External Prestressing Bavarian Examples
External Prestressing Bavarian Examples
c x ,
( / ) . G, P(t), Q
k
3 0 0
c x ,
axial concrete stress
G dead load of the structure
P(t) value of prestressing force at time t including loss of prestress due
to creep, shrinkage and relaxtion
Q
k
road traffic load according to the model of DIN 1072
- limit state of tensile stresses in concrete during construction
c
( ) . G, P(t), Q N / mm fr B 35 30
c
( ) . G, P(t), Q N / mm fr B 45 35
c
concrete stress in the extreme fibre of the section
G dead load of the structure
P(t) value of prestressing force at time t including loss of prestress due
to creep, shrinkage and relaxtion
Q variable actions according (snow, wind, settlement )
- limit state of tensile stresses in concrete in transverse direction
c
( ) . G, P(t), Q N / mm fr B 35 4 0
c
( ) . G, P(t), Q N / mm fr B 45 50
c
concrete stress in the extreme fibre of the section
G dead load of the structure
P(t) value of prestressing force in transvers direction at time t including
loss of prestress due to creep, shrinkage and relaxation
Q variable actions (snow, wind, traffic )
- limit state of steel stresses
stresses at tensioning
po ptk po ptk
f f
,max ,max
. . = = 085 0 75 or whichever is lesser
stresses immediately after tensioning
po ptk po ptk
f f
,max ,max
. . = = 080 070 or whichever is lesser
- limit state of cracking
The minimum reinforcement is provided according to DIN 4227-1
- ultimate limit state of fatigue
Crack width is controlled according to DIN 4227
- ultimate limit state
175
125
1 75
10
15
.
.
,
.
.
+ +
G Q P R
- shear
For the limit state of serviceability no analysis of the stresses is necessary. In ultimate
state the analysis has to be undertaken according to DIN 4227 -1.
In the addition regulation contains some detailing constructions rules for the anchorages,
deviators size of tendons and provisions for fixing additional tendons..
5. New Bavarian Bridges - Standard Construction Method
After introducing of external prestressing as a standard design method five new bridges
are built or designed in Bavaria. They are listed in the Tab.1.
Name Road Spans Alignment Implementation Method +
Trajectory of tendon
Ruderting (finished) B 85 36+4x45+36 = 252 m straight falsework
Hllthalbrcke St 2116 35+43+50+43+35= 206
m
straight falsework
Talbrcke
Mnchberg
A9 44.25+7x52+44+42.25=
= 496.50 m
straight incremental lauching
internal straight +
external deflected tendons
Talbrcke Trockau A9 51+55+60+85+100+85+
60+55+51= 602 m
double bend scaffold carriage
straight + deflected tendons
Naabtalbrcke A6 39.5 + 7x48.5 + 41.5 +
37.0= 457.5 m
circle R=1800 m incremental laucing
Schilternbachtal-
brcke
A6 41.6+2x52.0+41.6=
= 187.2 m
circle R=2200m falsework
Tab.1: Bavarian bridges with external pre-stressing
The Hllthalbrcke (Fig.7) is now under construction. The conditions of the bid were
similar to the Ruderting bridge. The offer from the company DYWIDAG AG was the
most economical. The superstructure is a single box girder with high of 3.0 m, the
slenderness of the middle span h / L = 1/16.7 (Fig.8).
The tendons are straight and the span-by-span implementation method with falsework
was chosen.
Fig.7 : View on the Hllthalbrcke
Fig.8 : Hllthalbrcke: superstructure cross-section in the span, view of pier
The superstructures of the other new bridges are still in the state of planing and design.
The length and alignment of the bridges give good conditions to application of different
technologies and implementation methods. Both the external pre-stressing only and the
combination of external and internal prestressing will be applied. The straight and
deflected layout of tendons as well as their combination will be used.
The different possible construction methods are planned. The incremental lauching as
well as span-by-span with falsework and scaffold carriage will be applied.
Therefore, interesting structures are expected.
The variety of the bridge buildings shows that the external pre-stressing is able to fulfil
the same requirements as the traditional internal prestressing and sets no limitations for
the design.
6. References
[1] Dischinger, F.: Entwicklungen und Fortschritte im Eisenbeton. In: Neues Bauen im
Eisenbeton. Deutscher Beton-Verein E.V. 1937, pp. 7 - 37.
[2] Eibl, J.: Brcken mit externer Vorspannung: Deutscher Beton-Verein E.V.,
Vortrge Betontag 1989, pp. 259 - 273
[3] Vo, W.: Alternativen zur konventionellen Vorspannung im Brckenbau; Deutscher
Beton-Verein E.V., Vortrge Betontag 1989, pp. 244 - 258
[4] Matthes, M.; Weber, J.; Zilch, K.: Talbrcke Ruderting - Eine sechsfeldrige
Brcke auf Lehrgerst mit externer Vorspannung. Vortrag auf dem Deutschen
Betontag 1997
[5] Metzler, H.; Schmitz, Chr.: Spannbetonbrcken mit externer Vorspannung -
Historischer Rckblick und Erfahrungen einer Straenbauverwaltung. Bauingenieur,
Vol.73, Feb. 1998