Cylinder Head Removal Removing Vanos Control Unit Installation Note: Check Seals, Replacing Them Is Necessary. Torque To 50 5 NM (37 3 LB FT)
Cylinder Head Removal Removing Vanos Control Unit Installation Note: Check Seals, Replacing Them Is Necessary. Torque To 50 5 NM (37 3 LB FT)
• Remove Thermostat Housing Cover If applicable, unscrew thermostat housing for other
work on cylinder head later.
Installation Note : Check installed direction. Vent or arrow faces up. Replace seal.
• Unscrew nuts.
• Remove ignition coils.
Installation Note : Check for ground strap of ignition coils at cylinder 3 and 6.
NOTE : Cylinder head cover is separated from the cylinder head as far as transmission of
oscillation is concerned by employing rubber mounts and gaskets.
Installation Note : Check cover gasket, replacing it if necessary. Place outer and inner cover
gaskets on cylinder head in advance.
Installation Note : Check for correct seating of gasket on back of the cylinder head when
mounting the cylinder head cover.
• Turn engine in its direction of rotation until the peaks of cams on intake and exhaust
camshafts for cylinder no. 1 point to each other.
Top of Form Top of Form
• Press down on upper chain tensioner and lock using Special Tool 11 3 290.
• Unscrew nuts.
• Remove VANOS control unit.
Top of Form Top of Form
Installation Note : Check for dowel sleeves (1). Apply 3 Bond 1209** liquid sealing compound
at the corners of the joint between the cylinder head and VANOS control unit. Replace gasket.
Installation Note : Align groove in piston perpendicular to the tensioning rail. Replace gasket.
Arrangement of Parts:
1 - Sleeve
2 - Spring
3 - Piston
Top of Form Top of Form
• Press upper chain tensioner down and arrest by inserting Special Tool 11 3 290.
• Unscrew sprockets.
• Lift both sprockets off complete with chain.
• Unscrew cylinder head bolts in several steps from outside to inside using Special Tool 11
2 250.
• Lift cylinder head off.
Top of Form Top of Form
NOTE : Some of the washers are locked in the standard cylinder heads to prevent them from
being lost.
NOTE : When installing a new cylinder head, install new washers without locking them. Make
sure that no washers are missing. When installing the cylinder head, conform with the waiting
time for hydraulic valve tappets. See: Service Precautions\Vehicle Damage Warnings
NOTE : Gaskets which are 0.3 mm (0.012 in) thicker are available for machined (ground)
cylinder heads.
Identification: 2.5 for 2.5 liter. + 0.3 for 0.3 mm (0.012 in) thicker gasket for repair machined
cylinder head.
Top of Form Top of Form
NOTE : Mount cylinder head and tighten new bolts (lightly oiled) in sequence of 1 ... 14 in three
steps.
Step 1: Tightening torque 30 ±2 Nm (22 lb ft)
Step 2: Torque angle 90 ±3°
Step 3: Torque angle 90 ±3°
CAUTION : Cylinder head bolts may only be used once. Keep oil out of tapped bores in the
engine block (danger of cracking the block, wrong tightening torque values).
Installation Note : Use torque angle tester together with Special Tools 11 2 250 and 11 2 113.
CAUTION : If it is necessary to correct the camshaft adjustment to such an extent that there is
valve movement in cylinders 1 and 6, first turn the crankshaft about 30°away from TDC position
in the engine's direction of rotation and return to TDC only after turning the camshaft. This
prevents contact between the valves and pistons.
Top of Form Top of Form
• Turn camshafts until the cam peaks of intake and exhaust cams for cylinder no. 1 face
each other.
• Unscrew the three rear studs for the valve cover.
• Install primary timing chain on the sprocket and center with the exhaust camshaft. Arrow
on sprocket faces up. Mount sprocket in such a manner that the tapped bores are on the
left hand side of the slots, as the sprocket will be moved to the left when installing the
chain tensioner.
• Insert special tool 11 3 390 into chain tensioner sleeve (1). Screw in adjusting screw on
tensioning rail as far as stop, but do not tighten.
Top of Form Top of Form
Top of Form
Top of Form
Zoom
Sized for Print
Bottom of
Bottom of Form
Form
CAUTION : Mount the intake camshaft sprocket correctly - flat side faces VANOS control unit
and collar faces camshaft.
Top of Form Top of Form
NOTE : Check for dowel sleeves (1). Apply 3 Bond 1209** liquid sealing compound on corners
of joint between cylinder head and VANOS control unit. Replace gasket.
CAUTION : Before installing the VANOS control unit, turn the sprockets together with
secondary chain as far as right-hand stop until slots are aligned with the studs.
Top of Form Top of Form
CAUTION : Before mounting the VANOS control unit, push back splined shaft together with
hydraulic plunger (1) in direction of housing (2) as far as stop.
NOTE : Mount VANOS control unit. Turn splined shaft (1) until splines mesh.
Top of Form Top of Form
• Turn chain together with sprockets counter-clockwise by hand until the splined shaft
meshes in the splines of sprocket (2).
CAUTION: It is absolutely essential to ensure that the "FIRST" suitable tooth meshes.
• Preload the tensioning rail with 1.3 Nm torque using Special Tool 11 3 390 by turning the
adjusting screw using Special Tool 00 2 050 or a standard torque wrench.
CAUTION : Always ensure that the timing chain is preloaded with help of Special Tool 11 3
390 when checking the adjustment of camshafts.
• Replace seal.
• Install plugs.
• Tightening to 29 ft.lbs (40Nm)
Top of Form Top of Form
• Measure gap between secondary tensioner and edge on the sender gear.
• Note the value.
Top of Form Top of Form
• Measure gap between secondary tensioner and edge on the sender gear.
• NOTE the value.
• The difference between both measured values must be at least 8.5 mm.
• Reassemble covers, manifolds and auxiliary components in reverse order of disassembly,
paying close attention to installation notes and tightening torques..