Specifications: General Conditions
Specifications: General Conditions
GENERAL CONDITIONS
a. All work to be done shall conform to the standard and accepted construction practice and workmanship. b. All materials to be used shall be of good quality and approved by the owner. c. Any changes made on the finishing works shall be the discretion of the owner. d. Changes and alteration on the plans shall be in consultation with the architect with the approval of the owner. e. Clearing of debris and other waste materials during the construction period shall be cleared by the contractor.
I. SITE PREPARATION
a. Staking out of the building and establishment of lines and grades with reference on the condition of the site. b. Stake out accurately the building lines and erect batter boards and reference marks in such place where they will not be disturb during the construction of the foundation works. c. Structural excavations shall be at a depth indicating bearing values before pouring of concrete. Remove all old foundation footings that will disturb the setting of column footings. d. Filling and backfilling shall be done after forms have been removed from the foundation wall and when is hard enough to resist the pressure resulting from the fill and backfilling. All filling materials shall be placed in layers not exceeding six inches in thickness each layer being thoroughly compacted and rammed by wetting tamping and rolling.
V. CARPENTRY WORKS.
a. All wood to be used shall be the approved type and quality of their respective kind for various part of the scope work. b. 1ood shall be well seasoned thoroughly dry 2 free from saps unsound knots 2 other imperfections impairing its strength durability and appearance. c. Fabrication of door3ambs and panels shall be part of the scope of works. d. Ceiling along third floor shall be 4$ thk marine plywood.
). 6very &0.'' meters of hori(ontal run of pipes. #. At the end of every hori(ontal run of pipes. e. !igestive chamber of septic tank shall be water proof. f. /ot less than .)' meters of air space must be left between the tap of the sewerage under part of the septic tank roof. g. /o septic tank shall be constructed under the building. h. All fixtures to be installed shall be of -hilippine standard. i. All plumbing works shall be done under the direct supervision of a licensed or master plumber.
X. PAINTING WORKS
a. All painting works shall be done in three coats with proper treatment preparation prior to the application of the final coat. b. All Colors shall be recommended by the architect with the approval of the owner. c. !avies paint shall be use as painting materials.
XI. OTHERS
a. Anti anay shall be applied to wood prior to installation. b. Foundation works shall be treated with anti anay.
Prepared b !
Appr"#ed b !
$ONEL CENTENO