Sample Format CV
Sample Format CV
Professional Qualification:
B.E (Electrical) from India, 1992.
Total experience: 15 Years
Nationality: Indian, Singapore PR
Age: 37 Years, Sex: Male
Summary of Experience:
Industries: Oil and Gas
FEED, Detail Engineering, Procurement, Project Management,
Installation, Testing and Commissioning.
FPSO, Well Head and Jack-Up Plate forms, FSO, LQ, E House etc.
Singapore, Malaysia, Middle East, Australia
Software Experience:
Intools
PDMS/PDS/Microstation/AutoCAD
Ansys
Caeser II
Please add what ever software you have experience (please do not include if
only training)
Detail Professional Experience:
1. Senior Engineer Electrical (Design) for the FPSOs, Well Head and
Jack-Up Platform, projects at Singapore with XXX Engineering Pte
Ltd from Dec 2007 to Sept 2009
(This should cover Position, Type of project, Place, Name of
company, Period)
A: Jack-Up and Well head Plate Forms
FEED and Detailed FEED Engineering
Prepare the Project schedule, Project CTR for the Electrical system
Supervising Team members.
Handle manpower loading.
Review the Basis of Design (from the Client) with team and finalise the
feasibility of the Design proceedings.
Prepare the Detail Engineering Basis as per the Project scope and issue
the Document control Register for the client review and approve.
Based on the DEB and DCR prepare the
o Specifications, Data sheets, Lay outs (E building, IER building
etc),
o One Line Diagrams, Schematic Drawings, Lighting, Small Power,
Cable Ladder, Cable routing Layouts
o
Equipment Design Studies for Generator, Transformer, Neutral
o
o
o
o
o
o
Sent RFQ for the Electrical Equipments and get the quotations /
prepared the comparative statements and conducted technical
discussion and commercial negotiation with various vendors. Select the
vendor with the best delivery, within budgetary cost with value added
support.
Based on the load list split the loads in to various switch boards and
prepared the operational philosophy of the various systems with
interlocks. Discuss with the Client and got the approval for the
Operational Philosophy of the various systems.
As per the approved operational philosophy, discussed with the vendor
and got the Single Line diagrams for HV, LV, Essential LV, Lighting,
Emergency and UPS systems etc.,
Based on the Single line diagrams, finalize the Schematic drawings and
GA drawings of the Switch Gears, MCC and Distribution boards.
Prepared the cable schedule and issued for procurement / construction.
Preliminary short circuit studies for the Electrical system, Cable Sizing,
Transformer sizing, Load analysis by using ETAP software
Supervision for Construction, Testing and Commissioning
3. Project Engineer/Electrical
companies from 1997 to
companies details here).