The document provides formulas and definitions for key project management terms related to earned value analysis, time estimation techniques, communication channels, project selection methods, and cost of quality. It consolidates formulas for PMP exam preparation covering topics like CV, SPI, ETC, EAC, variance, PERT, standard deviation, NPV, IRR, payback period, and more.
Download as DOCX, PDF, TXT or read online on Scribd
100%(2)100% found this document useful (2 votes)
228 views
PMP Formulas
The document provides formulas and definitions for key project management terms related to earned value analysis, time estimation techniques, communication channels, project selection methods, and cost of quality. It consolidates formulas for PMP exam preparation covering topics like CV, SPI, ETC, EAC, variance, PERT, standard deviation, NPV, IRR, payback period, and more.
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2
My Notes on PMP (Formulas)
Following are the Formulas I consolidated for PMP preparation
Earned Value Analysis PV (Planned Value) = BCWS (Budgeted Cost of Work Schedule) EV (Earned Value) = BCWP (Budgeted Cost of Work Performed) AC (Actual Cost) = ACWP (Actual Cost of Work Performed)
CV = EV AC SV = EV PV CPI = EV / AC SPI = EV / PV
ETC = BAC EV [Future Variances are Atypical or Not Consistent or Di similar] ETC = (BAC EV) / CPI [Future Variances are Typical or Consistent or similar]
EAC = BAC / CPI [simplest formula: typical or no variances] EAC = AC + ETC [Initial Estimates are flawed] EAC = AC + BAC EV [Future variances are Atypical or Not Consistent or Di similar] EAC = AC + BAC EV / CPI [Future Variances are Typical or Consistent or similar]
VAC = BAC EAC
% COMPLETE = EV / BAC x 100 % SPENT = AC / BAC x 100
CV% = CV / EV x 100 SV% = SV / PV x 100
Float or Slack LS - ES and LF EF
MEAN -> Average MODE -> The most found number RANGE -> Largest - Smallest Measure. MEDIUM -> No in the middle or avg. of 2 middle Nos
PERT = O + 4ML + P / 6 STD. DEV. OF TASK = P O / 6 TASK VAR. = [(P - O)/6 ] squared = Std. Dev ^ 2 CP STD. DEV. = + +
SIGMA 1 = 68.26 2 = 95.46 3 = 99.73 6 = 99.99
Channels of Communication (N x (N 1)) / 2
Project Selection PV = F V / (1+r) (or) FV = PV x (1+r)
Cash Flow = Cash Inflow Cash Outflow Discounted Cash Flow = CF x Discount Factor ARR = S Cash Flow / No. of Years ROI = (ARR / Investment) * 100 % Bigger is better BCR = Benefits / Cost
Benefit Cost Ratio (BCR) Bigger is better ((BCR or Benefit / Cost) Revenue or Payback VS. cost) Or PV or Revenue / PV of Cost
Net Present Value (NPV) = Net Present Value Bigger is better
Internal Rate of Return (IRR) Bigger is better
Payback Period Less is better Net Investment / Avg. Annual cash flow
Exp. Value = Probability % x Consequence $
Class of Estimates Definitive +5% Capital Cost +10-15% Appropriation +15-25% Feasibility +25-35% Order of Magnitude > +35% (-50 - 75%)
Contract Incentives Savings = Target Cost Actual Cost Bonus = Savings x Percentage Contract Cost = Bonus + Fees Total Cost = Actual Cost + Contract Cost
Expected Monetary Value Probability * Impact
Point of Total Assumption (PTA) ((Ceiling Price - Target Price) / buyer's Share Ratio) + Target Cost
To Complete Performance Index [TCPI] Values for the TCPI index of less then 1.0 is good because it indicates the efficiency to complete is less than planned. How efficient must the project team be to complete the remaining work with the remaining money? ( BAC - EV ) / ( BAC - AC )
Cost of Quality (CoQ) = ( ( Review Efforts + Test Efforts + Training Efforts + Rework Efforts + Efforts of Prevention) / Total efforts) x 100 %
Download Full (Ebook) Achieve PMP Exam Success: A Concise Study Guide for the Busy Project Manager by Margaret Y. Chu, Diane Altwies, Edward Walker ISBN 9781932159370, 1932159371 PDF All Chapters
Download Full (Ebook) Designing Data-Intensive Applications: The Big Ideas Behind Reliable, Scalable, and Maintainable Systems by Martin Kleppmann ISBN 9781449373320, 1449373321 PDF All Chapters
PDF (Ebook) Math for wastewater treatment operators grades 3 and 4 : practice problems to prepare for wastewater treatment operator certification exams by Giorgi, John ISBN 9781613000793, 1613000790 download