SITE CLEARING
***************************************************************
This section includes clearing site of incidental paving and
curbs, debris, grass, trees, and other plant life in preparation
for site or building excavation work.
This section includes provision for Work performed using unit
price payment method, when applicable.
Manufacturers listed in this section were identified by
Architects First Source, Inc. (AFS) as representative and not
as an endorsement for meeting this specification. Contact AFS
at 800-395-1988 for product listing.
This section includes performance, proprietary, and descriptive
type specifications. Edit to avoid conflicting requirements.
***************************************************************
GENERAL
SUMMARY
***************************************************************
Include last statement of the following paragraph when topsoil
excavation is included in this section. An alternative location
for specifying topsoil is in Section 02315. Topsoil removal is
specified in 02311. Edit this section and coordinate accordingly.
***************************************************************
02230 - 1
Site Clearing
Section [______-____________]:
Tree pruning.
02230 - 2
Site Clearing
Site Clearing:
Basis of Measurement: By the square [yard]
[foot] (square [meter] [________]).
Basis of Payment: Includes clearing site,
loading and removing waste materials from
site, applying herbicide to designated
plant life.
PRODUCTS
MATERIALS
Herbicide:
[________________].
EXECUTION
EXAMINATION
Section 01300 - Administrative Requirements:
Verification of existing conditions before
starting work.
Verify existing plant life designated to remain is
tagged or identified.
***************************************************************
Include the following paragraph when removed products are to be
kept on-site.
***************************************************************
02230 - 3
Site Clearing
02230 - 4
Site Clearing
02230 - 5
Site Clearing
02230 - 6
Site Clearing