Project Planning: CITS3220 Software Requirements & Project Management

The document discusses the importance of project planning and different planning techniques. It emphasizes that proper planning prevents poor performance by anticipating problems and issues. There are several key steps to project planning: [1] identifying tasks and their dependencies; [2] setting milestones to track progress; and [3] using tools like Gantt charts and PERT charts to schedule tasks and identify the critical path. Effective plans clearly define deliverables, responsibilities, risks, and acceptance criteria to help control the project.

Uploaded by

saleemm_2
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
63 views

Project Planning: CITS3220 Software Requirements & Project Management

The document discusses the importance of project planning and different planning techniques. It emphasizes that proper planning prevents poor performance by anticipating problems and issues. There are several key steps to project planning: [1] identifying tasks and their dependencies; [2] setting milestones to track progress; and [3] using tools like Gantt charts and PERT charts to schedule tasks and identify the critical path. Effective plans clearly define deliverables, responsibilities, risks, and acceptance criteria to help control the project.

Uploaded by

saleemm_2
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 22

Project Planning

CITS3220 Software Requirements &


Project Management
Why plan ?
! The superior programmer uses
superior planning skills
to avoid having to use
superior crisis management skills
! British Army Saying (The 6 P's)
Proper Planning Prevents Piss Poor
Performance
Issues in Project Management
(a reminder)
! Before starting the project:
" planning, estimation, risk analysis;
! While doing the project:
" monitoring, evaluation, metrics;
! After the project is done:
" assessment and improvement
Overview of Todays Lecture
! Issues
" Why plan? Whats in a plan? Human factors
! Definitions and Techniques
" planning steps; work breakdown structure;
critical path analysis and PERT charts; Gantt
charts
Why Plan ?
! Control of the project is based on derivation from the
plan
! Communication of roles, responsibilities and resource
requirements
! Strategy enables trade-offs in the cool light of day rather
than within a deadline panic
! Risk management anticipates problems and provides a
management strategy
! Granularity how much planning to do?
A plan is a living document
Questions for Project Managers
! What is the scope of our project?
! What gets delivered for the available time,
people, $? (And what won't we do?)
! What resources do we need?
! How do we tell where we are?
! Are we on schedule?
! Are we on budget?
! How do we communicate our plan inside &
outside the team?
The W
6
H
3
elements of a plan
! Objectives
" WHY is the system being
built?
! Deliverables
" WHAT has to be produced?
! Milestones
" WHICH process stages are
needed for control?
! Methods
" HOW will the tasks be done
(technically)?
! Resources
" WHERE do we get the
people/tools for the work?
! Risks
" HOW will potential problems
be minimised?
! Schedule
" WHEN will the stages be
completed?
! Verification
" HOW will we know the
system is correct?
! Responsibility
" WHO is responsible for
ensuring completion?
An effective plan includes
! Business perspective financial, technical commercial
! Deliverable components and the tasks required
! Clearly defined organizational responsibilities
! Product requirements and deliverables
! Risk quantified in $ or hours and risk management
strategy proposed
! Sensible task durations e.g. 2 months max
! Sensible task size (e.g. 1 to 2 person-months)
! Defined acceptance criteria
A poor plan
! only technical perspective or only task view
! no clear assignment of responsibility for
production of deliverables
! no milestones or acceptance criteria
! risk ignored or buried in bloated estimates
! long task durations (e.g. 1 year)
! very large tasks (eg 20 people for 2 months)
! no process to guarantee the clients needs are
met
Human Factors in Project
Planning
! people tend to be risk averse when there is a potential of
loss
! people are unduly optimistic in their plans and forecasts
! people prefer to use intuitive judgment rather than
(quantitative) models
! Managers are people also, and these human tendencies
apply to the managers who make business decisions at
the project to the executive level.
Tasks, Milestones &
Deliverables
! Tasks
" activities which must be completed to achieve
the project goal
! Milestones
" important checkpoints
! Deliverables
" milestones with an external output
Work Breakdown Structure
(WBS)
! A to-do list, sorted by category
! Task description (what)
! Estimated time (length)
! Person responsible for task (who)
! Resources required
! Cost ($)
3 Steps to a Project Plan
! Step 1: Identify Tasks & Resources
! Step 2: Identify Milestones
! Step 3: Analyse Dependencies and
Define Schedule with a Gantt Chart
Initial Plan, Tasks and
Resources
! Tedious and hard......but must be done
! What ==> tasks
! When ==> schedule
! How ==> people, materials, equipment
costs
! Set scope and avoid "scope creep"
Identifying Tasks & Resources
! State each task using "verb-noun" form
" Examples: Write manual; Implement Prototype;
Review requirements with client
! Use appropriate level of detail
! Function, not form, known at start of project
" Example: "Build concept demonstration prototype"
! Make each task significant
" e.g. Identify competitive products" not "Go to library
Defining tasks is hard but worthwhile!
Milestones
! Key targets for completion of certain phases of a project
! A milestone requires both the state of the task/phase
and a date/time to be set.
! Some typical SE milestones
" requirement specifications completed
" key plans completed
" systems documentation completed
" test data sets completed
" tests run with user prepared test data completed
" user manuals completed
" acceptance testing completed
" post-implementation review completed
Milestones
! Types of milestones
" Provide tangible interim goals
" Demonstrate progress and so provide
motivation
" Used to enforce schedule
! State each milestone in "noun-verb" form
Examples: Mission stated; Mid-quarter
review presented; Prototype completed
Scheduling &GANTT charts
! Gantt charts
" Best basic scheduling tool
" Developed in 1917 by Henry L. Gantt
! Pick appropriate time scale (days/wks)
! Method of tracking progress
! Who is responsible
! Good software (e.g. MS Project) is available.
! GANTT charts dont show dependencies
explicitly
Source http://searchcio.techtarget.com/
Gantt Chart components
! horizontal axis = total time span of the project
! vertical axis = project tasks
! horizontal bars = sequences, timing, and time
span for each task
! bar spans (tasks) may overlap
! secondary bars, arrowheads, or darkened bars
added as project progresses to indicate
completed tasks
! vertical line = report date
PERT charts
! Programme Evaluation & Review
Technique
" Explicitly shows dependency and parallel
tasks
" Shows critical path and where flex time is
" Can be hierarchical (with sub-tasks)
Source http://searchsmb.techtarget.com/