Tube Rupture (Two Phase-Omega Method)
Tube Rupture (Two Phase-Omega Method)
: CLIENT : UNIT :
DATE : BY : REV : DOC NO.: Tube Rupture Relief Rate Calculation (Two Phase Flow)
3/4/2011 S.R A 0
Input Data Vapor Mass Flow Rate Liquid Mass Flow Rate Vapor Mass Density Liquid Mass Density Latent Heat of Vaporization Liquid Specific Heat HP Side Operating Pressure LP Side PSV Set Pressure Relieving Temprature Exchanger Tube Length Exchanger Tube Diameter
500.0 500.0 10.0 900.0 125.0 2.50 20.00 5.00 100.00 2.00 1.0000
Calculation Results Vapor Mass Fraction HP Side Operating Pressure LP Side Design Pressure Pc/P Critical Pressure Flow Regime Actual P across rupture Mass Flux Through Tubesheet Mass Flux Through Tube Side Tube Discharge Area Relief Rate
0.5000 21.00 6.00 25.23 0.91 19.03 Critical 2.0 1162.7 4.2 0.00051 2127.5
General Notes
www.chemwork.org