: 6 sand) Metre
complete as per HP.PWD
specification

98

Labour
Rate
25.90

Through
Rate
Remarks
115.20

Chapter 9
PIPE CULVERTS
Sr.
No.

Reference to
MORD
Specifications

9.1

1100 & 300

Description

Unit

1100 & 800

Through
Rate
Remarks

Excavation for Structures


Earthwork
in
excavation
for Cum
foundation of structures upto 3 m
depth as per drawing and technical
specification Clause 1104 includding
setting out, construction of shoring
and bracing, removal of stumps and
other deleterious matter, dressing of
sides and bottom and backfilling with
approved material.

9.2

Labour
Rate

128.15

128.15

Cum

346.10

2,997.70

Cum

47.75

522.95

Bedding for Pipe


(i)

Type A (Concrete
Bedding

Cradle)

Laying
concrete
cradle
bedding with M.15 Grade
Cement concrete as
per
clause 1105(I)
Rate as per item No.11.4(II)
(ii)

Type B (First Class) Bedding


Laying (Ist class) bedding on
wall
compacted
sand
moorum
or
approved
granular material as per
clause 1105(ii)
Rate as item No.11.2(I)or(II)

9.3

11100

Providing and laying reinforced


cement concrete pipe NP2 as per
design in single Row.

99

Rate as
applicable
for
the
type
of
soil/rock
are to be
taken

Sr.
No.

Reference to
MORD
Specifications

Description

Unit

Labour
Rate

Through
Rate
Remarks

Providing and laying reinforced


cement concrete pipe NP2 for
culverts on first class bedding of
granular material in single row
including fixing collar with cement
mortar 1:2 but excluding excavation,
protection work, back filling, concrete
and masonary work in head walls
and parapets clause 1108.

9.4

9.5

1200mm dia

Metre

76.15

3,013.70

1000mm dia

Metre

47.70

2,275.70

900mm dia

Metre

38.25

1,975.70

750mm dia

Metre

28.65

1,254.05

600mm dia

Metre

22.90

933.70

1100

1100

Providing
and
laying
reinforced cement concrete
pipe NP2 for culverts on first
class bedding of granular
material in double row
including fixing collar with
cement mortar 1:2 but
excluding
excavation,
protection work, back filling,
concrete and masonary work
in head walls and parapets
clause 1106.

1200mmdia

Metre

182.80

6,058.40

1000mm dia

Metre

114.95

4,569.70

900mm dia

Metre

92.00

3,966.90

750mmdia

Metre

57.50

2,507.90

600mm dia

Metre

47.50

1,868.70

Providing and Laying Reinforced


Cement Concrete Pipe NP3 as per
design in Single Row

100

Sr.
No.

Reference to
MORD
Specifications

Description

Unit

Labour
Rate

Through
Rate
Remarks

Providing and laying reinforced


cement concrete pipe NP3 for
culverts on first class bedding of
granular
material in single row
including fixing collar with cement
mortar 1:2 but excluding excavation,
protection
works,
backfilling,
concrete and masonry works in head
walls and parapets Clause 1106.

9.6

1100

1200 mm dia

Metre

76.15

4,005.90

1000 mm dia

Metre

47.90

3,703.50

900mm dia

Metre

38.25

3,088.90

750 mm dia

Metre

28.65

2,312.80

600mm dia

Metre

22.90

1,792.80

Providing and Laying Reinforced


Cement Concrete Pipe NP4 as per
design in Single Row
Providing and laying reinforced
cement concrete pipe NP4 for
culverts on first class bedding of
granular
material in single row
including fixing collar with cement
mortar 1:2 but excluding excavation,
protection
works,
backfilling,
concrete and masonry works in head
walls and parapets Clause 1106.

1200 mm dia

Metre

76.15

4,731.90

1000 mm dia

Metre

47.90

3,945.50

900mm dia

Metre

38.25

3,572.90

750mm dia

Metre

28.65

2,948.05

600 mm dia

Metre

22.90

2,458.10

101

Sr.
No.

Reference to
MORD
Specifications

9.7

1100

Description

Unit

Labour
Rate

Through
Rate
Remarks

Providing and Laying Reinforced


Cement Concrete Pipe NP3 as per
Design in Double Row
Providing and laying reinforced
cement concrete pipe NP3
for
culverts on first class bedding of
granular
material in double row
including fixing collar with cement
mortar 1:2 but excluding excavation,
protection
works,
backfilling,
concrete and masonry works in head
walls and parapets as per Clause
1106.

9.8

1100

1200 mm dia

Metre

182.80

8,042.80

1000 mm dia

Metre

114.95

7,426.25

900mm dia

Metre

92.00

6,193.35

750mm dia

Metre

57.50

4,625.40

600mm dia

Metre

47.50

3,586.90

Providing and Laying Reinforced


Cement Concrete Pipe NP4 as per
Design in Double Row
Providing and laying reinforced
cement concrete pipe NP4
for
culverts on first class bedding of
granular
material in double row
including fixing collar with cement
mortar 1:2 but excluding excavation,
protection
works,
backfilling,
concrete and masonry works in head
walls and parapets as per Clause
1106.
A

1200 mm dia

Metre

182.80

9,494.80

1000 mm dia

Metre

114.95

7,910.25

900 mm dia

Metre

92.00

7,161.30

750mmdia

Metre

57.50

5,895.90

600mm dia

Metre

47.50

4,917.90

102

Sr.
No.

Reference to
MORD
Specifications

9.9

1100

9.10

9.11

1100

1100

Description

Unit

Labour
Rate

Through
Rate
Remarks

Laying Cement Concrete Pipe NP2


(burried conduits) on first class
bedding of granular material
including fixing collar with cement
sand mortar 1:2 but excluding
excavation,
protection
works,
backfilling,
concrete
and
masonary work in head wall and
parapets
A

500 mm dia

Metre

21.45

756.30

300mm dia

Metre

17.20

510.10

Laying Cement Concrete Pipe NP3


(burried conduits) on first class
bedding of granular material
including fixing collar with cement
sand mortar 1:2 but excluding
excavation,
protection
works,
backfilling,
concrete
and
masonary work in head wall and
parapets
A

500 mm dia

Metre

21.45

1,482.30

300mm dia

Metre

17.20

873.10

Laying Cement Concrete Pipe NP4


(burried conduits) on first class
bedding of granular material
including fixing collar with cement
sand mortar 1:2 but excluding
excavation,
protection
works,
backfilling,
concrete
and
masonary work in head wall and
parapets

(A)

500 mm dia

Metre

21.45

2,087.30

(B)

300mm dia

Metre

17.20

1,236.10

103

Sr.
No.

Reference to
MORD
Specifications

9.12

1100 & 800

Description

Unit

1100 & 600

Cum

346.10

2,928.35

cum

551.80

3,221.45

cum

627.80

3,629.10

Rate as per item No.11.6 (II)


(ii) Chapter 11
In
cement-lime
mortar
(1:0.5:4.5)

cum

756.10

2,338.00

Rate as per item No.11.6 (II)


(vi) Chapter 11

cum

859.30

2,898.55

10
sqm

258.10

369.50

Brick Masonry Work in cement


mortar in foundation of Head walls
complete exculding pointing and
plastering as per drawing and
technical specification Clause
1109
(A)

Brick Masonry in 1:4 cement


mortar
Rate as per item No.11.5 (ii)
Chapter 11

(B)

Brick Masonry in cementlime mortar (1:0.5:4.5)


Rate as per item No.11.5 (iii)
Chapter 11

9.14

1100 & 700

Stone Masonry Work in cement


mortar in foundation of Head walls
complete as per drawing and
technical specification Clasue
1109
(A)

(B)

9.15

1100 & 600

Through
Rate
Remarks

Plain Cement Concrete M10 (1:3:6


nominal mix) in levelling course
below open foundation of Head
walls as per drawings & Technical
Specification Clause 1109
Rate as per item No.11.4-1(1)

9.13

Labour
Rate

In 1:4 cement mortar

Pointing with Cement Mortar (1:3)


on brickwork as per technical
specification Clause 613.3
Rate as per item No.12.2 of Chapter
12

104

Sr.
No.

Reference to
MORD
Specifications

9.16

1100 & 600

Description

Unit

1100 & 300

Through
Rate
Remarks

Plastering with Cement Mortar


(1:4), 15 mm thick on brickwork in
substructure as per technical
specification
Rate as per item No.12.3 of Chapter
12

9.17

Labour
Rate

10
sqm

352.80

1,042.50

cum

47.75

522.95

23.80

223.00

Backfilling
in
Foundation
Trenches as per drawing and
technical specification Clause
1108
Rate as per Item No.11.2 of Chapter
11(I)&(II)

9.18 1100, 600, 700 Providing PCC M20 Architectural


& 1200
Wall, return wall etc. complete as
per
drawing
and
technical
specification Clause 6.15
Rate as per
Chapter 12

Item

No.12.17

105

of

Chapter 10
TRAFFIC SIGNS, MARKINGS AND OTHER ROAD APPURTENANCES
Sr.
No.

Reference to
MORD
Specifications

10.1

1700

Description

Unit

Printing New Letters


Figures of any Shade

Labour
Rate

Through Remark
Rate

and

Printing new letter and figures of


any shade with synthetic enamel
paint black or any other approved
colour to give an even shade as
per drawings and Technical
Specification Clause 1701
i)

Hindi (Matras commas Per.Cm


and the like not to be height
measured and paid for. per letter
Half letters shall be
counted as half only)

ii)

English and Roman


Hyphens, commas and the Per.Cm
like not to be measured and height
paid for.
per letter

10.2 1700, 300, 800 Traffic Signs


A.

Retro-reflectorised Traffic
Signs

107

0.30

0.40

0.20

0.25

Sr.
No.

Reference to
MORD
Specifications

Description

Unit

Labour
Rate

Through Remark
Rate

(1) Providing and fixing of retroreflectorised


cautionary,
mandatory and informatory
sign as per IRC:67 made of
encapsulated lens type
reflective sheeting vide
Clause 1701.2.3 fixed over
aluminium sheeting, 1.5 mm
thick supported on a mild
steel angle iron post 75 mm
x 75 mm x 6 mm firmly fixed
to the ground by means of
properly
designed
foundation with M15 grade
cement concrete 450 mm x
450 mm x 600 mm, 600 mm
below ground level as per
drawings and Technical
Specification Clause 801

i)

900
equilateral
triangle

mm

Each

114.35 1,902.40

ii)

600
equilateral
triangle

mm

Each

114.35 1,860.20

iii)

600 mm circular

Each

114.35 1,887.85

iv) 800 mm x 600


mm rectangular

Each

114.35 1,930.75

v)

600 mm x 450
mm rectangular

Each

114.35 1,885.00

vi) 600 mm x 600


mm square

Each

114.35 1,904.60

vii) 900 mm
octagon

Each

114.35 1,972.55

108

side

Sr.
No.

Reference to
MORD
Specifications

Description

Unit

Labour
Rate

Through Remark
Rate

(2) Providing and fixing of retroreflectorised


cautionary,
mandatory and informatory
sign as per IRC:67 made of
encapsulated lens type
reflective sheeting vide
Clause 1701.2.3, fixed over
aluminium sheeting, 1.5 mm
thick supported on GI pipe
50 mm dia firmly fixed to the
ground
by
means
of
properly
designed
foundation with M-15 grade
cement concrete 450 mm x
450 mm x 600 mm, 600 mm
below ground level as per
drawings and Technical
Specification Clause 1701

i)

900
equilateral
triangle

mm

Each

96.50 1,474.90

ii)

600
equilateral
triangle

mm

Each

96.50 1,432.70

iii)

600 mm circular

Each

96.50 1,398.75

iv) 800 mm x 600


mm rectangular

Each

96.50 1,503.25

v)

600 mm x 450
mm rectangular

Each

96.50 1,457.50

vi) 600 mm x 600


mm square

Each

96.50 1,477.10

vii) 900 mm sides


octagon

Each

96.50 1,545.05

109

Sr.
No.

Reference to
MORD
Specifications

Description

Unit

Labour
Rate

Through Remark
Rate

(3) Providing and fixing of retroreflectorised


cautionary,
mandatory and informatory
sign as per IRC:67 made of
encapsulated lens type
reflective sheeting vide
Clause 1701.2.3, fixed over
aluminium sheeting, 1.5 mm
thick supported on RCC
Post 100 mm x 100 mm
firmly fixed to the ground by
means of properly designed
foundation with M15 grade
cement concrete 450 mm x
450 mm x 600 mm, 600 mm
below ground level as per
approved drawing Clause
1701

Note:

i)

900
equilateral
triangle

mm

Each

135.15 1,213.25

ii)

600
equilateral
triangle

mm

Each

135.15 1,171.00

iii)

600 mm circular

Each

135.15 1,198.70

iv) 800 mm x 600


mm rectangular

Each

135.15 1,241.60

v)

600 mm x 450
mm rectangular

Each

135.15 1,195.85

vi) 600 mm x 600


mm square

Each

135.15 1,215.45

vii) 900 mm sides


octagon

Each

135.15 1,283.40

Any one area of aluminium


sheeting given at (i) to (vii) may
be
adopted
as
per
site
requirement and in accordance
with IRC:67.

110

Sr.
No.

Reference to
MORD
Specifications

Description

Unit

The rate for excavation, cement


concrete M-15, RCC M-15 in Substructure, steel re-inforcement
and painting may be taken from
respective Chapters.

The depth of foundation and


quantity of cement concrete in the
foundation are indicative. These
may be increased for areas
having higher wind velocities like
in coastal areas. This is
applicable to all road signs and
directions boards.
B.

Semi Reflective
Signs

Labour
Rate

Through Remark
Rate

Traffic

Providing and fixing of semi


reflective
cautionary,
mandatory and informatory
sign board as per IRC:67
made of 1.5 mm thick MS
Sheet duly stove white
colour in front and gray
colour on back with red
reflective border of 65 mm
width and required letters
and figures with reflective
tape engineering grade as
per Clause 1701.3.9 of
MORD for Rural Roads of
required shade and colour
supported and welded on
47mm x 47 mm x 12 SWG
sheet tube firmly fixed to the
ground by mean of properly
designed foundations with
M-15
grade
cement
concrete 450x450x600 mm,
600 mm below ground level
as per approved drawing
Clause 1701.2.2

i) 900
equilateral
triangle

111

mm
&

Each

105.75 1,696.40

Sr.
No.

Reference to
MORD
Specifications

Description

Unit

ii) 600
equilateral
triangle

Note:

mm
&

Through Remark
Rate

Each

105.75 1,541.50

iii) 600 mm circular

Each

105.75 1,642.90

iv) 800 mm x 600


mm rectangular

Each

105.75 1,800.25

v) 600 mm x 450
mm rectangular

Each

105.75 1,632.50

vi) 600 mm x 600


mm

Each

105.75 1,740.40

vii) 900 mm
octagon

Each

105.75 1,953.60

side

Any one area of M.S. Sheet given


at (i) to (viii) may be adopted as
per site requirement and in
accordance with IRC-67.

The rate for excavation, cement


concrete M-15, and painting may
be
taken
from
respective
Chapters.

The depth of foundation and


quantity of cement in the
foundation are indicative. These
may be increased for areas
having higher wind velocities like
in coastal area. This is applicable
10.3 1700, 800 & 300 Direction
andand direction
Place
to all road signs
Identification
signs upto 0.9
boards.
sqm size board
A.

Labour
Rate

Retro-reflectorised Traffic
Signs

112

Sr.
No.

Reference to
MORD
Specifications

Description

Unit

Labour
Rate

Through Remark
Rate

(i) Providing
and
erecting
direction
and
place
identification
retroreflectorised sign as per
IRC:67
made
of
encapsulated lens type
reflective sheeting vide
Clause 1701.2.3, fixed over
aluminium sheeting, 2 mm
thick
with area
not
exceeding
0.9
sqm
supported on a mild steel
single angle iron post 75 x
75 x 6 mm firmly fixed to the
ground
by
means
of
properly
designed
foundation with M-15 grade
cement concrete 450 x 450
x 600 mm, 600 mm below
ground
level
as
per
approved
drawing
and
Technical
Specification
Clause 1701

Sqm

127.05 2,247.90

(ii) Providing
and
erecting
direction
and
place
identification
retroreflectorised sign as per
IRC:67
made
of
encapsulated lens type
reflective sheeting vide
Clause 1701.2.3, fixed over
aluminium sheeting, 2 mm
thick
with area
not
exceeding
0.9
sqm
supported on 2 inch dia GI
Pipe firmly fixed to the
ground
by
means
of
properly
designed
foundation with M-15 grade
cement concrete 450 x 450
x 600 mm, 600 mm below
ground
level
as
per
approved
drawing
and
Tehnical
Specification
Clause 1701.

sqm

107.20 1,334.30

113

Sr.
No.

Note:

Reference to
MORD
Specifications

Description

Unit

(iii) Providing
and
erecting
direction
and
place
identification
retroreflectorised sign as per
IRC:67
made
of
encapsulated lens type
reflective sheeting vide
Clause 1701.2.3, fixed over
aluminium sheeting, 2 mm
thick
with area
not
exceeding
0.9
sqm
supported on RCC Post 100
mm x 100 mm firmly fixed to
the ground by means of
properly
designed
foundation with M-15 grade
cement concrete 450 x 450
x 600 mm, 600 mm below
ground
level
as
per
approved
drawing
and
Technical
Specification
Clause 1701

Sqm

Lettering and
sign board
separately
requirement.
items have
separately.

The rate for excavation, cement


concret M15, RCC M15 in Substructure, steel re-inforcement
and painting may be taken from
respective Chapters.

The depth of foundation and


quantity of cement concrete in the
foundation are indicative. These
may be increased for areas
having higher wind velocities like
in coastal areas. This is
applicable to all road signs and
directions boards.
(B)

arrow markings on
to be provided
as
per
actual
Rates for these
been analysed

Semi-reflective Traffic
signs.

114

Labour
Rate

Through Remark
Rate

151.30 1,481.20

Sr.
No.

Reference to
MORD
Specifications

Description

Unit

Labour
Rate

Through Remark
Rate

Direction
and
place
indentification signs up to
0.9 sqm size board
Providing
and
erecting
direction
and
place
identifications
of
semi
reflective sign boards as per
IRC:67 made of 2 mm thick
M.S. Sheet duly stove
enameled paint in white
colour in front and grey
colour on back with red
reflective border of 70 mm
width
and
required
message, letters, figures
with reflective engineering
grade tape as per MORD
specifications of required
shade
and
colour.
Supported and welded on
47 mm x 47mm of 12 SWG
Square tube of 3050 mm
height duly strengthened by
25 mm x 5 mm M/s flat iron
on edges on back firmly
fixed to the ground by
means of properly designed
foundations
with
M-15
grade cement concrete 450
mm x 450 mm x 600 mm,
600 mm below ground level
as per approved drawing
and Technical Specification
Clause 1701

Note: Rate for excavation, cement concrete M15 and


painting may be taken from respective Chapters.
10.4 1700, 800 & 300 Direction
and
Place
Identification signs with size
more than 0.9 sqm size board
A.

Retro-reflectorised Traffic
Signs

115

Each

120.40 2,583.35

Sr.
No.

Reference to
MORD
Specifications

Description
(i)

Unit

Labour
Rate

Through Remark
Rate

Providing
and
erecting
direction
and
place
identification
retro-\reflectorised sign as
per
IRC:67
made
of
encapsulated lens type
reflective sheeting vide
Clause 1701.2.3, fixed over
aluminium sheeting, 2 mm
thick with area exceeding
0.9 sqm supported on mild
steel angle iron posts 75
mm x 75 mm x 6 mm, 2
Nos.
firmly fixed to the
ground
by
means
of
properly
designed
foundation with M-15 grade
cement concrete 450 mm x
450 mm x 600 mm, 600 mm
below ground level as per
approved
drawing
and
Technical
Specification
Clause 1701

Sqm

152.45 2,641.60

(ii) Providing
and
erecting
direction
and
place
identification
retroreflectorised sign as per
IRC:67
made
of
encapsulated lens type
reflective sheeting vide
Clause 1701.2.3, fixed over
aluminium sheeting, 2 mm
thick with area exceeding
0.9 sqm supported on dia
GI Pipe firmly fixed to the
ground
by
means
of
properly
designed
foundation with M-15 grade
cement concrete 450 mm x
450 mm x 600 mm, 600 mm
below ground level as per
approved
drawing
and
Technical
Specification
Clause 1701

Sqm

128.60 2,071.60

116

Sr.
No.

Note:

Reference to
MORD
Specifications

Description

Unit

(iii) Providing
and
erecting
direction
and
place
identification
retroreflectorised sign as per
IRC:67
made
of
encapsulated lens type
reflective sheeting vide
Clause 1701.2.3, fixed over
aluminium sheeting, 2 mm
thick with area exceeding
0.9 sqm supported on RCC
Posts 100 mm x 100 mm
firmly fixed to the ground by
means of properly designed
foundation with M 15 grade
cement concrete 450 mm x
450 mm x 600 mm, 600 mm
below ground level as per
approved
drawing
and
Technical
Specification
Clause 1701

Sqm

Lettering and arrow markings on


sign boards to be provided
separately
as
per
actual
requirement. Rates for these
items have been analysed
separately.

The rate for excavation, cement


concrete M15, RCC M15 in Substructure, steel re-inforcement
and painting may be taken from
respective Chapters.

The depth of foundation and


quantity of cement concrete in the
foundation are indicative. These
may be increased for areas
having higher wind velocities like
in coastal areas. This is
applicable to all road signs and
directions boards.
B.

Semi-Reflective
signs

Traffic

117

Labour
Rate

Through Remark
Rate

182.10 1,724.70

Sr.
No.

Reference to
MORD
Specifications

Description

Unit

Labour
Rate

Through Remark
Rate

Direction
and
place
identification signs more
than 0.90 sqm sign board
Providing
and
erecting
direction
and
place
identification
of
semi
reflective sign boards as per
IRC-67 made of 2 mm thick
M.S. Sheet duly stove
enameled paint white colour
in front and grey colour on
back with reflective border
of 70 mm width and
required message, letters,
figures with reflective tape
of engineering grade as per
MORD specifications of
required shade and colour.
Supported and welded on
two nos. 47 mm x 47 mm of
12 SWG square tube of
3050 mm height duly
strengthened by 25 mm x 5
mm MS flat iron on edges
on back firmly fixed to the
ground
by
means
of
properly
designed
foundations
with
M-15
grade cement concrete 450
mm x 450 mm x 600 mm,
600 mm below ground level
as per approved drawing
and Technical Specification
Clause 1701

Note: Rate for excavation cement concrete M15 and


painting may be taken from respective chapter
10.5

1700

Painting Two Coats on New


Concrete Surfaces

118

Each

141.00 2,887.45

Sr.
No.

10.6

Reference to
MORD
Specifications

1700

Unit

Painting two coats including


primer coat after filling the surface
with synthetic enamel paint in all
shades on new, plastered /
concrete surfaces as per drawing
and
Technical
Specification
Clause 1701

Sqm

21.40

60.45

1700

Sqm

19.95

56.20

Sqm

19.95

74.50

Sqm

33.00

63.50

Painting
on Concrete/Steel
Surfaces with Epoxy
Painting two coats including prime
coat with epoxy paint of approved
brand on concrete/steel surfaces
after through cleaning of surface
to give an even shade as per
drawing
and
Technical
Specification Clause 1701

10.8

1700

Painting lines, Dashes, Arrows,


etc. on Road in Two Coats on
New Work
Painting lines, dashes, arrows,
etc. on roads in two coats on new
work with ready mixed road
marking paint conforming to
IS:164 on bituminous/concrete
surface, including cleaning the
surface of all dirt, dust and other
foreign matter, demarcation at site
and traffic control as per drawing
and
Technical
Specification
Clause 1702

10.9

1700

Through Remark
Rate

Painting on Steel Surfaces


Providing and applying two coats
of ready mix paint including
primer coat of approved brand on
steel surface after through
cleaning of surface to give an
even shade as per drawing and
Technical Specification Clause
1701

10.7

Labour
Rate

Description

Painting lines, Dashes, Arrows,


etc. on Roads in Two Coats on
Old Work

119

Sr.
No.

10.10

Reference to
MORD
Specifications

1700

Description

Unit

Painting lines, dashes, arrows,


etc. on roads in two coats on old
work with ready mixed road
marking paint conforming to
IS:164 on bituminous/concrete
surface, including cleaning the
surface of all dirt, dust and other
foreign matter, demarcation at site
and traffic control as per drawing
and technical specification Clause
1702

Sqm

Labour
Rate
23.90

Through Remark
Rate
42.40

Kilometre Stone
Reinforced cement concrete M15
grade kilometre stone/local stone
of standard design as per IRC:8
fixing in position including painting
and printing, etc as per drawing
and
Technical
Specification
Clause 1703
i)

5th
Kilometre
(precast)

Stone

Each

482.60 2,323.50

ii)

Ordinary Kilometer Stone


(Precast)
200 m stone (precast)

Each

272.20 1,368.10

iii)
Note:

10.11

The rate for excavation, cement


concrete, steel reinforcement,
painting and lettering may be
taken from respective Chapters.

In case local stone is to be used


in place of precast RCC stones,
then rate of cement concrete and
steel reinforcement may be
deleted.

1700

Each

75.90

420.00

Each

82.90

356.40

Boundary Pillar
Reinforced cement concrete M15
grade boundary pillars/local stone
of standard design as per IRC:25,
fixed in position including finishing
and lettering but excluding
painting as per drawing and
Technical Specification Clause
1704

120

Sr.
No.

Reference to
MORD
Specifications

Note:

In case of soft ground, a proper


foundation may be provided as
per approved design. In case
foundation is required to be
provided, the items of excavation
and foundation concrete are
required to be measured and paid
separately.

In case local stone is to be used


in place of precast RCC stones,
then rate of cement concrete and
steel reinforcement may be
deleted.

Description

Unit

Labour
Rate

Through Remark
Rate

10.12 1700, 800 & 300 G.I Barbed Wire Fencing 1.2 m
high
Providing and fixing 1.2 m high GI
barbed wire fencing with 1.8 m
RCC posts 150 mm x 150 mm
placed every 3 m centre-to-centre
founded in M15 grade cement
concrete, 0.6 m below ground
level, every 15th post, last but
one end post and corner post
shall be strutted on both sides
and end post on one side only
and provided with 9 horizontal
lines and 2 diagonals interwoven
with horizontal wires, fixed with GI
staples,
turn
buckles
etc.
complete as per Clause 1705.

Note: Cost of excavation for foundation and foundation


concrete to be added separately in the cost
estimate as per approved design. The rate for
these items may be taken from respective
Chapters.
10.13 1700, 800 & 300 G.I Barbed Wire Fencing 1.8 m
high

121

P.Rmt.

27.10

313.70

Sr.
No.

Reference to
MORD
Specifications

Labour
Rate

Description

Unit

Through Remark
Rate

Providing and fixing 1.8 m high GI


barbed wire fencing with 2.4 m
RCC M15 grade 150 mm x 150
mm concrete post placed every 3
m centre-to-centre founded in
M15 grade cement concrete, 0.6
m below ground level, every 15th
post, last but one end post and
corner post shall be strutted on
both sides and end post on one
side only and provided with 12
horizontal lines and 2 diagonals
interwoven with horizontal wires,
fixed with GI staples, turn buckles
etc. complete as per Clause
1705.

P/Rmt

37.30

P/Rmt

60.70 1,436.70

433.40

Note: Cost of excavation for foundation and foundation


concrete to be added separately in the cost
estimate as per approved design. The rate for
these items may be taken from respective
Chapters.
10.14 1700, 800 &300 Tubular
Steel
Railing
on
Medium Weight Steel Channel
(ISMC series) 100 mm x 50 mm
Providing, fixing and erecting 50
mm dia steel pipe railing in 3 rows
duly painted on medium weight
steel channels (ISMC series) 100
mm x 50 mm, 1.2 m high above
ground,
2 m centre-to-centre,
complete as per approved
drawings Clause 1706
10.15 1700, 800 & 300 Tubular
Steel
Railing
on
Precast RCC posts, 1.2 m high
above Ground Level

122

Sr.
No.

10.16

Reference to
MORD
Specifications

1700

Description

Unit

Providing, fencing and erecting 50


mm dia painted steel pipe railing
in 3 rows on precast M-20 grade
RCC vertical posts 175 mm x 175
mm x 1.8 m high (1.2 m above
Gl) with 3 holes 50 mm dia for
pipe, fixed 2 m centre-to- centre
complete as per approved
drawings Clause 1706

P.Rmt.

Labour
Rate

Through Remark
Rate

76.60 1,172.15

Providing and Fixing 'Logo' of


PMGSY Project
Providing and fixing of typical
PMGSY informatory sign board
with Logo as per MORD
specifications and drawing. Three
MS Plates of 1.6 mm thick, top
and middle plate duly welded with
MS flat iron 25mm x 5m size on
back on edges. The lower plate
will be welded with MS angle iron
frame of 25mm x 25mm x 5mm.
The angle iron frame of the lower
most plate and flat iron frame of
middle plate will be welded to 2
nos. 75mm x 75 mm of 12 SWG
sheet tubes posts duly embedded
in cement concrete M-15 grade
blocks of 450mm x 450mm x
600mm, 600mm below ground
level. The top most diamond
plate will be welded to middle
plate by 47mm x 47mm of 12
SWG steel plate tube. All M.S.
will be stove enameled on both
sides.
Lettering and printing
arrows, border etc. will be painted
with ready mixed synthetic
enamel paint of superior quality in
required shade and colour. All
sections of framed posts and
steel tube will be painted with
primer and two coats of epoxy
paint as per drawing Clause 1701
and Annexure 1700.1

123

Each

1,641.00 9,142.75

Sr.
No.

Reference to
MORD
Specifications

Description

Unit

Labour
Rate

Through Remark
Rate

Note: Printing and lettering for blank spaces on the lower


plate will be written as required and paid
seperately.
10.17

Suggestive

Traffic Cone
Provision of red fluorescent with
white reflective sleeve traffic cone
made
of
Low
Density
Polyethylene (LDPE) material with
a square base of 390 x 390 x 35
mm and a height of 770 mm, 4
kg in weight, placed at 1.5 m
interval, all as per BS:873

10.18

Suggestive

Rumble Strips
Provision of 15 nos. rumble strips
covered with premix bituminous
carpet, 15-20 mm high at centre,
250 mm wide placed at 1 m
centre-to-centre
at
approved
locations to control speed,
marked with white strips of road
marking paint.

Note: The rate per sqm of premix carpet and road


marking may be adopted from Chapters 5 & 10
respectively for the quantities calculated from
approved drawings.
10.19

Suggestive

Each

Safety Devices and Signs in


Construction Zones

124

Sqm

1.10

467.55

Sr.
No.

Reference to
MORD
Specifications

Description

Unit

Provision and fixing of traffic signs


for limited period at suitable
locations in construction zone
comprising of warning zone,
approach transition zone, working
zone and terminal transition zone
with a minimum distance of 2-3 m
from the edge of the carriageway.
The bottom edge of the lowest
sign plate to be not less than 2 m
above the road level, fixed on 600
mm x 600 mm x 6 mm angle iron
post, founded and installed as per
approved design and drawings,
removed and disposed of after
completion of construction work,
all as per IRC:SP:55-2001.

Each

Following types of signs are


required
to
be
fixed
in
construction zones for safety of
traffic:
a)
Diversion one km ahead
b)
Traffic sign ahead
c)
Road ahead closed
d)
Men at work
e)
Road narrow
f)
Un-even road
g)
Slippery road
h)
Loose chippings
i)
Diversion
j)
Do not enter
k)
Road closed
l)
Stop
m) Slow
n)
Speed limit
Note: The rate for traffic signs are already worked out
and given elsewhere in this Chapter. The same
may be adopted.
10.20

Suggestive

Road Markers/Road Stud with


Lens Reflector

125

Labour
Rate

Through Remark
Rate

Sr.
No.

Reference to
MORD
Specifications

Description

Unit

Providing and fixing of road stud


100 x 100 mm die cast in
aluminium, resistant to corrosive
effect of salt and grit, fitted with
lense reflectors, installed in
concrete or asphaltic surface by
drilling holes 30 mm upto a depth
of 600 mm and bedded in a
suitable bituminous grout or
epoxy mortar, all as per BS:873
(Part 4) 1973.

Each

126

Labour
Rate
2.95

Through Remark
Rate
202.60

Chapter 11
FOUNDATION
Sr.
No.

Reference to
MORD
Specifications

11.1

300

Description

Unit

Labour
Rate

Through
Rate
Remarks

Excavation for Structures


Earthwork in excavation for
structures as per drawing and
technical specifications Clause
305.1 including setting out,
construction of shoring and
bracing, removal of stumps and
other deleterious material and
disposal upto a lead of 50 m,
dressing of sides and bottom and
backfilling in trenches with
excavated suitable material.
I.

Ordinary soil
(i)

Note:

Upto 3 m depth

Cost of dewatering may be


added, where required, up to 10
per cent of labour cost.
Assessment for dewatering shall
be made as per site conditions.

The cost of shoring and


shuttering, where needed, may
be added @ 3 per cent on cost of
excavation for open foundation.

The excavated earth if found


suitable, can be used partly for
backfilling in trenches & partly for
road work. Hence cost of
disposal has not been added
except for marshy soil. This note
is common to all cases of item
11.1 excluding 11.1 V
(ii)

3 m to 6 m depth

126

Cum

128.15 --

Cum

152.20 --

Sr.
No.

Reference to
MORD
Specifications

Note:

Cost of dewatering may be


added, when needed, up to 15
per cent of labour cost.

Cost of shoring and shuttering,


where needed, may be taken @
10 per cent
on cost of
excavation for open foundation.

Description

II.

Unit

Ordinary
rock
requiring blasting)

Labour
Rate

Through
Rate
Remarks

(not

Upto 3 m depth

Cum

160.20 --

Note: Cost of dewatering upto 10 per cent of labour


cost may be added, where required as per site
condition.
III.

Hard rock (requiring blasti Cum

213.75

297.60

80.10

443.10

Note: Cost of dewatering @ 10 per cent of (a+b) may


be added, where required as per site condition.
IV.

Hard rock (blasting prohibi Cum

Note: Cost of dewatering up to 10 per cent of (a+b) may


be added, where required as per site conditions.
V.
Note:

Marshy soil

Cum

Cost of dewatering @ 30 per


cent of (a) may be added.

Shoring and shuttering @ 15 per


cent of (a) may be added where
required.

Since marshy soil cannot be


used in filling in trenches, it shall
be removed and replaced by
approved quality of soil. The
labour cost includes labour input
for disposal of marshy soil from
excavated pit with a lead upto 50
m lead.

127

240.25 --

Sr.
No.

11.2

Note:

11.3

Reference to
MORD
Specifications

Description

Unit

Marshy soil is generaly available


upto 3 m depth. The rate has,
therefore, been done upto 3 m
depth of excavation. For deeper
excavation refer analysis in item
11.1.

300 & 1200

Fillling in foundation trenches


as per drawing and technical
specification Clause 305.3.9

Labour
Rate

Through
Rate
Remarks

I.

Sand filling

Cum

47.75

II.

Earth filling (For marshy


soil)

Cum

82.15 --

Cost of transportation of good


quality earth has not been
included.
Only labour for
carrying carted earth with a lead
of 50 m to the foundation pits has
been taken in the rate. The cost
of carted earth may be worked
out separately if the same is not
available from the adjoining area.

Backfilling of foundation trenches


shall normally be done with
excavated earth. The cost of this
operation is included in item 11.1.
Only in case the excavated
earth is not of suitable quality,
sand filling or backfilling with
carted earth may be resorted to

300 & 1200

Filling annular space around


footing in rock as per technical
specification Clause 1203.4.3.

522.95

P.C.C grade M 15
Nominal
mixing)

mix

1:2.5:5(Hand Cum

128

407.00

2,948.70

Sr.
No.

Reference to
MORD
Specifications

11.4

800 & 1200

Description

II.

Through
Rate
Remarks

P.C.C grade M 10
(i)

Nominal mix 1:3:6

Cum

346.10

2,928.35

(ii)

Nominal mix
(Hand mixing)

1:3.6 Cum

407.00

2,879.40

P.C.C grade M 15
(i)

Nominal mix (1:2.5:5)

Cum

346.10

2,997.70

(ii)

Nominal mix 1:2.5:5 Cum


(Hand mixing)

407.00

2,948.70

Cum

346.10

3,424.50

1:2:4 Cum

407.00

3,375.50

Cum

367.95

3,595.70

25 Cum

367.05

3,949.40

Cum

346.10

2,793.40

1:3 Cum

551.80

3,423.25

Cement mortar 1:3 (1 cement : 3 Cum


sand)

119.00

2,933.00

551.80

3,221.45

III.

600 & 1200

Labour
Rate

Providing
concrete
for
plain/reinforced concrete in
open foundations complete as
per drawings and technical
specifications Clause 802, 803,
1202 & 1203
I.

11.5

Unit

P.C.C. grade M 20
(i)

Nominal mix (1:2:4)

(ii)

Nominal mix
(Hand mixed)

IV.

R.C.C grade M 20 1:2:4

V.

R.C.C.
grade
1:1/1/2:3

vi

PCC grade M-15(1:2.5:5)

Brick masonry work in cement


mortar in foundation complete
excluding
pointing
and
plastering as per drawing and
technical
specifications
Clauses 600, 1202 & 1203

I.

Brick masonry
cement mortar

in

Sub-analysis

II.

Brick masonry
cement mortar

in

129

1:4 Cum

Sr.
No.

Reference to
MORD
Specifications

Description

Unit

Labour
Rate

Through
Rate
Remarks

Sub-analysis
Cement mortar 1:4 (1 cement : 4 Cum
sand)
III.

119.00

2,296.00

626.80

3,629.10

Cum

355.85

3,582.85

Brick masonry in cement- Cum


lime-mortar (1:0.5:4.5)

Sub-analysis
Cement-lime-mortar 1:0.5:4.5 (1
cement: 0.5 lime putty : 4.5 sand)
11.6

700 & 1200

Stone masonry work in cement


mortar in foundation complete
as per drawing and technical
specifications Clauses 702,
704, 1202 & 1203.
I.

Coursed rubble masonry


(1st sort)
(i)

In 1:3 cement mortar

Cum

822.55

2,755.30

(ii)

In 1:4 cement mortar

Cum

822.55

2,503.00

(iii)

In 1:5 Cement mortar

Cum

822.55

2,367.20

(iv)

In 1:6 Cement mortar

Cum

822.55

2,250.80

(v)

In 1:8 Cement mortar

Cum

822.55

2,134.35

In cement-lime-sand Cum
mortar (1:0.5:4.5)
Note: Quantity of required chips has not been provided
for separately as it is assumed that the same will
be availble from dressing of stones

328.90

3,012.60

(vi)

II.

Coursed rubble masonry


(2nd sort)
(i)

In 1:3 cement mortar

Cum

756.10

2,615.50

(ii)

In 1:4 cement mortar

Cum

756.10

2,338.00

(iii)

In 1:5 cement mortar

Cum

756.10

2,188.60

130

Sr.
No.

Reference to
MORD
Specifications

III.

Labour
Rate

Through
Rate
Remarks

Description

Unit

(iv)

In 1:6 cement mortar

Cum

756.10

2,060.50

(v)

In 1:8 cement mortar

Cum

756.10

1,932.45

(vi)

In cement-lime-mortar Cum
(1:0.5:4.5)

859.30

2,898.55

Random Rubble Masonry


(i)

In 1:3 cement mortar

Cum

694.35

2,540.50

(ii)

In cement mortar 1:4

Cum

694.35

2,263.05

(iii)

In cement mortar 1:5

Cum

694.35

2,113.60

(iv)

In cement mortar 1:6

Cum

694.35

1,985.60

(v)

In cement lime mortar Cum


(1:0.5:4.5)

797.50

2,823.60

Note: Quantity of required chips has not been provided


for separately as it is assumed that the same will
be availble from dressing of stones
11.7

1000 & 1200

Supplying, fitting and placing Tonne


HYSD bar reinforcement in
foundation complete as per
drawings
and
technical
specifications Clauses 1000
and 1202

1,376.80 64,142.80

11.8

1000 & 1200

Supplying,
fitting
and Tonne
placingTMT bar reinforcement
in foundation complete as per
drawings
and
technical
specifications Clauses 1000
and 1202

1,376.80 64,142.80

11.9

1000 & 1200

Supplying, fitting and placing Tonne


MS bar reinforcement in
foundation complete as per
drawings
and
technical
specifications Clauses 1000
and 1202

1,376.80 61,370.80

131

Sr.
No.

Reference to
MORD
Specifications

11.10

800 & 1200

Providing and Laying concrete Cum


for plain/reinforced concrete in
open foundations complete as
per drawing and technical
specification clauses 802, 803,
1202 and 1203

346.10

2,337.20

11.11

800 & 1200

Providing and Laying concrete Cum


for plain/reinforced concrete in
open foundations complete as
per drawing and technical
specification clauses 802, 803,
1202 and 1203

346.10

2,346.15

11.12

800 & 1200

Providing and Laying concrete Cum


for plain/reinforced concrete in
open foundations complete as
per drawing and technical
specification clauses 802, 803,
1202 and 1203

346.10

2,068.20

11.13

800 & 1200

Providing and Laying concrete Cum


for plain/reinforced concrete in
open foundations complete as
per drawing and technical
specification clauses 802, 803,
1202 and 1203

346.10

1,933.60

11.14

800 & 1200

Providing and Laying cement Cum


concrete 1:5:10 with 15%
plams and curing complete
including the cost of farmwork
for plain/reinforced concrete in
retaining walls, breast walls,
the size of plum should be 150
to 300 mm as per drawing and
HP.PWD
technical
specifications.

346.10

2,087.10

Description

Unit

132

Labour
Rate

Through
Rate
Remarks

Sr.
No.

Reference to
MORD
Specifications

11.15

800 & 1200

Providing and Laying cement Cum


concrete 1:4:8 with 15% plams
and curing complete including
the cost of farmwork for
plain/reinforced concrete in
retaining walls, breast walls,
the size of plum should be 150
to 300 mm as per drawing and
HP.PWD
technical
specifications.

346.10

2,309.20

11.16

800 & 1200

Providing and Laying cement Cum


concrete 1:5:10( 1 cement :5
Sand
:10
graded
stone
aggregate 40 mm nominal size)
with 15% plams, the size of
plum should be 150 to 300 mm
and curing complete including
the cost of Farm work with
steel plates and filled by
bitumen drums in dressiest as
per drawing and HP.PWD
technical specifications.

482.95

1,847.30

Description

Unit

133

Labour
Rate

Through
Rate
Remarks

Chapter 12
SUBSTRUCTURE
Sr.
No.

Reference to
MORD
Specifications

12.1

600

Description

Unit

Labour
Rate

Through
Rate
Remarks

Brick masonry work in


cement
mortar
in
substructure
complete
excepting
pointing
and
plastering, as per drawing
and technical specification
Clauses 602, 603, 604, 1202
& 1204
I.

In 1:3 cement mortar

Cum

579.35

3,594.40

II.

In 1:4 Cement mortar

Cum

579.35

3,382.50

III.

In 1:5 cement mortar

Cum

579.35

3,268.40

119.00

1,953.00

658.15

3,810.60

258.10

369.50

344.95

890.95

352.80

1,042.50

Sub-analysis
Cement mortar 1:5 (1 cement,
5 sand)
IV.
12.2

Note:
12.3

12.4

600

In cement lime mortar


(1:0.5:4.5)

Cum

Pointing with cement mortar 10 Sqm


(1:3) on brickwork as per
drawing
and
technical
specification Clauses 613.3
and 1204

Scaffolding is already included in item 12.1


600
Plastering
with
cement 10 Sqm
mortar (1:4), 12 mm thick on
brickwork in substructure as
per technical specification
Clauses 613.4 & 1204
600

Plastering
with
cement 10 Sqm
mortar (1:4), 15 mm thick on
brickwork in substructure as
per technical specification
Clauses 613.4 & 1204

134

Sr.
No.

Reference to
MORD
Specifications

12.5

600

Note:

Scaffolding is already included


in item 12.1

Though cement mortar of


leaner mix has been included
in item 12.1, for cement plaster
mix of 1:4 has been proposed
for better finishing

12.6

700

Construction of dry rubble


masonary for retaining walls,
breast walls,revetment walls
and parapets etc. for substructure
and
super
structure complete as per
drawing
and
technical
specification clauses 704.6 &
1302.5

12.7

700

Stone masonry in cement


mortar
for
substructure
complete as per drawing &
technical
specification
Clauses 702, 704, 1202 and
1204

Description

Unit

Plastering
with
cement 10 Sqm
mortar (1:4), 18 mm thick on
brickwork in substructure as
per technical specification
Clauses 613.4 & 1204

I.

Labour
Rate

Through
Rate
Remarks

360.65

1,194.00

Cum

674.65

1,326.05

Coursed
rubble
masonry (1st sort)
(i)

In
1:3
mortar

cement

Cum

863.70

2,893.05

(ii)

In
1:4
mortar

cement

Cum

863.70

2,628.20

(iii)

In cement mortar
(1:5)
In
cement
lime
mortar (1:6)
In
cement
lime
mortar (1:8)

Cum

793.90

2,318.80

Cum

863.70

2,363.30

Cum

863.70

2,241.10

In
cement
lime
mortar (1:5:4.5)

Cum

962.15

3,163.25

(iv)
(v)
(vi)

135

Sr.
No.

Reference to
MORD
Specifications

Description
II.

III.

12.8

800

Unit

Coursed
Rubble
masonry (2nd sort)
(i) In cement mortar
(1:3)

Labour
Rate

Through
Rate
Remarks

Cum

793.90

2,746.25

(ii)

In
1:4
mortar

cement

Cum

793.90

2,454.90

(iii)

In cement mortar
(1:5)

Cum

793.90

2,298.00

(iv)

In cement mortar
(1:6)

Cum

793.90

2,163.55

(v)

In cement mortar
(1:8)

Cum

793.90

2,029.10

(vi)

In
cement
lime
mortar (1:0.5:4.5)

Cum

902.25

3,043.50

Cum

729.05

2,667.55

Random
rubble
masonry
(i) In cement mortar
(1:3)
(ii)

In
1:4
mortar

cement

Cum

729.05

2,376.20

(iii)

In cement mortar
(1:5)

Cum

729.05

2,219.30

(iv)

In cement mortar
(1:6)

Cum

729.05

2,084.90

(v)

In
cement
lime
mortar (1:0.5:4.5)

Cum

837.40

2,964.80

Plain/reinforced
cement
concrete in substructure
complete as per drawings
and technical specification
Clauses 802, 804, 805, 806,
807, 1202 ans 1204
For height upto 5 m
I.

II

P.C.C grade M 15
(i)

Nominal
(1:2.5:5)
PCC grade M 15

mix

Cum

366.10

3,170.60

(i)

Nominal mix 1:2.5:5


(Hand mixing)

Cum

430.50

3,118.85

136

Sr.
No.

Reference to
MORD
Specifications

Description
III.

IV

VI

Note:

Unit

Labour
Rate

Through
Rate
Remarks

P.C.C. grade M 20
(i)

Nominal mix (1:2:4)


(i) upto 5m height

Cum

366.10

3,505.90

(ii)

Nominal mix 1:2:4


(Hand
mixed)(ii)
above 5m to 10m
height

Cum

380.20

3,761.70

P.C.C.
(1:2:4)

grade

20

(i)

Hand mix upto 5m


height

Cum

430.50

3,570.30

(ii)

Hand mix for height


beyond 5m to 10m

Cum

447.05

3,707.90

R.C.C grade M 20(1:2:4)


nominal mix
(i)

Upto 5m height

Cum

389.15

3,803.10

(ii)

5m to 10m height

Cum

404.15

3,949.70

(iii)

Above 10m height

Cum

423.10

4,135.00

RCC
Grade
25(1:1.5:3)

M-

(i)

Upto 5m height

Cum

389.15

4,187.30

(ii)

5 to 10m height

Cum

403.30

4,348.70

(iii)

Above 10m height

Cum

423.10

4,552.75

The cost of formwork has been


increased for more height to
account for cost of side support
to formwork.

ii

Extra expenditure on structures


which are more than 5 m
height is to cater for cost
involved for approaching the
work spot by providing ramp for
use by labour.

137

Sr.
No.

Reference to
MORD
Specifications

12.9

1000

12.10

Labour
Rate

Through
Rate
Remarks

Supplying, fitting and placing Tonne


HYSD bar reinforcement (Fe
415)
in
substructrue
complete as per drawings
and technical specification
Clauses 1002, 1005, 1010 &
1202

1,444.60

64,210.60

1000

Supplying, fitting and placing Tonne


TMT bar reinforcement (Fe
415)
in
substructrue
complete as per drawings
and technical specification
Clauses 1002, 1005, 1010 &
1202

1,444.60

64,210.60

12.11

1000

Supplying, fitting and placing Tonne


with MS bar reinforcement
(Fe 415) in substructrue
complete as per drawings
and technical specification
Clauses 1002, 1005, 1010 &
1202

1,444.60

61,438.60

12.12

600

Providing weepholes in brick


masonry/stone
masonry,
plain/reinforced
concrete
abutment, wing wall, return
wall with 100 mm dia AC pipe
extending through the full
width of the structures with
slope of 1(V):20(H) towards
drawing face complete as
per drawing and technical
specification Clauses 614,
709, 1204.3.7

6.35

198.70

Description

Unit

138

Nos.

Sr.
No.

Reference to
MORD
Specifications

Nos.

5.00

253.70

600

Providing weapholes in brick


masonry / stone masonry
/plain reinforced concrete
abutment, wing wall, return
wall with 100 mm dia PVC
pipe extending through the
full with of the structures
with slop of 1(v):20(H)
towards
drawing
face
complete as per drawing and
technical
specification
clauses 614, 709, 1204.3.7

12.14

1200

Backfilling behind abutment,


wing wall and return wall
complete as per drawings &
technical
specification
Clause 1204.3.8

1200

Through
Rate
Remarks

Unit

12.13

12.15

Labour
Rate

Description

I)

Granular material

Cum

164.50

481.30

II)

Sandy material

Cum

166.30

641.50

Cum

167.90

563.90

Providing and laying filter


media with granular crushed
aggregates
as
per
specification to a thickness
of not less than 600 mm with
smaller size towards the soil
and bigger size towards the
wall and providing over the
entire
surface
behind
abutment, wing wall, return
wall to the full height,
compacted to firm condition
complete as per drawing and
technical
specification
Clause 1204.3.8

139

Sr.
No.
12.16

Note:
12.17

Reference to
MORD
Specifications
1200

Description

Unit

Supplying, fitting and fixing Cubic


in position true to line and Centim
level elastomeric bearing etre
conforming to IRC:83 (Part-II)
Section
IX
complete,
including all accessories as
per drawings and technical
specification Clause 1207.1

Labour
Rate

Through
Rate
Remarks

0.01

3.80

Rmt

23.80

223.00

For such type of manufactured item, the


overhead cost is taken as 30 per cent instead of
20 per600
cent
Providing
PCC
M-20
architectural coping on the
top of wing wall, return wall
etc. complete as per drawing
and technical specification
Clauses 615, 710
and
1204.3.11
PCC M-20 Grade
Nominal Mix

(1:2:4)

12.18

1200

Providing pressure relief Each


pipes 100 mm dia in bottom
slab of box cell on a filter
media base of 500 mm x 500
mm as per drawing and
technical
specification
Clause 1205.5.7

132.45

314.75

12.19

600

Painting with cement mortar 10Sqm


1:3
on
random
rubble
masonary as per drawing
and technical specification
clauses 613.3 and 1204

344.60

456.05

12.20

600

Painting with cement mortar 10Sqm


1:3 on coursed rubble
masonary as per drawing
and technical specification
clauses 613.3 and 1204

301.30

412.80

140

Sr.
No.

Reference to
MORD
Specifications

Labour
Rate

Through
Rate
Remarks

Description

Unit

12.21

Add extra over items of


Reinforcement
cement
concrete (beams/ columns
/slabs/tanks) for supply and
application of synthetic fibre
(polyester 12 mm Recrorn 3
S or equivalent) properly
mixed
with
sand
/cement/aggregates
including casting of slabs
(with dose of 125 gms per 50
kg of cement i.e. 0.25 per
cent by weight of cement or
in a ratio as specified by
manufacturer's specification
or as directed by the
Engineer-in-Charge

Cum

372.75

12.22

Add extra over items of


cement plaster for supply
and application of synthetic
fibre (polyester 6 mm Recron
3 S or equivalent) properly
mixed with sand /cement
mortar manually /machine
and finished on plaster (with
dose of 125 gms per 50 kg of
cement i.e. 0.25 per cent by
weight of cement or in a ratio
as
specified
by
manufacturer's specification
or as directed by the
Engineer-in-Charge)

Cum

59.10

141

Chapter 13
SUPERSTRUCTURE
Sr.
No.

Reference to
MORD
specifications

13.1

800

Description

Unit

Labour
Rate

Through
Rate

Providing
and
laying
reinforced cement concrete in
superstructure as per drawing
and technical specifications
Clauses 800, 1205.4 and
1205.5
I.

R.C.C grade M 20
(i)

For nominal
1:2:4

mix

Upto 5m height

Cum

424.55

4,148.85

II

5m to 10m height

Cum

442.20

4,321.70

III

Above 10m height

Cum

459.90

4,494.60

(ii)

For nominal mix


1:2:4 (Hand mixed)

Upto 5m height

Cum

469.60

4,067.20

II

5m to 10m height

Cum

489.20

4,236.65

III

Above 10m height

Cum

508.70

4,406.10

(iii) For design mix RCC


M 20 1:2:4
I

Upto 5m height

Cum

424.55

3,993.60

II

5m to 10m height

Cum

442.20

4,160.00

III

Above 10m height

Cum

459.90

4,326.40

II.

R.C.C M 25 1:1.5:3

Upto 5m height

Cum

424.55

4,458.60

II

5m to 10m height

Cum

442.20

4,725.95

III

Above 10m height

Cum

459.90

4,915.00

Note: This analysis will hold good for concrete of


nominal mix 1:1:3 also

143

Sr.
No.

Note:

Reference to
MORD
specifications

Description

Unit

Labour
Rate

Through
Rate

III.

R.C.C. Grade M 30 1:1:3

Upto 5m height

Cum

424.55

4,769.80

II

5m to 10m height

Cum

442.20

4,968.50

III

Above 10m height

Cum

459.90

5,167.25

IV

RCC Grade M 30 1:1:2

Cum

353.80

3,974.80

Quantity of cement provided for


various components of the
superstructure is for estimating
purpose only. Actual quantity of
cement will be as per approved
mix design. Similarly quantity for
corase and fine aggregates is for
estimating purpose and the
exact quantity shall be as per
the mix design use of design mix
in place of nominal mix of
concrete of M 20 and higher
grader shall be prepared.
Nominal mix of grades M 20 and
M 25 is to be used with
adequate
supervision
and
quality control requirements
Clause
803
technical
specification

For higher grades like M 25 and


M 30, if adopted, design mix is
recommended.

13.2

1000

Supplying, fitting, and placing Tonne


HYSD bar reinforcement in
superstructure complete as
per drawing and technical
specifications Clauses 1002,
1010 and 1202

1,866.55

64,784.55

13.3

1000

Supplying, fitting, and placing Tonne


TMT bar reinforcement in
superstructure complete as
per drawing and technical
specifications Clauses 1002,
1010 and 1202

1,866.55

64,784.55

144

Sr.
No.

Reference to
MORD
specifications

13.4

1000

Supplying, fitting, and placing Tonne


MS bar reinforcement in
superstructure complete as
per drawing and technical
specifications Clauses 1002,
1010 and 1202

13.5

800

13.6

800

Note:

13.7

Note:

Labour
Rate

Through
Rate

1,866.55

62,012.55

Providing and laying cement Cum


concrete wearing course M 30
grade including reinforcement
complete as per drawing and
technical
specifications
Clauses 800 and 1206.3

394.60

8,943.05

Construction of R.C.C. railing Rmt.


of M 25 grade in cast-in-situ
with 20 mm nominal size
aggregate, true to line and
grade, tolerance of vertical
railing post not to exceed 1 in
500, centre-to-centre spacing
between vertical posts not to
exceed 2000
mm as per
drawing
and
technical
specifications Clauses 800,
900 and 1208.3

111.50

2,318.70

Sub Analysis
Concrete

300.20

3,207.90

124.60

2,872.85

Description

for

Unit

Rate

of Cum

48 m length is the total linear


length adding both sides of 2x12
m span

Quantities of material have been


adopted from standard plans of
MORTH vide drawing No
SD/202

1200

Providing fitting and fixing Rmt.


mild steel railing complete as
per drawing and technical
specifications Clause 1208.2

A typical drawing for MS railing has been


followed for estimate purpose. Rate may be
worked out as per design to be followed

145

Sr.
No.

Reference to
MORD
specifications

13.8

1200

Providing
and
fixing
in Rmt.
position
pipe
railing
consisting of IS Rolled steel
joist posts designation IS MB
100 (100x75) at 2.5 m interval
and three rows of 50 mm dia
steel pipes (light) including
fixing in position on bridge
deck complete as per drawing
and technical specifications
Clause 1208.2

124.60

1,430.05

13.9

600

Brick masonry work in cement Cum


mortar
1:3
in
parapet
excluding
pointing
and
plastering as per drawing and
technical
specifications
Clauses 600, 900 and 1208.4

579.35

3,594.40

13.10

1200

Drainage spouts complete as Rmt.


per drawing and technical
specifications Clause 1209

76.60

1,185.40

13.11

800

P.C.C. M 15 ordinary grade


(1:2.5:5)
levelling
course
below approach slab complete
as per drawing and technical
specifications Clauses 800
and 1211

13.12

800

Description

Unit

Labour
Rate

Through
Rate

(i)

Nominal mix (1:2.5:5)

Cum

332.80

2,882.40

(ii)

Nominal mix 1:2.5:5 (Hand Cum


mixing)

391.30

2,835.30

Reinforced Cement Concrete Cum


M 25 grade approach slab
including reinforcement and
formwork complete as per
drawing
and
technical
specifications Clauses 800
and 1211

535.55

7,560.95

146

Sr.
No.

Reference to
MORD
specifications

13.13

1200

Description

Unit

Providing and laying of an Rmt.


elastomeric
slab
seal
expansion joint complete as
per approved drawing and
approved specifications to be
installed
by
manufacturer/supplier or their
authorised
representative
ensuring compliance to the
manufacturers
instructions
for installlation and as per
technical
specifications
Clause 1207.2.5

Labour
Rate

Through
Rate

25.40

71,525.40

13.90

3,134.60

Note: For this specialised item, overhead cost is


assumed as 30 per cent
13.14

1200

Providing and laying of Rmt.


compression
seal
joint
consisting of steel armoured
nosing at two edges of the
joint gap suitably anchored to
the deck concrete and a
preformed
chloroprene
elastomer or closed cell foam
joint sealer compressed and
formed into the joint gap with
special adhesive binder as per
drawing,
and technical
specifications Clause 1207.2.4

Note:

The installation shall be done by


the
manufacturer
or
his
authorised representative to the
satisfaction of the Engineer.

The concreting for joining the


expansion joint assembly with
the deck has not been included
in this analysis as the same is
catered for in the quantities of
R.C.C deck

The anchoring bars of the


expansion joint assembly shall
be welded to the main
reinforement of the deck.

147

Sr.
No.

Reference to
MORD
specifications
4

Description

Unit

Labour
Rate

Through
Rate

For
this
specialised
item
overheads are assumed @ 30
per cent

13.15

1200

Providing and laying a buried Rmt.


expansion joint, covered with
12 mm thick, 200 mm wide
galvanised weldable structrual
steel plate as per IS:2062,
placed symmetrical to centre
line of the joint, resting freely
over the top surface of the
deck concrete, welding of 8
mm dia, 100 mm long
galvanised nails spaced 300
mm c/c along the centre line
of the plate, as per technical
specifications
Clauses
1207.2.3

13.16

1200

Filler Joint

8.40

1,341.60

I)

Providing and fixing 2 mm Rmt.


thick corrugated copper
plate in expansion joint as
per drawing and technical
specifications
Clause
1207.2.2

14.80

3,605.20

II)

Providing and fixing 20 Rmt.


mm thick compressible
fibre board in expansion
joint complete as per
drawing and technical
specifications

4.30

98.40

III)

Providing and fixing in Rmt.


position 20 mm thick
premoulded joint filler in
expansion joint for fixed
ends of simply supported
spans,
covered
with
sealant complete as per
drawing and technical
specifications

4.30

194.40

148

Sr.
No.

Reference to
MORD
specifications

Description
IV)

Unit

Providing and fillling joint Rmt.


sealing compound as per
drawings and technical
specifications with coarse
sand and 6 per cent
bitumen by weight.

Labour
Rate

Through
Rate

12.75

18.70

729.05

2,667.55

863.70

2,893.05

sqm

25.80

36.95

sqm

35.30

104.25

Note: For arriving at the final rate for filler joints per m
length and per cm depth of joint filling
compound, the rates of Sr. Nos (i), (ii), (iii) and
(iv) shall be added.
13.17

700

Stone masonry in cement


mortar
1:3
for
parapet
complete as per drawing and
technical
specifications
Clauses 700 and 1208.4
I.

Random rubble masonry


Rate same as in item 12.7 cum
III (i)

II.

Coursed rubble masonry


(1st sort)
Rate same as in item 12.7 cum
I (i)

13.18

600

Pointing with cement mortar


(1:3) on brickwork in parapet
as per technical specifications
Clauses 613.3 and 1208.4

Rate same as in item 12.2


13.19

600

Plastering with cement mortar


(1:3)
15
mm
thick
on
brickwork in parapet as per
technical
specifications
Clauses 613.4 and 1208.4
Rate same as in item 12.4

13.20

800

Providing and laying parapet


with PCC M 15 as per drawing
& technical specifications
Clauses 800 and 1208.4

149

Sr.
No.

Reference to
MORD
specifications

Description
I.

Nominal
mix
(Hand mixing)

Unit

1200

430.50

3,118.85

366.10

3,170.60

Nominal mix (1:2.5:5)


Rate same as in item 12.5 cum
I (i)

13.21

Through
Rate

1:2.5:5

Rate same as in item 12.5 cum


I (ii)
II.

Labour
Rate

Providing bituminous wearing


coat comprising of 20 mm
thick premix carpet with 5 mm
thick seal coat Type B for
culverts as per drawing and
technical
specifications
Clauses 1206.2 and 500

i.

Rate for wearing coat as sqm


per item No. 5.9 of
Chapter 5

125.20

ii.

Rate for seal coat Type B sqm


as per item No. 5.12 of
Chapter 5

47.30

Note: This type of wearing coat may be adopted where


a cushion is provided over the culvert and the
adjoining road pavement is continued over it.
13.22

1200

Providing bituminous wearing


coat comprising of 50 mm
thick bituminous macadam
overlaid by 20 mm thick
premix carpet with 5 mm thick
seal coat Type B
i.

Rate for BM layer may be cum


analysed as per item No
5.3 of Chapter 5

5,882.75

ii.

Rate of 20 mm premix sqm


carpet wearing course as
per item No.5.9 of Chapter
5

125.20

iii.

Rate of seal coat Type B sqm


as per item No. 5.12 of
Chapter 5

47.30

150

Sr.
No.

Reference to
MORD
specifications

13.23

600

Brick work in arches in Cum


cement mortar 1:4 complete
including
centering
and
shuttering excluding pointing
and plastering as per drawing
and technical specifications
Clauses 606 and 1205.1

1,778.75

7,672.10

13.24

600

Brick work in special arches Cum


in cement mortar 1:3 complete
including
centering
and
shuttering excluding pointing
and plastering as per drawing
and technical specifications
Clauses 606 and 1205.1

1,875.90

8,095.90

13.25

600

Brick work in special arches Cum


in cement mortar 1:4 complete
including
centering
and
shuttering excluding pointing
and plastering as per drawing
and technical specifications
Clauses 606 and 1205.1

1,857.90

8,129.50

13.26

600

Brick work in special arches Cum


in cement mortar 1:3 complete
including
centering
and
shuttering excluding pointing
and plastering as per drawing
and technical specifications
Clauses 606 and 1205.1

1,857.90

8,129.50

Note:

In case cement mortar 1:3 is


used, rate as in item 11.5 I. will
hold good.

Quantity of bricks for arches will


be about 10 per cent more than
that for ordinary brickwork.

In case special arch bricks are


used, the quantity of bricks per
cum shall be taken as 580 Nos.

Description

Unit

151

Labour
Rate

Through
Rate

Sr.
No.

Reference to
MORD
specifications

Description

Unit

Rates for spandrel walls shall be


taken same as for brickwork in
substructure.

Rate for spandrel filling will


depend on the filling material
adopted

13.27

700

Note:

In case cement mortar 1:3 is


used, rate for the same shall be
as per item 11.5 I.

The addition for centering and


sluttering at (c) above is for arch
above 6 m span. For lesser span
length the addition shall be 80
per cent for span above 4 m
length and 50 per cent for spans
less than 4 m.

700

Coursed
rubble
stone
masonry arch (Ist sort) in
cement mortar (1:4) complete
including
centering
etc.
complete as per drawing and
technical
specifications
Clauses 706 and 1205.1

13.28

Coursed
rubble
stone Cum
masonry arch (Ist sort) in
cement mortar (1:4) complete
including
centering
etc.
complete as per drawing and
technical
specifications
Clauses 706 and 1205.1

Span above 4mtr


13.29

700

Cum

Coursed
rubble
stone
masonry arch (Ist sort) in
cement mortar (1:4) complete
including
centering
etc.
complete as per drawing and
technical
specifications
Clauses 706 and 1205.1

152

Labour
Rate

Through
Rate

2,515.20

5,876.20

2,263.70

5,288.55

Sr.
No.

Reference to
MORD
specifications

Description
Span less than 4mtr

13.30

700

700

700

800

Cum

1,886.40

4,407.00

Cum

2,515.20

6,380.70

Cum

2,263.70

5,742.60

Cum

1,886.40

4,785.50

Cum

580.30

5,235.70

Coursed
rubble
stone
masonry arch (Ist sort) in
cement mortar (1:3) complete
including
centering
etc.
complete as per drawing and
technical
specifications
Clauses 706 and 1205.1

Span less than 4mtrs.


13.33

Through
Rate

Coursed
rubble
stone
masonry arch (Ist sort) in
cement mortar (1:3) complete
including
centering
etc.
complete as per drawing and
technical
specifications
Clauses 706 and 1205.1

Above 4 mtrs.span
13.32

Labour
Rate

Coursed
rubble
stone
masonry arch (Ist sort) in
cement mortar (1:3) complete
including
centering
etc.
complete as per drawing and
technical
specifications
Clauses 706 and 1205.1

Above 6 mtrs.span
13.31

Unit

Providing & Laying reinforced


cement
concrete
arch
complete including centering
and
shuttering
excluding
reinforcement as per drawings
and technical specifications
Clauses 800, 900 and 1205.1

I.

RCC grade M20 (1:2.4)


nominal mix

(i)

Span 6m and above.

153

Sr.
No.

Reference to
MORD
specifications

Description

Unit

(ii)

Span above 4 mtrs.

Cum

(iii)

Span less than 4 metres

II.

RCC Grade M 25

(i)

Extra for span 6m width Cum


height above 5m

Cum

Labour
Rate

Through
Rate

541.60

4,886.60

502.90

4,537.60

560.95

5,567.60

414.95

7,014.20

Note: The additional cost of centering and shuttering


@ 50 per cent of cost of material and labour
shall hold good for arch spans of 6 m and above.
For lesser length of spans, the corresponding
additional cost can be taken as 40 per cent for
spans above 4 m length and 30 per cent for
spans less than 4m.
13.34

1200

Providing steel R.S.Js/built-up


steel
sections
including
cutting,
welding/rivetting,
hoisting, fixing in position for
composite girders with shear
connectors complete with
painting as per drawing and
technical
specifications
Clause 1205.6
A)

Note:

Steel section

P/Qtl

i)

In case of welded section,


welding charges per cm length
of welding shall substitute cost
of rivetting

ii)

Shear connectors should always


be welded to the top flange

iii)

The analysis of R.C.C. deck slab


for the composite girder to be
adopted from the item 13.1 of
concrete superstructure

154

Sr.
No.

Reference to
MORD
specifications

Description

Unit

iv)

In the analysis of deck slab for


composite girder superstructure,
the component of formwork for
the same shall be 20 per cent of
cost of materials, labour and
machinery for deck slab.

v)

For spans upto 6 m with height


above 5 m extra labour of
mazdoor @ 3.0 days per quintal
may be added

vi)

For higher span lengths of


different
heights
following
additional labour for erection of
steel girders on pier/abutment
caps may be provided:

vii)

The provision of 10 per cent for


shear connectors in the typical
case is tentative. The quantity
shall be worked out as per
design.

viii)

The cost of painting can also be


analysed in detail in accordance
with item 10.6 of Chapter 10

13.35 600, 700, 800 Extra for span upto 6 m with Cum
(I)
height above 5 m for item No.
13.23, 13.24, 13.25 and 13.26

(II)

Extra for higher span lengths Cum


of different heights following
additional labour for erection
of
steel
grader
on
pier/abutment caps may be
provided for item No. 13.23,
13.24, 13.25 and 13.26

155

Labour
Rate

462.00 --

47.75 --

Through
Rate

Remarks

156

Remarks

157

Remarks

158

Remarks

159

Remarks

160

Remarks

161

Remarks

162

Remarks

163

Remarks

164

Remarks

165

Remarks

166

Remarks

167

Remarks

168

Chapter 14
PROTECTION WORKS
Sr.
No.

Reference to
MORD
specification

14.1

1300

Labour
Rate

Through
Rate

Description

Unit

Providing and laying boulder


apron for bed protection with
stone boulders of minimum
size and weight as per Table
1300.1, no fragment weighing
less than 25 kg laid dry
complete as per drawing and
technical specifications Clause
1301

cum

210.10

665.50

cum

125.15

1,458.40

cum

353.00

3,057.65

Note: Nominal excavation required for preparation of


bed has been taken into account while making
provisions for labour.
14.2

1300

Providing
and
laying
of
boulder apron laid in wire
crates with 4 mm dia GI wire
conforming to IS:280 and
IS:4826 in 100 mm x 100 mm
mesh
(woven
diagonally)
including 10 per cent extra for
laps and joints laid with stone
boulders weighing not less
than 25 kg each as per drawing
and technical specifications
Clause 1301

Note:

Nominal cost of trimming for


preparation of bed has been
included in the cost of labour

The analysis will by & large hold


good for gabions

1300

Providing and laying of apron


with cement concrete blocks of
size as per Table 1300.1 castin-situ and made with nominal
mix of M-15 grade cement
concrete as per drawing and
technical specifications Clause
1301

14.3

157

Sr.
No.

Reference to
MORD
specification

14.4

1300

14.5

1300

Description

A)

Driven at least 900 mm


below ground and 1200
mm above ground

Through
Rate

53.00

487.60

B)

Driven at least 900 mm Rmt.


below ground and 900 mm
above ground on average

51.00

312.10

Rmt.

Cum

210.10

665.50

cum

353.00

3,057.65

Brick pitchng set in cement


mortar 1:4

cum

530.25

3,088.70

Providing and laying filter


material underneath pitching in
slopes
complete
as
per
drawing
and
technical
specifications Clause 1302

cum

194.80

877.90

Providing and laying pitching


on slopes laid over prepared
filter media as per drawing and
technical specifications Clause
1302
I.

Stone/Boulder

II.

Cement concrete blocks of


size as per Table 1300.2
cast in cement concrete of
grade M 15

III.
1300

Labour
Rate

Single bamboo palasiding /


walling of whole 2nd class
bamboo (Jati or Bethua) 75mm
dia and closely packed &
driven including fitting fixing
with half bamboo kamis
horizontally in three rows with
cane or tying with wire
complete and struts 1.5 m
apart
longitudinally
and
providing brush wood as per
drawing
and
technical
specifications Clause 1302.5

a)

14.6

Unit

Concrete grade
15(1:2.5:5)

Note: Labour cost includes labour required for trimming


of slope to proper profile and preparation of bed.

158

Sr.
No.

Reference to
MORD
specification

14.7

1300

Description

Unit

Labour
Rate

Through
Rate

Providing and laying flooring


laid over cement concrete
bedding complete as per
drawing
and
technical
specification Clause 1303
I.

Rubble stone laid


cement mortar 1:3

in

cum

735.35

5,233.30

II.

Cement conrete blocks


grade M 15(1:2.5:5)

cum

467.25

4,076.90

III.

Brick on edge laid


cement mortar (1:3)

cum

554.35

3,565.80

cum

369.70

1,050.20

cum

551.80

3,221.45

cum

793.90

2,454.90

cum

346.10

2,928.35

in

Note: Quantity of cement mortar is inclusive of mortar


for laying and filling of joints.
14.8

1303

Providing and laying of dry


rubble flooring complete as
per drawings and technical
specifications Clause 1303.3

14.9

1300

Providing and laying curtain


walls complete as per drawing
and technical specification
Clause 1304
I.

Brick masonry in cement


mortar (1:4)
(Rate same as per item
11.5 (II)

II.

Coursed rubble masonary


(2nd sort) in cement mortar
(1:4)
(Rate same as per item
12.7 II (ii) )

III.

Cement concrete grade M


10
(Rate same as per item
11.4 I (i)

Note:

Other items like excavation for


foundation, filling behind wall,
filter media, weep holes, etc.
shall be added separately as per
approved design.

159

Sr.
No.

Reference to
MORD
specification

Description

Unit

For this item, where reference


has been made to items
analysed in other Chapters, i.e.,
11, 12 & 13, the overheads shall
be taken as 15 per cent instead
of 20 per cent

14.10

1300

Construction of flexible apron


1 m thick comprising of loose
stone boulders weighing not
less then 25 kg beyond curtain
wall

14.11

1300

Construction of toe walls for


protection of slopes as per
drawing
and
technical
specifications Clause 1302.5

Labour
Rate

Through
Rate

cum

221.75

683.90

I.

Random rubble masonry in


case of stone pitching laid
with cement mortar (1:5)

cum

615.75

2,126.85

II.

Brick masonry in cement


mortar 1:4 in case of brick
pitching

cum

492.65

3,087.20

Cement mortar 1:4 (1 cement : 4 cum

119.00

2,296.00

318.95

2,806.35

Sub-analysis

III.

Cement concrete grade M


10 in case of concrete
block pitching

I.

P.C.C grade M 20
(i)

Nominal mix 1:3:6

Note: For height less than 3 m, dry rubble masonry can


also be used. In that case, the sub-item of
cement mortar may be omitted in the analysis.

160

cum

Sr.
No.

Reference to
MORD
specification

14.12

1300

14.13

Suggestive

Description

Unit

Labour
Rate

Through
Rate

Single bamboo spur and


palisading of whole 2nd class
bamboo (jati or Bethua) 65 mm
to 75 mm dia and closely
packed & driven, including
fitting, fixing with half bamboo
kamis horrizontally in three
rows with cane or tying wire
complete and struts 1500 mm
apart
longitudinally
and
providing brush wood as per
drawing
and
technical
specifications Clause 1302.5

A)

Driven at least 900 mm


below ground and 1800
mm above ground on
average

Rmt.

55.40

598.30

B)

Driven at least 900 mm


below ground and 900 mm
above ground on average

Rmt.

55.40

332.65

Single bamboo spur and


palisading of whole 1st class
bamboo (Bholuka or Barua) 85
mm to 100 mm dia. Closely
packed & driven including
fitting, fixing with half 2nd
class bamboo (jati or Bethua)
horizontally in three rows with
cane or tying wire complete
and struts 1500 mm apart
longitudinally and providing
brush wood in the spur as per
drawings
and
technical
specifications

A)

Driven at least 900 mm


below ground and 1800
mm above ground

Rmt

65.70

642.35

B)

Driven at least 900 mm


below ground and 900 mm
above ground on average

Rmt.

55.40

327.40

161

Sr.
No.

Reference to
MORD
specification

Description
C)

14.14

14.15

Suggestive

Suggestive

Unit

Driven at least 600 mm


below ground and 1200
mm above ground on
average.

Labour
Rate

Through
Rate

Rmt.

55.40

304.15

Bamboo spur 'A' type with


whole bamboo 85mm-100mm
dia, placed 230 mm centre to
centre driven 900 mm below
ground and 1200 mm to 1500
mm above ground tied with
2nd class bamboo (jati or
Bethua) on either side at 450
mm apart horizontally with
galvanised wire etc. complete
as per drawings and technical
specifications

A)

2nd class bamboo (jati or


Bethua) 75 mm dia

Rmt.

55.40

412.75

B)

1st class bamboo (Bholuka


or Barua ) 85 mm to 100
mm dia

Rmt.

76.05

373.30

Providing 'A' type single spur


with
1st
class
bamboo
(Bholuka or Barua) 85 mm to
100 mm dia. Driven closely
placed 3m to 4m above ground
and 1200 mm to 1500 mm
below ground tied with cane or
coir string, half 2nd class
bamboo
(jati
or
Bethua)
horizontally on both face
placed not more than one
metre apart including whole
bamboo struts inside one
metre apart and 2 nos. of
purlin at top and bottom fitted
with vertical struts at 1500 mm
apart
and
filling
with
brushwood or jungle wood
inside the spur complete as
per drawing and technical
specifications

Rmt.

80.95

1,194.20

162

Sr.
No.

Reference to
MORD
specification

14.16

Labour
Rate

Through
Rate

Description

Unit

1300

Providing close bamboo toe


walling consisting of 65mm to
75mm dia bamboos of length
ranging from 1.2 m to 3m
driven at 150 mm centre to
centre and provided with three
horizontal split bamboo runner
fixed with nails. All bamboos
to be duly protected by coal tar
painting.

Rmt.

24.30

727.50

14.17

Suggestive

Double timber spur with two


rows at 800 mm c/c apart of 1st
class local wood piles with
timber of Azar/Nahar/Nageswar
/ Zarul wood 150 mm to 200
mm dia driven 2000 mm
minimum below ground and
3600
mm
above
ground
average placed at 800 mm
belts, bracings etc. of 100 mm
x 75 mm size 1st class local
wood
longitudinally
&
crosswiswe at ends fitted with
10 mm dia bolts and nuts etc.
including coaltarring of timber
members
and
cost
of
necessary bamboo stagings
etc. as directed by the
Engineer as per drawing and
technical specifications

Rmt.

1,262.95

73,905.20

14.18

Suggestive

Supplying and filling up


hollows of the timber spur to
an average height of 3600 mm
above ground with jungle
wood branches as per drawing
and technical specifications as
directed by the Engineer.

Rmt.

163

37.55 --

Remarks

164

Remarks

165

Remarks

166

Remarks

167

Remarks

168

Remarks

169

Remarks

170

Chapter 15
MAINTENANCE OF ROADS
Sr.
No.

Reference to
MORD
Specifications

15.1

1900

Description

Unit

Labour
Rate

Through
Rate

Restoration of Rain Cuts


i)

Restoration of rain cuts


with soil, moorum gravel or
a
mixture
of
these,
clearing the loose soil,
benching for 300mm width
laying fresh material in
layers not exceeding 250
mm and compaction with
plate compactor or power
rammer to restore the
original alignment, level
and
slopes
as
per
drawings and technical
specifications Clause 1902

A.

Manual Means

Cum

88.10

144.40

B.

Mechanical Means

Cum

29.40

124.35

Making
up
loss
of Sqm
material/irregularities
on
shoulders to the design
level by adding fresh
approved selected soil and
compacting
it
with
appropriate equipment at
OMC upto a lead of 1000
m
as per technical
specification Clause 1903

7.35

23.10

Note: Only 75% of fresh material has been provided as


25% can be retrieved from site from earth i.e.
flown down the slop in the form of slurry and
deposited at the foot of rain cuts.
15.2

1900

1.

Maintenance of Earthen
shoulder (filling with
fresh selected soil)

165

Remarks

Sr.
No.

Reference to
MORD
Specifications

Description
2.

Unit

Labour
Rate

Through
Rate

3.70

6.35

Maintenance of Earhen
shoulder (stripping of
excess soil)
Stripping excess soil from Sqm
the shoulder surface to
achieve the approved level
and compacting with plate
compactor at OMC as per
drawings and Technical
Specification Clause 1903

Note: Earth stripped from earthen shoulders to be used


as shoulders or dumped on the side slopes
locally for disposal.
15.3

1900

Maintenace of
surface road

bituminous

i.

Repair to pot holes by Cum


removal of failed material,
trimming the sides to
vertical and levelling the
bottom, cleaning the same
with compressed air or any
appropriate method filled
with 75mm B.M, applying
bitumen emulsion prime
coat at the bottom and
bitumen emulsion tack
coat on sides and on
bottom as per technical
specifications
Clauses
502, 503 and 504.

208.85

7,229.55

ii.

Patch repair on already Sqm


filled pot holes with 75 mm
BM with 20 mm premix
carpet and seal coat Type
B as per drawings and
technical
specification
Clause 1904.2, 508 and
510

11.75

159.40

166

Remarks

Sr.
No.

15.4

Reference to
MORD
Specifications

1900

Description

Unit

Labour
Rate

Through
Rate

iii.

Repair to pot holes and Sqm


removal of loose material,
trimming of sides, cleaning
of surface by providing
tack coat, 20 mm thick
pre-mix carpet and seal
coat type B specification
Clause 1904.2,503 and
508.1.

14.70

170.70

iv.

Repair to pot holes and Sqm


removal of loose material,
trimming of sides, cleaning
of surface by providing
tack coat with bitumen
emulsion, 20 mm thick
pre-mix
carpet
using
catonic bitumen emulsion
and seal coat type B with
bitumen emulsion as per
technical
specification
clause 1904.2, 503 and
508.2.

11.75

191.20

Maintenance of Gravel Road


Maintenance of gravel road Sqm -including making up the loss of
profile, rectifying corrugated
surface, filling up of depressions,
pot holes and erosion gullies by
adding fresh material and
compacting it with appropriate
equipment or to strip excess of
material from the road surface
as per drawings and technical
specification Clause 1905

Note: The cost of 25% retrived material may be


deducted from rates.
15.5

1900

Maintenance of WBM Road

167

185.50

Remarks

Sr.
No.

Reference to
MORD
Specifications

Description

Unit

Labour
Rate

Through
Rate

Maintenance of WBM road Sqm -including filling up of pot holes,


ruts and rectifying corrugated
surface, damaged edges and
ravelling as per technical
specification Clause 1906.

107.75

Note: The cost of 25% retrived material may be


deducted from rates.
15.6

1900

Maintenance of Drains
The maintenance of drains RMT
include erosion, repair, clearing,
cleaning, reshaping, regrading,
deepening of side drains as well
as catch water drains as per
technical specification Clause
1907.

15.7

1900

(I)

Maintenance of Culverts
Maintenance of Hume pipe Each
Culvert by way of
Clearing,
Cleaning,
Erosion repair, repairs to
cracks, parapet wall and
protection work as per
drawing and technical
specification Clause 1908

(II)

1900

424.10

847.60

784.90

1,571.40

Maintenance of Culverts
Slab type
Maintenance of Slab type Each
Culverts
by
way
of
clearing, Cleaning, Erosion
repair, repairs to cracks,
parapet
walls
and
Protection works as per
drawing and technical
specification Clasue 1908

15.8

1.20 --

Maintenance of Causeway

168

Remarks

Sr.
No.

Reference to
MORD
Specifications

Labour
Rate

Through
Rate

27.20

39.30

Per
Km.

317.50

862.00

Steel Railing
Rmt.
Repair of RCC railing to
bring it to the original
shape,
cleaning
and
repainting as per drawings
and technical specification
Clause 1911

9.95

259.60

122.20

1,374.70

206.10

604.60

Description

Unit

Maintenance of Causeway by Metre


way of minor Surface repairs,
replacing Guide Posts, repair of
flood gauges, removal of debris,
providing
boulders
and
protection work and painting as
per
technical
specification
Clause 1909
15.9

1900

Maintenance of Road Signs


Maintenance of road signs by
way of cleaning and repainting
of mandatory / requlatory /
cautionary / informatory and
place identifications sign board
as perdrawings and technical
specification Clause 1910

15.10

1900

Maintenance of steel and RCC


Railing
(i)

(ii)

Repair of steel railing to


bring it to original shape
cleaning and repainting as
per drawing and technical
specification Clause 1911

RCC Railing
15.11

1900

Rmt.

Maintenance of 200 metre and


km stones
Maintenance of 200 metre km Per Km.
stone by way of refiting of tilted
stones repairing with cement
mortar, cleaning, repairing and
lettering on 200 metre km stone
and 5th km stone as per drawing
and
technical
specification
Clause 1912

169

Remarks

Sr.
No.

Reference to
MORD
Specifications

15.12

1900

15.13

1900

Description

Unit

Labour
Rate

Cutting of branches of trees


shrubs and trimming of grass
and weeds
(i)

Cutting of branches of Each


trees and shrubs from the
road way or with in R.O.W
including disposal of wood
and leaves to suitable
location as per technical
specification Clause 1914

(ii)

Cutting of shrubs from the


road way or with in R.O.W
and disposal of shrubs to
suitable locations as per
technical specifications
Clause 1914

Each

2.95 --

(iii)

Trimming of grass and Sqm


weeds
from
the
shoulders/berms
and
disposing off the same to
suitable locations as per
technical
specifications
Clause 1914

1.00 --

1900

44.05 --

White washing of parapet


walls of CD work and tree
truncks
White washing two coats on Sqm
parapet walls and tree trunks
including preparation of surface
by cleaning scraping etc. as per
technical specifications Clause
1915

15.14

Through
Rate

4.90

11.50

Periodical Renewal to existing


bituminous surface
1

Open graded Premix


carpet 20 mm thick
(i) Tack coat
Rates as per item 5.2 (ii)

170

Sqm --

12.25

Remarks

Sr.
No.

Reference to
MORD
Specifications

Description
(ii)

302

Labour
Rate

Pre-mix carpet
using bituminous
(penetration grade
modified bitumen)
binder
125.20

Rates as per item No. 5.10 Sqm -(iv) Seal coat Type A, B
or C

108.10

Rates as per item No. 5.11 Sqm -Surface dressing single


coat/first coat or 2nd
coat

179.70

Rates as per item No. 5.6


Sqm -Removal of land slide slip
clearance

73.35

Removal of land slide in hilly Cum


area in ordinary rock not
requiring blasting by mechnical
means including cutting and
trimming of slops and disposal of
cut material with in lift upto 1.5m
and lead upto 1000m as per
technical specification 302.3.5
and 1611.
15.16

Through
Rate

Rates as per item No. 5.9


Sqm -(iii) Premix carpet using
bitumen Emulsion

15.15

Unit

18.85

60.45

Snow clearance

(i) Snow clearance from road Cum --

2.70

surface by a Bulldozer 165 HP


and disposing it on the velly
sideas per MORTH and IRC
specification 48-1998.

(II) Snow clearance from road Cum -surface by a snow Blower


140HP and dispoding it on the
velly side as per MORTH and
IRC specification 48-1998.
15.17

Stone pitching

171

2.30

Remarks

Sr.
No.

Reference to
MORD
Specifications

Description

Unit

Labour
Rate

Providing and laying pitching on Cum


slopes laid over prepared filter
media including boulder apron
laid dry on front of the
embankment complete as per
drawing
and
technical
specification 2504 of MORTH
stone/Boulder.
15.18

501

Ruffing deprecession
carrugation Repair

501

501

614.30

11.75

233.85

Crack sealing repair


Crack sealing repair by widening Sqm -and thoruughly cleaning crack
with compressed Air and filling
using low Viscosity bitumen
emulsion and applying crusher
dust in case crack are wider
than 5mm as per MORD
technical specification 501.2.3.2.

15.20

178.75

and

Ruffing,
deprecession
and Sqm
carrugation Repair by clearing
and removal of loose material
providing tack coat with bitumen
Emulsion and filling with grading
premix
using
Catonic
Emulsion(special
technical
specification B2.3.3) in Layer not
exceeding 50mm to0 average
depth of 50mm as per MORD
technical specification 501.3

15.19

Through
Rate

30.20

Crocodile crack and surface


texture repair
Crocodile crack and surface Sqm -texture repair by thoroughly
cleaning
of
surface
with
compressed
air,
scrubbers,
etc.and applying Fog seal at the
rate of 0.5-1.0 ltrs./Sqm using
mechnical means as per MORD
technical speficiation 501.2.3.2

172

34.20

Remarks

Sr.
No.
15.21

Reference to
MORD
Specifications

Description

Unit

Labour
Rate

Through
Rate

Bleeding repair
Bleeding repair by applying P/Rmt. -pressure dust to area of road
where bleeding of excess
bitumen has accurred as per
MORTH technical specification
3004.4(spreading of binding
material)

173

0.20

Remarks

Sr.
No.

Chapter 16
BIO ENGINEERING ELEMENTS
Description
Unit Labour
Rate

Reference to
MORTH
Specifications

16.1

Through Remarks
Rate

Grassing with large


grasses (normal type)

Planting rooted slips of large


stature grasses on slopes,
including supplying clumps
of appropriate grasses,
splitting into slips, trimming
roots, preparing lines,
digging planting hole to a
max of 5 cm depth with
metal rod or wooden peg
depending on nature of soil,
planting slips at the rate of
three perdrill at the specing
specified, and subsequent
watering (if necessary)
(i)

16.2

On embankment slopes in
plain areas and fill slopes
<15, drills at 10 cm
spacings within the row; the
first row is 0.75 m from the
edge of the pavement and
subsequent rows are
spaced at 1 m intervals
down the

Sqm.

6.85

24.95

(ii) On fill slopes of 15 to 34


Sqm.
and cut slopes upto 45
drills at 10 cm spacing within
the row; rows spaced at 0.5
m intervals.

12.70

47.20

(iii) On cut slopes of 45 to 60,


drills at 10 cm spacings
within the row; rows
spaced at 0.25 m
intervals.with large
Grassing

22.60

89.70

grasses (large
rhizomatous type, like
samll bamboos)

180

Sqm.

Planting rooted rhizomes of


large stature grasses on
slopes, including supplying
clumps of appropriate
grasses, spliting into
separate viable rhizome
sections, trimming roots,
preparing lines, digging
planting hole to a max of 5
cm depth with metal rod or
wooden peg depending on
nature of soil planting
rhizomes at the spacing
specified, and subsequent
watering (if necessary).
(i)

16.3

On embankment slopes in
plain areas and fill slopes
<15, plants at 10 cm
spacings within the row; the
first row is 0.75 m from the
edge of the pavement and
subsequent rows are
spaced at 1 m intervals
down the

Sqm.

6.85

14.10

(ii) On fill slopes of 15 to 34


and cut slopes upto 45
plants at 10 cm spacing
within the row; rows spaced
at 0.5 m intervals.

Sqm.

12.70

25.40

(iii) On cut slopes of 45 to 60, Sqm.


plants at 10 cm spacings
within the row; rows
spaced at 0.25 m
intervals.with large grasses
Grassing

22.60

46.15

(heavy branching type)

180

Planting unrooted stem


cuttings (minimum 3 nodes
of viable stem) of large
stature grasses on slopes,
including supplying sterms
of appropriate grasses,
splitting into separate viable
cuttings, preparing lines,
digging planting hole to a
max of 5 cm depth with
metal rod or wooden peg
depending on nature of soil,
planting cuttings at the
spacing specified, and
subsequent watering (if
necessary)
(i)

16.4

On embankment slopes in
plain areas and fill slopes
<15, cutting at 10 cm
spacings within the row; the
first row is 0.75 m from the
edge of the pavement and
subsequent rows are
spaced at 1 m intervals
down the embankment.

Sqm.

4.80

9.00

(ii) On fill slopes of 15 to 34


and cut slopes upto 45
cuttings at 10 cm spacing
within the row; rows spaced
at 0.5 m intervals.

Sqm.

12.70

19.35

(iii) On cut slopes of 45 to 60,


cutting at 10 cm
spacings within the row;
rows spaced at 0.25 m
intervals. of live brush
Construction

Sqm.

22.60

34.05

layers made with hardwood


cuttings
Planting unrooted hardwod
cuttings (45 to 60 cm in
length and 1.5 to 3.0 cm in
diameter) of appropriate
approved species on slopes,
including final preparation of
cuttings, preparing lines,
digging and forming
trenches to specified
dimensions and constructing
brush layers.

180

(i)

16.5

Rmt.

29.65

102.25

Rmt.

36.70

109.30

On fill and cut slopes < 34,


cutting at 5 cm spacings
within rows, set in
individual vertical
planting holes to 2/3 of
the cutting depth.

Rmt.

18.35

54.65

(ii) On fill and cut slopes 34


to 45, cutting at 5 cm
spacings within rows, set
in individual vertical
planting holes to 2/3 of
the cutting depth.

Rmt.

24.00

60.30

On fill and cut slopes < 34,


cuttings at 5 cm
spacings within
staggered double rows,
set in shallow trenches
cm wide.
(ii) 45
On fill and cut slopes of 34
to 45, cuttings at 5 cm
spacings within
staggered double rows,
set in shallow trenches
45 cm wide.
Construction
of live
pallsades made with
hardwood cuttings
Planting unrooted hardwood
cuttings (45 to 60 cm in
length and 1.5 to 3.0 cm in
diameter) of appropriate
approved species on slopes,
including final preparation of
cuttings, preparing lines,
digging holes to specified
dimensions and forming
palisades.

(i)

16.6

Construction of live fascines


made with hardwood
cuttings
Planting unrooted hardwood
cuttings (2.0 m in length and
3.0 to 8.0 cm in diameter) of
appropriate approved
species on slopes, including
final preparation of cuttings,
preparing lines, digging
trenches to specified
dimensions and forming
fascines.

180

On fill and cut slopes upto


40, 8 cuttings per
running metre tied in
bundles so that the ends
are staggered to give
continuous overlap, set
in trenches 20 cm in
depth
Sub Analysis
Collection of materials for
bio-engineering techniques
that require live woody
cuttings (brush layers,
pallsades and fascines)

16.6

Rmt.

36.70

52.20

Each

0.30

1.50

Each

0.40

3.20

292.95

1,047.75

Collection of hardwood
cuttings from appropriate
approved species, from
sources within 1 km of the
road, including trimming the
sterms and making the
cuttings, and transporting
while wrapped in damp
material
(i)

16.6

16.7

(i)

Hardwood cuttings of 45 to
60 cm in length and 1.5 to
3.0 cm in diameter.
Sub Analysis
Hardwood cuttings of 2.0 m
in length and 3.0 to 8.0 m in
diameter.

Supplying and stacking of


Per
well decayed farm yard
Cum
manure at the site of work
as per instructions by the
Engineeer- in charge. The
Farm yard manure shall be
free from earth stone, brick
bats and other extraneous
stuff. The stacks of F.Y.M.
Should be 50 cm in height
having volume not less then
3.00 cum. The volume of the
stacksshall be reduced by
8% for looseness to arrive at
the net quantity for payment.

180

16.8

Bamboo tree guard 1.80


Each
mtr. Hight with 30 cm dia
with 4 Nos. verticals strips
(length 1.80 mtr. Breadth 30
mm thickness 5mm) further
weaving with different
smaller size of verticals and
circular strips. The weaved
portion should be 125 cm
having 3 rings at the top,
bottom and middle portion.
The first ring should be 55
cm above the 4 thick vertical
strips i/c strengthening with
barbed wire.

30.80

62.55

16.9

Live crivewall fomation


Per
Provinding & fixing one
Rmt.
metre high crib wall aling the
destabilized slopes including
fixing of 1.5 metre long
pegs, 10 metres horizontal
bamboo rooted plants,
hardwood cuttings, watering,
compacting and tyting with
binding wire etc. complete
as per direction of the
Engineer-in Charge

69.30

920.40

180