U-1 2938
U-1 2938
As Required by the Provisions of the ASME Boiler and Pressure Vessel Code Rules, Section VIII, Division 1
1. Manufactured and certified by
(Name and address of Manufacturer)
2. Manufactured for
(Name and address of Purchaser)
3. Location of installation
(Name and address)
4. Type
(Horizontal, vertical, or sphere)
(CRN)
Items 611 incl. to be completed for single wall vessels, jackets of jacketed vessels, shell of heat exchangers, or chamber of multichamber vessels.
6. Shell:
Course(s)
No.
Diameter
Material
Length
7. Heads: (a)
Thickness
Spec./Grade or Type
Nom.
Corr.
(b)
Location (Top,
Bottom, Ends)
Thickness
Min.
Corr.
Radius
Crown
Elliptical
Ratio
Knuckle
Conical
Apex Angle
Eff.
Heat Treatment
Type
Temp.
Eff.
Time
Hemispherical
Radius
Flat
Diameter
Side to Pressure
Convex
Concave
Category A
Type
Eff.
(a)
(b)
If removable, bolts used (describe other fastening)
(Material spec. number, grade, size, number)
8. Type of jacket
Jacket closure
(Describe as ogee and weld, bar, etc.)
9. MAWP
at max. temp.
(Internal)
(External)
(Internal)
at
(External)
at test temperature of
Proof test
(Diameter)
(Corr. allow.)
(Nominal thickness)
(Nominal thickness)
(Corr. allow.)
(Attachment)
13. Tubes
(Material spec. no., grade or type)
(O.D.)
(Nominal thickness)
(Number)
Items 1418 incl. to be completed for inner chambers of jacketed vessels or channels of heat exchangers.
14. Shell: (a) No. of course(s)
Course(s)
No.
Diameter
Material
Length
Thickness
Spec./Grade or Type
Nom.
Corr.
Heat Treatment
Type
Temp.
Time
Thickness
Min.
Corr.
Radius
Crown
Knuckle
Elliptical
Ratio
Conical
Apex Angle
Hemispherical
Radius
Flat
Diameter
Side to Pressure
Convex
Concave
(a)
(b)
If removable, bolts used (describe other fastening)
(Material spec. number, grade, size, number)
(07/10)
Eff.
(b)
(Material spec. number, grade or type) (H.T. time and temp.)
Location (Top,
Bottom, Ends)
Eff.
Category A
Type
Eff.
at max. temp.
(Internal)
(External)
(Internal)
at
(External)
at test temperature of
Proof test
Material
Diameter
or Size
No.
Type
Lugs
(Yes or no)
Nozzle
Legs
(Number)
Nozzle Thickness
Flange
Nom.
Reinforcement
Material
Corr.
Others
Attachment Details
Nozzle
Flange
Location
(Insp. Open.)
Attached
(Number)
(Describe)
21. Manufacturers Partial Data Reports properly identified and signed by Commissioned Inspectors have been furnished for the following items of
the report (list the name of part, item number, Manufacturers name, and identifying number):
22. Remarks
Expires
Name
Signed
(Manufacturer)
(Representative)
and employed by
of
have inspected the pressure vessel described in this Manufacturers Data Report on
, and
state that, to the best of my knowledge and belief, the Manufacturer has constructed this pressure vessel in accordance with ASME BOILER AND
PRESSURE VESSEL CODE, Section VIII, Division 1. By signing this certificate neither the Inspector nor his/her employer makes any warranty, expressed
or implied, concerning the pressure vessel described in this Manufacturer's Data Report. Furthermore, neither the Inspector nor his/her employer shall
be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Date
Signed
Commissions
(Authorized Inspector)
Name
Expires
Signed
(Assembler)
(Representative)
and employed by
of
, have compared the statements in this Manufacturers Data Report with the described pressure vessel
inspected by me and to the best of my knowledge and belief, the Manufacturer has constructed and assembled this pressure vessel in accordance
with the ASME BOILER AND PRESSURE VESSEL CODE, Section VIII, Division 1. The described vessel was inspected and subjected to a hydrostatic test of
. By signing this certificate neither the Inspector nor his/her employer makes any warranty, expressed or
implied, concerning the pressure vessel described in this Manufacturer's Data Report. Furthermore, neither the Inspector nor his/her employer
shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Date
Signed
Commissions
(Authorized Inspector)
(07/10)