0% found this document useful (0 votes)
2K views

SAP Status Code Table

This document contains status codes and their descriptions for a production or inventory management system. It includes over 100 status codes organized into categories like created, released, confirmed, delivered, printed, and more. Common codes indicate when an item is created, released, confirmed, delivered, or closed. Other codes provide more detailed statuses for processes, activities, costs, scheduling, and other areas of production and inventory management.

Uploaded by

Hector Fernandez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views

SAP Status Code Table

This document contains status codes and their descriptions for a production or inventory management system. It includes over 100 status codes organized into categories like created, released, confirmed, delivered, printed, and more. Common codes indicate when an item is created, released, confirmed, delivered, or closed. Other codes provide more detailed statuses for processes, activities, costs, scheduling, and other areas of production and inventory management.

Uploaded by

Hector Fernandez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 21

Status Code

CRTD
REL
MSCP
MSPT

Description
Created
Released
Capacity shortage
Material shortage

AVAC
ESTC
PRT
PPRT
CNF
PCNF
CPCK
DLV
DLT
PCST
NCMP
PRC
ISSD

SOCF
UMGP

Availability control active


Estimated costs
Printed
Part printed
Confirmed
Partially confirmed
Capacity checked
Delivered
Deletion indicator
Product costed
Not completed
Pre-costed
Goods issued
Ntwk header: final
delivery
General list 1 printed
General list 2 printed
General list 3 printed
General list 4 printed
Activity list 1 printed
Activity list 2 printed
Activity list 3 printed
Activity list 4 printed
Settlement fields
maintained
Settlement rule created
Date set by external
system
Multi-level: Top level
Multi-level: Bottom level
Multi-level: Dummy info
record
Costs not current
Subordinate order
released
Subordinate order
printed
Subordinate order
confirmed
Rescheduled

CONI
PREL
LKD
TECO
CLSD

Configuration incomplete
Partially released
Locked
Technically completed
Closed

NHFD
GEN1
GEN2
GEN3
GEN4
OPL1
OPL2
OPL3
OPL4
SFMT
SETC
DSEX
MLTL
MLBL
MLDI
CNC
SORL
SOPR

NOLV

Open reservations
posted
Standard confirmation
Milestone confirmation
Manually confirmed
Activity account
assignment
Capacity shortage
Release rejected
Variances calculated
Rescheduling (Actl.)
required
Costs posted
Planned costs
Planning locked
Date definition locked
Budget management
locked
Account assignment
locked
Master data locked
Approved
Budgeted
Outstanding notification
Notification postponed
Notification in process
Order assigned
Notification completed
Notification printed
Partially delivered
Withdrawal failed
Deletion Flag
Transaction LVMS not
permitted

COL1

Component list 1 printed

COL2

Component list 2 printed

COL3

Component list 3 printed

COL4

Component list 4 printed


Results analysis carried
out
PRT list 1 printed
PRT list 2 printed
PRT list 3 printed
PRT list 4 printed
Rescheduling required
(Basic)
Rescheduling required
(Frcst)
Goods movement in coll.
order

ORSP
STND
MILE
MCNF
ACAS
MSCP
RELR
VCAL
NDAT
CSPS
PLCS
PLLK
DDLK
BMLK
AALK
MDLK
APPR
BUDG
OSNO
NOPO
NOPR
ORAS
NOCO
NOPT
PDLV
WDFL
DLFL

RESA
PRL1
PRL2
PRL3
PRL4
NBDT
NFDT
GMCO

CFCO
SPCF
SCNF
ISBD
RVPS
MSPR
RVPL
FNBL
CRTE
AVLB
INST
EHIS
SETM
SCNF
SUST
SUIR
SUFN
PRST
PRIR
PRFN
TDST
TDIR
TDFN
COMO
PRTO
CSER
ASEQ
DSPT
NTUP
ACTV
RACR
ACLO
NOLO
RESI
COMM
COPA
CANC
RTAP
THRD
GRLO
PROP
UNOC
RENT

Confirmation in coll.
order
Sub-operation partially
conf.
Sub-operation finally
conf.
Insufficient budgeting
Revenue posted
PRT shortage
Revenue planned
Final billing
Created
Available
Installed
Entered historically
Settlemt rule created
manually
Summary confirm.
carried out
Setup started
Setup interrupted
Setup finished
Processing started
Processing interrupted
Processing finished
Teardown started
Teardown interrupted
Teardown finished
Components for object
PRTs for object
Error in cost calculation
Allocated to superior
equipt
Scheduled
Dates are not updated
Active
Rental agreements
created
Active lease-outs
No lease-outs
Residential Rental Agrmt
Commercial Contract
Comm. provisional
agrmnt
Canceled
Rent adjustments
planned
Utilized by third parties
Used by group with LO
For own use
Unoccupied
Intended for rent

CRES
RELS
CLOS
GRFL
IFSL
SOLD
PURI
PURC
PSLD
DEMO
PDEM
ERUI
PECR
POCR
BTRD
DIVI
PDIV
INMD
SECD
IFPF
PORT
TSOS
TSRL
TSCO
TSSC
OSTS
ATCO
NOTI
NOTE
DEFR
AUC
Cost
Cstd
FUAC
ARNB
ORD
SHPT
PREP
REJC
NPRT

Created (Standard WBS)


Released (Standard
WBS)
Closed (Standard WBS)
Goods receipt failed
Intended for sale
Sold
Intended for purchase
Purchased
Partially sold
Demolition
Partially demolished
Economic ruin
Partial economic ruin
Printout of changes
required
Block transaction data
Division declaration
Partial division
declaration
Inspection made
Security deposit paid out
Intended for portfolio
In portfolio
Task Outstanding
Task Released
Task Completed
Task successful
Outstanding task(s)
exist(s)
All Tasks Completed
Notification (internal)
Notification (external)
Defects Recording
Asset in construction
exists
To be costed
Costed
Follow-up action
completed
Notif. blocked by
archiving
Created from sales order
Created from shipment
doc.
Prepared
Rejected
PRT not ready for use

CRAB

Control Recipe
Discarded

ILNC
AUSS
ESTO
SLOR

Inspection lot not created


Scrap determined
In the warehouse
Assigned in sales order

EDEL

Assigned in delivery note


Assigned in service
contract
At customer site
In Review
Locked
In transport
From warehouse
Handling Unit Assigned
Inventory Active
Insp. completion w/o
confirm.
Plan/specific. required
Characterist. must be
created

ESER
ECUS
EINS
ELOK
ETRA
EAUS
HUAS
PIAC
PAOR
PREQ
CHCR
SPRQ
LTIN
PASG
CCTD
CALC
QLCH
SKIP
PRSI
PRII
INSP
RREC
DEF
SSAP
STIC
ICCO
UD
SPST
SPCO
STUP
QLUP
IRUP

Quantity posting required


Long-term inspection
Plan/specification
assigned
Insp. characteristics
created
Sample calculated
Quality level relevant
Skip lot
Sample drawing instr.
printed
Inspection instruction
printed
Inspection active
Results confirmed
Defects were recorded
Object created
Short-term insp.
completed
All inspections
completed
Usage decision has been
made
Stock posting started
Stock posting completed
Statistics updated
Quality level updated
Quality info record
updated

LTCA
ARBL
ARCH
REO3

Lot canceled
Blocked for Archiving
Lot archived
Lot detail data deleted

REO2

Lot sample data deleted


Charact. + operations
deleted
Transmit to subsystem
Q-info record changed
Lot marked for
cancellation
Marked for subsystem

REO1
SUB
IRCH
MCAN
MSUB
MtoO
NoMP
HCNF
CPIS
NOPR
NOCP
NOTR
CRCR
NCHK
NSCH
SPLT
PSPL
ASGN
PTAS
PTDS
ERTR
ITAA
CECR
CHKD
ECRA
ECOP
ECPC
ECCF
ECCM
ECOR
ECIR
CCO1

Make-to-order production
No make-to-order prod.
Order header confirmed
Confirmation issued
components
No PRTs
No material components
No trigger points
Control recipe created
Not checked
Not scheduled (forecast
dates)
Split
Partially split
Assigned
Partially assigned
Partially dispatched
Error creating transfer
reqmnt
Item account assignment
Check ECR
ECR Checked
ECR Approved
ECO to be processed
ECO partially confirmed
ECO confirmed
ECO completed
ECO released
Object: insp. req. for
ECR

CCO3

Object: change possible


Object: change not
necessary
Object: change not
possible

CCOB

Object: to be processed

CCO2

CCOI
CCOA

Object: in preparation
Object: change
completed

CCOF
CRFI
CCPO
CCFO

Object: change released


Control recipe finished
All objects checked
All objects released

WCRE
SUPF

Work center until release


Setup partially finished
Processing partially
finished
Teardown partially
finished
Boycott list
Export control
Locked for system
changes

PPF
TDPF
BLLS
EXLS
CCSL
CCUL
ORRQ
ORAC
ORTE
ILAS

BREQ
BASG

Locked for user changes


Order record required
Order record archived
Order record terminated
Inspection lot assigned
Planned InspCharacs.
allocated
QM data recorded
Batch assignment
required
Batch assigned

VACT
VACE
CAPP
CLAS

Var. activity partial conf.


Var. activity final. conf.
CAPP calculated
Complete Classification

CLQM
CUGT

Shortterm Classification
Copy attribute analysis
Error when processing
function
Confirmation with
personal ID
Certif.confirmation
missing
RA data in object
currency
RA data w/o object
currency
Usage decision reset
Secondary resource part
confd
Secondary resource
confirmed
Subobject exists

ICHA
QMDA

FKTF
RCKP
CTCM
RAOC
RAWO
UDRE
SRPC
SRCF
VOBJ

ZUOD
REJT
ICPL
PERR

Assigned
ECR Rejected
ECO incomplete
ECO: processing errors

CHER

Object: errors in change


Insp.lot cntd in order
record
Not available at request
date
Collect. order dates not
curr.
Control: Embargo
Control: Missing master
data
Control: Permission
Transfer prices for
agreements
Object Deactivated

ILOR
NAVD
CONC
FTC2
FTC3
FTC4
TPA
INAC
GMPS
APG
APGS
APRC
APNG
PIGN
APRS
OPGN
GBST
GBTS
BBGT
BUG
BRFL
AKNI
AKNO
AO01
AO02
AO03
MACM
ASSB
ECOC
CCRD
CBLK
SETT
CHKD
FAPP
MCRD
RBMS
MSPL
REJD

Goods movement posted


Approval granted
Single approval granted
Based on approved
recipe
Approval not granted
Process instructions
generated
Approval withdrawn
Operation generated
Confirmed
Counterconfirmed
Accounted
Exercised
Expired
Knocked in
Knocked out
Availability check error
Do availability check
Delivery groups present
Material committed
Assembly lock
ECO complete
Case created
Case blocked for
settlement
Settled
Tested
For approval
Measure created
Replaced by measure
Planning for task
Rejected

DEPS
NEWQ
USED
STRD
APRV
PROG
CROK
LBPR
FMAI
BCRQ
BASC
SIG1
SIG2
SIG3
SIG4
POAR
APIP
EOPD
EODL
BRAR
SOAS
LOLK
SERM
BNAS
IREP
TREP
REPA
BDRQ
BDMD
BRRQ
NOCH
CEFF
MADJ
RlNe

Depreciation simulation
avail.
New quantity calculation
Phys. sample no longer
exists
Sample was stored
Approved
Progress confirmation
(MST)
Certificate receipt
confirmed
Label printed
FM account assignmt
incomplete
Order to be handled in
batches
Batch assignment
complete
One dig. signature
missing
Two dig. signatures
missing
Three dig. signatures
missing
Four dig. signatures
missing
Part objects archived
Based on approved insp.
plan
Ext. operatn partly
delivered
External operation
delivered
Batch record archived
Sales order assigned
Lot locked for batch
record
SerialNo maintenance
required
Batch not assigned
Under repair
Partially repaired
Repaired
Business decision
required
Business decision made
Batch record required
Changes forbidden
Effectivity parameter
copied
Manual adjustment
necessary
Release in network taken
place

QUCR
QUAC
INVD
PTBL
CGFB
REPR
PCMN
PCC
ITG
BTG
PTAG
ETG
BUG
EUG
BTUG
ETUG
LBNP
RET
CNOK
CCOK
PAGE
ADVS
CONF
WCM
MANC
CANC
PRTA
DNEW
UNT
EXEC
WOCO
PROC
TENT
TEST
BLTC
PTST
VBCR
VBAP
VBPA
VBAR

Quotation created
Quotation accepted
Invoiced
partially billed
Confirm./goods mvmnt
forbidden
Repairs processing
Production campaign
Product cost collector
used
Inital tagging status
Tag
Tag printed
Tagged
Untag
Untagged
Untag Temporarily
Temporarily Untagged
Label not printed
Return
Credit limit check invalid
Credit limit check
successful
Paging occurs
Advance shipment
occurred
Conflict
Work Clearance
Management
Mat.availability not
checked
Capacity avail.not
checked
PRT availability not
checked
New dummy quantity
calculation
Untaggable
Released for execution
Work completed
Processing
Temporary entry
Test cycle
Block technical
completion
Test tag printed
Batch record created
Batch record approved
Batch rec. partially
approved
Batch record archived

VBPC
VBDE
VBAW
CR
CO
LO
RE
HUM
CONX
CHNG
POST
HI
AC
IC
OP
IP
CL
DE
IPEX
DLEX
FINV
REVS
PO
ACPT
ONHO
EXTS
NMAT
SPLT
CSPL
UNCO
CRTC
ADRJ
MISM
NOME
PTME
MERR
SUPP
QUOT

Batch rec. partially


archived
Batch rec. contains
deviations
Batch rec.: new version
exists
Created
Conference
Locked
Released
Handling units assigned
Fix configuration
Change mode
Postscript
Historical
Active
Inactive
Created
In Process
Closed
Data Entered
In Process Outside
EH&S
Deleted Outside EH&S
Further Investigation
Reversed
Posted
Order accepted
On Hold
Changed by external
system
No material components
Split
Created by splitting
Ref. object under
construction
From created to
tech.completed
Automatic deletion
rejected
Mismeasurement
No Measurement
Partial Measurement
Measurement Results
Recorded
Supplement

QUBP

No material components
Assigned in quote
(bump)

SLBP

Assigned in order (bump)

PPGI

Assigned in quote (vers.


chg.)
Assigned in order (vers.
chg.)
License split
Operation Quantities
Adjusted
Physically Exists
In Warehouse
Planned
Loaded
Unloaded
PPPI complete
Locked
Weighed
Reserved for PP
PPPI reservation for GI
post.

PPSC
PSTD
DLTD
SGPR
APRQ
APOK
APRF
CMSP
CANG
CBER
CABG
CPER

PPPI sequence checked


Goods Issue Posted
Deleted
Visually Checked
Approval: Required
Approval: OK
Approval: Refused
CM: Object locked
CM: Created
CM: Baselining allowed
CM: Object closed
CM: Process allowed

CBRE
CBAS

CM: Baseline requested


Baselined (fixed)

CFVE

Released for distribution


SU for Directly Assigned
Costs
No Automatic
Confirmation
In Inventory
Physically Inventoried
Owner Settlement
Relevant to Results
Analysis
Separate Order
Simulation
Order
Contract
Notice
To be settled
To be confirmed

QUVC
SLVC
SPTT
QADJ
PHEX
WHSE
PLND
LOAD
UNLD
PPCm
LOCK
WGHD
RESV

DRCT
NACO
INIV
INVE
OWNS
RRA
SEPO
ASIM
AORD
AVER
AKUE
AZUR
GZBE

CMSI
XSpr

Counterconfirmation
required
Changed
Reversed
Deleted
Expired
Initial
Fixing
Fixing executed
Rollover
Premature Settlement
Interest rate adjustment
Notice Given
Offer
In Process
For Release
Release Required
Release rejected
Cost Collector Created
External Conv.of
Planned Order
Noncritical Change
Released
IS-T: Opened
IS-T: Being processed
IS-T: Completed
IS-T: Complete lock
IS-T: Partial lock
IS-T: Item cancelled
IS-T: Operations
interruption
IS-T: Being processed
IS-T: Active
Operational protection
Work permit printed
Valuated
Data on Mobile Device
Push Effected
Push Accepted
Push Rejected
Push Maximum Time
Expired
Push Reset
Push Partially Rejected
Signature Attached
Case Marked Suppl.
Invoice
Control recipe created

XSez
XSgn

Control recipe in process


XStep Generated

GZER
AZAE
AZST
DELD
EXPD
INIT
AFIX
FIXD
ROLL
PREM
IRAD
NOTG
AANG
IP
FR
RLRQ
RLRJ
MKOS
EXPL
NC
RE
IOPN
IINP
ICMP
ICLK
IPLK
IICA
IOIN
IINP
IACT
PROT
PWP
VAL
MOBI
PUSH
PACC
PREJ
PEXP
PRST
PPRJ
SIGA

IRAE
IRAC
IRAR
AFWD
WCDR
WCDC
WCDP
RSRV
NEWQ
NOPR
MADJ
EXPR
QUIT
DELF
ARCH
FLEX
EXKU

OREL
OCOM
OASS
OINF
OREJ
OACC
OCUS
BLKE
BLKW
CDEN
CGBL
CCOM
CDEL
ARCR
DelA
DELT
LOCK
PARC
INAC
NREL
Pld
Rqst
App
Rej

Int. rate adjustment


executed
Int. rate adjustment
changed
Int. Rate Adjustment
Reversed
Maturity of forward
WEC: Date Adjustment
Requested
WEC: Date Adjustment
Completed
WEC: Date Adjustment
Pending
Reserved
New
In Process
Completed
External Processing
Confirmed
Deletion indicator
Blocked for Archiving
Specifications Assigned
External Processing
Customer
1100 Can be archived
1101 Archived
1102 Can be deleted
Released
Completed
Assigned
Informed
Rejected
Accepted
At customer site
Blocked (Error)
Blocked (Warning)
Flagged for Archiving
Locked
Do Not Contact
Marked for deletion
Can be archived
Archived
Deleted
Locked
To archive
Inactive
Not Released
Planned
Requested
Approved
Rejected

Act
Obsl
MvtC
AM00
AM01
AM02
AM03
AM04
AM05
AM06
AM07
AM08
AM09
AM10
AM11
AM12
AM13
AM14
AM15
AM16
AM17
AM18
AM19
AM20
AM21
AM22
AM23
AM24
SDVC
SDVY
SDVN
PLAN
APPL
RELE
APPR
LOCK
DELP
DELA
OBSO
REJE
APLA
AAPP
AAPR
ALOC
AOBS
AREJ
DPLA

Active
Obsolete
Reused Order
Being Created
In Process
Released
Completed
Locked
To Be Archived
Archived
To Be Approved
Rejected
Approved
Deletion Flag
Canceled
Unplanned Audit(s)
Question List(s)
Assigned
Download Completed
Confirmed
Report Created
Signature Provided
Outstanding Actions
Actions Completed
Completed w.
Outstanding Actns
Created
Outstanding
Forced Completion
Valuation Executed
Changeable copy to be
checked
Copy checked - OK
Copy checked - not OK
Planned
Requested
Released by Material
Owner
Approved
Locked
Flagged for Deletion
Deletion Requested
Obsolete
Rejected
Planned
Requested
Approved
Locked
Obsolete
Rejected
Planned

DAPP
DREL
DAPR
DLOC
DDLP
DDLA
DOBS
DREJ
EPLA
EAPP
EREL
EAPR
ELOC
EDLP
EDLA
EOBS
EREJ
FPLA
FAPP
FREL
FAPR
FLOC
FDLP
FDLA
FOBS
FREJ
GPLA
GAPP
GAPR
GREJ
GOBS
GLOC
HPLA
HAPP
HAPR
HREJ
HACT
HOBS
CNEW
CREL
CLOC
CINC
CDIS
ARCV
NEW
DECL
EXPO

Requested
Released by Material
Owner
Approved
Locked
Flagged for Deletion
Deletion Requested
Obsolete
Rejected
Planned
Requested
Released by Material
Owner
Approved
Locked
Flagged for Deletion
Deletion Requested
Obsolete
Rejected
Planned
Requested
Released by Material
Owner
Approved
Locked
Flagged for Deletion
Deletion Requested
Obsolete
Rejected
Planned
Requested
Approved
Rejected
Obsolete
Locked
Planned
Requested
Approved
Rejected
Active
Obsolete
In Process
Released
Locked
Inconsistent
Distributable
To Archive
Trial Created
Trial Definition Closed
Trial Data Exported

PLOR
MRCP
PROR
RESU
RECF
CLOS
JOB
CONV
QMCL
CHGD
FFUE
FHNC
IHNC
GMDR
GMPR
GMAP
GMAW
GMCL
GMCX
GMCA
Rcp0
Rcp1
Rcp2
Rcp3
Rcp4
Rcp5
Rcp6
SPEC
CONT
RESL
CSPT
MRGM
MRGS
RSTR
RWRK
SPL
SPTM
NEWO
RELO
CLOS

Planned Order Assigned


Master Recipe
Generated
Process Order Assigned
Results
Entered/Imported
Results Confirmed
Trial Closed
Background Processing
Trial Converted
QM Planning Closed
Creation of Change Docs
Active
From Follow-Up Entry
From History New
Construction
In History New
Construction
Initial draft
Proposal
Application
Award
Closing
Closed
Cancelled
In process
Processing Closed
Rejected
Released
Released for Scope
Inactive
Obsolete
RE:Spec home
RE:Contingency order
RE: Re-Sell to new
customer
Process Order Created
by Split
Process order was
merged
Process order merged
an order
Restart
Rework Insert
Process Order was Split
Process Order Split
Multiple
New/In Process
Released
Completed

DIST
NEW
Act
REL
CHK
END
NEWR
ACCE
REVI
CLOR
CREA
CGAT
CGMN
INPR
CMTD
DELD
HOLD
CBEX
CMOB
CMBG
MEBS
ORCR
OCRR
TBUS
MDCI
MDCU
MDFL
NUSD
BLFA
DFRD
COCE
CPCE
MDRQ
DOCC
COMP
CACL
INPC
XR01
XR02
XR03
XR04
XR05
XR06

Distributable
New
Active
Released
For Checking
Completed
ECR Processible
ECR Approved
ECR Rejected
ECR Completed
New IP-Data
Changed in Revision
System Status : Change
Manual
System Status :
Inprocess
System Status :
Completed
Deleted in Revision
System Status : Hold
CM: Baseline exploded
CM: Baseline obsolet
CM: Background
processing
MEB-Controlled
Order created by MEB
Order creation required
To be Used
Master Data Creation
Initiated
Master Data Created /
Updated
Master Data Creation
Failed
Not Used
Set Archive Indicator
Deferred
Completion Certified
Completion Partially
Certified
Meas. Doc. Creation
Required
Document Created
Completed
Cancelled
In Process
In Process
Rejected
Release for Test
Released
Obsolete
Flagged for Archiving

XR07
XR20
XR21
XR40
UPNW
UPSV
UPRL
UPSD
UPRC
UPAP
UPRJ
UPER
UPPO
UPIN
UPSP
UPSE
INTR
CKIN
LOST
LOPF
LOCM
ULST
ULPF
ULCO
MVPR
WEPR
AVWE
AVLO
AVUL
AVMO
AVCO
WACR
WALO
WACS
crea
actv
lega
inac
calc

Archived
Approved
Discarded
Current Signature
Process
Created
Saved
Released
Distributed
Received
Approved
Rejected
Errors found
Updated
Partially Posted
Partially Sent
Error Sending Data
In transit
Checked in
Load started
Load partly finished
Load complete
Unload started
Unload Partly finished
Unload complete
Move process
Weigh process
Available for weight
Available for load
Available for unload
Available for move
Available to check-out
WA-PRO: Created
WA-PRO: Locked
WA-PRO: Closed
Created
Active
Legally Active
Inactive
Calculation Relevant

WADL
LRCL
PRCS
liqi
liqd
OFRJ
RELF
INIT
IBDE
IBIN

WA-PRO: To Be Deleted
Land Register Closed
Parcel Ceased to Exist
In Liquidation
Liquidated
Rejected
Release Forbidden
Initial Status
Deletion flag
Deactivate

IB04
IB05

VCHG

Avail.
Avail.
Service Entry Sheet
created
Service Entry Sheet
released
Service Entry Sheet
cancelled
new
Released
Blocked
Logically Deleted
Ready for Archiving
New
Draft
Review
Rework
In Process
Open
Resolved
Closed
Reassessment
Validated
Submitted
In Process
Auto Closed
Shipping taken place
Partial Shipping
Clinical Order Created
Basic Med. Doc. in
Process
Basic Med. Doc.
Complete
Basic Med. Doc. to Be
Checked
Inactive
Active
Deletion flag set
Allocated
Value does not exist
Value missing
Valid value
Value was estimated
Value implausible
Value entered/changed
manually

VREL
VLCK
VPRO
VARC
VEPL

Value has been released


Value is locked
Value is protected
Value was activated
Value was extrapolated

CRE
SREL
CANL
CCIN
CCAK
CCLO
CCDL
CCAR
INIT
DRFT
REVW
REWK
IP
OPEN
RSLV
CLSD
REAS
VLDT
SBMT
Test
ATCL
SHIP
TVER
KLAU
MDIP
MDCP
MDTC
OINA
OACT
DFS
Asgd
VNE
VMSG
VVAK
VEST
VI

VINT
VaCh
VNVP
RINA
RACT
DFLS
DINS
RIPR
HANG
HPLN
HAUS
HCOP
HLVM
PANG
PAUS
PPZM
PNZM
PZUR
PABG
PLST
PBEH
PBCH
HLKZ

Value was interpolated


Val. Manually Chngd
Externally
Version Not In Validity
Period
Route Inactive
Route Active
Deletion Flag Set
Deletion Indicator Set
Route in Processing
Waste Disposal Order
Created
Waste Disposal Order
Planned
Waste Disposal Order
Output
CO Posting
Deletion Flag for WDO
Header
WDO Item Created
WDO Item Output
Positive Confirmation
Negative Confirmation
WDO Item Postponed
WDO Item Billed
Debit Memo Request
Generated
Container Transport
Container
Del/Remove/Replace.
Deletion Flag for WDO
Header

You might also like