HPSR 2009 Road Schedule
HPSR 2009 Road Schedule
1.1
Reference to
MORD
Description
Specifications
Labour
Rate
(Rs.)
Through
Rate
(Rs.)
1.2
Unit
Cum
--
43.60
(ii) Loading
of
Earth,
Sand,
Moorum, Manure, Flyash by
manual means including a lead
upto 30 m
Cum
--
21.80
Cum
--
21.80
Cum
--
13.40
Cum
--
31.50
20
Sr.
No.
Reference to
MORD
Description
Specifications
Unit
Labour
Rate
(Rs.)
Through
Rate
(Rs.)
1.3
(ii) Loading
of
Earth,
Sand,
Moorum, Manure, Flyash by
mechanical means including a
lead upto 30 m.Placing tipper at
loading point, loading with front
end loader excluding time for
haulage and return trip.
Cum
--
15.90
Cum
--
4.85
1000 Nos
--
73.30
1000 Nos
--
73.30
Tonne
--
55.30
Tonne
--
55.30
Tonne
--
59.70
Tonne
--
59.70
1.4
1.5
Loading
and
Unloading
of
Structural Steel and Steel Bars by
manual means
(i)
21
Sr.
No.
1.6
Reference to
MORD
Description
Specifications
Unit
Labour
Rate
(Rs.)
Through
Rate
(Rs.)
Loading
and
Unloading
of
Bitumen Drums by Manual Means
(i)
Tonne
--
65.05
Tonne
--
59.25
--
95.90
Tonne
--
95.90
Cum
--
144.15
Cum
--
144.15
RCC P/Pipe --
42.55
1.9
900/1000/1200mm
Hume pipe
dia
22
Sr.
No.
Reference to
MORD
Description
Specifications
Unit
Labour
Rate
(Rs.)
Through
Rate
(Rs.)
P/Pipe --
25.50
P/Pipe --
18.25
175.05
P/Pipe --
109.40
29.00
P/Pipe --
17.40
12.45
145.9
(ii)
(iii) Unloading of RCC Hume Pipe
by manual means including a
lead upto 30m
1.10
Haulage excluding
Unloading
Loading
&
Surface road.
T/Km.
--
2.30
(ii)
T/Km.
--
2.80
T/Km.
--
5.60
P/Pipe --
25.50
Haulage excluding
Unloading
Loading
&
Surface road.
23
Sr.
No.
Reference to
MORD
Description
Specifications
Unit
Labour
Rate
(Rs.)
Through
Rate
(Rs.)
Case-II
(ii)
P/Pipe --
30.70
(iii) Katcha track and track in River P/Pipe -Bed/Nallah bed & Choe bed
61.75
Case-III
Surface road.
P/Pipe --
15.30
P/Pipe --
18.40
(iii) Katcha track and track in River P/Pipe -Bed/Nallah bed & Choe bed
37.05
Case-II
(ii)
Case-III
Surface road.
P/Pipe --
10.95
P/Pipe --
13.15
(iii) Katcha track and track in River P/Pipe -Bed/Nallah bed & Choe bed
24.5
Case-II
(ii)
Case-III
1.12
24
Cum
--
575.50
Sr.
No.
Reference to
MORD
Description
Specifications
1.13
Unit
Through
Rate
(Rs.)
Cum
--
619.55
Cum
--
663.60
Cum
--
363.00
Cum
--
363.00
Cum
--
379.50
Note:
Labour
Rate
(Rs.)
25
Sr.
No.
Reference to
MORD
Description
Specifications
1.14
Unit
1.15
Through
Rate
(Rs.)
Note:
Labour
Rate
(Rs.)
26
Cum
--
432.55
Sr.
No.
Note:
1.16
Reference to
MORD
Description
Specifications
Unit
Labour
Rate
(Rs.)
Through
Rate
(Rs.)
Cum
--
484.40
II
Cum
--
484.40
27
Sr.
No.
Note:
1.17
Reference to
MORD
Description
Specifications
Unit
Through
Rate
(Rs.)
Cum
--
509.85
Cum
--
514.50
100
Labour
Rate
(Rs.)
Setting Out
(i)
Km.
485.60
2346.4
Km.
233.80
1068.25
28
Sr.
No.
Reference to
MORD
Description
Specifications
Unit
29
Labour
Rate
(Rs.)
Through
Rate
(Rs.)
Sr.
No.
Reference to
MORD
Description
Specifications
Unit
30
Labour
Rate
(Rs.)
Through
Rate
(Rs.)
Remarks
31
Remarks
32
Remarks
33
Remarks
34
Remarks
35
Remarks
36
Remarks
37
Remarks
38
Remarks
39
Remarks
40
Remarks
41
Chapter 2
SITE CLEARANCE
Sr.
No.
Reference to
MORD
Specification
2.1
201
Description
Unit
201
(II)
201
Hectare 5,872.70 --
2.3
Through Remarks
Rate
2.2
Labour
Rate
By Manual Means
(A)
22,440.10
(B)
Hectare --
30,198.40
(A)
45,774.70
(B)
55,231.10
By Mechanical Means
31
Hectare --
Sr.
No.
Reference to
MORD
Specification
Description
Unit
Labour
Rate
Through Remarks
Rate
Each
--
117.30
(ii)
Each
--
219.80
(iii)
Each
--
410.50
(iv)
Each
--
762.60
Each
--
1,592.00
Each
--
4,505.35
to
Each
--
129.85
to
Each
--
257.40
to
Each
--
460.60
to
Each
--
837.75
to
Each
--
1,675.50
Each
--
4,714.05
(v)
(vi)
B.
2.4
201
32
Sr.
No.
Reference to
MORD
Specification
Description
A.
Each
--
66.25
(ii)
Each
--
108.95
Each
--
224.45
Each
--
436.95
Each
--
886.45
Each
--
2,515.35
(v)
(vi)
(i)
Each
--
69.15
(ii)
Each
--
119.40
Each
--
237.00
(iv)
Each
--
453.70
(v)
Each
--
907.30
(vi)
Each
--
2,619.70
(iii)
202
Through Remarks
Rate
(i)
(iv)
2.5
Labour
Rate
(iii)
B.
Unit
Dismantling of Structures
Dismantling of existing structures
like culverts, bridges, retaining
walls
and
other
structure
comprising of masonry, cement
concrete, wood work, steel work,
including T&P and scaffolding
wherever necessary, sorting the
dismantled material, disposal of
unserviceable
material
and
stacking the serviceable material
with all lifts and lead of 1000 m as
per Technical Specification Clause
202.
(I) By Manual Means
33
Sr.
No.
Reference to
MORD
Specification
Unit
Labour
Rate
(A)
Lime Concrete
Cum
--
207.60
(B)
Cement Concrete
Cum
--
237.00
Cum
--
538.25
Cum
--
369.85
Cum
--
567.20
Cement Concrete
(B)
2.6
202
Through Remarks
Rate
Description
Reinforced Cement
Concrete
Dismantling Brick/Tile Work
Dismantling of existing structures
like culverts, bridges, retaining
walls
and
other
structures
comprising of brick masonry,
including disposal of unserviceable
material
and
stacking
the
serviceable material with all lift and
lead of 1000 m as per Technical
Specification Clause 202.
2.7
202
(A)
Lime mortar
Cum
--
148.90
(B)
Cement mortar
Cum
--
178.25
(C)
Mud Mortar
Cum
--
137.15
(D)
Cum
--
131.30
Cum
--
160.65
34
Sr.
No.
Reference to
MORD
Specification
Description
Cum
--
178.25
(C)
Cum
--
148.90
(D)
Cum
--
143.00
(E)
Cum
--
137.15
(F)
Cum
--
148.90
Cum
--
312.10
2.9
202
Including dismembering
Tonne
--
636.75
(B)
Excluding dismembering
Tonne
--
466.70
(C)
202
4.30 --
2.11
Through Remarks
Rate
202
202
Labour
Rate
(B)
2.8
2.10
Unit
1000Nos
513.85 --
Cum
206.10 --
35
Sr.
No.
Reference to
MORD
Specification
2.12
2.13
Note:
2.14
Description
Unit
Labour
Rate
202
Sqm
--
202
Through Remarks
Rate
7.20
(A)
Mtre
76.23 --
(B)
Mtre
103.05 --
(C)
Mtre
176.50 --
The
excavation
of
earth,
dismantling of stone masonry work
in head walls and protection works
is not included which is to be
measured and paid separately.
202
Dismantling
of
Flexible
Pavements
Dismantling of flexible pavements
and
disposal
of
dismantled
materials upto a lead of 100 m,
stacking
serviceable
and
unserviceable materials separately
as per Technical Specification
Clause 202
(I)
By Manual Means
(A)
(II)
Bituminous Courses
Cum
--
378.85
Cum
--
284.60
(A)
Cum
--
209.30
Bituminous Courses
36
Sr.
No.
Reference to
MORD
Specification
2.15
202
Through Remarks
Rate
Unit
Labour
Rate
Cum
--
1,516.35
Dismantling guard rails by manual Running -means and disposal of dismantled metre
material with all lifts and upto a lead
of 1000 m, stacking serviceable
materials
and
unserviceable
materials
separately
as
per
Technical Specification Clause 202.
42.90
Description
Dismantling of Cement Concrete
Pavements as per Technical
Specification Clause 202.
Dismantling of cement concrete
pavements by mechanical means
using pneumatic tools breaking to
pieces not exceeding 0.02 cum in
volume and stock piling at
designated locations and disposal
of dismantled materials upto a lead
of 1000 m, stacking serviceable
and
unserviceable
materials
separately
2.17
202
202
2.18
2.19
202
202
37
10.55
15.90
Sr.
No.
Reference to
MORD
Specification
Description
Unit
Labour
Rate
Through Remarks
Rate
2.20
2.21
202
202
(A)
5th km Stone
Each
--
172.75
(B)
Ordinary km Stones
Each
--
106.80
(C)
200 m Stones
Each
--
23.05
(D)
Boundary Pillar
Cum
--
23.05
Dismantling
of
barbed
wire Running -fencing / wire mesh fencing metre
including
posts,
foundation
concrete, backfilling of pit by
manual means including disposal of
dismantled material with all lifts and
upto a lead of 1000 m, stacking
serviceable
material
and
unserviceable material separately
as per Technical Specification
Clause 202.
21.40
Dismantling of Fencing
202
38
72.55
Sr.
No.
Reference to
MORD
Specification
Description
Unit
Labour
Rate
Removal of cement concrete pipe Running -of sewer gutter 1500 mm dia under metre
the supervision of concerned
department including disposal with
all lifts and upto a lead of 1000 m
and stacking of serviceable and
unserviceable material separately
but excluding earth excavation and
dismantling of masonry works as
per Technical Specification Clause
202.
Through Remarks
Rate
88.15
202
Removal of Telephone/Electric
Poles and Lines
Removal of telephone/electric poles
with wires including excavation and
dismantling of foundation concrete
and lines under the supervision of
concerned department, disposal
with all lifts and upto a lead of 1000
m and stacking the serviceable and
unserviceable material separately
as per Technical Specification
Clause 202.
39
Each
--
85.25
Chapter 3
EARTHWORK, EROSION CONTROL AND DRAINAGE
Sr.
No.
Reference to
MORD
Description
Specification
3.1
Unit
Labour Through
Rate
Rate
Sqm.
--
12.15
Sqm
--
6.60
Cum
--
56.65
3.3
301.5
Construction of Embankment
with Material Obtained from
Roadway Cutting
Construction of embankment with
approved materials deposited at
site from roadway cutting and
excavation
from
drain
and
foundation of other structures
graded and compacted to meet
requirement of Tables 300.1 and
300.2
as
per
Technical
Specification Clause 301.5
41
Sr.
No.
Reference to
MORD
Description
Specification
Unit
Labour Through
Rate
Rate
301.5
Construction of Embankment
with Material Obtained from
Borrow Pits
Construction of embankment with
approved material obtained from
borrow pits with a lift upto 1.5 m,
transporting to site, spreading,
grading to required slope and
compacting to meet requirement of
Tables 300.1 and 300.2 with a lead
upto 1000 m as per Technical
Specification Clause 301.5
3.5
302
(i)
--
178.10
Excavation in Cutting in
Soil by manual means with
lead upto 50 m
Excavation for roadway in
soil using manual means for
carrying of cut earth to
embankment site with a lift
upto 1.5 m and lead upto 50
m
as
per
Technical
Specification Clause 302.3
(ii)
Cum
Cum
55.10 --
42
Cum
--
46.40
Sr.
No.
Reference to
MORD
Description
Specification
(iii)
Unit
3.6
302.3.6
302.3.11
Cum
--
28.00
Cum
--
41.50
Cum
--
28.00
3.7
Labour Through
Rate
Rate
43
Sr.
No.
Reference to
MORD
Description
Specification
Unit
Labour Through
Rate
Rate
302.3.5
(i)
(ii)
(iii)
Excavation in ordinary
Rock by manual means
Excavation in ordinary rock
using
manual
means
including loading in a truck
and carrying of excavated
material to embankment site
with a lift upto 1.5 m and
lead upto 50 m as per
Technical
Excavation
inSpecification
Ordinary
Clausewith
302.3.5.
Rock
Dozer with lead
upto 100 m
Cum
Cum
Excavation in Ordinary
Rock
using Hydraulic
Excavator
and Tippers
with disposal upto 1000 m
44
85.65
--
--
48.85
Sr.
No.
Reference to
MORD
Description
Specification
Unit
3.9
302.3.5
(i)
Cum
--
49.75
Cum
--
198.50
Note:
Labour Through
Rate
Rate
45
Sr.
No.
Reference to
MORD
Description
Specification
(ii)
Unit
Labour Through
Rate
Rate
(A)
Note:
Manual Means
Note:
46
Cum
--
515.15
Cum
--
322.70
Sr.
No.
Reference to
MORD
Description
Specification
Unit
3.10
302.3.2
3.11
302.3.2
47
Labour Through
Rate
Rate
Cum
--
219.90
Cum
--
95.80
Sr.
No.
Reference to
MORD
Description
Specification
Unit
3.12
309
310
3.15
303.1
301.4
--
93.70
Sqm
--
50.30
Sqm
--
144.60
Cum
--
170.10
3.14
Cum
3.13
Labour Through
Rate
Rate
48
Sr.
No.
Reference to
MORD
Description
Specification
(i)
Unit
Compacting
ground
embankment
original
supporting
303
(ii)
Compacting
ground
subgrade
3.17
301.5.5.1
304.3
Rock
Cum
--
15.70
Cum
--
47.45
original
supporting
Labour Through
Rate
Rate
Excavation
49
Sqm
1.10
Sr.
No.
Reference to
MORD
Description
Specification
Unit
Labour Through
Rate
Rate
Sqm
--
124.85
Cum
--
133.10
306
Construction of Embankment
with Flyash/Pond ash available
from Coal or Lignite Burning
Thermal
Plants
as
Waste
Material
Construction of embankment with
flyash conforming to Table 1 of
IRC:SP:58 obtained from coal or
lignite burning thermal power
stations as waste material, spread
and compacted in layer of 200 mm
thickness each at OMC, all as
specified in IRC:SP:58 and as per
approved plans with lead upto
1000 m as per Technical
Specification Clause 306.
Note:
50
Sr.
No.
3.19
Reference to
MORD
Description
Specification
307
(i)
Unit
Labour Through
Rate
Rate
Manual Means
Metre
29.40
--
--
9.00
(A)
(iii)
Metre
Manual Means
Metre
Metre
Surface
Rock
(A)
Drains
in
--
20.65
Hard
Manual Means
Metre
Metre
51
44.05 --
31.20 ---
50.00
Sr.
No.
3.20
Reference to
MORD
Description
Specification
307
Unit
Labour Through
Rate
Rate
Chute Drains
A.
Providing
chute
drains
across embankment slopes
in approches of bridges and
on horizontal curves as per
drawings.
Metre
1,132.70 6,894.40
Providing
chute
drains
across embankment slopes
in approches of bridges and
on horizontal curves as per
drawings.
Metre
1,347.25 6,080.90
52
ND DRAINAGE
Remarks
53
Remarks
54
Remarks
55
Remarks
56
Remarks
57
Remarks
58
Remarks
59
Remarks
60
Remarks
61
Remarks
62
Remarks
63
Remarks
64
Chapter 4
GRANULAR SUB-BASES, BASES (NON-BITUMINOUS) AND SHOULDERS
Sr.
No.
Reference to
MORD
Specifications
4.1
401
Description
Unit
Labour Through
Rate
Rate
Cum --
824.60
(ii)
Cum --
802.80
Cum --
781.00
(B)
Cum --
847.00
(ii)
Cum --
831.15
Cum --
797.70
53
Sr.
No.
Reference to
MORD
Specifications
4.2
402
Description
i)
Unit
Labour Through
Rate
Rate
Gravel/Soil-Aggregate Base
(Table 400.2) Grading A
Construction
of
gravel/soil- Cum -aggregate base by providing
well graded material, spreading
in uniform layers with Tractor
mount grader on prepared
surface, mixing by mix in place
method with rotavator at OMC,
and compacting with three wheel
80-100 kN static roller to achieve
the desired density, complete as
per
Technical
Specifications
Clause 402
ii)
Gravel/Soil-Aggregate Base
(Table 400.2) Grading B
Construction of granular sub- Cum -base by providing well graded
material, spreading in uniform
layers with Tractor mount grader
on prepared surface, mixing by
mix in place method with
rotavator
at OMC, and
compacting with three wheel 80100 kN static roller capacity to
achieve the
desired density,
complete as per Technical
Specification Clause 402
iii)
830.90
823.60
Gravel/Soil-Aggregate Base
(Table 400.2) Grading C
Construction of granular sub- Cum -base by providing well graded
material, spreading in uniform
layers with Tractor mount grader
on prepared surface, mixing by
mix in place method with
rotavator
at OMC, and
compacting with three wheel 80100 kN static roller capacity to
achieve the
desired density,
complete as per Technical
Specification Clause 402
54
816.35
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
Labour Through
Rate
Rate
iv)
Cum
729.20
v)
Cum
758.30
Cum
787.30
vi)
55
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
Labour Through
Rate
Rate
4.3
403 (i)
Gravel/Soil-Aggregate
Course (Table 400.3)
Surface
Construction of granular surface course Cum -by providing well graded material,
spreading in uniform layers with Tractor
mount grader on prepared surface,
mixing by mix in place method with
rotavator at OMC, and compacting
with three wheel 80-100 kN static roller
capacity to achieve the
desired
density, complete as per Technical
Specification Clause 402
ii)
56
Cum
794.60
816.35
Sr.
No.
Reference to
MORD
Specifications
iii)
Description
Unit
Labour Through
Rate
Rate
Cum
830.90
4.4
402
Lime Stabilisation
Subgrade
for
Improving
By Manual Means
Cum --
310.80
(B)
By Mechanical Means
Cum --
327.05
57
Sr.
No.
Reference to
MORD
Specifications
4.5
403
Description
Unit
Labour Through
Rate
Rate
622.00
404
405
Water Bound
base/base
1)
Macadam
528.85
Sub-
WBM Grading 1
Providing, laying, spreading and
compacting stone aggregates of
specific sizes to water bound
macadam specification including
spreading in uniform thickness,
hand packing, rolling with three
wheel 80-100 kN static roller in
stages to proper grade and
camber, applying and brooming,
stone screening/binding materials
to fill-up the interstices of coarse
aggregate,
watering
and
compacting to the required
density Grading 1 as per
Technical Specification Clause
405.
(A)
By Manual Means
58
Cum --
957.75
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
Labour Through
Rate
Rate
Cum --
894.55
By Manual Means
Cum --
1,015.70
Cum --
952.50
By Manual Means
Cum --
995.50
Cum --
932.30
WBM Grading 2
Providing, laying, spreading and
compacting stone aggregates of
specific sizes to water bound
macadam specification including
spreading in uniform thickness,
hand packing, rolling with smooth
wheel roller 80-100 kN in stages
to proper grade and camber,
applying and brooming, stone
screening/binding materials to fillup the interstices of coarse
aggregate,
watering
and
compacting to the required
density grading 2 as per
Technical Specification Clause
405.
(A)
WBM Grading 3
Providing, laying, spreading and
compacting stone aggregates of
specific sizes to water bound
macadam specification including
spreading in uniform thickness,
hand packing, rolling with smooth
wheel roller 80-100 kN in stages
to proper grade and camber,
applying and brooming, stone
screening to fill-up the interstices
of coarse aggregate, watering
and compacting to the required
density Grading 3 as per
Technical Specification Clause
405.
(A)
4.8
405
Water
Bound
Macadam
Crushable Screenings
59
with
Sr.
No.
Reference to
MORD
Specifications
Description
1)
Unit
Labour Through
Rate
Rate
WBM Grading 1
Providing, laying, spreading and
compacting stone aggregates of
specific sizes to water bound
macadam specification including
spreading in uniform thickness,
hand packing, rolling with three
wheel 80-100 kN static roller in
stages to proper grade and
camber, applying and brooming,
crushable screening to fill-up the
interstices of coarse aggregate,
watering and compacting to the
required density Grading 1 as per
Technical Specification Clause
405.
(A)
2)
By Manual Means
Cum --
893.70
Cum --
830.55
By Manual Means
Cum --
947.90
Cum --
884.75
WBM Grading 2
Providing, laying, spreading and
compacting stone aggregates of
specific sizes to water bound
macadam specification including
spreading in uniform thickness,
hand packing, rolling with three
wheel 80-100 kN static roller in
stages to proper grade and
camber, applying and brooming,
crushable screening to fill-up the
interstices of coarse aggregate,
watering and compacting to the
required density Grading 2 as per
Technical Specification Clause
405.
(A)
3)
WBM Grading 3
60
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
Labour Through
Rate
Rate
(A)
4.9
406
By Manual Means
Cum --
962.55
Cum --
899.40
861.65
4.10
407
Earthen Shoulders
61
Sr.
No.
4.11
4.12
Reference to
MORD
Specifications
408
408
Description
B.
Hard Shoulders
C.
Paved Shoulders
Unit
Labour Through
Rate
Rate
Granular
sub-base/base/surface
course with local materials (Table
400.13) by mix in place method
normal Construction of granular
sub-base by providing local material
spreading in uniform layers with
motor grader on prepared surface,
mixing by mix in place method with
rotavator at once and compacting
with smooth wheel roller to achieve
the desired density complete as per
Clause 401.4 as per Technical
Specification Clause 408.
(i)
Cum --
429.40
(ii)
Cum --
428.40
Construction
of
Water
Bound
Macadam
using locally available
material (Table 400.13)
62
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
Labour Through
Rate
Rate
4.13
409
Note:
441.50
63
593.00
Sr.
No.
4.14
Reference to
MORD
Specifications
Description
Unit
410
Construction of Sub-base/Course
Using Crushed Slag as per Table
400.19
Labour Through
Rate
Rate
4.16
410
410
64
461.60
589.00
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
Labour Through
Rate
Rate
Providing
laying
and
spreading Cum -granulated blast furnace slag on a
prepared sub-grade pulverising adding
the designed quantitity of cement to the
spread granulated blast furnace slag
mixing in place with rotavator grading
with the mortar grader and compacting
with smooth wheel roller 80-100 kN at
OMC
to
achieve
the
desired
unconfined compressive strength and
to form a layer of sub-base/base as per
Technical Specification Clauses 404.3
and 410.4.2.
Note: (i)
(ii)
4.17
411
512.30
By mix-in-place method
(i)
(ii)
B)
4.18
412
804.05
910.55
998.10
(ii)
1,011.10
Brick Soling
65
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
Labour Through
Rate
Rate
Laying brick soling layer on prepared Sqm -sub-grade with brick on end edging
according to lines, graded and crosssection shown on the drawing filling
joints with sand and earth, spreading
25 mm thick layer of earth over brick
soling, watering and rolliing the same
with three wheel road roller 80-100 kN
as per Technical Specification Clause
412
4.19
413
260.75
66
218.30
67
Remarks
68
Remarks
69
Remarks
70
Remarks
71
Remarks
72
Remarks
73
Remarks
74
Remarks
The rate as
applicable for
sub-grade
construction
may
be
adopted.
75
Remarks
Rate
as
applicable for
sub-base
and/or
base
may
be
adopted as per
approved
design.
The
rates
may
be
adopted
as
applicable for
different
layers
of
pavement
depending
upon
approved
design
of
paved
shoulders.
76
Remarks
77
Remarks
78
Remarks
79
Remarks
80
Chapter 5
BASES AND SURFACE COURSES (BITUMINOUS)
Sr.
No.
Reference of
MORD
Specifications
5.1
502
Description
Unit
Labour Through
Rate
Rate
Prime Coat
(i)
Low porosity
Providing and applying primer coat with Sqm. -bitumen emulsion (SS-1) on prepared
surface of granular base including
cleaning of road surface and spraying
primer at the rate of 0.70-1.0 kg/sqm
using mechanical means as per
Technical Specification Clause 502
(ii)
Medium porosity
Providing and applying primer coat with Sqm. -Bitumen emulsion (SS-1) on prepared
surface of granular base including
cleaning of road surface and spraying
primer at the rate of 0.90- 1.2 kg/sqm
using mechanical means as per
Technical Specification Clause 502.
(iii)
503
42.10
High porosity
Providing and applying primer coat with Sqm. -Bitumen emulsion (SS-1) on prepared
surface of granular base including
cleaning of road surface and spraying
primer at the rate of 1.2-1.5 kg/sqm
using mechanical means as per
Technical Specification Clause 502.
5.2
34.25
53.90
Tack Coat
(i)
(ii)
Providing and applying tack coat with Sqm. -Bitumen emulsion (RS-1) using emulsion
distributor at the rate of 0.20 to 0.25 kg
per sqm on the prepared bituminous
surface cleaned with Hydraulic broom as
per Technical Specification Clause 503.
10.20
Providing and applying tack coat with Sqm. -Bitumen emulsion (RS-1)
using
emulsion distributor at the rate of 0.25 to
0.30 kg per sqm on the prepared dry and
hungry bituminous surface cleaned with
Hydraulic broom as per Technical
Specification Clause 503.
12.25
68
Remarks
Sr.
No.
Reference of
MORD
Specifications
Description
Unit
(iii)
Providing and applying tack coat with Sqm. -Bitumen emulsion (RS-1)
using
emulsion distributor at the rate of 0.25 to
0.30 kg per sqm on the prepared
granular surfaces treated with primer &
cleaned with Hydraulic broom as per
Technical Specification Clause 503.
12.25
(iv)
Providing and applying tack coat with Sqm. -Bitumen emulsion (RS-1)
using
emulsion pressure distributor at the rate
of 0.30 to 0.35 kg per sqm on the
prepared
non-bituminous
surfaces
(cement concrete pavement) cleaned
with Hydraulic broom as per Technical
Specification Clause 503.
14.30
Note: (i)
(ii)
5.3
504
Labour Through
Rate
Rate
Bituminous Macadam
Providing and laying bituminous macadam with Cum -hot mix plant using crushed aggregates of
grading as per Table 500.4 premixed with
bituminous binder, transported to site upto a
lead of 1000 m laid over a previously prepared
surface with paver finisher to the required
grade, level and alignment and rolled to
achieve the desired compaction as per
Technical Specification Clause 504.
Note:
69
5,882.75
Remarks
Sr.
No.
5.4
Reference of
MORD
Specifications
Description
Unit
505
Labour Through
Rate
Rate
(B)
By Manual Means
(I) Bitumen (S-90)
Sqm --
259.90
Sqm --
263.30
By Mechanical Means
Sqm --
236.80
Sqm --
138.10
Sqm --
165.50
Sqm --
167.70
506
5.6
507
(A)
50 mm thick
(B)
75 mm thick
Surface
Dressing
using
Bituminous
(Penetrations grade / modified bitumen)
Binder
70
Remarks
Sr.
No.
Reference of
MORD
Specifications
Description
Unit
Labour Through
Rate
Rate
By Manual Means
(i)
Bitumen (S-90)
Sqm --
73.35
(II)
Bitumen (S-65)
Sqm --
74.50
Sqm --
77.05
Sqm --
76.90
(V)
Sqm --
76.90
(ii)
(I)
Bitumen (S-90)
Sqm --
65.10
(II)
Bitumen (S-65)
Sqm --
66.10
Sqm --
68.45
Sqm --
68.30
(V)
Sqm --
68.30
(B)
By Mechanical Means
(i)
(ii)
(I)
Bitumen (S-90)
Sqm --
65.25
(II)
Bitumen (S-65)
Sqm --
66.40
Sqm --
69.00
Sqm --
68.80
(V)
Sqm --
68.80
Sqm --
58.60
Bitumen (S-90)
71
Remarks
Sr.
No.
Reference of
MORD
Specifications
Description
(II)
5.7
507
Unit
Bitumen (S-65)
Labour Through
Rate
Rate
Sqm --
59.65
Sqm --
62.00
Sqm --
61.80
(V)
Sqm --
61.90
Sqm --
79.25
Sqm --
72.40
Sqm --
71.95
Sqm --
66.55
(A)
(B)
By Manual Means
By Mechanical Means
Note: Where the proposed aggregate fails to pass the stripping value
test, an approved adhesion agent may be added to the binder
as per Clause 507.24. Alternatively, chips may be pre-coated as
per Clause 507.25.
5.8
507.2.5
Pre-coating Chips
Pre-coating of chips with 1 per cent of paving
bitumen by weight of chips in a suitable mixer
duly heated to 160 degree C as per Technical
Specification Clause 507.2.5
5.9
508
(I)
Bitumen (S-90)
Cum --
1,479.50
(II)
Bitumen (S-65)
Cum --
1,497.60
72
Remarks
Sr.
No.
Reference of
MORD
Specifications
Description
Unit
Labour Through
Rate
Rate
Bitumen (S-90)
Sqm --
125.20
(II)
Bitumen (S-65)
Sqm --
126.80
(III)
Sqm --
130.60
(IV)
Sqm --
130.30
(V)
Sqm --
130.40
By Mechanical Means
5.10
508.2
5.11
509
(I)
Bitumen (S-90)
Sqm --
118.20
(II)
Bitumen (S-65)
Sqm --
119.85
(III)
Sqm --
123.60
(IV)
Sqm --
123.30
(V)
Sqm --
123.40
20 mm thick Open Graded Premix Carpet Sqm -using Bitumen Emulsion as per Technical
Specification Clause 508.2
108.10
73
Remarks
Sr.
No.
Reference of
MORD
Specifications
Description
Unit
Labour Through
Rate
Rate
(A)
By Manual Means
(i)
Type A
(I)
Bitumen (S-90)
Sqm --
180.05
(II)
Bitumen (S-65)
Sqm --
182.55
(III)
Sqm --
188.20
(IV)
Sqm --
187.80
(V)
Sqm --
187.95
(ii)
Type B
(I)
Bitumen (S-90)
Sqm --
164.10
(II)
Bitumen (S-65)
Sqm --
166.25
(III)
Sqm --
171.15
(IV)
Sqm --
170.80
(V)
Sqm --
170.90
(B)
By Mechanical Means
(i)
Type A
(I)
Bitumen (S-90)
Sqm --
161.20
(II)
Bitumen (S-65)
Sqm --
163.70
(III)
Sqm --
169.40
(IV)
Sqm --
169.00
(V)
Sqm --
169.10
74
Remarks
Sr.
No.
Reference of
MORD
Specifications
Description
(ii)
5.12
510
Unit
Labour Through
Rate
Rate
Type B
(I)
Bitumen (S-90)
Sqm --
145.30
(II)
Bitumen (S-65)
Sqm --
147.45
(III)
Sqm --
152.30
(IV)
Sqm --
152.00
(V)
Sqm --
153.00
Seal Coat
Providing and laying seal coat sealing the
voids in a bituminous surface laid to the
specified levels, grade and cross fall using
Type A, Type B and Type C as per Technical
Specification Clause 510
A.
By Manual Means
I : Type A
(I)
Bitumen (S-90)
Sqm --
62.90
(II)
Bitumen (S-65)
Sqm --
64.00
(III)
Sqm --
66.55
(IV)
Sqm --
66.55
(V)
Sqm --
66.40
II : Type B
(I)
Bitumen (S-90)
Sqm --
47.30
(II)
Bitumen (S-65)
Sqm --
48.10
(III)
Sqm --
49.80
(IV)
Sqm --
49.70
(V)
Sqm --
49.70
III : Type C
(I)
(II)
Bitumen (S-90)
Bitumen (S-65)
Sqm -Sqm --
46.70
47.45
(III)
Sqm --
49.10
(IV)
Sqm --
49.00
(V)
Sqm --
49.00
75
Remarks
Sr.
No.
Reference of
MORD
Specifications
Description
Unit
Labour Through
Rate
Rate
By Mechanical Means
I : Type A
(I)
Bitumen (S-90)
Sqm --
62.90
(II)
Bitumen (S-65)
Sqm --
64.00
(III)
Sqm --
66.55
(IV)
Sqm --
66.35
(V)
Sqm --
66.40
II : Type B
(I)
Bitumen (S-90)
Sqm --
45.90
(II)
Bitumen (S-65)
Sqm --
46.70
(III)
Sqm --
48.40
(IV)
Sqm --
48.30
(V)
Sqm --
48.30
Note: Since seal coat is required to be provided over the premix carpet
on the same day, out of the 6 working hours of the HMP, 4.00
hours are proposed to be utilised for the premix carpet and the
balance 2.00 hours have been considered for this case.
III : Type C
(I)
(II)
Bitumen (S-90)
Bitumen (S-65)
Sqm -Sqm --
45.30
46.10
(III)
Sqm --
47.75
47.60
47.65
5.13
511
(i)
76
176.20
575.50
Remarks
Sr.
No.
Reference of
MORD
Specifications
Description
Unit
Labour Through
Rate
Rate
(ii)
220.25
619.55
(iii)
264.30
663.60
77
Remarks
Chapter 6
CEMENT CONCRETE PAVEMENT
Sr.
No.
Reference to
MORD
Specifications
6.1
400
Description
6.3
400
824.60
622.00
By Manual Means
As per item
Chapter 4
(B)
No.4.7
of Cum --
957.75
of Cum --
894.55
By Mechnical Means
As per item
Chapter 4
1500
Through
Rate
Cum --
(A)
6.4
Labour
Rate
Granual Sub-base
As item No.4.1 of Chapter 4
6.2
Unit
No.4.7
78
Sr.
No.
Reference to
MORD
Specifications
Description
(A)
6.5
1500
Unit
Construction
of
un- Cum
reinforced, dowel jointed at
expansion and construction
joint only, plain cement
concrete
pavement,
thickness as per design,
over a prepared sub base,
with 43 grade cement or any
other type as per Clause
1501.2.2
M30
(Grade),
coarse and fine aggregates
conforming
to
IS:383,
maximum size of coarse
aggregate not exceeding 25
mm, mixed in a concrete
mixer of not less than 0.2
cum
capacity
and
appropriate weigh batcher
using approved mix design,
laid in approved fixed side
formwork (steel channel,
laying and fixing of 125
micron thick polythene film,
wedges,
steel
plates
including
levelling
the
formwork as per drawing),
spreading the concrete with
shovels, rakes, compacted
needle,Concrete
screed Pavement
and
Rollerusing
Compacted
plate vibrators and finished
in continuous operation
including
provision
of
contraction and expansion,
construction joints, applying
debonding strips, primer,
sealant, dowel bars, near
approaches to bridge/culvert
and
construction
joints,
admixtures as approved,
curing of concrete slabs for
14days
using
curing
compound (where specified)
and water finishing lines and
grade as per drawing and
Technical
specification
clause 1501
79
Labour
Rate
353.50
Through
Rate
4,526.40
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
Labour
Rate
Through
Rate
322.30
3,441.45
67.55
363.35
1500
Rectangular
Pavement
Concrete
Block
i.
ii.
80
Sr.
No.
Reference to
MORD
Specifications
6.7
1500
Description
Unit
Labour
Rate
Note:
6.8
i.
ii.
iii.
81
--
Through
Rate
18.10
589.10
15.95
493.25
341.70
MENT
Remarks
82
Remarks
83
Remarks
84
Remarks
85
Chapter 7
CAUSEWAY AND SUBMERSIBLE BRIDGES
Sr.
No.
Reference to
MORD
Specification
Description
Unit
Labour
Rate
Through
Rate
Remarks
(ii)
(v)
300
400
400
1500
822.55
2,503.00
23.80
223.00
cum --
47.45
cum --
765.65
cum --
894.55
7.5
3,221.45
Granular Sub-base
Rate as per item No.4.1 of Chapter 4
7.4
551.80
Preparation of Subgrade
Rate as per item No.3.15(ii) of Chapter
3
7.3
2,997.70
346.10
(iv)
128.15
(iii)
128.15
83
Sr.
No.
Reference to
MORD
Specification
Unit
Labour
Rate
cum
353.50
4,525.70
210.10
665.50
125.15
1,458.40
353.00
3,057.65
Cum
128.15
128.15
Cum
346.10
2,997.70
Description
(ii)
Providing
and
Laying
of
Boulder Apron Laid in Wire
Crates as per Drawing and
Technnical
Specification
Clause 1301
Rate as per item No.14.2 of cum
Chapter 14
(iii)
7.7
Through
Rate
Remarks
(ii)
(iii)
(iv)
Sqm
84
21.40
60.45
Sr.
No.
7.8
Reference to
MORD
Specification
Description
Labour
Rate
Through
Rate
Remarks
cum
346.10
2,997.70
cum
47.75
522.95
47.90
3,703.50
47.90
3,945.50
47.90
2,275.65
(ii)
7.9
Unit
85
Chapter 8
HILL ROADS
Sr.
No.
Reference to
MORD
Specifications
8.1
200
Site Clearance
8.2
1600
Setting Out
Description
Unit
(1)
1,346.15
3,753.10
(2)
5,261.60
14,871.60
(3)
131.40
370.30
(ii)
Through
Rate
Remarks
Rate
taken
from
Chapter
2
Note: (i)
8.3
Labour
Rate
87
Sr.
No.
Reference to
MORD
Specifications
Description
(ii)
(iii)
Unit
Labour
Rate
A)
73.40 --
B)
Extra
for
Every Cum
Additional Lift of 1.5 m
or Part thereof
7.80 --
Through
Rate
Remarks
B)
Extra
for
Every Cum
Additional Lift of 1.5 m
or Part thereof
88
11.30
7.80 --
84.95
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
A)
161.50 --
B)
Extra
for
Every Cum
Additional Lift of 1.5 m
or Part thereof
12.15 --
Note: (i)
(ii)
(iii)
Labour
Rate
Through
Rate
Remarks
89
22.20
134.45
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
Note: (i)
(ii)
Note:
Labour
Rate
Through
Rate
Remarks
Excavation
in
hilly Cum
areas in hard rock
requiring blasting, by
mechanical means, lift
upto
1.5
m
and
disposal of excavated
rock upto a lead of 20
m as per Clause
1603.2.
31.60
B)
Extra
for
Every Cum
Additional Lift of 1.5 m
or Part thereof
15.25 --
(1)
(2)
90
212.55
Sr.
No.
Reference to
MORD
Specifications
(3)
8.4
Description
Unit
Labour
Rate
Through
Rate
Remarks
(ii)
(iii)
Earthwork in excavation
for structures
Rate as per item No.11.1 of cum
Chapter 11
Plain cement concrete M
10 grade
128.15
128.15
346.10
2,928.35
729.05
2,219.30
25.80
36.95
23.80
223.00
167.90
563.90
(iv)
Pointing
with
mortar 1:3
cement
Providing P.C.C. M 20
architectural coping on
top
of
retaining
wall/breast wall
Rate as per item No.12.17 Metre
of Chapter 12
(vi)
Filter
material
behind
retaining wall / breast wall
as
per
Specification
1204.3.8 in a width of 600
m
Rate as per item No. 12.15 cum
of Chapter 12
91
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
Labour
Rate
Through
Rate
Remarks
(vii) Back
filling
behind
retaining wall/breast wall
Rate as per item No. 12.14 cum
of Chapter 12
Note:
8.5
164.50
481.30
128.15
128.15
346.10
2,928.35
729.05
2,219.30
346.10
2,997.70
Earthwork in excavation
for structures as per
drawing and technical
specification
Rate as per item No.11.1 of Cum
Chapter 11
(ii)
Plain cement
M10 grade
concrete
(iv)
Plain cement
M15 grade
concrete
92
Sr.
No.
Reference to
MORD
Specifications
Description
(v)
Unit
Note:
8.6
Through
Rate
Remarks
Cement plaster 15 mm
thick
1:4
on
stone
masonry
Rate as per item No.12.3 of Sqm
Chapter 12
(vi)
Labour
Rate
Providing
P.C.C.
M20
architectural coping on
top of wall
Rate as per item No.12.17
Metre
of Chapter 12
1600, 300,
700 & 800
35.30
104.25
23.80
223.00
128.15
128.15
346.10
2,928.35
729.05
2,219.30
Construction
of
catch
water/intercepting drain in random
rubble masonry in 1:5 cement
mortar true to the specified lines
grades levels and dimensions as
per the requirement of the
specifications Clause 1606.2
(i)
Earthwork in excavation
for structures as per
drawing and technical
specification
Rate as per item No.11.1 of Cum
Chapter 11
(ii)
Plain cement
M10 grade
concrete
(iv)
Plain cement
M15 grade
concrete
93
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
Providing P.C.C. M
architectural coping
top of wall
346.10
2,997.70
35.30
104.25
23.80
223.00
20
on
Through
Rate
Remarks
Cement plaster 15 mm
thick
1:4
on
stone
masonry
Rate as per item No. 12.3 of Sqm
Chapter 12
(vi)
Labour
Rate
Note:
(i)
2,456.20
2,456.20
(ii)
3,048.80
6,650.60
(iii)
491.30
24,721.50
(iv)
73.40
799.40
94
Sr.
No.
Reference to
MORD
Specifications
3
8.8
Description
Unit
Labour
Rate
Through
Rate
Remarks
(i)
128.15
128.15
346.10
2,997.70
1,444.60
64,210.60
Sqm
21.40
60.45
27.10
113.80
(ii)
(iii)
(iv)
Tonne
Painting
two
coats
including prime coat on
new concrete surface
Rate as per item No.10.5
1600
8.10
95
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
Labour
Rate
Through
Rate
Remarks
5.90
38.10
9.20
146.65
8.12
0.45
0.45
8.13
8.11
96
0.55
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
Labour
Rate
Through
Rate
Remarks
8.14
71.80
484.20
8.15
71.80
478.00
8.16
9.70
61.60
8.17
15.70
86.90
8.18
18.70
78.60
97
Sr.
No.
8.19
Reference to
MORD
Specifications
Description
Unit
98
Labour
Rate
25.90
Through
Rate
Remarks
115.20
Chapter 9
PIPE CULVERTS
Sr.
No.
Reference to
MORD
Specifications
9.1
Description
Unit
Through
Rate
Remarks
9.2
Labour
Rate
128.15
128.15
Cum
346.10
2,997.70
Cum
47.75
522.95
Type A (Concrete
Bedding
Cradle)
Laying
concrete
cradle
bedding with M.15 Grade
Cement concrete as
per
clause 1105(I)
Rate as per item No.11.4(II)
(ii)
9.3
11100
99
Rate as
applicable
for
the
type
of
soil/rock
are to be
taken
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
Labour
Rate
Through
Rate
Remarks
9.4
9.5
1200mm dia
Metre
76.15
3,013.70
1000mm dia
Metre
47.70
2,275.70
900mm dia
Metre
38.25
1,975.70
750mm dia
Metre
28.65
1,254.05
600mm dia
Metre
22.90
933.70
1100
1100
Providing
and
laying
reinforced cement concrete
pipe NP2 for culverts on first
class bedding of granular
material in double row
including fixing collar with
cement mortar 1:2 but
excluding
excavation,
protection work, back filling,
concrete and masonary work
in head walls and parapets
clause 1106.
1200mmdia
Metre
182.80
6,058.40
1000mm dia
Metre
114.95
4,569.70
900mm dia
Metre
92.00
3,966.90
750mmdia
Metre
57.50
2,507.90
600mm dia
Metre
47.50
1,868.70
100
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
Labour
Rate
Through
Rate
Remarks
9.6
1100
1200 mm dia
Metre
76.15
4,005.90
1000 mm dia
Metre
47.90
3,703.50
900mm dia
Metre
38.25
3,088.90
750 mm dia
Metre
28.65
2,312.80
600mm dia
Metre
22.90
1,792.80
1200 mm dia
Metre
76.15
4,731.90
1000 mm dia
Metre
47.90
3,945.50
900mm dia
Metre
38.25
3,572.90
750mm dia
Metre
28.65
2,948.05
600 mm dia
Metre
22.90
2,458.10
101
Sr.
No.
Reference to
MORD
Specifications
9.7
1100
Description
Unit
Labour
Rate
Through
Rate
Remarks
9.8
1100
1200 mm dia
Metre
182.80
8,042.80
1000 mm dia
Metre
114.95
7,426.25
900mm dia
Metre
92.00
6,193.35
750mm dia
Metre
57.50
4,625.40
600mm dia
Metre
47.50
3,586.90
1200 mm dia
Metre
182.80
9,494.80
1000 mm dia
Metre
114.95
7,910.25
900 mm dia
Metre
92.00
7,161.30
750mmdia
Metre
57.50
5,895.90
600mm dia
Metre
47.50
4,917.90
102
Sr.
No.
Reference to
MORD
Specifications
9.9
1100
9.10
9.11
1100
1100
Description
Unit
Labour
Rate
Through
Rate
Remarks
500 mm dia
Metre
21.45
756.30
300mm dia
Metre
17.20
510.10
500 mm dia
Metre
21.45
1,482.30
300mm dia
Metre
17.20
873.10
(A)
500 mm dia
Metre
21.45
2,087.30
(B)
300mm dia
Metre
17.20
1,236.10
103
Sr.
No.
Reference to
MORD
Specifications
9.12
Description
Unit
Cum
346.10
2,928.35
cum
551.80
3,221.45
cum
627.80
3,629.10
cum
756.10
2,338.00
cum
859.30
2,898.55
10
sqm
258.10
369.50
(B)
9.14
(B)
9.15
Through
Rate
Remarks
9.13
Labour
Rate
104
Sr.
No.
Reference to
MORD
Specifications
9.16
Description
Unit
Through
Rate
Remarks
9.17
Labour
Rate
10
sqm
352.80
1,042.50
cum
47.75
522.95
23.80
223.00
Backfilling
in
Foundation
Trenches as per drawing and
technical specification Clause
1108
Rate as per Item No.11.2 of Chapter
11(I)&(II)
Item
No.12.17
105
of
Chapter 10
TRAFFIC SIGNS, MARKINGS AND OTHER ROAD APPURTENANCES
Sr.
No.
Reference to
MORD
Specifications
10.1
1700
Description
Unit
Labour
Rate
Through Remark
Rate
and
ii)
Retro-reflectorised Traffic
Signs
107
0.30
0.40
0.20
0.25
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
Labour
Rate
Through Remark
Rate
i)
900
equilateral
triangle
mm
Each
114.35 1,902.40
ii)
600
equilateral
triangle
mm
Each
114.35 1,860.20
iii)
600 mm circular
Each
114.35 1,887.85
Each
114.35 1,930.75
v)
600 mm x 450
mm rectangular
Each
114.35 1,885.00
Each
114.35 1,904.60
vii) 900 mm
octagon
Each
114.35 1,972.55
108
side
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
Labour
Rate
Through Remark
Rate
i)
900
equilateral
triangle
mm
Each
96.50 1,474.90
ii)
600
equilateral
triangle
mm
Each
96.50 1,432.70
iii)
600 mm circular
Each
96.50 1,398.75
Each
96.50 1,503.25
v)
600 mm x 450
mm rectangular
Each
96.50 1,457.50
Each
96.50 1,477.10
Each
96.50 1,545.05
109
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
Labour
Rate
Through Remark
Rate
Note:
i)
900
equilateral
triangle
mm
Each
135.15 1,213.25
ii)
600
equilateral
triangle
mm
Each
135.15 1,171.00
iii)
600 mm circular
Each
135.15 1,198.70
Each
135.15 1,241.60
v)
600 mm x 450
mm rectangular
Each
135.15 1,195.85
Each
135.15 1,215.45
Each
135.15 1,283.40
110
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
Semi Reflective
Signs
Labour
Rate
Through Remark
Rate
Traffic
i) 900
equilateral
triangle
111
mm
&
Each
105.75 1,696.40
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
ii) 600
equilateral
triangle
Note:
mm
&
Through Remark
Rate
Each
105.75 1,541.50
Each
105.75 1,642.90
Each
105.75 1,800.25
v) 600 mm x 450
mm rectangular
Each
105.75 1,632.50
Each
105.75 1,740.40
vii) 900 mm
octagon
Each
105.75 1,953.60
side
Labour
Rate
Retro-reflectorised Traffic
Signs
112
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
Labour
Rate
Through Remark
Rate
(i) Providing
and
erecting
direction
and
place
identification
retroreflectorised sign as per
IRC:67
made
of
encapsulated lens type
reflective sheeting vide
Clause 1701.2.3, fixed over
aluminium sheeting, 2 mm
thick
with area
not
exceeding
0.9
sqm
supported on a mild steel
single angle iron post 75 x
75 x 6 mm firmly fixed to the
ground
by
means
of
properly
designed
foundation with M-15 grade
cement concrete 450 x 450
x 600 mm, 600 mm below
ground
level
as
per
approved
drawing
and
Technical
Specification
Clause 1701
Sqm
127.05 2,247.90
(ii) Providing
and
erecting
direction
and
place
identification
retroreflectorised sign as per
IRC:67
made
of
encapsulated lens type
reflective sheeting vide
Clause 1701.2.3, fixed over
aluminium sheeting, 2 mm
thick
with area
not
exceeding
0.9
sqm
supported on 2 inch dia GI
Pipe firmly fixed to the
ground
by
means
of
properly
designed
foundation with M-15 grade
cement concrete 450 x 450
x 600 mm, 600 mm below
ground
level
as
per
approved
drawing
and
Tehnical
Specification
Clause 1701.
sqm
107.20 1,334.30
113
Sr.
No.
Note:
Reference to
MORD
Specifications
Description
Unit
(iii) Providing
and
erecting
direction
and
place
identification
retroreflectorised sign as per
IRC:67
made
of
encapsulated lens type
reflective sheeting vide
Clause 1701.2.3, fixed over
aluminium sheeting, 2 mm
thick
with area
not
exceeding
0.9
sqm
supported on RCC Post 100
mm x 100 mm firmly fixed to
the ground by means of
properly
designed
foundation with M-15 grade
cement concrete 450 x 450
x 600 mm, 600 mm below
ground
level
as
per
approved
drawing
and
Technical
Specification
Clause 1701
Sqm
Lettering and
sign board
separately
requirement.
items have
separately.
arrow markings on
to be provided
as
per
actual
Rates for these
been analysed
Semi-reflective Traffic
signs.
114
Labour
Rate
Through Remark
Rate
151.30 1,481.20
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
Labour
Rate
Through Remark
Rate
Direction
and
place
indentification signs up to
0.9 sqm size board
Providing
and
erecting
direction
and
place
identifications
of
semi
reflective sign boards as per
IRC:67 made of 2 mm thick
M.S. Sheet duly stove
enameled paint in white
colour in front and grey
colour on back with red
reflective border of 70 mm
width
and
required
message, letters, figures
with reflective engineering
grade tape as per MORD
specifications of required
shade
and
colour.
Supported and welded on
47 mm x 47mm of 12 SWG
Square tube of 3050 mm
height duly strengthened by
25 mm x 5 mm M/s flat iron
on edges on back firmly
fixed to the ground by
means of properly designed
foundations
with
M-15
grade cement concrete 450
mm x 450 mm x 600 mm,
600 mm below ground level
as per approved drawing
and Technical Specification
Clause 1701
Retro-reflectorised Traffic
Signs
115
Each
120.40 2,583.35
Sr.
No.
Reference to
MORD
Specifications
Description
(i)
Unit
Labour
Rate
Through Remark
Rate
Providing
and
erecting
direction
and
place
identification
retro-\reflectorised sign as
per
IRC:67
made
of
encapsulated lens type
reflective sheeting vide
Clause 1701.2.3, fixed over
aluminium sheeting, 2 mm
thick with area exceeding
0.9 sqm supported on mild
steel angle iron posts 75
mm x 75 mm x 6 mm, 2
Nos.
firmly fixed to the
ground
by
means
of
properly
designed
foundation with M-15 grade
cement concrete 450 mm x
450 mm x 600 mm, 600 mm
below ground level as per
approved
drawing
and
Technical
Specification
Clause 1701
Sqm
152.45 2,641.60
(ii) Providing
and
erecting
direction
and
place
identification
retroreflectorised sign as per
IRC:67
made
of
encapsulated lens type
reflective sheeting vide
Clause 1701.2.3, fixed over
aluminium sheeting, 2 mm
thick with area exceeding
0.9 sqm supported on dia
GI Pipe firmly fixed to the
ground
by
means
of
properly
designed
foundation with M-15 grade
cement concrete 450 mm x
450 mm x 600 mm, 600 mm
below ground level as per
approved
drawing
and
Technical
Specification
Clause 1701
Sqm
128.60 2,071.60
116
Sr.
No.
Note:
Reference to
MORD
Specifications
Description
Unit
(iii) Providing
and
erecting
direction
and
place
identification
retroreflectorised sign as per
IRC:67
made
of
encapsulated lens type
reflective sheeting vide
Clause 1701.2.3, fixed over
aluminium sheeting, 2 mm
thick with area exceeding
0.9 sqm supported on RCC
Posts 100 mm x 100 mm
firmly fixed to the ground by
means of properly designed
foundation with M 15 grade
cement concrete 450 mm x
450 mm x 600 mm, 600 mm
below ground level as per
approved
drawing
and
Technical
Specification
Clause 1701
Sqm
Semi-Reflective
signs
Traffic
117
Labour
Rate
Through Remark
Rate
182.10 1,724.70
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
Labour
Rate
Through Remark
Rate
Direction
and
place
identification signs more
than 0.90 sqm sign board
Providing
and
erecting
direction
and
place
identification
of
semi
reflective sign boards as per
IRC-67 made of 2 mm thick
M.S. Sheet duly stove
enameled paint white colour
in front and grey colour on
back with reflective border
of 70 mm width and
required message, letters,
figures with reflective tape
of engineering grade as per
MORD specifications of
required shade and colour.
Supported and welded on
two nos. 47 mm x 47 mm of
12 SWG square tube of
3050 mm height duly
strengthened by 25 mm x 5
mm MS flat iron on edges
on back firmly fixed to the
ground
by
means
of
properly
designed
foundations
with
M-15
grade cement concrete 450
mm x 450 mm x 600 mm,
600 mm below ground level
as per approved drawing
and Technical Specification
Clause 1701
1700
118
Each
141.00 2,887.45
Sr.
No.
10.6
Reference to
MORD
Specifications
1700
Unit
Sqm
21.40
60.45
1700
Sqm
19.95
56.20
Sqm
19.95
74.50
Sqm
33.00
63.50
Painting
on Concrete/Steel
Surfaces with Epoxy
Painting two coats including prime
coat with epoxy paint of approved
brand on concrete/steel surfaces
after through cleaning of surface
to give an even shade as per
drawing
and
Technical
Specification Clause 1701
10.8
1700
10.9
1700
Through Remark
Rate
10.7
Labour
Rate
Description
119
Sr.
No.
10.10
Reference to
MORD
Specifications
1700
Description
Unit
Sqm
Labour
Rate
23.90
Through Remark
Rate
42.40
Kilometre Stone
Reinforced cement concrete M15
grade kilometre stone/local stone
of standard design as per IRC:8
fixing in position including painting
and printing, etc as per drawing
and
Technical
Specification
Clause 1703
i)
5th
Kilometre
(precast)
Stone
Each
482.60 2,323.50
ii)
Each
272.20 1,368.10
iii)
Note:
10.11
1700
Each
75.90
420.00
Each
82.90
356.40
Boundary Pillar
Reinforced cement concrete M15
grade boundary pillars/local stone
of standard design as per IRC:25,
fixed in position including finishing
and lettering but excluding
painting as per drawing and
Technical Specification Clause
1704
120
Sr.
No.
Reference to
MORD
Specifications
Note:
Description
Unit
Labour
Rate
Through Remark
Rate
10.12 1700, 800 & 300 G.I Barbed Wire Fencing 1.2 m
high
Providing and fixing 1.2 m high GI
barbed wire fencing with 1.8 m
RCC posts 150 mm x 150 mm
placed every 3 m centre-to-centre
founded in M15 grade cement
concrete, 0.6 m below ground
level, every 15th post, last but
one end post and corner post
shall be strutted on both sides
and end post on one side only
and provided with 9 horizontal
lines and 2 diagonals interwoven
with horizontal wires, fixed with GI
staples,
turn
buckles
etc.
complete as per Clause 1705.
121
P.Rmt.
27.10
313.70
Sr.
No.
Reference to
MORD
Specifications
Labour
Rate
Description
Unit
Through Remark
Rate
P/Rmt
37.30
P/Rmt
60.70 1,436.70
433.40
122
Sr.
No.
10.16
Reference to
MORD
Specifications
1700
Description
Unit
P.Rmt.
Labour
Rate
Through Remark
Rate
76.60 1,172.15
123
Each
1,641.00 9,142.75
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
Labour
Rate
Through Remark
Rate
Suggestive
Traffic Cone
Provision of red fluorescent with
white reflective sleeve traffic cone
made
of
Low
Density
Polyethylene (LDPE) material with
a square base of 390 x 390 x 35
mm and a height of 770 mm, 4
kg in weight, placed at 1.5 m
interval, all as per BS:873
10.18
Suggestive
Rumble Strips
Provision of 15 nos. rumble strips
covered with premix bituminous
carpet, 15-20 mm high at centre,
250 mm wide placed at 1 m
centre-to-centre
at
approved
locations to control speed,
marked with white strips of road
marking paint.
Suggestive
Each
124
Sqm
1.10
467.55
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
Each
Suggestive
125
Labour
Rate
Through Remark
Rate
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
Each
126
Labour
Rate
2.95
Through Remark
Rate
202.60
Chapter 11
FOUNDATION
Sr.
No.
Reference to
MORD
Specifications
11.1
300
Description
Unit
Labour
Rate
Through
Rate
Remarks
Ordinary soil
(i)
Note:
Upto 3 m depth
3 m to 6 m depth
126
Cum
128.15 --
Cum
152.20 --
Sr.
No.
Reference to
MORD
Specifications
Note:
Description
II.
Unit
Ordinary
rock
requiring blasting)
Labour
Rate
Through
Rate
Remarks
(not
Upto 3 m depth
Cum
160.20 --
213.75
297.60
80.10
443.10
Marshy soil
Cum
127
240.25 --
Sr.
No.
11.2
Note:
11.3
Reference to
MORD
Specifications
Description
Unit
Labour
Rate
Through
Rate
Remarks
I.
Sand filling
Cum
47.75
II.
Cum
82.15 --
522.95
P.C.C grade M 15
Nominal
mixing)
mix
1:2.5:5(Hand Cum
128
407.00
2,948.70
Sr.
No.
Reference to
MORD
Specifications
11.4
Description
II.
Through
Rate
Remarks
P.C.C grade M 10
(i)
Cum
346.10
2,928.35
(ii)
Nominal mix
(Hand mixing)
1:3.6 Cum
407.00
2,879.40
P.C.C grade M 15
(i)
Cum
346.10
2,997.70
(ii)
407.00
2,948.70
Cum
346.10
3,424.50
1:2:4 Cum
407.00
3,375.50
Cum
367.95
3,595.70
25 Cum
367.05
3,949.40
Cum
346.10
2,793.40
1:3 Cum
551.80
3,423.25
119.00
2,933.00
551.80
3,221.45
III.
Labour
Rate
Providing
concrete
for
plain/reinforced concrete in
open foundations complete as
per drawings and technical
specifications Clause 802, 803,
1202 & 1203
I.
11.5
Unit
P.C.C. grade M 20
(i)
(ii)
Nominal mix
(Hand mixed)
IV.
V.
R.C.C.
grade
1:1/1/2:3
vi
I.
Brick masonry
cement mortar
in
Sub-analysis
II.
Brick masonry
cement mortar
in
129
1:4 Cum
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
Labour
Rate
Through
Rate
Remarks
Sub-analysis
Cement mortar 1:4 (1 cement : 4 Cum
sand)
III.
119.00
2,296.00
626.80
3,629.10
Cum
355.85
3,582.85
Sub-analysis
Cement-lime-mortar 1:0.5:4.5 (1
cement: 0.5 lime putty : 4.5 sand)
11.6
Cum
822.55
2,755.30
(ii)
Cum
822.55
2,503.00
(iii)
Cum
822.55
2,367.20
(iv)
Cum
822.55
2,250.80
(v)
Cum
822.55
2,134.35
In cement-lime-sand Cum
mortar (1:0.5:4.5)
Note: Quantity of required chips has not been provided
for separately as it is assumed that the same will
be availble from dressing of stones
328.90
3,012.60
(vi)
II.
Cum
756.10
2,615.50
(ii)
Cum
756.10
2,338.00
(iii)
Cum
756.10
2,188.60
130
Sr.
No.
Reference to
MORD
Specifications
III.
Labour
Rate
Through
Rate
Remarks
Description
Unit
(iv)
Cum
756.10
2,060.50
(v)
Cum
756.10
1,932.45
(vi)
In cement-lime-mortar Cum
(1:0.5:4.5)
859.30
2,898.55
Cum
694.35
2,540.50
(ii)
Cum
694.35
2,263.05
(iii)
Cum
694.35
2,113.60
(iv)
Cum
694.35
1,985.60
(v)
797.50
2,823.60
1,376.80 64,142.80
11.8
Supplying,
fitting
and Tonne
placingTMT bar reinforcement
in foundation complete as per
drawings
and
technical
specifications Clauses 1000
and 1202
1,376.80 64,142.80
11.9
1,376.80 61,370.80
131
Sr.
No.
Reference to
MORD
Specifications
11.10
346.10
2,337.20
11.11
346.10
2,346.15
11.12
346.10
2,068.20
11.13
346.10
1,933.60
11.14
346.10
2,087.10
Description
Unit
132
Labour
Rate
Through
Rate
Remarks
Sr.
No.
Reference to
MORD
Specifications
11.15
346.10
2,309.20
11.16
482.95
1,847.30
Description
Unit
133
Labour
Rate
Through
Rate
Remarks
Chapter 12
SUBSTRUCTURE
Sr.
No.
Reference to
MORD
Specifications
12.1
600
Description
Unit
Labour
Rate
Through
Rate
Remarks
Cum
579.35
3,594.40
II.
Cum
579.35
3,382.50
III.
Cum
579.35
3,268.40
119.00
1,953.00
658.15
3,810.60
258.10
369.50
344.95
890.95
352.80
1,042.50
Sub-analysis
Cement mortar 1:5 (1 cement,
5 sand)
IV.
12.2
Note:
12.3
12.4
600
Cum
Plastering
with
cement 10 Sqm
mortar (1:4), 15 mm thick on
brickwork in substructure as
per technical specification
Clauses 613.4 & 1204
134
Sr.
No.
Reference to
MORD
Specifications
12.5
600
Note:
12.6
700
12.7
700
Description
Unit
Plastering
with
cement 10 Sqm
mortar (1:4), 18 mm thick on
brickwork in substructure as
per technical specification
Clauses 613.4 & 1204
I.
Labour
Rate
Through
Rate
Remarks
360.65
1,194.00
Cum
674.65
1,326.05
Coursed
rubble
masonry (1st sort)
(i)
In
1:3
mortar
cement
Cum
863.70
2,893.05
(ii)
In
1:4
mortar
cement
Cum
863.70
2,628.20
(iii)
In cement mortar
(1:5)
In
cement
lime
mortar (1:6)
In
cement
lime
mortar (1:8)
Cum
793.90
2,318.80
Cum
863.70
2,363.30
Cum
863.70
2,241.10
In
cement
lime
mortar (1:5:4.5)
Cum
962.15
3,163.25
(iv)
(v)
(vi)
135
Sr.
No.
Reference to
MORD
Specifications
Description
II.
III.
12.8
800
Unit
Coursed
Rubble
masonry (2nd sort)
(i) In cement mortar
(1:3)
Labour
Rate
Through
Rate
Remarks
Cum
793.90
2,746.25
(ii)
In
1:4
mortar
cement
Cum
793.90
2,454.90
(iii)
In cement mortar
(1:5)
Cum
793.90
2,298.00
(iv)
In cement mortar
(1:6)
Cum
793.90
2,163.55
(v)
In cement mortar
(1:8)
Cum
793.90
2,029.10
(vi)
In
cement
lime
mortar (1:0.5:4.5)
Cum
902.25
3,043.50
Cum
729.05
2,667.55
Random
rubble
masonry
(i) In cement mortar
(1:3)
(ii)
In
1:4
mortar
cement
Cum
729.05
2,376.20
(iii)
In cement mortar
(1:5)
Cum
729.05
2,219.30
(iv)
In cement mortar
(1:6)
Cum
729.05
2,084.90
(v)
In
cement
lime
mortar (1:0.5:4.5)
Cum
837.40
2,964.80
Plain/reinforced
cement
concrete in substructure
complete as per drawings
and technical specification
Clauses 802, 804, 805, 806,
807, 1202 ans 1204
For height upto 5 m
I.
II
P.C.C grade M 15
(i)
Nominal
(1:2.5:5)
PCC grade M 15
mix
Cum
366.10
3,170.60
(i)
Cum
430.50
3,118.85
136
Sr.
No.
Reference to
MORD
Specifications
Description
III.
IV
VI
Note:
Unit
Labour
Rate
Through
Rate
Remarks
P.C.C. grade M 20
(i)
Cum
366.10
3,505.90
(ii)
Cum
380.20
3,761.70
P.C.C.
(1:2:4)
grade
20
(i)
Cum
430.50
3,570.30
(ii)
Cum
447.05
3,707.90
Upto 5m height
Cum
389.15
3,803.10
(ii)
5m to 10m height
Cum
404.15
3,949.70
(iii)
Cum
423.10
4,135.00
RCC
Grade
25(1:1.5:3)
M-
(i)
Upto 5m height
Cum
389.15
4,187.30
(ii)
5 to 10m height
Cum
403.30
4,348.70
(iii)
Cum
423.10
4,552.75
ii
137
Sr.
No.
Reference to
MORD
Specifications
12.9
1000
12.10
Labour
Rate
Through
Rate
Remarks
1,444.60
64,210.60
1000
1,444.60
64,210.60
12.11
1000
1,444.60
61,438.60
12.12
600
6.35
198.70
Description
Unit
138
Nos.
Sr.
No.
Reference to
MORD
Specifications
Nos.
5.00
253.70
600
12.14
1200
1200
Through
Rate
Remarks
Unit
12.13
12.15
Labour
Rate
Description
I)
Granular material
Cum
164.50
481.30
II)
Sandy material
Cum
166.30
641.50
Cum
167.90
563.90
139
Sr.
No.
12.16
Note:
12.17
Reference to
MORD
Specifications
1200
Description
Unit
Labour
Rate
Through
Rate
Remarks
0.01
3.80
Rmt
23.80
223.00
(1:2:4)
12.18
1200
132.45
314.75
12.19
600
344.60
456.05
12.20
600
301.30
412.80
140
Sr.
No.
Reference to
MORD
Specifications
Labour
Rate
Through
Rate
Remarks
Description
Unit
12.21
Cum
372.75
12.22
Cum
59.10
141
Chapter 13
SUPERSTRUCTURE
Sr.
No.
Reference to
MORD
specifications
13.1
800
Description
Unit
Labour
Rate
Through
Rate
Providing
and
laying
reinforced cement concrete in
superstructure as per drawing
and technical specifications
Clauses 800, 1205.4 and
1205.5
I.
R.C.C grade M 20
(i)
For nominal
1:2:4
mix
Upto 5m height
Cum
424.55
4,148.85
II
5m to 10m height
Cum
442.20
4,321.70
III
Cum
459.90
4,494.60
(ii)
Upto 5m height
Cum
469.60
4,067.20
II
5m to 10m height
Cum
489.20
4,236.65
III
Cum
508.70
4,406.10
Upto 5m height
Cum
424.55
3,993.60
II
5m to 10m height
Cum
442.20
4,160.00
III
Cum
459.90
4,326.40
II.
R.C.C M 25 1:1.5:3
Upto 5m height
Cum
424.55
4,458.60
II
5m to 10m height
Cum
442.20
4,725.95
III
Cum
459.90
4,915.00
143
Sr.
No.
Note:
Reference to
MORD
specifications
Description
Unit
Labour
Rate
Through
Rate
III.
Upto 5m height
Cum
424.55
4,769.80
II
5m to 10m height
Cum
442.20
4,968.50
III
Cum
459.90
5,167.25
IV
Cum
353.80
3,974.80
13.2
1000
1,866.55
64,784.55
13.3
1000
1,866.55
64,784.55
144
Sr.
No.
Reference to
MORD
specifications
13.4
1000
13.5
800
13.6
800
Note:
13.7
Note:
Labour
Rate
Through
Rate
1,866.55
62,012.55
394.60
8,943.05
111.50
2,318.70
Sub Analysis
Concrete
300.20
3,207.90
124.60
2,872.85
Description
for
Unit
Rate
of Cum
1200
145
Sr.
No.
Reference to
MORD
specifications
13.8
1200
Providing
and
fixing
in Rmt.
position
pipe
railing
consisting of IS Rolled steel
joist posts designation IS MB
100 (100x75) at 2.5 m interval
and three rows of 50 mm dia
steel pipes (light) including
fixing in position on bridge
deck complete as per drawing
and technical specifications
Clause 1208.2
124.60
1,430.05
13.9
600
579.35
3,594.40
13.10
1200
76.60
1,185.40
13.11
800
13.12
800
Description
Unit
Labour
Rate
Through
Rate
(i)
Cum
332.80
2,882.40
(ii)
391.30
2,835.30
535.55
7,560.95
146
Sr.
No.
Reference to
MORD
specifications
13.13
1200
Description
Unit
Labour
Rate
Through
Rate
25.40
71,525.40
13.90
3,134.60
1200
Note:
147
Sr.
No.
Reference to
MORD
specifications
4
Description
Unit
Labour
Rate
Through
Rate
For
this
specialised
item
overheads are assumed @ 30
per cent
13.15
1200
13.16
1200
Filler Joint
8.40
1,341.60
I)
14.80
3,605.20
II)
4.30
98.40
III)
4.30
194.40
148
Sr.
No.
Reference to
MORD
specifications
Description
IV)
Unit
Labour
Rate
Through
Rate
12.75
18.70
729.05
2,667.55
863.70
2,893.05
sqm
25.80
36.95
sqm
35.30
104.25
Note: For arriving at the final rate for filler joints per m
length and per cm depth of joint filling
compound, the rates of Sr. Nos (i), (ii), (iii) and
(iv) shall be added.
13.17
700
II.
13.18
600
600
13.20
800
149
Sr.
No.
Reference to
MORD
specifications
Description
I.
Nominal
mix
(Hand mixing)
Unit
1200
430.50
3,118.85
366.10
3,170.60
13.21
Through
Rate
1:2.5:5
Labour
Rate
i.
125.20
ii.
47.30
1200
5,882.75
ii.
125.20
iii.
47.30
150
Sr.
No.
Reference to
MORD
specifications
13.23
600
1,778.75
7,672.10
13.24
600
1,875.90
8,095.90
13.25
600
1,857.90
8,129.50
13.26
600
1,857.90
8,129.50
Note:
Description
Unit
151
Labour
Rate
Through
Rate
Sr.
No.
Reference to
MORD
specifications
Description
Unit
13.27
700
Note:
700
Coursed
rubble
stone
masonry arch (Ist sort) in
cement mortar (1:4) complete
including
centering
etc.
complete as per drawing and
technical
specifications
Clauses 706 and 1205.1
13.28
Coursed
rubble
stone Cum
masonry arch (Ist sort) in
cement mortar (1:4) complete
including
centering
etc.
complete as per drawing and
technical
specifications
Clauses 706 and 1205.1
700
Cum
Coursed
rubble
stone
masonry arch (Ist sort) in
cement mortar (1:4) complete
including
centering
etc.
complete as per drawing and
technical
specifications
Clauses 706 and 1205.1
152
Labour
Rate
Through
Rate
2,515.20
5,876.20
2,263.70
5,288.55
Sr.
No.
Reference to
MORD
specifications
Description
Span less than 4mtr
13.30
700
700
700
800
Cum
1,886.40
4,407.00
Cum
2,515.20
6,380.70
Cum
2,263.70
5,742.60
Cum
1,886.40
4,785.50
Cum
580.30
5,235.70
Coursed
rubble
stone
masonry arch (Ist sort) in
cement mortar (1:3) complete
including
centering
etc.
complete as per drawing and
technical
specifications
Clauses 706 and 1205.1
Through
Rate
Coursed
rubble
stone
masonry arch (Ist sort) in
cement mortar (1:3) complete
including
centering
etc.
complete as per drawing and
technical
specifications
Clauses 706 and 1205.1
Above 4 mtrs.span
13.32
Labour
Rate
Coursed
rubble
stone
masonry arch (Ist sort) in
cement mortar (1:3) complete
including
centering
etc.
complete as per drawing and
technical
specifications
Clauses 706 and 1205.1
Above 6 mtrs.span
13.31
Unit
I.
(i)
153
Sr.
No.
Reference to
MORD
specifications
Description
Unit
(ii)
Cum
(iii)
II.
RCC Grade M 25
(i)
Cum
Labour
Rate
Through
Rate
541.60
4,886.60
502.90
4,537.60
560.95
5,567.60
414.95
7,014.20
1200
Note:
Steel section
P/Qtl
i)
ii)
iii)
154
Sr.
No.
Reference to
MORD
specifications
Description
Unit
iv)
v)
vi)
vii)
viii)
13.35 600, 700, 800 Extra for span upto 6 m with Cum
(I)
height above 5 m for item No.
13.23, 13.24, 13.25 and 13.26
(II)
155
Labour
Rate
462.00 --
47.75 --
Through
Rate
Remarks
156
Remarks
157
Remarks
158
Remarks
159
Remarks
160
Remarks
161
Remarks
162
Remarks
163
Remarks
164
Remarks
165
Remarks
166
Remarks
167
Remarks
168
Chapter 14
PROTECTION WORKS
Sr.
No.
Reference to
MORD
specification
14.1
1300
Labour
Rate
Through
Rate
Description
Unit
cum
210.10
665.50
cum
125.15
1,458.40
cum
353.00
3,057.65
1300
Providing
and
laying
of
boulder apron laid in wire
crates with 4 mm dia GI wire
conforming to IS:280 and
IS:4826 in 100 mm x 100 mm
mesh
(woven
diagonally)
including 10 per cent extra for
laps and joints laid with stone
boulders weighing not less
than 25 kg each as per drawing
and technical specifications
Clause 1301
Note:
1300
14.3
157
Sr.
No.
Reference to
MORD
specification
14.4
1300
14.5
1300
Description
A)
Through
Rate
53.00
487.60
B)
51.00
312.10
Rmt.
Cum
210.10
665.50
cum
353.00
3,057.65
cum
530.25
3,088.70
cum
194.80
877.90
Stone/Boulder
II.
III.
1300
Labour
Rate
a)
14.6
Unit
Concrete grade
15(1:2.5:5)
158
Sr.
No.
Reference to
MORD
specification
14.7
1300
Description
Unit
Labour
Rate
Through
Rate
in
cum
735.35
5,233.30
II.
cum
467.25
4,076.90
III.
cum
554.35
3,565.80
cum
369.70
1,050.20
cum
551.80
3,221.45
cum
793.90
2,454.90
cum
346.10
2,928.35
in
1303
14.9
1300
II.
III.
Note:
159
Sr.
No.
Reference to
MORD
specification
Description
Unit
14.10
1300
14.11
1300
Labour
Rate
Through
Rate
cum
221.75
683.90
I.
cum
615.75
2,126.85
II.
cum
492.65
3,087.20
119.00
2,296.00
318.95
2,806.35
Sub-analysis
III.
I.
P.C.C grade M 20
(i)
160
cum
Sr.
No.
Reference to
MORD
specification
14.12
1300
14.13
Suggestive
Description
Unit
Labour
Rate
Through
Rate
A)
Rmt.
55.40
598.30
B)
Rmt.
55.40
332.65
A)
Rmt
65.70
642.35
B)
Rmt.
55.40
327.40
161
Sr.
No.
Reference to
MORD
specification
Description
C)
14.14
14.15
Suggestive
Suggestive
Unit
Labour
Rate
Through
Rate
Rmt.
55.40
304.15
A)
Rmt.
55.40
412.75
B)
Rmt.
76.05
373.30
Rmt.
80.95
1,194.20
162
Sr.
No.
Reference to
MORD
specification
14.16
Labour
Rate
Through
Rate
Description
Unit
1300
Rmt.
24.30
727.50
14.17
Suggestive
Rmt.
1,262.95
73,905.20
14.18
Suggestive
Rmt.
163
37.55 --
Remarks
164
Remarks
165
Remarks
166
Remarks
167
Remarks
168
Remarks
169
Remarks
170
Chapter 15
MAINTENANCE OF ROADS
Sr.
No.
Reference to
MORD
Specifications
15.1
1900
Description
Unit
Labour
Rate
Through
Rate
A.
Manual Means
Cum
88.10
144.40
B.
Mechanical Means
Cum
29.40
124.35
Making
up
loss
of Sqm
material/irregularities
on
shoulders to the design
level by adding fresh
approved selected soil and
compacting
it
with
appropriate equipment at
OMC upto a lead of 1000
m
as per technical
specification Clause 1903
7.35
23.10
1900
1.
Maintenance of Earthen
shoulder (filling with
fresh selected soil)
165
Remarks
Sr.
No.
Reference to
MORD
Specifications
Description
2.
Unit
Labour
Rate
Through
Rate
3.70
6.35
Maintenance of Earhen
shoulder (stripping of
excess soil)
Stripping excess soil from Sqm
the shoulder surface to
achieve the approved level
and compacting with plate
compactor at OMC as per
drawings and Technical
Specification Clause 1903
1900
Maintenace of
surface road
bituminous
i.
208.85
7,229.55
ii.
11.75
159.40
166
Remarks
Sr.
No.
15.4
Reference to
MORD
Specifications
1900
Description
Unit
Labour
Rate
Through
Rate
iii.
14.70
170.70
iv.
11.75
191.20
1900
167
185.50
Remarks
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
Labour
Rate
Through
Rate
107.75
1900
Maintenance of Drains
The maintenance of drains RMT
include erosion, repair, clearing,
cleaning, reshaping, regrading,
deepening of side drains as well
as catch water drains as per
technical specification Clause
1907.
15.7
1900
(I)
Maintenance of Culverts
Maintenance of Hume pipe Each
Culvert by way of
Clearing,
Cleaning,
Erosion repair, repairs to
cracks, parapet wall and
protection work as per
drawing and technical
specification Clause 1908
(II)
1900
424.10
847.60
784.90
1,571.40
Maintenance of Culverts
Slab type
Maintenance of Slab type Each
Culverts
by
way
of
clearing, Cleaning, Erosion
repair, repairs to cracks,
parapet
walls
and
Protection works as per
drawing and technical
specification Clasue 1908
15.8
1.20 --
Maintenance of Causeway
168
Remarks
Sr.
No.
Reference to
MORD
Specifications
Labour
Rate
Through
Rate
27.20
39.30
Per
Km.
317.50
862.00
Steel Railing
Rmt.
Repair of RCC railing to
bring it to the original
shape,
cleaning
and
repainting as per drawings
and technical specification
Clause 1911
9.95
259.60
122.20
1,374.70
206.10
604.60
Description
Unit
1900
15.10
1900
(ii)
RCC Railing
15.11
1900
Rmt.
169
Remarks
Sr.
No.
Reference to
MORD
Specifications
15.12
1900
15.13
1900
Description
Unit
Labour
Rate
(ii)
Each
2.95 --
(iii)
1.00 --
1900
44.05 --
15.14
Through
Rate
4.90
11.50
170
Sqm --
12.25
Remarks
Sr.
No.
Reference to
MORD
Specifications
Description
(ii)
302
Labour
Rate
Pre-mix carpet
using bituminous
(penetration grade
modified bitumen)
binder
125.20
Rates as per item No. 5.10 Sqm -(iv) Seal coat Type A, B
or C
108.10
179.70
73.35
Through
Rate
15.15
Unit
18.85
60.45
Snow clearance
2.70
Stone pitching
171
2.30
Remarks
Sr.
No.
Reference to
MORD
Specifications
Description
Unit
Labour
Rate
501
Ruffing deprecession
carrugation Repair
501
501
614.30
11.75
233.85
15.20
178.75
and
Ruffing,
deprecession
and Sqm
carrugation Repair by clearing
and removal of loose material
providing tack coat with bitumen
Emulsion and filling with grading
premix
using
Catonic
Emulsion(special
technical
specification B2.3.3) in Layer not
exceeding 50mm to0 average
depth of 50mm as per MORD
technical specification 501.3
15.19
Through
Rate
30.20
172
34.20
Remarks
Sr.
No.
15.21
Reference to
MORD
Specifications
Description
Unit
Labour
Rate
Through
Rate
Bleeding repair
Bleeding repair by applying P/Rmt. -pressure dust to area of road
where bleeding of excess
bitumen has accurred as per
MORTH technical specification
3004.4(spreading of binding
material)
173
0.20
Remarks
Sr.
No.
Chapter 16
BIO ENGINEERING ELEMENTS
Description
Unit Labour
Rate
Reference to
MORTH
Specifications
16.1
Through Remarks
Rate
16.2
On embankment slopes in
plain areas and fill slopes
<15, drills at 10 cm
spacings within the row; the
first row is 0.75 m from the
edge of the pavement and
subsequent rows are
spaced at 1 m intervals
down the
Sqm.
6.85
24.95
12.70
47.20
22.60
89.70
grasses (large
rhizomatous type, like
samll bamboos)
180
Sqm.
16.3
On embankment slopes in
plain areas and fill slopes
<15, plants at 10 cm
spacings within the row; the
first row is 0.75 m from the
edge of the pavement and
subsequent rows are
spaced at 1 m intervals
down the
Sqm.
6.85
14.10
Sqm.
12.70
25.40
22.60
46.15
180
16.4
On embankment slopes in
plain areas and fill slopes
<15, cutting at 10 cm
spacings within the row; the
first row is 0.75 m from the
edge of the pavement and
subsequent rows are
spaced at 1 m intervals
down the embankment.
Sqm.
4.80
9.00
Sqm.
12.70
19.35
Sqm.
22.60
34.05
180
(i)
16.5
Rmt.
29.65
102.25
Rmt.
36.70
109.30
Rmt.
18.35
54.65
Rmt.
24.00
60.30
(i)
16.6
180
16.6
Rmt.
36.70
52.20
Each
0.30
1.50
Each
0.40
3.20
292.95
1,047.75
Collection of hardwood
cuttings from appropriate
approved species, from
sources within 1 km of the
road, including trimming the
sterms and making the
cuttings, and transporting
while wrapped in damp
material
(i)
16.6
16.7
(i)
Hardwood cuttings of 45 to
60 cm in length and 1.5 to
3.0 cm in diameter.
Sub Analysis
Hardwood cuttings of 2.0 m
in length and 3.0 to 8.0 m in
diameter.
180
16.8
30.80
62.55
16.9
69.30
920.40
180