Automation Check List

This document contains summaries of several instrumentation and control system commissioning checklists, including checklists for instrumentation switches, transmitter loops, modulating control devices, PID controllers, PLC discrete inputs, and PLC discrete outputs. The checklists provide a means to systematically inspect, test, and verify the proper installation, configuration, and functionality of various field instruments and control system components.

Uploaded by

renjithv_4
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views

Automation Check List

This document contains summaries of several instrumentation and control system commissioning checklists, including checklists for instrumentation switches, transmitter loops, modulating control devices, PID controllers, PLC discrete inputs, and PLC discrete outputs. The checklists provide a means to systematically inspect, test, and verify the proper installation, configuration, and functionality of various field instruments and control system components.

Uploaded by

renjithv_4
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

INSTRUMENTATION SWITCH CHECKLIST

Page

1 of 1

Project Facility: Area : Project Name: Bid Opportunity: Instrument Tag: Manufacturer: Description: Model: Inspection Checklist No. 1. 2. 3. 4. 5. 6. 7. 8. 9. Item to be Inspected Instrument type and class per P&ID and specification Instrument tag(s) installed and correct Installation of sensor complete and correct Block and drain valves Pneumatic / hydraulic tubing leak tested Heat tracing / insulation / instrument housing Wiring correct Drawings marked up as-built HMI Graphic symbol and tag correct State Checklist State 0 1 Calibration Transition 01 10 Comments: Setpoint Trip Point (incl. units) Actual Trip Point (incl. units) Setpoint Time Delay Actual Time Delay Pass (P/F) State Desc PLC Input Local HMI SCADA On On Alarm Off Off N/A Pass (P/F) Comments Pass (P/F) Serial Number:

Company Tested By Witnessed By

Name

Signature

Date (yyyy/mm/dd)

Form F-INST-SW-CHECKLIST Rev 00, Created by SNC-Lavalin Inc Form F-LOOP-CHECKLIST Rev 00, Created by SNC-Lavalin Inc. L:\40ENG\48I&C\Commissioning Forms\F-INST-SW-CHECKLIST.doc

INSTRUMENTATION TRANSMITTER LOOP CHECKLIST

Page

1 of 2

Project Facility: Area : Project Name: Bid Opportunity: Instrument (Sensor / Element) Tag: Manufacturer: Description: Model: Transmitter Tag: Manufacturer: Units: Output 4-20 mA 0-10 V Description: Model: Design Range: Modbus Ethernet IP Other: Serial Number: Serial Number:

Inspection Checklist No. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. Item to be Inspected Instrument type and class per P&ID and specification Instrument tag(s) installed and correct Installation of sensor complete and correct Block and drain valves Pneumatic / hydraulic tubing leak tested Heat tracing / insulation / instrument housing Impulse lines pressure tested Wiring correct Drawings marked up as-built HMI Graphic symbol, tag and units correct Comments Pass (P/F)

Form F-INST-TRANS-CHECKLIST Rev 00, Created by SNC-Lavalin Inc. L:\40ENG\48I&C\Commissioning Forms\F-INST-TRANS-CHECKLIST.doc

INSTRUMENTATION TRANSMITTER LOOP CHECKLIST

Page

2 of 2

Signal Validation Input Signal Location Transmitter Display Transmitter Output Process Display PLC HMI Transmitter Display Transmitter Output Process Display PLC HMI Transmitter Display Transmitter Output Process Display PLC HMI Notes: 1. 2. Comments: Design Value Actual Value Error (%) Pass (P/F)

Attach factory calbration forms for all instruments where provided and/or specified. Provide instrument parameters for each parameter changed from the factory default.

Company Tested By Witnessed By

Name

Signature

Date (yyyy/mm/dd)

Form F-INST-TRANS-CHECKLIST Rev 00, Created by SNC-Lavalin Inc. L:\40ENG\48I&C\Commissioning Forms\F-INST-TRANS-CHECKLIST.doc

MODULATING CONTROL DEVICE CHECKLIST

Page

1 of 1

Project Facility: Area : Project Name: Bid Opportunity: Control Device Tag: Manufacturer: Description: Model: Inspection Checklist No. 1. 2. 3. 4. 5. 6. Item to be Inspected Actuator type and class per P&ID and specification Instrument tag(s) installed and correct Installation of actuator complete and correct Wiring correct Drawings marked up as-built HMI graphic symbol, tag and units correct Control Validation Control Output 0% Field Device PLC Output 50% Field Device PLC Output 100% Field Device Notes: 1. 2. Comments: Location PLC Output Design Value Actual Value Error (%) Pass (P/F) Comments Pass (P/F) Serial Number:

Attach factory calbration forms for all instruments where provided and/or specified. Provide instrument parameters for each parameter changed from the factory default.

Company Tested By Witnessed By

Name

Signature

Date (yyyy/mm/dd)

Form F-MOD-CTRL-DEV-CHECKLIST Rev 00, Created by SNC-Lavalin Inc. L:\40ENG\48I&C\Commissioning Forms\F-MOD-CTRL-DEV-CHECKLIST.doc

PID CONTROLLER CHECKLIST

Page

1 of 1

Project Facility: Area : Project Name: Bid Opportunity: Controller Loop Tag: Description: Test Checklist No. 1. 2. 3. 4. 4. 5. 6. 7. Item to be Inspected Startup Test Input signal positive bump test Input signal negative bump test Bumpless auto-manual control transition Manual output capability Bumpless manual-auto control transition HMI graphic symbols, tag and units correct HMI equipment faceplate correct Final PID Tuning Values P: Notes: 1. Comments: I: D: Comments Pass (P/F)

Attach printouts of trends for varous tests, with final PID tuning values.

Company Tested By Witnessed By

Name

Signature

Date (yyyy/mm/dd)

Form F-PID-CTRLR-CHECKLIST Rev 00, Created by SNC-Lavalin Inc. L:\40ENG\48I&C\Commissioning Forms\F-PID-CTRLR-CHECKLIST.doc

PLC DISCRETE INPUT CHECKLIST

Page

1 of 2

Project Facility: Area : Project Name: Bid Opportunity: PLC PLC ID: Rack: Description: Slot: PLC Input Local HMI Pass (P/F) N/A 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 On On On On On On On On On On On On On On On On On On On On On On On Off Off N/A Off Off N/A Off Off N/A Off Off N/A Off Off N/A Off Off N/A Off Off N/A Off Off N/A Off Off N/A Off Off N/A Off Off N/A Off

Pt

Tag

Description

State 0

State Desc.

SCADA On

Alarm Off

Form F-PLC-DI-CHECKLIST Rev 00, Created by SNC-Lavalin Inc. L:\40ENG\48I&C\Commissioning Forms\F-PLC-DI-CHECKLIST.doc

PLC DISCRETE INPUT CHECKLIST

Page

2 of 2

0 1 0 1 0 1 0 1 Comments:

On On On On On On On On

Off N/A Off Off N/A Off Off N/A Off Off N/A Off

Company Tested By Witnessed By

Name

Signature

Date (yyyy/mm/dd)

Form F-PLC-DI-CHECKLIST Rev 00, Created by SNC-Lavalin Inc. L:\40ENG\48I&C\Commissioning Forms\F-PLC-DI-CHECKLIST.doc

PLC DISCRETE OUTPUT CHECKLIST

Page

1 of 2

Project Facility: Area : Project Name: Bid Opportunity: PLC PLC ID: Rack: Description: Slot: Pass (P/F)

Pt

Tag

Description

State 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1

State Desc.

PLC Output

Field Device

Form F-PLC-DO-CHECKLIST Rev 00, Created by SNC-Lavalin Inc. L:\40ENG\48I&C\Commissioning Forms\F-PLC-DO-CHECKLIST.doc

PLC DISCRETE OUTPUT CHECKLIST

Page

2 of 2

0 1 0 1 0 1 0 1 Comments:

Company Tested By Witnessed By

Name

Signature

Date (yyyy/mm/dd)

Form F-PLC-DO-CHECKLIST Rev 00, Created by SNC-Lavalin Inc. L:\40ENG\48I&C\Commissioning Forms\F-PLC-DO-CHECKLIST.doc

You might also like