Control Plan
Control Plan
- Voice of the
Customer -Business Plan/ Marketing Strategy
-Product/Process Benchmark Data
-Design Goals
-Reliability and Quality Goals
-Design Failure Mode and Effects Analysis (DFMEA) -Design for Manufacturability and Assembly -Design Verification
-Packaging Standards
-Production Trial Run -Measurement Systems Evaluation -Preliminary Process Capability Study
-Reduce Variation
Customer Satisfaction
-Delivery and Service
-Preliminary Process flowchart -Preliminary Listing of special product and process Characteristics -Product Assurance Plan
-Management Support
-Product/Process Assumptions
-Product Reliability
Studies -Customer Inputs
-Process Failure Mode and Effects Analysis (PFMEA) -Pre-Launch Control Plan -Process Instructions -Measurement System Analysis Plan -Preliminary Process Capability Study Plan -Packaging Specifications -Management support
-New Equipment, Tooling and Facilities -Special Product and Process Characteristics -Gages/Testing Equipment Requirement
-Team Feasibility Commitment and Management Support