Quality Control
Quality Control
Purpose of QC
Key Concepts:
Control Charts
Key tool for monitoring and controlling processes. A control chart is a time-ordered plot
of sample statistics
UCL x z ( /
n)
LCL x z ( /
n)
UCL x A2 R
LCL x A2 R
where :
x grand mean
z confidence level
population standard deviation
n sample size
R average range
A2 value from table given a sample size
(2) Range chart (a.k.a. R-chart) - used to monitor the variability of the process
UCL D4 R
LCL D3 R
UCL p z
p (1 p )
n
LCL p z
p (1 p )
n
where :
p average proportion
z confidence level
(2) c-chart (used when the goal is to control the number of defects per unit
UCL c z
LCL c z
where :
c average number of defects
z confidence level
Factor for R
Chart
Number of
Observation
s in
Subgroup
n
Factor
for xbar
Chart
A2
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
1.88
1.02
0.73
0.58
0.48
0.42
0.37
0.34
0.31
0.29
0.27
0.25
0.24
0.22
0.21
0.20
0.19
0.19
0.18
Lower Upper
Control Control
Limit
Limit
D3
D4
0.00
0.00
0.00
0.00
0.00
0.08
0.14
0.18
0.22
0.26
0.28
0.31
0.33
0.35
0.36
0.38
0.39
0.40
0.41
3.27
2.57
2.28
2.11
2.00
1.92
1.86
1.82
1.78
1.74
1.72
1.69
1.67
1.65
1.64
1.62
1.61
1.60
1.59
Problems
4 Control charts for Variables Mean and Range charts
6 Control chart for Attributes p-chart
7 Control chart for Attributes c-chart
8 How many to produce given a certain production survival rate
1
79.2
78.8
80.0
78.4
81.0
2
80.5
78.7
81.0
80.4
80.1
SAMPLE
3
4
79.8
78.9
79.4
79.4
80.4
79.7
80.3
79.4
80.8
80.6
5
80.5
79.6
80.4
80.8
78.8
6
79.7
80.6
80.5
80.0
81.1
Excel Solution
UCL x A2 R
UCL D4 R
LCL x A2 R
LCL D3 R
Number of
defectives
SAMPLE
6
7
8
10
11
12
13
Excel Solution
UCL p z
p (1 p )
n
LCL p z
p (1 p )
n
PROBLEM NO. 10 - 7
The postmaster of a small western city receives a certain number of complaints each day
about mail delivery. Assume that the distribution of daily complaints is Poisson. Construct
a control chart with three sigma limits using the following data. Is the process in control?
Number of
complaints
SAMPLE
6
7
8
10
14
12
10
11
12
13
14
13
10
Excel Solution
Problem 18
A production process consists of a three-step operation. The scrap rate is 10 percent for the first step and 6
percent for the other two steps.
(a)
If the desired daily output is 450 units, how many units must be started to allow for loss due to scrap?
(b)
If the scrap rate for each step would be cut in half, how many units would this save in terms of the scrap
allowance?
(c )
If the scrap represents a cost of $10 per unit, how much is it costing the company per day for the original
scrap rate?