Leak Detection Ref
Leak Detection Ref
4.007.0.047
LEAK DETECTION SYSTEM
USER MANUAL
V.1.0
rev:
8.014.0.047
GALILEO TP
PROCESS EQUIPMENT
Via di Castelpulci, 17/M-17/H
50018 Scandicci - FI - ITALY
GALILEO TP
PROCESS EQUIPMENT
Mod. LDS:
S.N. 47105
Voltage:
Current:
Weight
Supply Pressure He:
Max Pressure N2:
Air Pressure:
CE
Date 20-11-2010
400 V 3 ph + n 50/60 Hz
63 A, 25 kW
4000 kg
4000 kPa
10000 kPa
600-800 kPa
2
____________________________________________________________
Manual 8.014.0.047
INDEX
SECTION 1
INTRODUCTION
SECTION 2
PLANT DESCRIPTIONS
SECTION 3
SECTION 4
SECTION 5
ANALYSIS SPECIFICATIONS
AUTOMATIC CYCLE SPECIFICATIONS
STRUCTURAL PERFORMANCES
4.3.1 TEST CHAMBER
4.3.2 OPEN/CLOSE CHAMBER SYSTEM
GENERAL PERFORMANCES
MAINTENANCE AND INSTALLATION
5.1
5.2
5.3
5.4
5.5
5.6
SECTION 6
TECHNICAL FEATURES
SECTION 7
OPERATIVE INSTRUCTIONS
7.1
7.2
7.3
7.4
7.5
SECTION 8
8.1
8.2
8.3
SECTION 9
9.1
9.2
9.3
9.4
INTRODUCTION
MAIN MENU
AUTOMATIC CYCLE
MANUAL CYCLE
3
____________________________________________________________
Manual 8.014.0.047
9.5
9.6
9.7
PLANT CALIBRATION
PARAMETERS
ARCHIVES
9.7.1
MODELS
9.7.2
USERS
9.7.3
TEST FOR DATA
9.7.4
TEST FOR MODELS
9.7.5
ALL TESTS
9.7.6
SAVE TESTS
9.8
9.9
9.10
SECTION 10
MAINTENANCE
10.1
10.2
10.3
10.4
10.5
10.6
DAILY
MONTHLY
EVERY SIX MONTH PERIOD
ANNUAL
EVERY 2.000-6.000-10.000 HOURS
EVERY 3 YEARS
SECTION 11
FAILURE ANALISYS
SECTION 12
ALARM ANALISYS
SECTION 13
SPARE PARTS
SECTION 14
4
____________________________________________________________
Manual 8.014.0.047
SECTION 1: INTRODUCTION
The plant Leak Detection System (named in the following pages LDS) allows to make Helium test
on a lot of components (radiators, valves ) with the goal to detect and measure their leaks.
The unit contains a mass spectrometer with Helium as tracer element in order to measure global
leak of the component. This one is located into a vacuum chamber, also called analysis chamber.
After, a vacuum is created into the chamber and the component is pressured with Helium. When the
vacuum into the chamber reach an adapt value the mass spectrometer is put in contact with the
analysis chamber in order to measure the output quantity of Helium from the detected component
and define the leakage value.
The test cycle is totally automatic and is controlled by a PLC. The user interface is managed by an
industrial PC by means of dedicated software totally projected and developed by GALILEO TP.
LDS can be used:
To detect the absence of occlusions in the component (if present the input and output
junctions).
To detect the mechanical resistance of the component.
To detect the presence of big leakage
To detect the presence of small leakage and to measure them.
One complete test cycle is composed of the follow phases:
Vacuum chamber
the chamber is brought by the atmospheric pressure thin to a value <= to 25mbar ABSs,
value parameter setting. Reached the value of vacuum the chamber will be put in
communication with the circuit of analysis.
It verifies occlusion
the component loaded into the chamber will be pressurized with air to low pressure for the
verification of possible occlusions, for this verification a simple sensor of pressure can be
used installed to the opposite extremity to the load or a more sophisticated sensor of flow
where can also be verified the exact course of the made a will piece
High Pressure Loading
The component is pressurized with nitrogen or dry air until a prefixed value (about 20-100
bar) in order to detect the absence of occlusions and the circuit resistance. The maximum
value of pressure that the user can introduce is 100 Bar. The high pressure loading is enabled
if the vacuum of the chamber has reached the set point parameter min vacuum chamber for
charging HP nitrogen. This parameter must be less than 5000 mPsi.
Pressure Drop Test:
The component is isolated on itself in order to detect if its drop pressure go down the fixed
value
Vacuum component:
finished the verification of fall of pressure the component is voided with the purpose not to
create possible mixtures air/helium or to alter the percentage of mixtures of helium used for
the pressurization for the helium test
Helium Pressure Loading:
5
____________________________________________________________
Manual 8.014.0.047
The component is pressurized with Helium until a pressure fixed from the user for the Leak
Detection phase.
Leakage Detection Test:
Measure of the Helium quantity which escape from the component and relative comparison
with the value defined as threshold reject.
Helium discharge:
finished the phase of "Leak Detection" the plant will unload the residual helium from the
component bringing the component to the atmospheric pressure. Where foreseen the
unloaded helium will be carried at the recovery
Chamber ventilation:
also reached the atmospheric pressure in the piece the chamber through a valve of
ventilation will be brought to the atmospheric pressure and subsequently open for the unload
some test a will component
6
____________________________________________________________
Manual 8.014.0.047
7
____________________________________________________________
Manual 8.014.0.047
8
____________________________________________________________
Manual 8.014.0.047
The software LDS (Leak Detection System), developed by GALILEO TP on the basis of own
experience in the field of automatic leak detection systems, is a system that allows the supervision
of test process. The needs expressed by customers to have an automatic and certifying system,
convinced the company to develop this software that is able:
To store each test on an MSAccess database file (.mdb).
To manage calibration of the system.
To create/modify models code of the components to test.
To run a statistical analysis for period, for model, for operator.
To control the test for different test mixtures.
To control manually each component of the system.
To simulate manually the automatic test through the activation of the single component.
To allow the connection of the system to existing LAN .
To allow the service with TELESERVICE
The software LDS is today the only instrument dedicated to the analysis and control of Leak
Detection, totally developed by the company that manufacturers the system. In this way each
modification, hardware and/or software, required by the customer is immediate.
Warning
In case of temporary power supply failure can be lost the machines parameters temporary stored in
the pc ram.
Warning
Its necessary to do pc shut-down before switch off the power supply of the machine.
Warning
The machine must be used only by one operator, otherwise the machine can not be safety.
9
____________________________________________________________
Manual 8.014.0.047
1E-5 mbarl/s of He
fixed by user
2
1
2
1
Manual
Automatic
archives in model
Manual
plan by the user
plan by the user
plan by the user, max 100 bar
plan by user, max 40 Bar
plan by user in the range from 5 to 100%
plan by user
plan by user
10
____________________________________________________________
Manual 8.014.0.047
Used Material:
Each chamber is equipped with aluminium lid of an automatic close system with electric power .
25 KW
6-8 BAR
400 V, 50/60 Hz, 3 Phase + Neutral pole +
Ground
11
____________________________________________________________
Manual 8.014.0.047
TOTAL WEIGHT:
PUMP GROUP DIMENSION:
PUMP GROUP WEIGHT:
CHAMBER AND STRUCTURE
DIMENSION
CHAMBER AND STRUCTURE
WEIGHT
MAIN STRUCTURE DIMENSION
4000Kg
1300 (W) x 1500 (D) x 2000 (H)
mm
910Kg
3500 (W) x 1000 (D) x 2000 (H)
mm
1475Kg
3350(W) x 1800 (D) x 2460 (H)
mm
1500 Kg
26 m3
5.3 INSTALLATION
Only workers of the company that has manufactured the system can complete the installation of the
system. So the following instruction do not authorize the customer to carry out the installation by
himself.
1. Put the rack in the selected place.
2. Verify the alignment of the supports and that the system is stable.
3. Position pumping groups in the right place.
4. Verify oil level of all rotary vane pumps.
5. Make electrical and vacuum connections.
6. Verify electrical connections.
7. Connect compressed air for pneumatic components, with a pressure between 5 and 7 Bar.
8. Connect Nitrogen and Helium.
9. Connect the system to power supply.
10. Connect the system to the recovery machine (optional).
WARNING:
It is necessary to verify the perfect electrical compatibility between the power supply and the
system.
The signal of main power present will be given by a signaller flashing place inside the electric
cabinet.
13
____________________________________________________________
Manual 8.014.0.047
Now it is possible to switch on the plant bringing the main switch from the position 0 (OFF)
to the position 1 (ON).
Just operated the main switch it will have to ignite the white spy of line it posts on the door of
the electric cabinet (HL1), now the plant is electrically fed. If it didn't ignite this spy to verify
that the light bulb has not burnt, that the tension arrives to the terminals of the light bulb, that
the connections of the main line entry have correctly been effected.
The main switch will immediately give tension to:
PLC;
personal computer;
mass spectrometer and your pump;
REMARKS:
The group of pumping has his electric cabinet, to verify that the main switch is in position 1
(ON) and that also the relative switch of dissection of the motors of the pumps are in
position 1 (ON).
Only the first starting is recommended to hold the switch of dissection of the pumps in
position 0 (OFF), since necessary to verify the exact sense of rotation of the motors.
To verify the sense of rotation to bring the switch of the pump to verify in position 1 (ON)
and to check that the sense of rotation corresponds to the arrow pointed out on the carter of
the motor.
We suggest us you to perform the verification in the following sequence:
1. mechanicals pump of chamber vacuum.
2. roots pump of chamber vacuum.
3. mechanicals pump component vacuum.
4. mechanicals pump of mass spectrometer.
5. other pumps or motor installed on the plant.
We suggest you to verify the exact sense of rotation of the roots pump operating at least a
mechanical pump in unloaded to it with the purpose not to create over pressure to the collector of
unloading.
Besides we suggest you if there were problems with the rotation of the pump of analysis to switch
off the controls of the spectrometer and turbo pump , otherwise they will turn on him same without
having the unload necessary and therefore to damage him.
discharge vacuum pump are on the roof of the machine. We suggest to use an aspiration system to
help the discharging of the pumps.
WARNING:
WARNING:
WARNING:
It is necessary to verify the maximum pressure of the incomes lines. This value must be higher of
the maximum pressure of the machine. This line must be protected with safety valves.
The system has four safety valves regulated to 130 Bar to protect from overpressure the flexible
hoses of the chamber and the manifold of pneumatic box.
The exhaust of nitrogen can be dangerous due to high pressure of the system: we suggest to pipe on
the roof of the plant the exhaust end protect or install a silent filter on the exits exhaust.
15
____________________________________________________________
Manual 8.014.0.047
in
16
____________________________________________________________
Manual 8.014.0.047
REMARK:
In any case, before start to use the plant it is better to wait 3-5 minutes, at least, in order to
permit to the mass spectrometer to reach the optimal working conditions. This time gap is
also necessary to reach the high vacuum into the spectrometer for very low background
signal. Also during the heating phase the PLC check and, eventually, indicate the presence
of alarms and/or absence of auxiliary use (compressed air, nitrogen).
17
____________________________________________________________
Manual 8.014.0.047
Figure 7.2:
18
____________________________________________________________
Manual 8.014.0.047
19
____________________________________________________________
Manual 8.014.0.047
20
____________________________________________________________
Manual 8.014.0.047
21
____________________________________________________________
Manual 8.014.0.047
STATUS
It switches on to indicate an alarm
situation.
It switches on to indicate that the plant is
ready for automatic cycles as soon are
verified all the safety condition and pre-
22
____________________________________________________________
Manual 8.014.0.047
RED LIGHT
BLU LIGHT
WHITE LIGHT
warning.
It switches on to indicate an alarm of the
plant or plant not ready to work
It switches on to indicate that the plant is
working in manual condition.
It switches on to indicate that the plant is
making an automatic cycle.
COMPONENT EVACUATION
CHAMBER EVACUATION
BACKGROUND READING
CYCLE PHASE
In the component is introduced nitrogen for
removing possible pieces of workmanship
It comes loaded nitrogen to high pressure
in the component.
Phase of stabilization of the pressure into
the component.
Measurement of the fall of pressure in the
component.
Drainage of residual pressure from the
component
Phase of evacuation in the component
before loading helium to the aim to
guarantee air absence in order not to create
mixtures
Phase of evacuation in the chamber until
the set up value of vacuum
Reading and memorization of the value of
background of the spectrometer
Phase of loaded helium in the component
for successive phase with search of the
leak. It is possible to charge at a low
pressure value and then at high pressure
value.
Reading and calculation of the real leak
through the spectrometer
Finished phase search of the leak, will
come marked if the piece is in specification
or is discarded
23
____________________________________________________________
Manual 8.014.0.047
HELIUM DISCHARGE
CHAMBER VENTILATION
CHAMBER OPENING
END OF CYCLE
SPECTROMETER CALIBRATION
COMMENT
After a test with piece to discard it comes
demanded the confirmation through blue
push-button ACK
As set up in the relative parameter
periodically it comes demanded the
calibration of the spectrometer. This
operation blocks the system and obligates
to carry out the calibration
Attended for the phase of calibration of the
spectrometer. the system will remain
blocked until a positive outcome
Demand for calibration or sensibility. the
system will remain blocked until a positive
outcome.
Demand for maintenance to the vacuum
valves. to supply to the maintenance and to
annul the counter
Demand for maintenance to the pressure
valves. to supply to the maintenance and to
annul the counter
24
____________________________________________________________
Manual 8.014.0.047
EMERGENCY
ACTION
Red Light signal button with N.O. contact.
This button permits the reset of an
emergency after the elimination of the
emergency cause.
Red head button with N.C. contact. This
button permit the uncouple of the general
switch removing voltage to the movement
components and stopping the pumping
group (where it is foreseen, it discharge
also the high pressure). In order to remove
the emergency it is necessary to eliminate
the cause and push the red light button
REMOVE EMERGENCY. Moreover it is
necessary to go in the manual modality and
check the configuration of the machine. We
25
____________________________________________________________
Manual 8.014.0.047
STOP CYCLE
ACK
ACKNOWLEDGE
(operator consol)
ACK
ACKNOWLEDGE
(remote control)
RESET ALLARM
ACTION
White light button with N.O. contact
scheme codified. Pushing this button it
starts the automatic cycle into the chamber.
The white light confirm the cycle is
running.
Black button with N.C. contact. It permits
to stop the test cycle in the chamber.
Blue light button with N.O. contact. After a
negative test it is necessary to push this
button in order to open the chamber. When
the test is negative the blue light is on
Blue button with N.O. contact. After a
negative test it is necessary to push this
button in order to open the chamber.
Red light head button with N.O. contact.
This button permits the reset of any alarm
after the elimination of the alarm cause.
When there are the alarms the red light is
on.
When install the remote control there are two spy lamps on it:
RED SPY LAMP: this lamp lighting when the component is not in specification.
GREEN SPY LAMP: this lamp lighting when the component is in specification.
26
____________________________________________________________
Manual 8.014.0.047
SECTION 9:
REMARKS:
The software Leak Detection System (wording LDS) described in the follow pages is
developed considering the request of the final user and can be different respect to what is
above reported considering the modifications and/or upgrade established with the customer,
after give this manual.
9.1 INTRODUCTION
The LDS software realized from GALIELO TP basing on its experience in the leak detection field is
a supervision system of the test process. The necessity of the final customer to have an automatic
system and, in particular, to certify the made tests, have suggested to our company to develop this
packet which is able to:
The LDS software is today the only instrument dedicated to the management of leakage plants
developed directly from the plant manufacturer. This permit to offer immediately assistance for
hardware and software.
longer, specially after a long stop period of the plant). In any case it is possible to use the plant
when the software main screen appear like in figure 7.2
All the software functions, except the input automatic cycle screen and the switch off of the PC, are
protected with a password. All the passwords are imposed in our factory at 1234 but they can be
changed from the user.
The software is sensible to capital and small letters. It means that it is necessary to introduce a
password or a code exactly as defined the first time otherwise it doesnt consider valid the
introduced data.
EXAMPLE: if the introduced password is TeSt it must be introduced always as under reported in
order to be recognized from the system. Otherwise, introducing for example TEST or test or Test
the message Not exactly password will appear on the screen.
The main menu of the LDS software is divided in the follow parts, each one dedicated to different
plant functionality:
Cycle selection for the chose of the plant modality use (automatic, manual or calibration).
Functions for the definition of the chambers parameters, instrument calibration, switch
on/off pumps, spectrometer calibration, open/close chambers and encoder zeroing.
File for show the archives and statistic. Show the virtual key on the screen
Exit to log out from the LDS software and prepare the computer to the switch off or to
accede to the Windows Desktop.
28
____________________________________________________________
Manual 8.014.0.047
HELIUM CONCENTRATION
TEST RESULT
LEAK VALUE
NITROGEN PRESSURE
PRESSURE DROP
TEST PRESSURE
PARTIAL
MODEL BUTTON
30
____________________________________________________________
Manual 8.014.0.047
OPERATOR BUTTON
SENSITIVITY BUTTON
ORDER BUTTON
31
____________________________________________________________
Manual 8.014.0.047
The software show if the enter password is not correct and automatically turn back to the previous
screen.
The calibration is necessary to calculate the K coefficient of each chamber and to check the correct
working of the plant. For this reason the plant is equipped of a certificated calibrated leak
SERIAL NUMBER
MEANING
Reference to type code or model of the
calibrated leak .
Serial number or building number of the
calibrated leak
33
____________________________________________________________
Manual 8.014.0.047
VALUE
DATA
Certificate data
ANNUAL DECREMENT
ACTUAL TEMPERATURE
THERMAL COEFFICIENT
= Leak (20C) +
+ Leak (20C) (T-20)
Leak (20C) DifData
Where:
Real leak:
Leak (20C):
:
DifData:
calibration test.
:
The software makes automatically the calculation under reported and show the real value of the
leak.
When there are the necessary condition to start the calibration cycle, the button START CYCLE
flash. Now, pushing the START CYCLE button, the calibration cycle will start.
It can be described as follow:
The K coefficient of the plant is given from the ratio between the real leak value (calculated with
the under reported law) and the leak net value (the difference between the signal helium value after
the open of the calibration valve and the background correspondent). So:
34
____________________________________________________________
Manual 8.014.0.047
Where:
Real leak:
Read leak:
Background:
The K value calculated is memorized until the next calibration and it is used to correct the read
during the automatic cycle. It means that the real leak value will be the product between the read
from the mass spectrometer and the K coefficient now calculated.
The software further shows real time eventual alarms and the phase of the cycle. Are also indicated:
1.
2.
3.
4.
The software offers the possibility to memorize the data of more calibrated leak. In order to do it is
enough to push the EDIT button. After the introduction of the protection password there is the
access to the list of the memorized calibrated leak.
To modify the data of the already memorized calibrated leak or to introduce a new one it is enough
to push the EDIT button and appear the calibrated leak screen (fig. 9.5.2). To save the
modifications push the SAVE button .
Here follow is showed the parameters and screen that appear pushing EDIT Button:
35
____________________________________________________________
Manual 8.014.0.047
MEANING
SERIAL NUMBER
NOMINAL VALUE
NOMINAL TEMPARATURE
CERTIFICATION DATE
TEMPERATURE COEFFICIENT
ANNUAL REDUCTION
TOLERANCE
36
____________________________________________________________
Manual 8.014.0.047
The data to introduce are included in the calibration certificate which is supplied with the same
calibrated leak.
REMARKS:
To cancel the data relative to a calibrated leak, push the CANCEL button
To select a calibrated leak which is different from the proposed ones in the calibration
software screen ,un the list with the cursor indicators to find the selected leak and push the
SAVE and EXIT buttons.
Instead, to exit without change the calibrated leak proposed by the software in the
calibration screen, push the EXIT button.
To exit from the calibration screen and turn back to the main screen of the software push
EXIT .
9.6 PARAMETERS
Pushing the PARAMETERS chamber 1 or chamber 2 button from the main men (fig. 7.2) is
possible to enter in the screen for the introduction of the chamber parameters. (fig. 9.6.1)
As already described, to enter to this function it is necessary a password .The software show if the
introduced password is not correct and automatically turn back to the previous screen.
MAXIMUM
PRESSURE
HELIUM DISCHARGE END
MAXIMUM
PRESSURE
FOR Pressure value to consider finished the nitrogen
NITROGEN DISCHARGE END
discharge of the component.
CHAMBER VENTILATION TIME
HELIUM PRESSURE FOR SNIFFER Helium pressure when is used the sniffer per leak
TEST
measurements.
MIN CHAMBER VACUUM FOR Vacuum value of the chamber for beginning the HP
CHARGING HP NITROGEN
nitrogen charge.
K COEFFICIENT
MIN K COEFFICIENT
MAX K COEFFICIENT
HELIUM CONCENTRATION
PUMPS ENABLE
LANGUAGE SELECTION
ENABLE CHAMBER
____________________________________________________________
Manual 8.014.0.047
SPECTROMETER
INTERVAL
CHAMBER
INTERVAL
Push the SAVE button to save the effectuated modifications and turn back to the main manage
software screen of the plant.
Push the CANCEL OR EXIT button to not save the effectuated modifications and turn back to
the main manage software screen of the plant.
REMARK:
It is further possible change the language of the software.
40
____________________________________________________________
Manual 8.014.0.047
9.7 Archives
Pushing the ARCHIVES MANAGEMENT button from the main menu (fig7.2) is possible to
enter in manage stock screen of the plant check software. (fig. 9.7.1)
As already described, to enter into this function it is necessary to introduce a password. The
software show if the introduced password is not correct and automatically turn back to the previous
screen.
From the stock manage screen it is possible:
To show/change the models and the test parameters of the components
To show/change the user code
To show the data relative to the effectuated test.
ACTION
To Enter in the model stock.
To Enter in the user stock.
To look the effectuated test in a selected
time interval.
to look all the effectuated value
To save in the database the tes.
41
____________________________________________________________
Manual 8.014.0.047
ORDER
ORDER LIST
EXIT
Order
Order List
turn back to the main screen
To look the effectuated test with a selected
model.
MODEL
ACTION
To change the existent data and/or
42
____________________________________________________________
Manual 8.014.0.047
DELETE
EXIT
Here follow is described the meaning of the parameters corresponding to each model:
LABEL
MODEL
MEANING
Alphanumeric code of the model of the
component to test. It is possible to
introduce all the characters normally
accepted from Windows.
DESCRIPTION
Model description
CUSTOMER CODE
LP NITROGEN PRESSURE (PSI)
CUSTOMER CODE
Pressure value at which it check the correct
connection of the component and the
clogged of the circuit of the unit.
Maximum time to reach the imposed
nitrogen pressure.
43
____________________________________________________________
Manual 8.014.0.047
9.7.2 USER
Pushing the Operator button from the screen of fig. 9.7.1 it is possible to enter in the user code
manage screen (fig. 9.7.3).In this page is possible show or modify the user code and insert a new
one.
44
____________________________________________________________
Manual 8.014.0.047
ACTION
to change the existent data and/or introduce
new ones.
to cancel the selected user code.
turn back to the stock manage main screen
(fig. 9.7.1)
Figure 9.7.4: date introduction of the date for the test research
BUTTON
OK
CANCEL
ACTION
to look the effectuated test in the defined
period.
turn back to the screen of fig. 9.7.1.
45
____________________________________________________________
Manual 8.014.0.047
REMARK:
During the introduction of the date must be followed the same points:
The date introduced in the window to the date must be successive to the date introduced in
the window from the date.
The introduced date must be a valid date.
If the introduced dates are valid, pushing the button OK the software will show the entire
effectuated test between that periods. For the description of the test see the section 9.7.5(test)
Figure 9.7.5: introduction of the model code for the test research
BUTTON
OK
Cancel
ACTION
to show the effectuated test in the defined
period.
the software turn back to the screen of
figure 9.7.1.
46
____________________________________________________________
Manual 8.014.0.047
ACTION
To look the exit of the test with an
histogram graphic
To cancel the selected test.
Turn back to the stock test main manage
screen (fig. 9.7.1).
47
____________________________________________________________
Manual 8.014.0.047
Here follow is reported the meaning of the showed parameters in the test screen:
LABEL
TEST DATA
TEST HOUR
MODEL
DESCRIPTION
OPERATOR CODE
RESULT
COMMENT ON RESULT
NUMBER OF CHAMBER
CIRCUIT NUMBER
NITROGEN PRESSURE (PSI)
PRESSURE FALL (PSI)
HELIUM PRESSURE (PSI)
LEAK VALUE
ORDER
MEANING
Data of the effectuated test.
Hour of the effectuated test
Alphanumeric code of the tested
component.
Description of the model
User code of the user who made the test
Alphanumeric value corresponding to the
exit of the test: -1 means a test with
positive result, 0 a test with a negative
result
Short comment to the exit of the test.
Number of the chamber where the test is
made
Number of the junction where the test was
made.
Nitrogen pressure reached for the
mechanical resistance test.
Decay pressure value into the circuit.
Helium pressure reached for the test of
leakage research with mass spectrometer
Leak value measured during the test.
Order number.
48
____________________________________________________________
Manual 8.014.0.047
Figure 9.7.7:
BUTTON
SAVE
EXIT
49
____________________________________________________________
Manual 8.014.0.047
In case of temporary power supply failure can be lost the machines parameters
temporary stored in the pc ram.
Warning
Its necessary to do pc shut-down before switch off the power supply of the
machine.
50
____________________________________________________________
Manual 8.014.0.047
51
____________________________________________________________
Manual 8.014.0.047
10.4 ANNUAL
Change the oil of all the rotary vane pumps of the plant.
Change the seal of the test chamber
Change the seal of the vacuum circuit
Change the o-rings of the pneumatic valve
Helium check of the piping
Make calibration of the instruments (vacuum gauge, pressure switch, mass spectrometer,
flux measure) and calibrated leak.
Make revision of analysis rotary vacuum vane pump.
Clean the cell of the mass spectrometer
Clean and change the kit o-ring vacuum valve
Clean and change the kit o-ring pressure valve
54
____________________________________________________________
Manual 8.014.0.047
FAILURE OR ANOMALY
The main switch doesnt switch on
POSSIBLE CAUSE
Switch QS1 breakdown
Not make the switch on of rotary movement
____________________________________________________________
Manual 8.014.0.047
56
____________________________________________________________
Manual 8.014.0.047
Mass spectrometer
alarm
ID:5
Emergency activated
ID:6
MEANING
POSSIBLE CAUSE
Chambers vacuum
pump thermal
protection
ID:7
Components vacuum
pump thermal
protection
ID:8
Spectrometer not
ready
ID:9
Spectrometer error
ID:10
Spectrometers
A motor protector of a vacuum
vacuum pump thermal chamber pump is tripped
protection
ID:11
____________________________________________________________
Manual 8.014.0.047
alarm
ID:36
Helium discharge
alarm
ID:45
Chamber opening
alarm
ID:46
Chambers vacuum
reading error
ID:57
Circuit pressure
reading error
ID:58
59
____________________________________________________________
Manual 8.014.0.047
INFORMATION
MEANING
Vacuum valve
maintenance
Pressure valve
maintenance
Please wait
ACTION
Push ACK (blue) for open the
chamber and unlocked the
component refuse.
Make a maintenance at the vacuum
valve and reset the counter
60
____________________________________________________________
Manual 8.014.0.047
GALILEO TP CODE
Pressure transducer
Vacuum head PIRANI
Pressure regulator
Two way valve
Electrovalve 3/2 24 v
Electrovalve 2/2 high pressure
Electrovalve 3/2 230 V
Spectrometer filament
Vacuum oil 25 lt
Vacuum pneumatic valve DN80
Vacuum pneumatic valve DN100
Vacuum pneumatic valve DN63
Kit o-ring vc300
Vc 50 exhaust filter
Vc 300 exhaust filter
Filament collector
Magnetic sensor d-73
Pneumatic cylinder
Kit filter zeoliti
5.501.0.072
5.025.0.109
5.016.0.067
5.004.0.190
5.005.0.004
5.005.0.150
5.005.0.058
5.026.0.190
5.023.0.014
5.004.0.251
5.004.0.252
5.004.0.250
5.001.1.205
5.007.0.071
5.007.1.206
5.026.0.0179
5.501.0.123
5.002.0.091
5.007.0.076
61
____________________________________________________________
Manual 8.014.0.047
7.001.0.168
7.001.0.168
7.002.0.255
7.002.0.255
7.002.0.255
62
____________________________________________________________
Manual 8.014.0.047