O&M Manual For FCU

This document provides operation, maintenance, and testing information for a building HVAC system. It includes: 1) A description of the HVAC equipment installed including fan coil units. 2) Instructions for operating and maintaining the fan coil units, including monthly, semi-annual, and annual maintenance schedules. 3) Equipment schedules and supplier lists. 4) Drawings and spare parts lists. 5) Catalog information and a test report for commissioning the fan coil units.

Uploaded by

Beatrice Li
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
50% found this document useful (2 votes)
1K views30 pages

O&M Manual For FCU

This document provides operation, maintenance, and testing information for a building HVAC system. It includes: 1) A description of the HVAC equipment installed including fan coil units. 2) Instructions for operating and maintaining the fan coil units, including monthly, semi-annual, and annual maintenance schedules. 3) Equipment schedules and supplier lists. 4) Drawings and spare parts lists. 5) Catalog information and a test report for commissioning the fan coil units.

Uploaded by

Beatrice Li
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 30

OPERATION AND MAINTENANCE MANUAL FOR

Client Architect E&M Consultant Main Contractor

: : : :

MVAC Contractor :

Dated :

PROJECT INFORMATION

Project Title Project No. Client Contractor Contract Person Telephone Fax No.

: : : :

: :

CONTENT
1. S STEM DESC!"PT"#N $.$ Scope o% &or's

$.( S)ste* Description 2. #PE!AT"N+ AND MA"NTENANCE "NST!,CT"#N (.$ Manual #peration (.( Maintenance Schedule (.(.$ Monthl) &or's (.(.( -al% earl) &or's (.(.. Annual &or's 3. E/,"PMENT SC-ED,0E ..$ Fan Coil ,nits 4. 5. 6. 7. 8. S,PP0"E! 0"ST EME!+ENC CA00 AS1F"TTED D!A&"N+ 0"ST SPA!E PA!TS 0"ST E/,"PMENT CATA0#+,E 2.$ Fan Coil ,nits 9. TEST AND C#MM"SS"#N"N+ !EP#!T

3.$ Fan Coil ,nits Test !eport4

1. SYSTEM DESCRIPTION $.$ Scope o% 5or's


"n this project6 our scope o% 5or's includin7 suppl) and install o% :1
A. Fan Coil ,nit

$.(. S)ste* Description

The Proposed De8elop*ent is located at.

a9 Fan Coil ,nits Fan coil units are installed in all area located on 0+ %loor6 ,+ %loor and +round %loor 5hich re:uired indi8idual air1conditionin7 control. Fresh air %or those roo*s has ;een pro8ided ;) pre1treated air supplied ;) pre1treated air handlin7 units. Electrical duct heaters are pro8ided %or so*e roo*s and co**on area.

2. OPERATION AND MAINTENANCE INSTRUCTIONS


(.$. Manual #peration a9 Fan Coil ,nit Start $. Ensure %use spur %or FC, is nor*al

(. S5itch on %an at 5all *ounted ther*ostat .. FC, starts St ! $. S5itch <o%%= %an at 5all *ounted ther*ostat (. FC, Stops

(.( 2.2.1

MA"NTENANCE SC-ED,0E >MVAC9 M "t#$% & r'( )a* +,",ra$ >i9 To chec' the 7eneral condition o% the plant and e:uip*ent. To ensure that the plant and e:uip*ent are satis%actoril) operatin7

>ii9 >iii9 >i89 >89

>8i9 >8ii9

5ithin desi7n conditions4 To chec' the lu;ricatin7 s)ste* o% all runnin7 parts4 cleanin76 7reasin7 and oilin7 5here necessar)4 To chec' an) 5ater lea'a7e %ro* the pipe 5or' and to repair i% re:uired4 Visual chec'in7 on all suppl) and return 7rilles and lou8ers6 cleanin7 i% necessar)4 To chec' the corrosion o% *etal sur%ace6 %ra*e5or' and support?*ountin7 ;rac'ets6 etc.6 and to reinstate the sur%ace ;) re*o8in7 rust and repaint i% necessar)4 To chec' the operation conditions o% the 5ater treat*ent s)ste*. To chec' & record the readin7 o% the pressure & te*perature 7au7e at suction and dischar7e 5ater pipe 5hich are on nor*al operatin7 condition.

)-* Fa" C .$ U".t( >i9 To chec' that the %an coil units and its control?sensin7 de8ices are %unctionin7 properl) and inspect drain pipes to ensure no clo77in7 and %loodin7. !ecti%) i% necessar)4 To chec' and clean the condensin7 5ater drain pan6 drain pipes to ensure no clo77in7 and %loodin7. !ecti%) i% necessar)4 and Visual chec'in7 on sur%ace condition o% the suppl) and return air 7rilles and %ilter6 cleanin7 as necessar). To chec' the operation and o8erheat cut1out o% duct heater i% a8aila;le

>ii9 >iii9 >i89

1.2.2

/a$0 Y,ar$% & r'(

-al%1)earl) ser8ice and *aintenance shall include the %ollo5in7 ite*s:1 >a9 To inspect the condition o% pipe %ittin7s6 supports6 duct5or's6 han7ers6 etc.6 %or si7n o% corrosion. !e*o8e the rust and repaint 5ith pri*er and %inish coatin7 as necessar)4 >;9 To chec' the per%or*ance o% controls and sa%et) cut1outs and

>c9 >d9 >e9 >%9

>79

>h9

>i9

chec' all control panel indication la*ps6 recti%) as re:uired4 To clean electrical panels includin7 5irin7 ter*inals and connection points as re:uired4 To touch up 5ith %inish1coatin7 5here there is an) rust or si7n o% corrosion o% the e:uip*ent ;) %irst re*o8in7 the rust?corrosion4 To chec' and adjust6 i% necessar)6 the air %lo5 in the air1duct5or' s)ste*4 Visual chec'in7 on air1cooled chiller@s condenser coils6 cleanin7 ;) hi7h1pressure 5ater or stea* jet 5ith appro8ed cleanin7 deter7ent i% necessar)4 Visual chec'in7 on coolin7?heatin7 coils o% all A-,s? PA,s>excludin7 %an coil units96 cleanin7 ;) hi7h1pressure 5ater or stea* jet 5ith appro8ed cleanin7 deter7ent i% necessar)4 To chec' and ser8e all "A/ control and sensin7 e:uip*ent includin7 C#( sensors6 air *o8e*ent sensors6 ther*ostat6 pressure sensors6 te*perature sensors and 8olu*e control da*pers as necessar)4 and To inspect all co*ponents o% 8entilation s)ste* %or cleanliness and *icro;ial 7ro5th and clean the* as necessar) at no cost to +o8ern*ent.

1.2.3

A""1a$ & r'( >a9 To inspect the condition o% pipe %ittin7s6 supports6 duct5or'6 han7ers6 etc.6 %or si7n o% corrosion. !e*o8e the rust and repaint 5ith pri*er and %inish coatin7 as necessar)4 >;9 To chec' the condition o% pipe 5or' and duct5or'. !econdition and i% instructed6 replace the deteriorated portion in accordance 5ith

accepta;le en7ineerin7 practice and standard4 >c9 To re%it the isolatin7 8al8es6 chan7e the 8al8e 7land and 7as'et6 and recondition the 7lo;e 8al8es6 etc. i% necessar)4 >d9 To exa*ine6 chec' and *aintain the proper operation o% associated electrical panels in the plant roo*. !epair and rene5 as appropriate4 >e9 To chec'6 test and recali;rate or replace as necessar)6 all control and sa%et) de8ices4 >%9 To chec'6 test6 adjust6 clean and repair?recti%) de%ects i% re:uired %or all electronic circuit ;oards and control? sensin7? detection de8ices includin7 ;uildin7 auto*ation s)ste* i% a8aila;le in the s)ste*4

>79 To inspect and clean all internal sur%ace o% duct5or' includin7 the suppl) and return air plenu*s i% necessar). The cleanin7 o% the duct5or' shall not a%%ect the nor*al operation o% the ;uildin7. The contractor shall arran7e the cleanin7 a%ter the o%%ice hours o% the ;uildin74 >h9 To inspect alu*inu* %oil6 paints or other concrete sealin7 la)ers and 5all sur%ace 5hich *eant to stop radon 7as e*ission and pro8ide all necessar) touch up 5or'4 and >i9 Chec' operation o% all %ire da*per6 %ire & s*o'e da*per and issue the 8entilation certi%icate

3. E2UIPMENT SC/EDULE 1.1 Fa" C .$ U".t

4. SUPPLIER LISTS

5. EMER+ENCY CALL
Contractor Contact Person : :

6. AS3FITTED DRA&IN+
Dra5in7 !e%. No. !e8ision Description

7. SPARE PARTS LIST


!eco**end Spare Parts 0ist "te* $ ( . B C E Aa7 %ilter Panel %ilter Ther*ostat 1 Fuse %or control? indicatin7 panels Fuse %or *otor control cu;icle "ndicatin7 la*p and li7ht ;ul;s 1 E:uip*ent Description (B= >-9 x (B= >&9 (B= >-9 x $(= >&9 C3D** >-9 x C3D** >&9 C3D** >-9 x (3D** >&9 &all Mounted EA Control Fuse EA Control Fuse &hite !ed Alue +reen /uantit) . nos. $ nos. . nos. $ nos. . nos. . nos. . nos. . nos. . nos. . nos. . nos.

F 2 3

Pressure 7au7es 1 Ther*o*eter Ge) %or DDC Panel6 "nter%acin7 Aox6 Chiller ,nits and C!AC ,nits Spanner $(= Fusi;le 0in' >E2 De7 C9 0u;ricatin7 #il

!an7e: D1FDD 'Pa Diesel T)pe N.A.

. nos. . nos. . nos.

$D $$ $(

N.A. N.A. N.A.

$ set C nos $ +al

1. E2UIPMENT CATALO+UE
Catalo7ue "ndex $. Fan Coil ,nit

2.$ Air Cooled Chiller

2.( Chilled &ater Pu*p

2.. Pre1Treated Air -andlin7 ,nit

2.C Split T)pe A?C ,nit

2.E -eat Exchan7er

2.F MCC S5itch;oard

2.2 Val8e and Accessories

2.3 &ater Treat*ent

2.$D Ventilation Fan

2.$$ V!V

2.$( Filter

2.$. Silencer

2.$B Sprin7 "solator

2.$C Air Puri%ier

2.$E Air Curtain

9. TEST AND COMMISSIONIN+ REPORT


Test !eport "ndex 3.$ Fan Coil ,nit Test !eport4

3.$ Fan Coil ,nits Test !eport