Site Specific Document: TRX Test Measurement
Site Specific Document: TRX Test Measurement
ER_Number 2G:
ER_Number 3G:
Parter:
Date:
The information contained herein is the property of Orange Communications SA and is proided
on condition that it !ill not "e reproduced# copied# lent or disclosed# directly or indirectly# nor used
for any purpose other than that for !hich it !as speci$cally furnished%
Author
&ocument O!ner
&iision Technical
&epartment 'ngineering( RA) 'ng
Con$dentiality
Status
France Telecom Group *nrestricted
&ate of last
modi$cation
&ocument
Reference
&ocument
Reision
Reie! +eriod
SSD_TRX Test_v1.0 1/5
,ntroduction
+urpose
The purpose of this document is to record the TRX Test measurement after installation and
commissioning of 2G or 3G Fle-i .ultiradio /TS to certify that the !or0 has "een carried out in
accordance to the releant manuals and agreed Orange procedures% This document !ill "e
used for RA) rene!al pro1ect until OC2 is con$dent of Fle-i .ultiradio e3uipment%
Scope
The document coers the TRX measurement after installation# commissioning and ,ntegration
of )S) 2G and 3G Fle-i .ultiradio /ase Station for s!ap%
4% General References
*ser .anual5s reference for ,nstallation# Commissioning and ,ntegration of )S) products and
Site Support System ta0en from6 )O7S
Orange +ro1ect speci$cations for Site ,nstallation and Commissioning# from6 Control
8AR),)G6 /e sure to use the latest ersion of documents%
SSD_TRX Test_v1.0 2/5
2% Commissioning Acceptance
2%4 Test tools and cali"ration information
Standard e3uipment is already !rited# add e3uipment if needed%
Test Equipment Serial Number Calibration Date Completed
Power Meter* 123456789 DD.MM.YYYY
9 *se appropriate sensor for each fre3uency range% :GS.# 8C&.A;
2%2 2G Fle-i .ultiradio
2%2%4 Transmitter Output +o!er 7eel for Fle-i 'dge .ultiradio
)ote6 perform the test !ithout A"is connection
Transmitter output po!er leel is measured from RF module antenna connector # start /CC2
transmission# set ARF) alue of <42# =>?# and ??< or >>4 :for 'GS.;# po!er leel @% .a0e sure
that only one TRX is transmitting at the same time% Test only TRX po!er according site
con$guration :S8O;% All con$gura"le TRX shall "e tested%
The follo!ing Aalues are speci$ed6
Number of TRXs / Sector Minimum Nominal Maximum
1 TRX per Setor !60"/TRX# 49.5 $"% 60 $"% 72 $"%
2 TRX per Setor !30"/TRX# 24.9 $"% 30 $"% 36 $"%
3 TRX per Setor !20"/TRX# 16.5 $"% 20 $"% 24 $"%
4 TRX per Setor !15"/TRX# 12.4 $"% 15 $"% 18 $"%
P-e!el P-e!el P-e!el P-e!el
"R#NC $%&
TRX 1 TRX 5 TRX 91 TRX 13
"R#NC '()
TRX 1 TRX 5 TRX 91 TRX 13
"R#NC ))$
TRX 1 TRX 5 TRX 91 TRX 13
"R#NC ((%
TRX 1 TRX 5 TRX 91 TRX 13
"R#NC $%&
TRX 2 TRX 6 TRX 10 TRX 14
"R#NC '()
TRX 2 TRX 6 TRX 10 TRX 14
"R#NC ))$
TRX 2 TRX 6 TRX 10 TRX 14
"R#NC ((%
TRX 2 TRX 6 TRX 10 TRX 14
"R#NC $%&
TRX 3 TRX 7 TRX 11 TRX 15
SSD_TRX Test_v1.0 3/5
"R#NC '()
TRX 3 TRX 7 TRX 11 TRX 15
"R#NC ))$
TRX 3 TRX 7 TRX 11 TRX 15
"R#NC ((%
TRX 3 TRX 7 TRX 11 TRX 15
"R#NC $%&
TRX 4 TRX 8 TRX 12 TRX 16
"R#NC '()
TRX 4 TRX 8 TRX 12 TRX 16
"R#NC ))$
TRX 4 TRX 8 TRX 12 TRX 16
"R#NC ((%
TRX 4 TRX 8 TRX 12 TRX 16
)ote6 TRX ,& corresponds to TRX )um"er of /CC2 Transmission test and not TRX ,& from S8O%
2%3 TRX Test Fle-i '&G' .ultiradio
8ithout AC"is connection use manual TRX test during commissioning !iDard# test ARF)
alue#=>? :&CS; or >>4
: 'GS.; !ith radio time slots 2 and = of all TRX shall "e tested%
)ote6 ,n case of upgrade only ne! TRXs should "e tested%
The TRX sensitiity alue in la"oratory conditions is typically from C4@> d/m to C444 d/m% ,n
$eld conditions !ith interference# an accepta"le alue is under C4@@ d/m% /'R in RF part shall
not "e "igger than 2E other!ise the test fails% /'R in // part shall not e-ceed @E other!ise
the test fails%
All TRX test done and passed6
2%F 3G Fle-i .ultiradio
2%F%4 Transmitter Output +o!er 7eel for )ode/
'nter +o!er 7eel in 8 :.easurement points are antenna connector on RFCmodule for Fle-i and
antenna or connector on ca"inet roof for *ltra Site;% The measured po!er leel must "e
"et!een the limits de$ned in the ta"le here "elo! other!ise test failed and the RF unit must
"e s!apped%
Number of *TR+s Minimum Nominal Maximun
&rr'er "P( 20 " 17.0 " 20.9 " 33)1 "
&rr'er "P( 40" 33.9 " 42.7 " 67.6 "
*ote+ ,&-.e '/ " s0o.-1 2e wr'te1 0ere&3ter
Power
4eve- $"%
"TR 1 51 "TR 2 51 "TR 3 51 "TR 4 51 "TR 5 51 "TR 6 51
"TR 1 52 "TR 2 52 "TR 3 52 "TR 4 52 "TR 5 52 "TR 6 52
SSD_TRX Test_v1.0 4/5
2%< /TS commissioning test
Test &/1 6e&s.re6e/ts '/ 7TS
o66'ss'o/'/8+
Do/e &/1 P&sse1
9/ter/&- -oop test
TRX Test
Tr&/s6'tter :.tp.t Power
2%= '3uipment Commissioning Certi$cate
T0e o66'ss'o/er ert'3'es t0&t o66'ss'o/'/8 0&s 2ee/ 1o/e '/ &or1&/e to t0e re-ev&/t o66'ss'o/'/8
6&/.&-s &/1 &8ree1 :r&/8e proe1.res.
;/1 o3 <o66'ss'o/'/8 1&te+ / /
P&rt/er+
*&6e o3 o66'ss'o/er+
!9/ <&p't&- -etters#
P0o/e /.62er+
S'8/&t.re+
Report and Files
All reports and $les related to ,nstallation and commissioning and must "e stored into '&.S for
successful site acceptance%
SSD_TRX Test_v1.0 5/5