Installation and Use Manual Oil Transformer
Installation and Use Manual Oil Transformer
Emiss. 10/12
Rev.00 - Pag. 1/19
Emiss. 10/12
Rev.00 - Pag. 2/19
TABLE OF CONTENTS
1 INTRODUCTION........................................................................................................................................ 3
1.1 Reference standard .................................................................................................................................. 3
1.2 Electromagnetic compatibility ................................................................................................................ 3
1.3 Marking CE ............................................................................................................................................. 3
2 GENERAL ................................................................................................................................................... 3
3 OUTLINE OF THE TRANSFORMER AND THE ACCESSORIES ......................................................... 4
4 RECEPTION, HANDLING, STORAGE .................................................................................................... 8
4.1 Reception ................................................................................................................................................. 8
4.2 Handling .................................................................................................................................................. 9
4.3 Storage ................................................................................................................................................... 11
5 INSTALLATION ....................................................................................................................................... 11
5.1 Standard installation conditions ............................................................................................................ 11
5.2 Ventilation ............................................................................................................................................. 11
5.3 Insulating distances ............................................................................................................................... 13
5.4 Earthing connections ............................................................................................................................. 13
5.5 LV and HV connections ........................................................................................................................ 13
5.6 Regulation of transformation ratio ........................................................................................................ 14
5.7 Parallel connection of transformers ....................................................................................................... 14
6 TRANSFORMER PROTECTIONS .......................................................................................................... 15
6.1 Over temperature protection .................................................................................................................. 15
6.2 Overloading and short circuit protection ............................................................................................... 15
6.3 Protection against over voltages ............................................................................................................ 15
7 COMMISSIONING ................................................................................................................................... 16
7.1 Mechanical checks before the commissioning ...................................................................................... 16
7.2 Electrical checks before the commissioning ......................................................................................... 17
7.3 Insulating fluid level.............................................................................................................................. 17
7.4 Arcing horns .......................................................................................................................................... 18
7.5 Air dryer ................................................................................................................................................ 18
7.6 Buchholz Relay ..................................................................................................................................... 18
7.7 Thermometer ......................................................................................................................................... 18
7.8 Integrated safety device ......................................................................................................................... 18
7.9 Operations for commissioning .............................................................................................................. 19
Emiss. 10/12
Rev.00 - Pag. 3/19
1 INTRODUCTION
1.1
Reference standard
The oil transformer referred to the attached test report, has been designed and manufactured by TESAR
in order to meet to Italian CEI and international IEC Standards requirements in force at the moment of
its manufacturing (unless different agreement).
1.2
CEI EN 60076-1
CEI EN 60076-2
CEI EN 60076-3
CEI EN 60076-4
CEI EN 60076-5
CEI EN 60076-10
CEI 14-7
CEI 14-15
IEC 60076-1
IEC 60076-2
IEC 60076-3
IEC 60076-4
IEC 60076-5
IEC 60076-10
IEC 60616
IEC 60076-7
Electromagnetic compatibility
The intensity of low frequency magnetic field emitted by the windings is of a limited value and,
however, it is equal or lower than those of the field emitted by the connections and the low voltage
bars. Its value quickly decreases by increasing of the distance from the transformer.
1.3 Marking CE
TESAR does not affix the marking CE on its transformers as foreseen at paragraph 5.4.2 of the Guide
to the application of the Directive 89/336/EEC which excludes from the Directive application field:
High voltage inductor
High voltage transformer
2 GENERAL
This publication aims to guide users on the properties of power and distribution transformers insulated
with mineral, silicone or vegetable oil. Two types of transformers are considered:
- Hermetically sealed total filled (Fig. 1)
- Breathing with conservator (Fig. 2)
Emiss. 10/12
Rev.00 - Pag. 4/19
Fig. 1
Fig. 2
Emiss. 10/12
Rev.00 - Pag. 5/19
Fig. 3
Rating plate
Emiss. 10/12
Rev.00 - Pag. 6/19
k
g
i
f
b
c
d
a
j
e
Fig. 4
II Thermometer
IV - Buchholz Relay
(for breathing transformer)
V - Safety valve
Emiss. 10/12
VI - PT100 thermo-resistance
Emiss. 10/12
Rev.00 - Pag. 8/19
Emiss. 10/12
Rev.00 - Pag. 9/19
4.2 Handling
During the transport or the handling, it is recommended to use only the special lifting eyes and tow
attachments (see g and f letter in the Fig. 4).
IMPORTANT: The transformer cannot be moved pushing the cooling fins or radiators or tank.
Ropes must be arranged so as not to interfere with the radiators or cooling fins.
Lifting can be made using the appropriate hooks remembering to use ropes long enough so that H is
never less than L (Fig. 6). Always use all the existing hooks and not only one of them.
Fig. 6
Lifting transformer
Example of handling
Fig. 7
Fig. 8
Manual handling
Fig. 9
Wrong handling
Emiss. 10/12
Rev.00 - Pag. 10/19
Emiss. 10/12
4.3 Storage
4.3.1 Transformer for indoor installation
The transformer must be stored in a sheltered, clean and dry ambient maintaining the packing up to the
installation.
5 INSTALLATION
5.1 Standard installation conditions
The maximum height of installation must not exceed 1000 m above sea level.
When the transformer is in service, the ambient temperature of the room must be within the following
limits:
Minimum temperature:
-25C
Yearly average temperature:
+20C
Monthly average temperature:
+30C
Maximum temperature:
+ 40C
In case the height of the place of installation and/or the ambient temperature values are higher
than the ones specified above, it is necessary to specify it at the ordering stage since a particular
dimensioning of the transformer depends upon these values.
5.2 Ventilation
The electric current passing through the windings, and the effect of the core magnetising current
produce electrical losses resulting in localised heating of the windings and core.
The transformer is designed in such a way that natural cooling maintains the transformer temperature
under the maximum values foreseen by the standards.
In order to avoid temperature accumulation in the room where the transformer is installed, it is
necessary to provide suitable ventilation.
Each TESAR transformer is equipped with a thermometer pocket where a thermometer with contacts
may be installed (optional accessory).
The suggested values for setting the contacts are following (oil temperature):
Description
Alarm C
Trip C
Oil
90C
100C
Emiss. 10/12
Rev.00 - Pag. 12/19
S 0.188
P
H
S ' 1.10 S
where:
P = Sum of the transformer no-load losses and the load losses at 120C [kW]
(if the losses are at 75C, they must be multiply for 1.15)
S = Surface of the incoming louver [m2]
S = Surface of the outgoing louver [m2]
H = Height between the two louvers [m]
In order not to obstruct cooling is necessary that the transformer is installed at a distance not less
than 30 cm from the walls and not less than 60 cm from other transformers.
Forced cooling
Forced cooling is necessary in the following cases:
Frequent overloading
Low-dimensioned room
Room scarcely ventilated
Medium daily temperature higher than 30C.
The forced cooling can be realized by means of installation of air extractor located in the upper
part of the room controlled by a suitable thermostat or directly by a transformer thermal protection
relay, with a suggested flow of approx. 3,54 m3/min for each kW of total losses at 120 C (if the
losses are at 75C, they must be multiplied by 1.15).
ATTENTION: an insufficient air circulation, besides reducing the nominal life of the
transformer, causes over heating which, in the worst cases, can determine the intervention of the
thermal protection relay.
Emiss. 10/12
Rev.00 - Pag. 13/19
Fig. 11 Cables coming from the bottom (left) and from the top (right)
Emiss. 10/12
Rev.00 - Pag. 14/19
Important
A) In case of transformers with double ratio, please be sure the tap corresponding to
voltage of the system feeding the transformer it-self, is duly connected.
B) In case the position of the tap-changer has to be changed after the transformer has
been put into service the first time, it is recommended to put the transformer out of
service and to connect to ground the LV and HV circuits before approaching the
transformer.
5.7 Parallel connection of transformers
If the transformer must be connected in parallel with other transformers, please verify the total
compatibility of the voltage ratio and of the conditions stated by the IEC 60076-1 standards, and
particularly:
Emiss. 10/12
Rev.00 - Pag. 15/19
6 TRANSFORMER PROTECTIONS
6.1 Over temperature protection
The protection can be realized with:
- thermometer (optional accessories)
- RIS or equivalent equipment (optional accessories for hermetically sealed transformer)
The thermometer is generally installed in the thermometric pocket on the cover of the tank.
The thermometer may be equipped with two settable contacts, one for alarm, the other for trip.
The suggested values are written at paragraph 5.2.
The integrated safety device for hermetically sealed transformer (RIS or equivalent) provides:
- two settable contacts for temperature, one for alarm and the other for trip. The suggested values
are written at paragraph 5.2.
- one settable trip contact for pressure (The suggested value is 0.3 bar)
- one trip contact for oil level
Emiss. 10/12
Rev.00 - Pag. 16/19
7 COMMISSIONING
7.1 Mechanical checks before the commissioning
Check the earth connections
Check of the insulating distance of the parts under voltage towards ground as shown at paragraph
5.3
Check the tightening of HV and LV terminals applying the following values of the tightening
torque.
Bushing
On the central conductor LV/HV in copper or brass
Bolts
Torque N*m
Mechanical parts
Bolts
M8
M10
M12
M14
M16
M18
M20
M22
Torque N*m
20
45
75
125
190
275
385
530
Emiss. 10/12
Rev.00 - Pag. 17/19
Emiss. 10/12
Rev.00 - Pag. 18/19
A
[mm]
B
[mm]
12
15
70
17.5
15
90
24
15
100
36
15
200
Fig. 12
Arcing horns
7.7 Thermometer
If the transformer is equipped with the thermometer check the threshold of the alarm and trip are set at
the operating conditions. The setting temperature are provided to the manufacturers in according to
transformer type and the insulation class.
Emiss. 10/12
Rev.00 - Pag. 19/19
IMPORTANT
We remind you that qualified technical personnel must carry out the operation,
commissioning and energization. Furthermore, during the voltage measurements and the
phase displacement checks on the upper terminals of the LV switches, you are
recommended to use suitable instruments and suitable insulating gauntlets.
For more accurate and complete checks, please contact our Assistance Service
Phone
Fax
E-Mail
(+39)-0575.317.1
(+39)-0575.317.201
[email protected]