No portion (graphics or text) of this guide may be reproduced, translated, or transmitted in any form or manner by any meansincluding but not limited to electronic copy, photocopy, or any other informational storage and retrieval system without explicit written consent from Bureau of Energy Efficiency, New Delhi.
All rights reserved Printed in New Delhi, India ISBN No. 978-81-909025-3-3
1st Printed : July 2009 Reprinted : April 2011
This Guide is made possible by the support of the American People through United States Agency for International Development (USAID) under the terms of Award No. 386C-00-06-00153-00. The contents of the Guide are the sole responsibility of International Resources Group (IRG), and do not necessarily reflect the views of USAID or the United States Government.
Foreword
The Energy Conservation Act, 2001(52 of 2001) empowers the Central Government under Section 14(p) read with Section 56(2)(l) to prescribe Energy Conservation Building Code (ECBC). The Code defines norms and standards for the energy performance of buildings and their components based on the climate zone in which they are located. Under the leadership of Bureau of Energy Efficiency (BEE), a Committee of Experts finalized ECBC in consultation with various Stakeholders in 2007, with an overall purpose to provide minimum requirements for the energy-efficient design and construction of buildings. ECBC covers building envelope, heating, ventilation, and air conditioning system, interior and exterior lighting system, service hot water, electrical power system and motors. In May 2007, the Ministry of Power, Government of India formally launched the ECBC for its voluntary adoption in the country. Since then, BEE has been promoting and facilitating its adoption through several training and capacity building programmes. BEE is also monitoring implementation of ECBC through the ECBC Programme Committee (EPC). EPC also reviews periodically the inconsistencies and comments on ECBC received from various quarters. In this context, BEE in consultation with EPC and support from USAID ECO-III Project brought out a revised version of ECBC in May 2008. During the capacity building effort, a need was clearly felt to provide additional guidance to design and construction professionals on the rationale behind the ECBC specifications and provide explanations to the key terms and concepts governing these specifications so that people are able to comprehend ECBC in a better way. Considering this growing need for developing a better understanding of ECBC in the country, the ECBC User Guide has been prepared under the USAID ECO-III Project in close partnership with BEE. The document aims to guide and assist the building designers, architects and all others involved in the building construction industry to implement ECBC in real situations. The document is written both as a reference and as an instructional guide. It also features examples, best practices, checklists, etc. to direct and facilitate the design and construction of ECBC-compliant buildings in India. I am happy to note that the ECBC User Guide Development Team has made a concerted effort to provide all the information, especially minimum performance standards that buildings need to comply with, in one place. Consequently, it is my hope that users of ECBC trying to show compliance through the prescriptive path will find it easier to do so through the guidance provided in the document. The ECBC User Guide also provides additional guidance on the Whole Building Performance method by making references to international publications that are widely used by the building design community. I thank the entire ECBC User Guide Development Team, led by Dr. Satish Kumar, for its extensive efforts in bringing out this document. I would like to express my sincere appreciation to the USAID for providing this technical assistance under the ECO-III Project and to the International Resources Group for spearheading this team effort.
iii
iv
Acknowledgements
Energy Conservation Building Code (ECBC) User Guide, developed by the USAID ECO-III Project in association with Bureau of Energy Efficiency (BEE) aims to support the implementation of ECBC. I would like to thank Dr. Archana Walia and Mr. S. Padmanaban of USAID for their constant encouragement and steadfast support during the development process. I would like to acknowledge the tremendous support and encouragement provided by Dr. Ajay Mathur, Director General, and Mr. Sanjay Seth, Energy Economist of BEE in the preparation of the Guide. A substantial undertaking of this nature would not have been possible without the extremely valuable technical contribution provided by the Development Team of ECBC User Guide especially Ms. Vasudha Lathey, Ms. Aleisha Khan of Alliance to Save Energy (ASE), Dr. Vishal Garg and Ms. Surekha Tetali of International Institute of Information Technology (IIIT), Prof. Rajan Rawal of Center for Environmental Planning and Technology (CEPT), Dr. Jyotirmay Mathur of Malviya National Institute Technology (MNIT), Mr. P. C. Thomas and Mr. G. S. Rao of Team Catalyst. I would like to acknowledge the assistance that the Development Team received from the American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) Inc., USA. The 90.1 User Manual, ANSI/ ASHRAE/IESNA Standard 90.1-2004, provided us with a robust framework and a sound technical reference during the development of the ECBC User Guide. I am also thankful to Ms. Meredydd Evans of Pacific NorthWest National Laboratory (PNNL), and to Saint Gobain, DuPont, ASAHI-India, and Dr. Mahabir Bhandari (DesignBuilder) for providing inputs on many iterations of this document. I would like to convey my special thanks to the ECO-III Project Team Mr. Ravi Kapoor for his substantial technical contribution to the development of the entire guide, Mr. Anurag Bajpai for his tireless efforts in coordinating inputs from the Development Team members, Ms. Meetu Sharma for her persistence efforts to prepare the graphics and desktop layout of multiple iterations of the guide, and Ms. Vidhi Kapoor for her meticulous coordination and follow up with the printer for timely bringing out the guide. Without the perseverance and discipline of ECO-III Project Team this work would not have been possible. I also like to thank Ms. Laurie Chamberlain of International Resources Group (IRG) HQ for assisting us in carrying out technical editing of this document. 17th July, 2009 (Dr. Satish Kumar) Chief of Party, USAID ECO-III Project International Resources Group
Minimum VLT
0.27 0.20
b) Boxed Text showing Tips, Frequently Asked Questions (FAQ), Examples, etc.
The Boxed Text provides guidance to the users for better understanding of ECBC concepts and ECBC applicability in different situations. An example of Boxed Text is shown below:
vi
Table of Contents
USAID ECO-III Project . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . i Foreword. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iii ECBC User Guide Development Team. . . . . . . . . . . . . . . . . . . . . . . . . . . iv Acknowledgements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . v How to Use This Guide. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vi 1. Purpose. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2. Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 2.1 Applicable Building Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 2.2 Exemptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 2.3 Safety, Health, and Environmental Codes Take Precedence. . . . . . . . . . . . . . . . 2 2.4 Reference Standards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 3. Administration and Enforcement. . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 3.1 Compliance Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 3.1.1 Mandatory Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . 3 3.1.2 New Buildings. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 3.1.3 Additions to Existing Buildings. . . . . . . . . . . . . . . . . . . . . . . . 4 3.1.4 Alterations to Existing Buildings . . . . . . . . . . . . . . . . . . . . . . . 5 3.2 Compliance Approaches . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 3.3 Administrative Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 3.4 Compliance Documents. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 3.4.1 General. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 3.4.2 Supplemental Information . . . . . . . . . . . . . . . . . . . . . . . . . 11 4. Building Envelope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 4.1 General. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 4.2 Mandatory Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 4.2.1 Fenestration. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 4.2.2 Opaque Construction. . . . . . . . . . . . . . . . . . . . . . . . . . . 18 4.2.3 Building Envelope Sealing. . . . . . . . . . . . . . . . . . . . . . . . . 18 4.3 Prescriptive Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 4.3.1 Roofs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 4.3.2 Opaque Walls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26 4.3.3 Vertical Fenestration. . . . . . . . . . . . . . . . . . . . . . . . . . . . 26 4.3.4 Skylights . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 4.4 Building Envelope Trade-Off Option . . . . . . . . . . . . . . . . . . . . . . . 32 5. Heating, Ventilation and Air Conditioning. . . . . . . . . . . . . . . . . . . . . . . . 33 5.1 General. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33 5.2 Mandatory Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34
5.2.1 Natural Ventilation . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34 5.2.2 Minimum Equipment Efficiencies . . . . . . . . . . . . . . . . . . . . . . 38 5.2.3 Controls. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42 5.2.4 Piping and Ductwork. . . . . . . . . . . . . . . . . . . . . . . . . . . 44 5.2.5 System Balancing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46 5.2.6 Condensers. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48 5.3 Prescriptive Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . 48 5.3.1 Economizers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49 5.3.2 Variable Flow Hydronic Systems . . . . . . . . . . . . . . . . . . . . . . . 50 6. Service Water Heating and Pumping. . . . . . . . . . . . . . . . . . . . . . . . . . . 52 6.1 General. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52 6.2 Mandatory Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52 6.2.1 Solar Water Heating . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52 6.2.2 Equipment Efficiency . . . . . . . . . . . . . . . . . . . . . . . . . . . 54 6.2.3 Supplementary Water Heating System . . . . . . . . . . . . . . . . . . . . . 55 6.2.4 Piping Insulation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55 6.2.5 Heat Traps. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56 6.2.6 Swimming Pools. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57 6.2.7 Compliance Documentation . . . . . . . . . . . . . . . . . . . . . . . . 57 7. Lighting. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58 7.1 General. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58 7.2 Mandatory Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58 7.2.1 Lighting Control. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59 7.2.2 Exit Signs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63 7.2.3 Exterior Building Grounds Lighting . . . . . . . . . . . . . . . . . . . . . 64 7.3 Prescriptive Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . 65 7.3.1 Interior Lighting Power. . . . . . . . . . . . . . . . . . . . . . . . . . 65 7.3.2 Building Area Method. . . . . . . . . . . . . . . . . . . . . . . . . . . 65 7.3.3 Space Function Method . . . . . . . . . . . . . . . . . . . . . . . . . . 66 7.3.4 Installed Interior Lighting Power . . . . . . . . . . . . . . . . . . . . . . . 67 7.3.5 Exterior Lighting Power. . . . . . . . . . . . . . . . . . . . . . . . . . 68 8. Electrical Power . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69 8.1 General. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69 8.2 Mandatory Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69 8.2.1 Transformers. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69 8.2.2 Energy-Efficient Motors . . . . . . . . . . . . . . . . . . . . . . . . . . 72 8.2.3 Power Factor Correction. . . . . . . . . . . . . . . . . . . . . . . . . . 77 8.2.4 Check-Metering and Monitoring. . . . . . . . . . . . . . . . . . . . . . . 78 8.2.5 Power Distribution Systems . . . . . . . . . . . . . . . . . . . . . . . . . 78
9. APPENDIX A: Definitions, Abbreviations and Acronyms . . . . . . . . . . . . . . . . . A.1 9.1 General. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.1 9.2 Definitions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A.1 9.3 Abbreviations and Acronyms. . . . . . . . . . . . . . . . . . . . . . . . . . . A.12 10. APPENDIX B: Whole Building Performance Method . . . . . . . . . . . . . . . . . . . B.1 10.1 General. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10.1.2 Compliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10.1.4 Trade-offs Limited to Building Permit. . . . . . . . . . . . . . . . . . . . 10.1.5 Documentation Requirements . . . . . . . . . . . . . . . . . . . . . . . 10.2.1 Energy Simulation Program. . . . . . . . . . . . . . . . . . . . . . . . B.1 B.2 B.3 B.3 B.3 10.1.1 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B.1 10.1.3 Annual Energy Use . . . . . . . . . . . . . . . . . . . . . . . . . . . . B.3
10.2 Simulation General Requirements. . . . . . . . . . . . . . . . . . . . . . . . . B.3 10.2.2 Climate Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B.5 10.2.3 Compliance Calculations. . . . . . . . . . . . . . . . . . . . . . . . . . B.5 10.3 Calculating the Energy Consumption of the Proposed Design and the Standard Design. . . . B.6 10.3.1 The simulation model for calculating the Proposed Design and the Standard Design shall be developed in accordance with the requirements in Table 10.1. . . . . . . . B.6 11. APPENDIX C: Default Values for Typical Constructions . . . . . . . . . . . . . . . . . . C.1 11.1 Procedure for Determining Fenestration Product U-Factor and Solar Heat Gain Coefficient . . C.1 11.2 Default U-factors and Solar Heat Gain Coefficients for Unrated Fenestration Products . . . . C.2 11.2.1 Unrated Vertical Fenestration . . . . . . . . . . . . . . . . . . . . . . . C.2 11.2.2 Unrated Sloped Glazing and Skylights. . . . . . . . . . . . . . . . . . . . C.2 11.3 Typical Roof Constructions. . . . . . . . . . . . . . . . . . . . . . . . . . . C.2 11.4 Typical Wall Constructions. . . . . . . . . . . . . . . . . . . . . . . . . . . . C.3 12. APPENDIX D: Building Envelope Tradeoff Method . . . . . . . . . . . . . . . . . . . D.1 12.1 The Envelope Performance Factor . . . . . . . . . . . . . . . . . . . . . . . . D.1 12.1.1 The envelope performance factor shall be calculated using the following equations. . . D.1 12.1.2 Overhang and Side Fin Coefficients . . . . . . . . . . . . . . . . . . . . . D.2 12.1.3 Baseline Building Definition . . . . . . . . . . . . . . . . . . . . . . . . D.5 13. APPENDIX E: Climate Zone Map of India. . . . . . . . . . . . . . . . . . . . . . . E.1 13.1 Climate Zones . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . E.1 14. APPENDIX F: Air-Side Economizer Acceptance Procedures . . . . . . . . . . . . . . . . F.1 14.1 Construction Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F.1 14.2 Equipment Testing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F.1 15. APPENDIX G: Compliance Forms*. . . . . . . . . . . . . . . . . . . . . . . . . . G.1 15.1 Envelope Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G.1 15.2 Building Permit Plans Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . G.2 15.3 Mechanical Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G.3
15.4 Mechanical Checklist. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G.4 15.5 Lighting Summary. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G.5 15.6 Lighting Permit Checklist. . . . . . . . . . . . . . . . . . . . . . . . . . . . G.6 15.7 Electrical Power . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G.6 15.8 Whole Building Performance Checklist. . . . . . . . . . . . . . . . . . . . . . . G.7 16. APPENDIX H: Comparison Of International Building Energy Standards. . . . . . . . . . . H.1 17. APPENDIX I: References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I.1
List of Tables
Table 4.1: Values of Surface Film Resistance Based on Direction of Heat Flow. . . . . . . . . . . 14 Table 4.2: Thermal Resistances of Unventilated Air Layers Between Surfaces with High Emittance . . . 15 Table 4.3: Comfort Requirements and Physical Manifestations in Buildings . . . . . . . . . . . . . 19 Table 4.4: Roof Assembly U-Factor and Insulation R-value Requirements (ECBC Table 4.1). . . . . . 21 Table 4.5: Opaque Wall Assembly U-Factor and Insulation R-value Requirements (ECBC Table 4.2). . . 26 Table 4.6: Vertical Fenestration U-factor (W/m2K) and SHGC Requirements (ECBC Table 4.3). . . . . 26 Table 4.7: Defaults for Unrated Vertical Fenestration (Overall Assembly including Sash and Frame) Table 11.1 of ECBC. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 Table 4.8: SHGC M Factor Adjustments for Overhangs and Fins (ECBC Table 4.4) . . . . . . . . . 28 Table 4.9: Minimum VLT Requirements (ECBC Table 4.5) . . . . . . . . . . . . . . . . . . . Table 5.1: Optimum Size/Number of Fans for Rooms of Different Sizes . . . . . . . . . . . . . Table 5.2: Chillers (ECBC Table 5.1) . . . . . . . . . . . . . . . . . . . . . . . . . . . 29 37 . 41 Table 4.10: Skylight U-Factor and SHGC Requirements (ECBC Table 4.6) . . . . . . . . . . . . . 31
Table 5.3: Power Consumption Ratings for Unitary Air Conditioners Under Test Conditions . . . . . 42 Table 5.4: Power Consumption Ratings for Split Air Conditioners Under Test Conditions . . . . . . . 42 Table 5.5: Power Consumption Rating for Packaged air Conditioners-under test conditions. . . . . . . 42 Table 5.6: Insulation of Heating Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . 44 Table 5.7: Insulation of Cooling Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . 44 Table 5.8: Ductwork Insulation (Table 5.2 of ECBC) . . . . . . . . . . . . . . . . . . . . . . 45 Table 5.9: Sample R-values for Duct Insulation Materials . . . . . . . . . . . . . . . . . . . . 45 Table 6.1: Standing Loss in Storage Type Electric Water Heaters . . . . . . . . . . . . . . . . . 55 Table 6.2: Insulation of Hot Water Piping. . . . . . . . . . . . . . . . . . . . . . . . . . . 55 Table 7.1: Interior Lighting Power- Building Area Method (ECBC Table 7.1). . . . . . . . . . . . . 66 Table 7.2: Interior Lighting Power- Space Function Method (ECBC Table 7.2) . . . . . . . . . . . . 66 Table 7.3: Exterior Lighting Building Power (ECBC Table 7.3) . . . . . . . . . . . . . . . . . . 68 Table 8.1: Dry-Type Transformers (ECBC Table 8.1) . . . . . . . . . . . . . . . . . . . . . . 71 Table 8.2: Oil Filled Transformers (ECBC Table 8.2). . . . . . . . . . . . . . . . . . . . . . 71 Table 8.3: Values of Performance Characteristic of Two Pole Energy-Efficient Induction Motors. . . . . 73 Table 8.4: Values of Performance Characteristic of 4 Pole Energy-Efficient Induction Motors. . . . . . 74 Table 8.5: Values of Performance Characteristic of 6 Pole Energy-Efficient Induction Motors. . . . . . 75 Table 8.6: Values of Performance Characteristic of 8 Pole Energy-Efficient Induction Motors. . . . . . 75 Table 10.1: Modeling Requirements for Calculating Proposed and Standard Design . . . . . . . . . Table 10.3: Type and Number of Chillers . . . . . . . . . . . . . . . . . . . . . . . . . B.7 B.19 Table 10.2: Standard Fan Brake Horsepower. . . . . . . . . . . . . . . . . . . . . . . . . B.19 Table 10.4: Part-Load Performance for VAV Fan Systems . . . . . . . . . . . . . . . . . . . B.20 Table 10.5: HVAC Systems Map (ECBC Table 10.2) . . . . . . . . . . . . . . . . . . . . . B.22 Table 10.6: Electrically Operated Packaged Terminal Air Conditioners. . . . . . . . . . . . . . . B.22
Table 10.7: Fenestration Summary. . . . . . . . . . . . . . . . . . . . . . . . . . . . . B.25 Table 10.8: Building Energy Model Information. . . . . . . . . . . . . . . . . . . . . . . B.32 Table 11.1: Defaults for Unrated Vertical Fenestration (Overall Assembly including the Sash and Frame) . C.2 Table 11.2: Defaults for effective U-Factor for Exterior Insulation layers (under review) . . . . . . . . C.2 Table 11.3: Defaults for effective U-factor for Exterior Insulation Layers (under review). . . . . . . . C.3 Table 12.1: Envelope Performance Factor Coefficients-Composite Climate (under review). . . . . . . D.1 Table 12.2: Envelope Performance Factor Coefficients-Hot Dry Climate (under review) . . . . . . . . D.2 Table 12.3: Envelope Performance Factor Coefficients-Hot Humid Climate (under review) . . . . . . . D.2 Table 12.4: Envelope Performance Factor Coefficients-Moderate Climate (under review) . . . . . . . D.2 Table 12.5: Envelope Performance Factor Coefficients-Cold Climate (under review) . . . . . . . . . D.2 Table 12.6: Overhang and Side Fin Coefficients . . . . . . . . . . . . . . . . . . . . . . . . D.3 Table 13.1: Classifications of Different Climate Zones in India . . . . . . . . . . . . . . . . . E.2 Table 13.2: Climate Zone of the Major Indian Cities . . . . . . . . . . . . . . . . . . . . . . E.3
List of Figures
Figure 3.1: Design Process for the Whole Building Performance Method. . . . . . . . . . . . . . . 7 Figure 3.2: The Building Design and Construction Process. . . . . . . . . . . . . . . . . . . . 9 Figure 4.1: Building Envelope. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 Figure 4.2: The Solar and Blackbody Spectrum. . . . . . . . . . . . . . . . . . . . . . . . 13 Figure 4.3: Schematic Showing Three Modes of Heat Transfer. . . . . . . . . . . . . . . . . . 13 Figure 4.4: Typical Cavity Wall Construction . . . . . . . . . . . . . . . . . . . . . . . . . 15 Figure 4.5: Direct and Indirect Solar Radiation . . . . . . . . . . . . . . . . . . . . . . . . 16 . 17 Figure 4.6: Heat Transfer (Conduction, Convection, & Radiation) and Infiltration Across a Window . . .
Figure 4.7: Building Roofs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 Figure 4.8: Typical Insulation Technique for RCC Roof Construction . . . . . . . . . . . . . . . 24 Figure 4.9: Heat Transfer Through Roof . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 Figure 4.10: Projection Factor Calculation. . . . . . . . . . . . . . . . . . . . . . . . . . 28 30 49 Figure 4.11: Illustration to show U-factor, SHGC, and VLT. . . . . . . . . . . . . . . . . . . 30 Figure 4.12: Skylight Installations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Figure 5.2: Economizer. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Figure 5.1: Acceptable operative temperature ranges for naturally conditioned spaces.. . . . . . . . . 38 Figure 6.1: Batch Collector Passive System. . . . . . . . . . . . . . . . . . . . . . . . . . 53 Figure 6.2: Active Indirect System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53 Figure 6.3: Instantaneous Water Heater. . . . . . . . . . . . . . . . . . . . . . . . . . . 54 Figure 6.4: Heat Trap Elements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57 .64 . . 64 Figure 7.1: Relative Efficacy of Major Light Sources (Lumens/Watt) Figure 7.2: Exterior Grounds Lighting and specific Technologies .
Figure 8.1: Transformer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69 Figure 8.2: Transformer loss vs % Load. . . . . . . . . . . . . . . . . . . . . . . . . . . 70 Figure 8.3: Increase in efficiency (Percentage points) . . . . . . . . . . . . . . . . . . . . . . 76 Figure 8.4: Profile cutaway of an induction motor stator and rotor . . . . . . . . . . . . . . . . . 77 Figure 10.1: Five zone floor plate showing the perimeter and core zoning . . . . . . . . . . . . . B.25 Figure 10.2: Simplified Zoning of the Case Study Building when HVAC Zoning is Not Designed . . . Figure 13.1: Climate Zone Map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B.28 . E.1
Purpose
1. Purpose
purpose of Energy Conservation Building Code (ECBC) is to provide minimum requirements for The energy-efficient design and construction of buildings and their systems. The building sector represents about 33% of electricity consumption in India, with commercial sector and residential sector accounting for 8%and 25% respectively. Estimates based on computer simulation models indicate that ECBC-compliant buildings can use 40 to 60% less energy than conventional buildings. It is estimated that the nationwide mandatory enforcement of the ECBC will yield annual savings of approximately 1.7 billion kWh. The ECBC is expected to overcome market barriers, which otherwise result in under-investment in building energy efficiency. The ECBC was developed as a first step towards promoting energy efficiency in the building sector. The ECBC (also referred to as The Code in this document) is the result of extensive work by the Bureau of Energy Efficiency (BEE) and its Committee of Experts. It is written in code-enforceable language and addresses the views of the manufacturing, design, and construction communities as an appropriate set of minimum requirements for energy-efficient building design and construction. For developing the Code, building construction methods across the country were reviewed and various energyefficient design and construction practices were evaluated that could reduce energy consumption in building. In addition, detailed life-cycle cost analyses were conducted to ensure that the Code requirements reflect costeffectiveness and practical efficiency measures across five different climate zones in India. While taking into account different climate zones, the Code also addresses site orientation and specifies better design practices and technologies that can reduce energy consumption without sacrificing comfort and productivity of the occupants. The ECBC User Guide (also referred to as The Guide in this document) has been developed to provide detailed guidance to building owners, designers, engineers, builders, energy consultants, and others on how to comply with the Code. It provides expanded interpretation, examples, and supplementary information to assist in applying ECBC during the design and construction of new buildings as well as additions and alterations to existing buildings. This Guide can also be used as a document by authorities having jurisdiction in the enforcement of the Code once it is made mandatory. The Guide follows the nomenclature of the Code. It is written both as a reference and as an instructional guide, and can be helpful for anyone who is directly or indirectly involved in the design and construction of ECBC-compliant buildings.
Scope
2. Scope
he Code is applicable to buildings or building complexes that have a connected load of 100 kW or greater or a contract demand of 120 kVA or greater *.
Generally, buildings or complexes having conditioned area of 1,000 m2 or more will fall under this category. The Code is presently under voluntary adoption in the country. This Code would become mandatory as and when it is notified by the Central and State government in the official Gazette under clause (p) of 14 or clause (a) of 15 of the Energy Conservation Act 2001 (52 of 2001)
2.2 Exemptions
The provisions of this Code do not apply to: Buildings that do not use either electricity or fossil fuel Equipment and portions of building systems that use energy primarily for manufacturing processes
This Chapter has been adapted from ASHRAE User Manual (2004).
A: Area of Existing Office = 30m 30m = 900m 2 Additional Area of Office = 30m 15m = 450m2 However, the Code applies to the 30m 45m space that is being converted from unconditioned to conditioned space. The Code does not apply to the existing office or the existing warehouse space. The existing HVAC system does not need to be modified, but the ductwork extensions must be insulated to the requirements of 5. The new lighting system installed in the office addition must meet the requirements of 7. The walls that separate the office addition from the unconditioned warehouse must be insulated to the requirements of 4. The exterior wall and roof are exterior building envelope components and must meet the Code requirements. Source: Adapted from ASHRAE User Manual (2004).
3.1.4.4 Lighting
As per the Code: Alterations to building lighting equipment or systems shall comply with the requirements of Chapter 7 applicable to the portions of the building and its systems being altered. New lighting systems, including controls, installed in an existing building and any change of building area type as listed in Table 7.1 shall be considered an alteration. Any new equipment or control devices installed in conjunction with the alteration shall comply with the specific requirements applicable to that equipment or control device. Exception to above: Alterations that replace less than 50% of the luminaires in a space need not comply with these requirements provided such alterations do not increase the connected lighting load.
b. Whole Building Performance Method Use of energy simulation software is necessary to show ECBC compliance via the Whole Building Performance Method. Energy simulation is a computer-based analytical process that helps building owners and designers to evaluate the energy performance of a building and make it more energy-efficient by making necessary modifications in the design before the building is constructed. These computer-based energy simulation programs model the thermal, visual, ventilation, and other energyconsuming processes taking place within the building to predict its energy performance. The simulation program takes into account the building geometry and orientation, building materials, building faade design and characteristics, climate, indoor environmental conditions, occupant activities and schedules, HVAC and lighting system and other parameters to analyze and predict the energy performance of the building. Computer simulation of energy use can be accomplished with a variety of computer software tools and in many cases may be the best method for guiding a building project to be energy-efficient. However, this approach does require considerable knowledge of building simulation tools and very close communication between members of the design team. Appendix B of the Code describes the Whole Building Performance Method for complying with the Code. This method involves developing a computer model of the Proposed Design and comparing its energy consumption to the Standard Design for that building. Energy consumption in the Standard Design represents the upper limit of energy use allowed for that particular building under a scenario where all the prescriptive requirements of the Code are adopted. Code compliance will be achieved if the energy use in Proposed Design is no greater than the energy used in the Standard Design. Three basic steps are involved: 1. Design the building with energy efficiency measures; the prescriptive approach requirements provide a good starting point for the development of the design. 2. Demonstrate that the building complies with the mandatory measures (See sections 4.2, 5.2, 6.2, 7.2, and 8.2). 3. Using an approved simulation software, model the energy consumption of the building using the proposed features to create the Proposed Design. The model will also automatically calculate the energy use for the Proposed Design. If the energy use in Proposed Design is no greater than the energy use in the Standard Design, the building complies with the Code. Figure 3.1 shows a schematic depicting the WBP method
Figure 3.1: Design Process for the Whole Building Performance Method
The biggest advantage of using this approach is that it enables the design and construction team to make comparisons between different design options to identify the most cost-effective and energy-efficient design solution. For instance, the efficiency of the indoor lighting system might be improved in order to justify
fenestration design that does not meet the prescriptive envelope requirements. As long as the total energy use of the Proposed Design does not exceed the allowed energy use in Standard Design, the building will be ECBC compliant. Note: For a detailed description of the computer simulation process and details, please refer to the Energy Simulation Tip Sheet which can be accessed at: http://eco3.org/energy-simulation-tip-sheet/
The local building department has jurisdiction for determining the administrative requirements relating to permit applications. They are also the final word on interpretations, claims of exemption, and rights of appeal. From time to time, the concerned authority will issue interpretations clarifying the intent of the Code. The local building department may take these under consideration, but the local building department still has the final word. To achieve the greatest degree of compliance and to facilitate the enforcement process, the Code should be considered at each phase of the design and construction process (see Figure 3.2). 1. At the design phase, designers must understand both the requirements and the underlying intent of the Code. The technical sections of this Guide provide information that designers need to understand how the Code applies both to individual building systems and to the integrated building design. 2. At permit application, the design team must make sure that the construction documents submitted with the permit application contain all the information that the building official will need to verify that the building satisfies the requirements of the Code. (This Guide provides compliance forms and worksheets to help ensure that all the required information is submitted.) 3. During plan review, the building official must verify that the proposed work satisfies the requirements of the Code and that the plans (not just the forms) describe a building that complies with the Code. The building official may also make a list of items to be verified later by the field inspector. 4. During construction, the contractor must carefully follow the approved plans and specifications. The design professional should carefully check the specifications and working drawings that demonstrate compliance and should observe the construction in progress to see that compliance is achieved. The building official must verify that the building is constructed according to the plans and specifications. 5. After completion of construction, the contractor and/or designer should provide information to the building operators on maintenance and operation of the building and its equipment. Although only minimal completion and commissioning is required by the Code, most energy efficiency experts agree that full commissioning is important for proper building operation and management. Figure 3.2 maps the Design and Construction process along with the Compliances/Enforcement steps needed to show ECBC compliance.
10
They provide a roadmap showing the enforcement agency where to look for the necessary information on the plans and specifications. They provide a checklist for the enforcement agency to help structure the drawing check process. They promote communication between the drawings examiner and the field inspector. They provide a checklist for the inspector.
11
Building Envelope
4. Building Envelope
4.1 General
Overview
he building envelope refers to the exterior faade, and is comprised of opaque components and T fenestration systems. Opaque components include walls, roofs, slabs on grade (in touch with ground), basement walls, and opaque doors. Fenestration systems include windows, skylights, ventilators, and doors that are more than one-half glazed. The envelope protects the buildings interior and occupants from the weather conditions and shields them from other external factors e.g. noise, air pollution, etc.
The building envelope depicted here by the green line, which separates the conditioned space from the unconditioned space.
Figure 4.1: Building Envelope Envelope design strongly affects the visual and thermal comfort of the occupants, as well as energy consumption in the building. Box 4-A discusses the there modes of heat transfer (Conduction, Convection and Radiation) in the building. Conductive heat transfer across the envelope also depends upon the conductivity of the building material used. Different materials offer different thermal resistance to the conduction process. Individually, walls and roofs are comprised of a number of layers composed of different building materials. Thus, it is important to establish overall thermal resistance and heat transfer coefficient (U-factor), also termed thermal transmittance. The concepts of thermal resistance and U- factor are discussed in Box 4-B for better understanding.
12
Building Envelope
Figure 4.2: The Solar and Blackbody Spectrum When the Solar Infrared component of the waves comes in contact with the earth or any object or a building, it transfers its energy to the object/building in the form of heat. The phenomenon is known as solar radiation heat transfer. Radiation heat transfer, in fact, can be between any two bodies having different temperatures with heat transfer taking place from the body at higher temperature to the body at the lower temperature. The Figure 4.3 shows all three modes of heat transfer across a building wall facing the external environment.
13
Building Envelope
Resistance Thermal Resistance is proportional to the thickness of material of construction and inversely proportional to its conductivity. This, a lower value of conductivity means less heat flow and so does the greater thickness of material. Together these parameters form the Thermal Resistance to the process of heat conduction. d R = k [ m2 K W- 1 ] Description of Surface Resistance The total thermal resistance RT of a plane element consisting of thermally homogeneous layers perpendicular to the heat flow is calculated by the following formula: RT : Rsi + Rt + Rse Where Rt is the sum of thermal resistance of each layer in the wall/roof. Rt : R1 + R2+ + Rn Where R1, R2, , Rn are the thermal resistance of each layer. For the calculation of the thermal transmittance (U-factor) under ordinary building conditions, the seasonal mean values of the exterior surface thermal resistance (Rse) and the interior surface thermal resistance (Rsi) can be obtained from Table 4.1. These values are the result of empirical studies and merely represent magnitudes of order. They consider both convection and radiation influences. Table 4.1: Values of Surface Film Resistance Based on Direction of Heat Flow Rsi
Horizontal
0.13
Rse
Down
0.17
Horizontal
0.04
Down
0.04
Thermal Resistance of an Element Consisting of Homogenous Layers A building element is usually composed of a number of different materials. When materials are placed in series, their thermal resistances are added so that the same area conducts lesser heat for a given temperature difference. Formation of air film at the surface of wall or roof, due to convection movements of air, also provides resistance to the heat flow, similar to the construction material. The total resistance of the wall or roof includes all of the resistances of the individual materials that make it up as well as both the internal and external air-film resistance. U-factor = 1/RT
14
Building Envelope
Thermal Resistance of Unventilated Air Layers Table 4.2 gives the thermal resistances of unventilated air layers (valid for emittance of the bounding surfaces > 0.8). The values under "horizontal" should be used for heat flow directions 30 from the horizontal plane; for other heat flow directions, the values under "up" or "down" should be used. Table 4.2: Thermal Resistances of Unventilated Air Layers Between Surfaces with High Emittance Thickness of Air Layer (mm)
Horizontal
5 7 10 15 25 50 100 300 0.12 0.12 0.14 0.16 0.18 0.18 0.18 0.18
Down
0.10 0.12 0.14 0.16 0.18 0.20 0.20 0.21
Example 4.1: R -Value and U-factor Calculations for Cavity Wall Construction
Figure 4.4: Typical Cavity Wall Construction R1: Resistance for Layer 1 (13 mm Gypsum Plaster) = 0.079 K m2/W (from ECBC Table 11.4) R2: Resistance of Layer 2 (230 mm brick wall, density=1920kg/m3) = d2/k2 = 0.230/0.81 =0.284 K m2/W R3: Resistance of Layer 3 (115 mm air gap) (from ECBC Table 11.4) = 0.18 Km2/W (from Table 4.2) (from ECBC Table 11.4) Rt: R-value for the composite wall RT: Rsi+ Rt+R se U-factor for the composite wall = R1+ R2+ R3 + R4 = 0.079+ 0.284 + 0.18 + 0.142 = 0.685 Km2/W = 0.13+ 0.685 +0.04= 0.855 (from Table 4.1) = 1/RT = 1/0.855 = 1.169 W/m 2K
R4: Resistance of Layer 4 (115 mm brick wall, density=1920kg/m3) = d4/k4 = 0.115/0.81 =0.142 K m2/W
15
Building Envelope
The design of the building envelope is generally the responsibility of an architect. The building designer is responsible for making sure that the building envelope is energy-efficient and complies with the mandatory and prescriptive requirements of the Code. ECBC also provides trade-off option which allows flexibility to the designer to trade-off prescriptive requirements of building components, while meeting the minimum energy performance requirements of the envelope.
Figure 4.5: Direct and Indirect Solar Radiation In hot climates, SHGC is more important than the U-factor of the glazing. A lower SHGC means that lesser heat can pass through the glazing. The SHGC is based on the properties of the glazing material, whether the window has single, double, or triple glazing, and the window operation (either operable or fixed). Glazing units with a low SHGC will help reduce the air conditioning energy use during the cooling season.
16
Building Envelope
Figure 4.6: Heat Transfer (Conduction, Convection, & Radiation) and Infiltration Across a Window
4.2.1.1 U-factors
Clear glass, which is the most common type of glass used today, has no significant thermal resistance (R-value) from the pane itself. It has a value of R-0.9 to R-1.0 due to the thin films of air on the interior and exterior surfaces of the glass. The U-factor (thermal conductance), must account for the entire fenestration system including the effects of the frame, the spacers in double glazed assemblies, and the glazing. There are a wide variety of materials, systems, and techniques used to manufacture fenestration products, and accurately accounting for these factors is of utmost importance when meeting the fenestration requirements. The Code also specifies U-factor for sloped glazing and skylights, and minimum U-factors for unrated products. ECBC has used W/m2C as the unit for U-factor. Since differences in temperature are always denoted in K in physics literature, ECBC User Guide has used W/m2K as the unit of U-factor. Wherever, C was being used for differences in temperature, it has been replaced with K in the Guide. U-factors for fenestration systems (including the sash and frame) are required to be determined in accordance with ISO-15099 (as specified in ECBC 11: Appendix C) by an accredited independently laboratory and labeled and certified by the manufacturer or other responsible party. Box 4-D briefly explains how these issues are addressed in US.
Box 4-D: How Fenestration Products are Tested, Certified, and Labeled in the U.S.
In the U.S, the fenestration U-factors are determined in accordance with the National Fenestration Rating Council (NFRC) Standard 100. NFRC is a membership organization of window manufacturers, researchers, and others that develops, supports, and maintains fenestration rating and labeling procedures. Most fenestration manufacturers have their products rated and labeled through the NFRC program. Certified products receive an 8 by 11 inch NFRC label that lists the U-factor, SHGC, and the visible transmittance.
17
Building Envelope
18
Building Envelope
ECBC identifies several areas in the building envelope where attention should be paid to infiltration control. These include: a. Joints around fenestration and doorframes. b. Openings at penetrations of utility services through roofs, walls, and floors. c. Site-built fenestration and doors. d. Building assemblies used as ducts or plenums. e. Joints, seams, and penetrations of vapor retarders. f. All other openings in the building envelope. It is also recommended that junctions between walls and foundations, between walls at building corners, between walls and structural floors or roofs, and between walls and roof or wall panels. Fenestration products, including doors, can also significantly contribute to infiltration. Although not included in the Code, it is recommended that fenestration products should have infiltration less than 0.4 cfm/ft (2.0 l/sm). For glazed entrance doors that open with a swinging mechanism and for revolving doors, it is recommended that infiltration be limited to 1.0 cfm/ft (5.0 l/sm).
4.3.1 Roofs
In roofs, the U-factor for the overall assemblies or minimum R-values for the insulation must be complied with the provisions of the Code. ECBC Appendix C provides values for typical constructions. In real practice, the heat gains through the walls, roof, and fenestration depends upon the climate zone in which the building is located. The National Building Code of India, 2005 has divided the country in five climate zones (Hot-Dry; Warm-Humid; Composite; Temperate/Moderate; and Cold), and the air temperature and humidity variations that exist need to be considered while designing the building envelope.
Physical Manifestation
19
Building Envelope
External surfaces protected by overhangs, fins and trees Pale colour, glazed china mosaic tiles etc. Use glazing with lower SHGC and provide shading for windows. Minimize glazing in East and West Courtyards/wind towers/arrangement of openings Trees, water ponds, evaporative cooling
Physical Manifestation
Physical Manifestation
Physical Manifestation
Building Envelope
Increase buffer spaces Decrease air exchange rate Increase shading Increase surface reflectivity Reduce solar heat gain
Air locks/Balconies Weather stripping Walls, glass surfaces protected by overhangs, fins and trees Pale color, glazed china mosaic tiles, etc. Use glazing with lower SHGC and provide shading for windows. Minimize glazing in East and West Courtyards/wind towers/arrangement of openings Trees and water ponds for evaporative cooling Dehumidifiers/desiccant cooling
Exterior roofs can meet the prescriptive requirements in one of two ways: Use the required R-value of the insulation (this R-value does not apply to building materials or air film. It should be referred exclusively for insulation), or Use a roof assembly U-factor that meets the maximum U-factor criterion for thermal performance (see ECBC Table 4.3.1). The U-factor takes into account all elements or layers in the construction assembly, including the sheathing, interior finishes, and air gaps, as well as exterior and interior air films. As per the Code: The roof insulation shall not be located on a suspended ceiling with removable ceiling panels. The Code requirements for the U-factor and R-values for 24 hours use buildings and daytime use buildings for five climate zones as shown in Table 4.4 below. Table 4.4: Roof Assembly U-Factor and Insulation R-value Requirements (ECBC Table 4.1) Climate Zone 24-Hour use buildings Hospitals, Hotels, Call Centers etc.
Maximum U-factor of the overall assembly (W/m2K) Composite Hot and Dry Warm and Humid Moderate Cold
U-0.261 U-0.261 U-0.261 U-0.409 U-0.261
Minimum R-value Maximum U-factor of of insulation alone the overall assembly (m2K/W) (W/m2K)
R-3.5 R-3.5 R-3.5 R-2.1 R-3.5 U-0.409 U-0.409 U-0.409 U-0.409 U-0.409
Some recommended practices for proper installation and protection of insulation are provided below:
Insulation
The first set of mandatory requirements addresses the proper installation and protection of insulation materials. It is recommended that insulation materials be installed according to the manufacturers recommendations and in a manner that will achieve the rated insulation R-value. Compressing the insulation reduces the effective R-value and the thermal performance of the construction assembly.
Substantial Contact
It is recommended that insulation be installed in a permanent manner and in substantial contact with the inside surface of the construction assembly. If the insulation does not entirely fill the cavity, the air gap should be on the outside surface. Maintaining substantial contact is particularly important (and problematic) for batt insulation installed between floor joists. Without proper support, gravity will cause the insulation to fall away from the floor surface, leaving an air gap above the insulation. Air currents will ultimately find their way to the gap, and when they do, the effectiveness of the insulation will be substantially reduced.
21
Building Envelope
It is not good practice to install insulation directly over suspended ceilings with removable ceiling panels. This is because the insulations continuity is likely to be disturbed by maintenance workers. Also, suspended ceilings may not meet the ECBCs infiltration requirements unless they are properly sealed. Compliance with this requirement could have a significant impact in some parts of the country, as it is common practice to install insulation over suspended ceilings. Many building codes will consider the space above the ceiling to be an attic and require that it be ventilated to the exterior. If vented to the exterior, air in the attic could be quite cold (or hot) and the impact of the leaky suspended ceiling would be made worse.
Insulation Protection
It is strongly recommended that insulation be protected from sunlight, moisture, landscaping equipment, wind, and other physical damage. Rigid insulation used at the slab perimeter of the building should be covered to prevent damage from gardening or landscaping equipment. Rigid insulation used on the exterior of walls and roofs should be protected by a permanent waterproof membrane or exterior finish. In general, a prudent designer should pay attention to moisture migration in all building construction. Vapor retarders prevent moisture from condensing within walls, roofs, or floors but care should be taken to install them on the correct side (warmer or cooler side) of the walls and roofs to prevent water damage. Water condensation can damage the building structure and can seriously degrade the performance of building insulation and create many other problems such as mold and mildew. The designer should evaluate the thermal and moisture conditions that might contribute to condensation and make sure that vapor retarders are correctly installed to prevent condensation. In addition to correctly installing a vapor retarder, it is important to provide adequate ventilation of spaces where moisture can build up. Figure 4.7 shows some common techniques to insulate different types of roofing systems.
22
Building Envelope
Insulation entirely above deck: Insulation is installed above (a) concrete, (b) wood or (c) metal deck in a continuous manner. (a), (b), and (c) are shown sequentially right to left.
A. RCC Slab Insulated with Vermiculite B. RCC Slab Insulated with Earthen Pots
23
Building Envelope
24
Building Envelope
Solar Reflectance and Absorptance The solar reflectance is the fraction of solar radiation reflected by roof. The complement of reflectance is absorptance; whatever radiant energy incident on a surface that is not reflected is absorbed in the roof. The reflectance and absorptance of building materials are usually measured across the solar spectrum, since these are exposed to that range of wavelength. Reflectance is measured on a scale of 0 to 1, with 0 being a perfect absorber and 1 being a perfect reflector. Absorptance is also rated from 0 to 1, and can be calculated from the relation: Reflectance + Absorptance = 1. Emissivity or Thermal Emittance Emissivity (or thermal emittance) of a material (usually written or e) is the ratio of energy radiated by a particular material to energy radiated by a black body at the same temperature. It is a measure of a materials ability to radiate the absorbed energy. A true black body would have an e =1 while any real object would have e <1. Emissivity is a dimensionless quantity (does not have units). In general, the duller and blacker a material is, the closer its emissivity is to 1. The more reflective a material is, the lower its emissivity. The emissivity of building material, unlike reflectance, is usually measured in the far infrared part of the spectrum. Ideal Exterior Surface An ideal exterior surface coating of a building in hot climate and under indoor cooling would have reflectance near 1, and absorptance near zero, and Emissivity near 1 to radiate absorbed heat back to the sky. If designing a cool roof, requirements for minimum solar reflectance and initial emittance levels are specified [ECBC 4.3.1.1]. Roofs with slopes less than 20 shall have an initial solar reflectance of no less than 0.70 and an initial emittance no less than 0.75. Solar reflectance shall be determined in accordance with ASTM E903-96 and emittance shall be determined in accordance with ASTM E408-71 (RA 1996).
25
Building Envelope
What types of roofing products are available? Products for low-slope roofs, found on commercial and industrial buildings fall into two categories: singleply materials and coatings. Single-ply materials are large sheets of pre-made roofing that are mechanically fastened over the existing roof and sealed at the seams. Coatings are applied using rollers, sprays, or brushes, over an existing clean, leak-free roof surface. Products for sloped roofs are currently available in clay, or concrete tiles. These products stay cooler by the use of special pigments that reflect the suns infrared heat. In India, lime coats, white tiles grouted with white cement, special paints, etc. are used as cool roofing materials.
40% <WWR60%
Maximum SHGC
0.20 0.20 0.20 0.30 0.51
Maximum SHGC
0.25 0.25 0.25 0.40 0.51
26
Building Envelope
For unrated windows, follow the values given in Table 4.7 (Table 11.1 of Appendix C of ECBC). Table 4.7: Defaults for Unrated Vertical Fenestration (Overall Assembly including Sash and Frame) - Table 11.1 of ECBC
Frame Type Glazing Type
Clear Glass
U-factor (W/m2 K) SHGC
0.82 0.59 0.68
Tinted Glass
VLT
0.76 0.64 0.66
U-Factor (W/m2 K)
7.1 3.4 5.1
SHGC
0.70 0.42 0.50
VLT
0.58 0.39 0.40
All frame types Wood, vinyl, or fiberglass frame Metal and other frame type
27
Building Envelope
PF= Ratio of overhang projection divided by height from window sill to bottom of overhang (must be permanent) Solar Heat Gain Coefficient Requirements dependent on: Overhang projection factor M- Factor from Table 4.8 Orientation Climate Zone
Figure 4.10: Projection Factor Calculation ECBC Table 4.4 provides the values of M-factor for various projection factors. Table 4.8: SHGC M Factor Adjustments for Overhangs and Fins (ECBC Table 4.4) Overhang M Factors for 4 Projection Factors
Project Location
Orientation 0.25 0.50 0.75 1.00 0.25 0.50 0.75 + 0.49 0.74 0.99 0.49 0.74 0.99
N E/W S N E/W S .88 .79 .79 .83 .80 .78 .80 .65 .64 .74 .67 .62 .76 .56 .52 .69 .59 .55 .73 .50 .43 .66 .53 .50 .74 .80 .79 .73 .80 .74 .67 .72 .69 .65 .72 .65 .58 .65 .60 .57 .63 .57
1.00 +
.31 .16 .02 .23 .16 .04
28
Building Envelope
Q: Does my building envelope comply Prescriptively with the ECBC? A: To utilize the prescriptive requirements of ECBC, vertical fenestration is limited to 60% of the gross wall area, so this building is allowed under this method. ECBC Table 4.3 limits the SHGC value to a maximum of 0.20 for composite climate zone, however an exception exists by use of an overhang. ECBC 4.3.3 allows for an M Factor, or multiplier. In this case the M is 0.79. Multiplying M times the SHGC [0.7900 0.20=0.1580] and thus complies with ECBC Table 4.3. Exception to SHGC Requirements in 4.3.3: Vertical Fenestration areas located more than 2.2 m (7 ft) above the level of the floor are exempt from the SHGC requirement in Table 4.3 if the following conditions are complied with: a. Total Effective Aperture: The total Effective Aperture for the elevation is less than 0.25, including all fenestration areas greater than 1.0 m (3 ft) above the floor level b. An interior light shelf is provided at the bottom of this fenestration area, with an interior projection factor not less than: i. 1.0 for E-W, SE, SW, NE, and NW orientations ii. 0.5 for S orientation, and iii. 0.35 for N orientation when latitude is < 23
Minimum VLT
0.27 0.20 0.16 0.13
29
Building Envelope
Figure 4.11: Illustration to show U-factor, SHGC, and VLT Effective Aperture of Glazing In simple terms, as the area of an aperture/opening in the building envelope increases, the amount of daylight received in the building space also increases. However the glazing material within that aperture can effectively reduce the amount of visible light that enters the space. Therefore, aperture size alone is not an effective determinant to measure illumination levels. If the glazing in an opening is a perfectly transparent material the effective aperture size would be equal to the area of the opening (because the visible transmittance of the glazing would be one). If however, the glazing has a VLT of 0.5, the opening will transmit only half of the light striking it, and the effective aperture will be half of the actual size of the opening. The Effective Aperture (EA) or light admitting potential of a glazing system is determined by multiplying the Visible Light Transmittance of the glazing by the window-to-wall ratio of the building. The window to wall ratio is the ratio of the net window area to the exterior wall area. Effective Aperture: Visible Light Transmittance Window-to-Wall Ratio (WWR). = VLT WWR. Example: Two cases with WWR =0.4, and WWR = 0.6 are discussed below.
Case 1 WWR = 0.4 VLT = 0.26 EA = 0.104 (EA > 0.1) Glazing complies with ECBC Case 2 WWR = 0.6 VLT = 0.15 EA = 0.09 (EA < 0.1) Glazing does not comply with ECBC
4.3.4 Skylights
A skylight is a fenestration surface having a slope of less than 60 degrees from the horizontal plane. Other fenestration, even if mounted on the roof of a building, is considered vertical fenestration. Skylights can be installed into a roof system either flush-mounted or curb-mounted (including site built). In order to create a positive water flow around them, skylights are often mounted on curbs set above the roof plane. However, these curbs, rising 6 to 12 inches (15 to 30 centimeters) above the roof, create additional heat loss surfaces right where the warmest air of the building tends to collect. Portions of roof that serve as curbs that mount the skylight above the level of the roof (See below) are part of the opaque building envelope.
Building Envelope
As per the Code: Skylights shall comply with the maximum U-factor and maximum SHGC requirements of Table 4.6. Skylight area is limited to a maximum of 5% of the gross roof area for the prescriptive requirement. Table 4.10: Skylight U-Factor and SHGC Requirements (ECBC Table 4.6) Maximum U-factor
Climate Composite Hot and Dry Warm and Humid Moderate Cold With Curb
11.24 11.24 11.24 11.24 11.24
Maximum SHGC
0-2% SRR
0.40 0.40 0.40 0.61 0.61
w/o Curb
7.71 7.71 7.71 7.71 7.71
2.1-5% SRR
0.25 0.25 0.25 0.4 0.4
SRR: Skylight roof ratio which is the ratio of the total skylight area of the roof, measured to the outside of
the frame, to the gross exterior roof. See 11.2.2 for typical complying skylight constructions.
Q: Does my building envelope comply with the ECBC using the prescriptive path? A: No, this building does not comply because the prescriptive approach limits skylights area to a maximum of 5% of the roof area. This building would need to comply under the envelope trade off option or the Whole Building Approach. As with windows, the skylight-roof ratio must be calculated separately for each space category. The criteria for each space category are determined from its own skylight-roof ratio, not the skylight-roof ratio for the whole building.
31
Building Envelope
What is low-e glass? Low-e stands for low-emissivity and refers to a special coating that reduces the heat transfer of a window assembly. Low-e coated products that reduce solar heat gain can be produced by adding a metallic coating either while the glass is in a molten state or by applying to the glass after it has cooled to a solid state. Low-e glass is readily available from all the glass and window manufacturers. The coatings typically add about 10% to the cost of a window but costs vary by product type, by manufacturer, by retailer and by location. What is spectrally selective glass? The sun emits visible solar radiation in the form of light and infrared radiation that cannot be seen, but causes heat. Spectrally selective glass transmits a high proportion of the visible solar radiation, but screens out radiant heat from the sun significantly reducing the need to cool a buildings interior. Spectrally selective glass is used to describe low-e coated glass that lowers the SHGC. How can I be sure I have spectrally selective glass? The SHGC rating for the product is the key to determining whether you have glass with a spectrally selective coating. In general, windows with a spectrally selective low-e coating will have SHGC ratings of 0.40 or lower.
32
Expansion Device
A D
Evaporater Suction Line
Room air is drawn across an indoor coil called the evaporator that cools and dehumidifies the air during the cooling cycle. The condenser condenses the refrigerant and transforms the high pressure vapor into high pressure liquid. Heat is rejected via air drawn across the condenser coils using fans (air-cooled condenser) or using a shell and tube heat exchanger in conjunction with a condenser water reticulation system and cooling towers (water cooled condenser). The expansion device transforms the high pressure high temperature liquid refrigerant to low pressure low temperature mixture of refrigerant liquid and vapor. This mixture fully evaporates in the evaporator absorbing the heat from the water (cooling the water in a chilled water system) or cooling the air drawn across the coil (direct expansion system). The compressor then raises the pressure and temperature of the refrigerant and the cycle continues on.
33
34
iv.
Inlet openings should not, as far as possible, be obstructed by adjoining buildings, trees, sign boards or other obstructions or by partitions inside in the path of air flow. v. In rooms of normal size having identical windows on opposite walls the average indoor air speed increases rapidly by increasing the width of the window up to two-thirds of the wall width; beyond that the increase is in much smaller proportion than the increase of the window width. The air motion in the working zone is maximum when window height is 1.1 m. Further increase in window height promotes air motion at higher level of window, but does not contribute additional benefits as regards air motion in the occupancy zones in buildings. vi. Greatest flow per unit area of openings is obtained by using inlet and outlet openings of nearby equal areas at the same level. vii. For a total area of openings (inlet and outlet) of 20% to 30% of floor area, the average indoor wind velocity is around 30% of outdoor velocity. Further increase in window size increases the available velocity but not in the same proportion. In fact, even under most favorable conditions the maximum average indoor wind speed does not exceed 40% of outdoor velocity. viii. Where the direction of wind is quite constant and dependable, the size of the inlet should be kept within 30 to 50% of the total area of openings and the building should be oriented perpendicular to the incident wind. Where direction of the wind is quite variable, the openings may be arranged so that as far as possible there is approximately equal area on all sides. Thus no matter what the wind direction is, there would be some openings directly exposed to wind pressure and others to air suction and effective air movement through the building would be assured. ix. Windows of living rooms should open directly to an open space. In places where building sites are restricted, open space may have to be created in the buildings by providing adequate courtyards. x. In the case of rooms with only one wall exposed to outside, provision of two windows on that wall is preferred to that of a single window. xi. Windows located diagonally opposite to each other with the windward window near the upstream comer give better performance than other window arrangements for most of the building orientations. xii. Horizontal louvers, that is a sunshade, atop a window deflects the incident wind upward and reduces air motion in the zone of occupancy. A horizontal slot between the wall and horizontal louver prevents upward deflection of air in the interior of rooms. Provision of inverted L type (r) louver increases the room air motion provided that the vertical projection does not obstruct the incident wind. xiii. Provision of horizontal sashes inclined at an angle of 45 in appropriate direction helps to promote the indoor air motion. Sashes projecting outward are more effective than projecting inward. xiv. Air motion at working plane 0.4 m above the floor can be enhanced by 30% using a pelmet type wind deflector. xv. Roof overhangs help by promoting air motion in the working zone inside buildings. xvi. Verandah open on three sides is to be preferred since it causes an increase in the room air motion for most of the orientations of the building with respect to the outdoor wind. xvii. A partition placed parallel to the incident wind has little influence on the pattern of the air flow, but when located perpendicular to the main flow, the same partition creates a wind shadow. Provision of a partition with spacing of 0.3 m underneath helps by augmenting air motion near floor level in the leeward compartment of wide span buildings. xviii. Air motion in a building unit having windows tangential to the incident wind is accelerated when unit is located at end-on position on downstream side. xix. Air motion in two wings oriented parallel to the prevailing breeze is promoted by connecting them with a block on downstream side. xx. Air motion in a building is not affected by constructing another building of equal or smaller height on the leeward side; but it is slightly reduced if the leeward building is taller than the windward block.
Energy Conservation Building Code (ECBC) User Guide 35
xxi. Air motion in a shielded building is less than that in an unobstructed building. To minimize the shielding effect, the distances between two rows should be 8H for semi-detached houses and 10H for long rows houses. However, for smaller spacing the shielding effect is also diminished by raising the height of the shielded building. xxii. Hedges and shrubs deflect the air away from the inlet openings and cause a reduction in indoor air motion. These elements should not be planted at a distance of about 8m from the building because the induced air motion is reduced to minimum in that case. However, air motion in the leeward part of the building can be enhanced by planting a low hedge at a distance of 2m from the building. xxiii. Trees with large foliage mass having trunk bare of branches up to the top level of window, deflect the outdoor wind downwards and promotes air motion in the leeward portion of buildings. xxiv. Ventilation conditions indoors can be ameliorated by constructing buildings on earth mound having a slant surface with a slope of 10 on the upstream side. xxv. In case of industrial buildings the window height should be about 1.6m and the width about two-thirds of wall width. These should be located at a height of 1.1m above the floor. In addition, openings around 0.9m high should be provided over two-thirds of the length of the glazed area in the roof lights. xxvi. Height of industrial buildings, although determined by the requirements of industrial processes involved, generally kept large enough to protect the workers against hot stagnant air below the ceiling as also to dilute the concentration of contaminant inside. However, if high level openings in roof or walls are provided, building height can be reduced to 4m without in any way impairing the ventilation performance. By Stack Effect Natural ventilation by stack effect occurs when air inside a building is at a different temperature than air outside. Thus, in heated buildings or in buildings wherein hot processes are carried out and in ordinary buildings during summer nights and during premonsoon periods, when the inside temperature is higher than that of outside, cool outside air will tend to enter through openings at low level and warm air will tend to leave through openings at high level. It would, therefore, be advantageous to provide ventilators as close to ceilings as possible. Ventilators can also be provided in roofs as, for example, cowl, ventpipe, covered roof and ridge vent.
36
Room Width
m (1)
3 4 5 6 7 8 9 10 11 12 13 14
Room Length
4m (2)
1200/1 1200/1 1400/1 1200/2 1200/2 1200/2 1400/2 1400/2 1500/2 1200/3 1400/3 1400/3
5m (3)
1400/1 1400/1 1400/1 1400/2 1400/2 1400/2 1400/2 1400/2 1500/2 1400/3 1400/3 1400/3
6m (4)
1500/1 1200/2 1400/2 900/4 1050/4 1200/4 1400/4 1400/4 1500/4 1200/6 1200/6 1400/6
7m (5)
1050/2 1200/2 1400/2 1050/4 1050/4 1200/4 1400/4 1400/4 1500/4 1200/6 1200/6 1400/6
8m (6)
1200/2 1200/2 1400/2 1200/4 1200/4 1200/4 1400/4 1400/4 1500/4 1200/6 1200/6 1400/6
9m (7)
1400/2 1400/2 1400/2 1400/4 1400/4 1400/4 1400/4 1400/4 1500/4 1400/6 1400/6 1400/6
10m (8)
1400/2 1400/2 1400/2 1400/4 1400/4 1400/4 1400/4 1400/4 1500/4 1400/6 1400/6 1400/6
11m (9)
1400/2 1500/2 1500/2 1500/4 1500/4 1500/4 1500/4 1500/4 1500/4 1500/6 1500/6 1500/6
12m (10)
1200/3 1200/3 1400/3 1200/6 1200/6 1200/6 1400/6 1400/6 1500/6 1200n 1400/9 1400/9
14m (11)
1400/3 1400/3 1400/3 1400/6 1400/6 1400/6 1400/6 1400/6 1500/6 1400/9 1400/9 1400/9
16m (12)
1400/3 1500/3 1 500/3 1 500/6 1 500/6 1 500/6 1500/6 1 500/6 1 500/6 1400/9 1 500/9 1500/9
Source: National Building Code of India 2005. For data on outdoor wind speeds at a place, reference may be made to The Climatic Data Handbook prepared by Central Building Research Institute, Roorkee, 1999. Box 5-D provides additional information in naturally ventilated spaces for tropical countries.
Box 5-D: Optional Method for Determining Acceptable Thermal Conditions in Naturally Conditioned Spaces Based on Field Experiments Conducted in Tropical Countries
The adaptive model of thermal comfort is derived from a global database of 21,000 measurements taken primarily in office buildings in the tropical climate. The allowable operative temperature limits may not be extrapolated to the outdoor temperature above and below the end points of the curves in this figure. If the mean monthly outdoor temperature is less than 10C or greater than 33.5C, this option may not be used. Occupant-controlled naturally conditioned spaces are those spaces where the thermal conditions of the space are regulated primarily by the occupants through opening and closing of windows. Field experiments have shown that occupants thermal responses in such spaces depend in part on the outdoor climate and may differ from thermal responses in buildings with centralized HVAC systems primarily because of the different thermal experiences, changes in clothing, availability of control, and shifts in occupant expectations. This optional method is intended for such spaces. In order for this optional method to apply, the space must be equipped with operable windows that open to the outdoor and that can be readily opened and adjusted by the occupants of the space. Mechanical ventilation with unconditioned air may be utilized, but opening and closing of windows must be the primary means of regulating the thermal conditions in the space. The space may be provided with a heating system, but this optional method does not apply when a heating system is in operation. It applies only to spaces where the occupants are engaged in near sedentary physical activities, with metabolic rates ranging from 1.0 met to 1.3 met1. This optional method applies only to spaces where the occupants may freely adapt their clothing to the indoor and/or outdoor thermal conditions. Limits on Temperature Drifts and Ramps
Time Period Maximum Operative Temperature Change Allowed
0.25h 1.1 C (2.0F) 0.5h 1.7C (3.0F) 1h 2.2C (4.0F) 2h 2.8C (5.0F) 4h 3.3C (6.0F)
37
Figure 5.1: Acceptable operative temperature ranges for naturally conditioned spaces. Allowable indoor operative temperature for spaces that meet these criteria may be determined from the figure above. This figure includes two sets of operative temperature limits one for 80% acceptability and one for 90% acceptability. The 90% acceptability limits may be used when a higher standard of thermal comfort is desired.
1 1met=
58W/m2 : for typical office activity, one person is likely to produce 100- 125 watts of heat.
Central Plant Systems Central plant air conditioning systems: In central air-conditioning systems, chilled water is generated via a central chilled water plant. The chilled water is distributed to air-handling units or fan-coil units via a chilled water reticulation system consisting of chilled water pipes, valves, fittings, and pumps. The chillers used in central chilled water plants include air-cooled chillers as well as water-cooled chiller systems that work in conjunction with cooling towers for heat rejection. Box 5-F provides an overview of the differences between DX and Central HVAC systems. It should help in selecting appropriate system for the building.
Aesthetics Zoning
Air Quality
Controls
The appearance of local units can be unappealing and may not necessarily blend well with the aesthetics. A local HVAC system typically serves a single thermal zone and has its major components located within the zone itself or directly adjacent to the zone. Multiple units are required for multiple zones. This system is less flexible to zoning requirements. The quality of air conditioning is comparatively The air quality is not comparable to central superior, with better control over temperature, relative systems. These systems typically cannot humidity, air filtration, and air distribution. provide close humidity control or high Best suited for applications demanding close control efficiency filtration. of temperature, humidity, and cleanliness and can be The compact systems, being standard factory customized as per the design conditions. items, typically cannot be modified to suit the required design conditions all the times. Central HVAC systems will require a control point for Local units are off-shelf items complete each thermal zone. The controls are field wired and are with integrated controls. They usually have integrated to a central control panel. The controls are a single control point which is typically only complex and depend on the type of system. a thermostat. Constant air volume (CAV) systems alter the temperature while keeping the constant air delivery. CAV systems serving multiple zones rely on reheat coils to control the delivered cooling. This incurs a lot of energy wastage due to simultaneous cooling and heating. The room-by-room or zone control minimizes over cooling typical of central air-conditioning systems. With the zonecontrol ability of the compact systems, only occupied spaces are maintained at a comfort Space temperature control can also be achieved by level, and conditioning for the rest of the applying a variable air volume (VAV) system, which building is turned down or shut off. primarily alters the air delivery rates. The VAV system may It should be noted that some DX systems or may not have a reheat coil, which provides additional have limited capacity control and have heat when the space does not need to be cooled or needs limited capability to reduce airflow during less cooling than would be delivered by supply air at the low load situations. Hence, there is a terminal boxs minimum air quantity setting. limitation in saving fan energy in DX systems Proper zoning using face zoned AHUs working in with some types of DX systems only having conjunction with downstream VAV boxes will provide on/off control for the compressors that energy-efficient cooling and eliminate the need of can result in considerable hunting and space temperature fluctuation. reheat.
39
Efficiency
Central systems usually operate under part load In a building where a large number of spaces conditions, and localized areas cannot be isolated for may be unoccupied at any given time, such complete shut down under any condition. as a dormitory or a motel, local systems may In a central system, the individual control option is not be totally shut off in the unused spaces, thus always available. If individual control is desired, the providing huge energy saving potential.
Refrigerant Containment
air handling units, it is possible to achieve excellent As the compact systems are small, they are savings in power. designed for full peak load and the standard Proper zoning as mentioned earlier can avoid rooftop or package units are not typically available with variable speed option. This conflicting demands for heating and cooling. type of system therefore has very limited potential to operate efficiently during part load situations. The availability of VRF system is changing this. Central plant systems provide an excellent means to Unlike central systems, DX systems pose contain all refrigerant within the chiller housing and a greater risk of refrigerant leaks to the plant room. It is possible to detect any minor leaks atmosphere. With DX systems installed in within the localized plant room and take remedial several localized areas it may be very difficult action to arrest the leak. or impossible to detect these leaks, especially in split systems with long pipe runs using high pressure refrigerant. Large central systems can have a life useful life of up Local systems can have a useful life of up to 25 years. to 15 years. Central systems allow major equipment components to be kept isolated in a mechanical room. Grouping and isolating key operating components allows maintenance to occur with limited disruption to building functions. The initial purchasing and installation cost of a central air conditioning system is much higher than a local system. These systems can offer higher system efficiencies (full load and part load) and thus, can pay pack the elevated initial costs through reduced costs of operations within a few years. Extra cost benefits can be achieved due to the potential for energy efficiency measures like thermal heat recovery, economizers, energy storage systems and etc. Local systems maintenance may often be relatively simple but maintenance may have to occur directly in occupied spaces. Packaged and split units have much lower first costs than a central system. The operating costs of unitary systems is usually higher due to lower efficiency ratings and lower part load performance values The potential for adoption of high-tech energy efficiency measures is very limited
system shall be designed as variable air volume system As a self-contained system, a local HVAC with localized thermostats. system may provide greater occupant Central systems designed for VAV system is based comfort through totally individualized on block load calculations, as the VAV units allow control options -- if one room needs heating the system to borrow air from areas with low load. while an adjacent one needs cooling, two By incorporating VAVs with variable speed drive on local systems can respond without conflict
Cost
Source: A. Bhatia, Course Content (PDH 149), HVAC Design Aspects: Choosing A Right System-Central V/s Compact Systems. http://www.pdhcenter.com/Heating System Types, and Team Catalyst The Code refers to various types of chillers; Box 5-G gives a brief description of the chillers.
40
What are the different types of chillers? Chillers are classified according to compressor type. Electric chillers for commercial comfort cooling have centrifugal, screw, scroll, or reciprocating compressors. Centrifugal and screw chillers have one or two compressors. Scroll and reciprocating chillers are built with multiple, smaller compressors. Centrifugal chillers are the quiet, efficient, and reliable workhorses of comfort cooling. Although centrifugal chillers are available as small as 70 tons, most are 300 tons or larger. Screw chillers are up to 40% smaller and lighter than centrifugal chillers, so are becoming popular as replacement chillers. Scroll compressors are rotary positive-displacement machines, also fairly new to the comfort cooling market. These small compressors are efficient, quiet, and reliable. Scroll compressors are made in sizes of 1.5 to 15 tons. The energy efficiency of cooling and heating systems in terms of Coefficient of Performance (COP), Energy Efficiency Ratio (EER) and Integrated Part-Load Value as specified by the Code are presented in Box 5-H
Equipment Class
Air Cooled Chiller <530 kW (<150 tons) Air Cooled Chiller 530 kW (150 tons) *Centrifugal Water Cooled Chiller < 530 kW (<150 tons) *Centrifugal Water Cooled Chiller 530 and <1050 kW (150 and <300 tons) *Centrifugal Water Cooled Chiller 1050 kW ( 300 tons) Reciprocating Compressor, Water Cooled Chiller all sizes Rotary Screw and Scroll Compressor, Water Cooled Chiller <530 kW (<150 tons)
Test Standard
ARI 550/590-1998 ARI 550/590-1998 ARI 550/590-1998 ARI 550/590-1998 ARI 550/590-1998 ARI 550/590-1998 ARI 550/590-1998
41
Rotary Screw and Scroll Compressor, Water 5.40 Cooled Chiller 530 and <1050 kW (150 and <300 tons) Rotary Screw and Scroll Compressor, Water 5.75 Cooled Chiller 1050 kW ( 300 tons) *These are aspirational values. For mandatory values refer to ASHRAE 90.1-2004
6.17
ARI 550/590-1998
6.43
ARI 550/590-1998
As per the Code: Unitary Air Conditioner shall meet IS 1391- Part 1 (Table 5.3), split air conditioner shall meet IS 1391 - Part 2 (Table 5.4), packaged air conditioner shall meet IS 8148 (Table 5.5) and boilers shall meet IS 13980 (the standard specifies the procedure with above 75% thermal efficiency.
Table 5.3: Power Consumption Ratings for Unitary Air Conditioners Under Test Conditions Table 5.4: Power Consumption Ratings for Split Air Conditioners Under Test Conditions
kW
1.7 2.6 3.5 4.4 5.2 7.0 8.7 10.5
kW
3.5 5.2 7.0 8.7 10.5
Source: Code No.: IS 1391 (Part-1): 1992 (amendment No. 2 Dec.2006 ) Cooling Capacity
Watts
10,000 17,500 26,250 35,000 52,000
Source: Code No.: IS 1319 (Part-2): 1992 (amendment No. 2 Dec.2006) Maximum Power Consumption in Watts
Water Cooled
3,750 6,000 9,000 11,500 17,000
Table 5.5: Power Consumption Rating for Packaged air Conditioners-under test conditions Tons of Refrigeration
3 5 7.5 10 15
Air Cooled
4,750 7,000 10,000 13,500 20,000
Source: Code No.: IS 8148: 2003 Selection of individual equipment efficiency should be considered in the context of the whole HVAC system. In a chilled-water system, for example, although the chiller is at the core of the system and typically is the single largest energy user, simply selecting a high-efficiency chiller does not guarantee high performance. Auxiliary equipment (such as fans and blowers) and design decisions (such as approach temperatures) can have substantial effects on overall efficiency. Thus, attention to overall system design and auxiliary components is critical to achieving optimal performance and comfort. Even in packaged air-conditioning systems, leaky ductwork, improper sizing, refrigerant charge, and air flow rates can considerably affect energy performance.
5.2.3 Controls
Controls are one of the most critical elements for improving efficiency of any HVAC system. Controls determine how HVAC systems should operate to meet the design goals of comfort, efficiency, and cost-effective operation. In this context, the Code specifies the use of time clocks, temperature controls/thermostats, and two-speed or variable speed drives for fans.
Energy Conservation Building Code (ECBC) User Guide 42
5.2.3.3 Controls for Cooling Towers and Closed Circuit Fluid Coolers
As per the Code: All cooling towers and closed circuit fluid coolers shall have either two speed motors, pony motors, or variable speed drives controlling the fans. Box 5-I briefly discusses the concept of Variable Speed Drive, and Box 5-J provides guidelines for improving energy and water efficiency in cooling towers.
43
Heating System
Designed Operating Temperature of Piping
60C and above Above 40C and below 60C
Cooling System
Designed Operating Temperature of Piping
Below 15C Split System
As per the Code: Insulation exposed to weather shall be protected by aluminum sheet metal, painted canvas, or plastic cover. Cellular foam insulation shall be protected as above, or be painted with water retardant paint.
44
5.2.4.2 Ductwork
As per the Code: Ductwork shall be insulated in accordance with the Table 5.8.
Table 5.8: Ductwork Insulation (Table 5.2 of ECBC)
Spaceb Spacec
Indirectly Conditioned
R-value is measured on a horizontal plane in accordance with ASTM C518 at a mean temperature of 24C (75F) at the installed thickness crawlspaces, both ventilated and non-ventilated return air plenums with or without exposed roofs above.
Installed R-value1 (h F f t 2) / B t u
1.9 3.5
6.0
1 in. Mineral fiber duct liner per ASTM C1071, Types I & II 1 in. Mineral fiber duct board per UL 181 1 in. Mineral fiber board per ASTM C 612, Types IA & IB 2 in.. 2 lb/ft3 Mineral fiber duct wrap per ASTM C 1290 2 in. 0.6 to 1 lb./ft3 Mineral fiber duct wrap per ASTM C 1290 2 in. Insulated flex duct per UL 181
8.0
2 in. Mineral fiber duct liner per ASTM C 1071, Types I & II 2 in. Mineral fiber duct board per UL 181 2 in. Mineral fiber board per ASTM C 612, Types IA & IB 3 in. lb/ft3 Mineral fiber duct wrap insulation per ASTM C 1290 3 in. Insulated flex duct per UL 181
10.0
1 Listed R-values are for the insulation only as determined in accordance with ASTM C 518 at a mean temperature of 24C at the installed thickness and do not include air film resistance. 2 Consult with manufacturers for other materials or combinations of insulation thickness or density meeting the required R-value.
Ductwork should be properly air sealed (Box 5-K) and also be protected from moisture absorption. Condensing moisture can cause many types of insulation, such as fiberglass, to lose their insulating properties or degrade.
Exhaust
C C B
Return
A B C
498.2 Pa
A A B
Sealing Requirements
All transverse joints and longitudinal seams, and duct wall penetrations. Pressure-sensitive tape shall not be used as the primary sealant. All transverse joints and longitudinal seams. Pressure-sensitive tape shall not be used as the primary sealant Transverse joints only.
46
5.2.5.1.1 Air Systems Balancing Air System Balancing refers to the adjustment of airflow rates through air distribution system devices, such as fans and diffusers. This is done by adjusting the position of dampers, splitter vanes, extractors, etc., manually or by using automatic control devices, such as constant air volume or variable air volume boxes. Balancing is necessary to verify that each space served by a system receives the air volume designed for that space. Proper means for air balancing should be installed at each supply air outlet and zone terminal device. These include balancing dampers or other means of supply-air adjustment provided in the branch ducts or at each individual duct register, grille, or diffuser. Installation in the duct system of all devices used for balancing, shown on the approved mechanical plans, typically, on the ductwork layout, should be verified. As per the Code: Air systems shall be balanced in a manner to minimize throttling losses. Then, for fans greater than 0.75 KW (1.0 HP), fans must then be adjusted to meet design flow conditions. Box 5-M provides the concepts related to air handling units for air distribution systems for energy efficiency.
5.2.5.1.2 Hydronic Systems Balancing Hydronic System Balancing refers to the adjustment of water flow rates through distribution system devices,
47
such as pumps and coils, by manually adjusting the position of valves, or by using automatic control devices, such as flow control valves. When something is balanced, it is even on both sides. Therefore, a balanced hydronic system is one that delivers even flow to all of the devices on that piping system. Each component has an effective equal length of pipe on the supply and return. And when a system is balanced, all of the pressure drops are correct for the devices. When that happens, the highest efficiencies are possible in the system. One need not have to change system supply temperatures to accommodate one zone only. The system has the least amount of pressure drop possible, which translates into reduced pumping costs. A balanced hydronic system is one that is efficient. If a system that is not delivering the water to the right devices in the right amounts, then the system is out of balance. As per the Code: Hydronic systems shall be proportionately balanced in a manner to first minimize throttling losses; then the pump impeller shall be trimmed or pump speed shall be adjusted to meet design flow conditions. Exceptions to above: a. Impellers need not be trimmed nor pump speed adjusted for pumps with pump motors of 7.5 kW (10 hp) or less, b. Impellers need not be trimmed when throttling results in no greater than 5% of the nameplate horsepower draw, or 2.2 kW (3 hp), whichever is greater.
5.2.6 Condensers
5.2.6.1 Condenser Locations
A condenser is a heat exchanger that liquefies refrigerant vapor through heat removal. The typical condensing unit houses a compressor, a condenser fan motor, and coils, along with controls which make all the components work sequentially. As per the Code: Care shall be exercised in locating the condensers in such a manner that the heat sink is free of interference from heat discharge by devices located in adjoining spaces and also does not interfere with such other systems installed nearby. Condensers should be located in such a manner that there is no restriction to the air flow around the condenser coils, there is no short-circuiting of discharge air to the intake side, and the heat discharge of other adjacent equipment is not anywhere the air intake of the condenser.
5.3.1 Economizers
Economizers allow the use of outdoor air to cool the building when the outside temperature is cooler than that inside. An economizer consists of dampers, sensors, actuators, and logic devices that together decide how much outside air to bring into a building (See Figure 5.2).Under the right conditions, sensors and controls shut down the compressor and bring in the outside air through the economizer louvers. A properly operating economizer can cut energy costs by as much as 10% of a buildings total energy consumption, depending mostly on local climate and internal cooling loads.
49
Exceptions to above are: a. Projects in the hot-dry and warm-humid climate zones are exempt b. Individual ceiling mounted fan systems < 3,200 l/s (6,500 cfm) are exempt
50
51
52
Instantaneous Electric: An electric water heater controlled automatically by a thermostat, instantaneous water heaters are not generally designed for use with solar water heating systems or as heat sources for indirect fired water heaters. They are also typically inappropriate for use with recirculation systems. Refer Box 6-B for more information. Indirect Gas: A water heater consisting of a storage tank with no heating elements or combustion devices, connected via piping and recirculating pump to a heat source consisting of a gas or oil fired boiler, or instantaneous gas water heater (see note following the definitions of Instantaneous Gas and Electric). Passive Solar: Systems, which collect and store solar thermal energy for water heating applications and do not require electricity to recirculate water through a solar collector. Active Solar: Systems, which collect and store solar thermal energy for water heating applications requiring electricity to operate pumps or other components.
The simplest systems are passive solar water heaters, also called batch or bread box collectors, they are most common in regions that do not experience extensive periods of below freezing temperatures. The water in these solar collectors circulates without the aid of pumps or controls.
Active solar water heaters use pumps to circulate water or an antifreeze solution through heatabsorbing solar thermal collectors.
53
54
For Electric Water Heaters, IS 2082 (Part 1) covers the safety and performance requirements of heaters with rated capacities in the range of 6 liters to 200 liters. In these heaters, certain amount of energy is consumed to keep the water hot while it is not being used. This consumption of electricity is called as standing loss (or standby loss). Refer Box 6-C.
Source: IS 2082 (Part 1): 1993 (Reaffirmed 2004) Edition 5.4 (2002-05) Stationary Storage Type Electric Water
55
Box 6-D and Box 6-E provide guidelines for hot water temperature controls and measures for improving heating efficiency respectively.
56
57
Lighting
7. Lighting
7.1 General
ighting accounts for 15% of total energy consumption in India. Lighting is an area that offers many energy efficiency opportunities in almost any building facility, existing or new.
A century ago, a person could read by the light of a single candle, but today a person in a typical office uses hundreds or even thousand times more light. Over the years, illumination standards have increased radically along with efficiency of lamps. People want light for different reasons, and a good lighting designer need to keep all of them in mind. Different tasks and building facilities require different amounts and types of light. For example, a surgeon in an operation theater needs lots of light with low glare and excellent color rendering, restaurant owners and diners often want low light levels, corporate boardrooms call for lighting that reinforces a feeling of importance and success while adapting to audio-visual presentations; retail outlets in many situations want to make their merchandise sparkle so that it draws the customers and encourages them to buy. An office executive needs modest ambient lighting level, good task lighting on work surface, and minimal glare to effectively read and work on computers. While energy efficiency is an attractive goal for many reasons, lighting designers also need to consider a host of other factors, including the effect of quality of light on the visual comfort and productivity of the occupants. Small improvement in lighting quality can improve productivity of the user substantially. In practice, the right quality and quantity of light can be provided efficiently (with less energy) by using the right technology and its effective integration with daylight. General Design Considerations Using efficient lighting equipment and controls is the best way to ensure lighting energy efficiency while maintaining or even improving lighting conditions. For instance, modern fluorescent lighting, such as T-8 systems with electronic ballast, can provide the same quantity of light as older fluorescent lighting while consuming as little as two-thirds of the energy. Similarly, compact fluorescent sources are three to four times more efficient than the traditional incandescent lamps they are designed to replace. For a lighting designer an energy-efficient lighting design involves sensitive integration of many requirements and considerations that include building orientation, interior building layout, task illumination, daylight strategies, glazing specification, choice of lighting system and controls etc. The designer is also responsible for making sure that lighting complies with the Code, meeting both mandatory and prescriptive requirements. The lighting requirements in the Code apply to: a. Interior spaces of buildings b. Exterior building features, including faades, illuminated roofs, architectural features, entrances, exits, loading docks, and illuminated canopies c. Exterior building grounds lighting that is provided through the buildings electrical service Exceptions to above: a. Emergency lighting that is automatically off during normal building operation and is powered by battery, generator, or other alternate power source b. Lighting in dwelling units
58
Lighting
Lighting
60
Lighting
Occupancy-sensing lighting controls represent a refinement of the technology developed in the early 1970s to detect intruders for residential and commercial security applications. With lighting control, two different means of detecting occupancy are used: Passive Infrared (PIR) sensors perceive and respond to the heat patterns of motion. This same technology is used in most residential and commercial security systems. The chief advantage of PIR sensors is that they are relatively inexpensive and reliable. They very rarely false trigger (that is, respond to non occupant motion in a space). The major limitation of PIR sensors is that they are strictly line-of-sight devices, unable to see around corners or partitions. Ultrasound (US) detectors radiate ultrasonic waves into a space, then read the frequency of the reflected waves. Motion causes a slight shift in frequency, which the detector interprets as occupancy. They are more sensitive than PIR sensors, which is both an advantage and a disadvantage. They are often used very effectively in partitioned spaces but are also more prone to false triggering due to their sensitivity to air movement. Proper design and installation minimizes this potential problem.
Space Area
Up to 1000 m2 More than 1000 m2
Exception to (c) above: The required control device may be remotely installed if required for reasons of safety or security. A remotely located device shall have a pilot light indicator as part of or next to the control device and shall be clearly labeled to identify the controlled lighting. An exception to (c) is provided for control devices that need to be remotely installed for reasons of safety or security. However, a remotely located device must have a pilot light indicator as part of or next to the control device and it must be clearly labeled to identify the controlled lighting device.
61
Lighting
Lighting
f. Demonstration Lighting: Lighting equipment that is for sale or for demonstrations in lighting education shall be equipped with a separate control device accessible only to authorized personnel Box 7-G provides more information and guidelines for installation of controls for the above lighting applications:
Lighting
64
Lighting
Lighting
The second step is to calculate the gross lighted floor area for each of the building area types (this can be done using the building plans). Finally, the last step is to multiply the allowed watts per square meter listed for each selected building type by the corresponding lighted floor areas to determine the allowed light power allowance. Table 7.1: Interior Lighting Power- Building Area Method (ECBC Table 7.1) Building Area Type
Automotive Facility Convention Center Dining: Bar Lounge/Leisure Dining: Cafeteria/Fast Food Dining: Family Dormitory/Hostel Gymnasium Health care-Clinic Hospital/Health Care Hotel Library Manufacturing Facility Motel Motion Picture Theater
LPD (W/m2)
9.7 12.9 14.0 15.1 17.2 10.8 11.8 10.8 12.9 10.8 14.0 14.0 10.8 12.9
LPD (W/m2)
7.5 11.8 10.8 3.2 17.2 10.8 11.8 14.0 16.1 12.9 11.8 10.8 8.6 15.1
In cases where both a general building area type and a specific building area type are listed, the specific building area type shall apply.
LPD (W/m2)
11.8 11.8 14.0 15.1 14.0 11.8 35.5 11.8 9.7 4.3 7.5 18.3 4.3 28.0 12.9 5.4 6.5 2.2 Hospital
Space Function
For Reading Area For Emergency For Recovery For Nurse Station For Exam Treatment For Pharmacy For Patient Room For Operating Room For Nursery For Medical Supply For Physical Therapy For Radiology For Laundry Washing Automotive Service Repair Manufacturing Facility For Low Bay (<8m ceiling) For High Bay (>8m ceiling)
LPD (W/m2)
12.9 29.1 8.6 10.8 16.1 12.9 7.5 23.7 6.5 15.1 9.7 4.3 6.5 7.5 12.9 18.3
66
Lighting
Lounge/Recreation* For Hospital Dining Area* For Hotel For Motel For Bar Lounge/Leisure Dining For Family Dining Food Preparation Laboratory Restrooms Dressing/Locker/Fitting Room Corridor/Transition* For Hospital For Manufacturing Facility Stairs-active Active Storage* For Hospital Inactive Storage* For Museum Electrical/Mechanical Facility Workshop Convention Center Exhibit Space Library For Card File & Cataloging For Stacks * For
12.9 8.6 9.7 14.0 12.9 15.1 22.6 12.9 15.1 9.7 6.5 5.4 10.8 5.4 6.5 8.6 9.7 3.2 8.6 16.1 20.5 14.0
For Detailed Manufacturing For Equipment Room For Control Room Hotel/Motel Guest Rooms Dormitory Living Quarters Museum For General Exhibition For Restoration Bank Office Banking Activity Area Retail For Sales Area For Mall Concourse Sports Arena For Ring Sports Area For Court Sports Area For Indoor Field Area Warehouse For Fine Material Storage For Medium/Bulky Material Storage Parking Garage Garage Area Transportation For Airport Concourse For Air/Train/Bus Baggage Area
22.6 12.9 5.4 11.8 11.8 10.8 18.3 16.1 18.3 18.3 29.1 24.8 15.1 15.1 9.7 2.2 6.5 10.8 16.1
11.8 18.3
Second, for each space that is enclosed by partitions which are 80% or greater than ceiling height, the gross interior floor area must be determined. This applies to all space area types except for retail. The gross interior floor area should be calculated by measuring to the center of the partition walls and must also include spaces allotted to balconies or other projections. Finally, the individual lighting power allowances for each space is determined by multiplying its gross lighted floor area by the allowed lighting power density for that space. The lighting power allowances are summed to equal the Interior Lighting Power Allowance for the building.
67
Lighting
Power Limits
13 W/m2 (1.3 W/ft2) of canopied area 90 W/lin m (30 W/lin f) of door width 60 W/lin m (20 W/lin f) of door width 2 W/m2 (0.2 W/ft2) of vertical facade area
68
Electrical Power
8. Electrical Power
8.1 General
CBC has only mandatory requirements for electric power systems installed in buildings. These provisions are related to distribution transformers, electric motors, power factor, and distribution losses.
8.2.1 Transformers
Transformer is a static device, which is used to either increase (Step up) or decrease (Step down) the input supply voltage depending on the application and requirement. Transformers consist of two or more coils that are electrically insulated, but magnetically linked (see Figure 8.1). The primary coil connected to the power source and secondary coil connects to the load.
Figure 8.1: Transformer Power transmitted from power plants, is in the form of high-tension voltage (400 kV - 33 kV). The reasons for transmitting HT voltage are: Reduced conductor size and investment on conductors Reduced the transmission losses and voltage drop. At the user end, equipment with various voltage rating is used for different applications. Hence, the transmitted voltage is first stepped down (11 kV - 230V) through distribution transformers and then the power supply is distributed to the various sections and equipment. Distribution transformers are used normally in all commercial buildings. They are kept energized around the clock providing power to the buildings electrical equipment.
Electrical Power
Distribution transformers consume energy even when the building is not occupied or its equipment are not operating, resulting in energy loss. Transformers losses are discussed in Box 8-A.
Figure 8.2: Transformer loss vs % Load For a given transformer, the manufacturer can supply values for no-load loss, PNo-load, and load loss, PLoad. The total transformer loss, PTotal, at any load level can then be calculated from: PTotal = PNo-load+ (% Load/100)2 PLoad Source: Energy Efficiency in Electrical Utilities, Bureau of Energy Efficiency, 2005. As per the Code: Power transformers of the proper ratings and design must be selected to satisfy the minimum acceptable efficiency at 50% and full load rating. In addition, the transformer must be selected such that it minimizes the total of its initial cost in addition to the present value of the cost of its total lost energy while serving its estimated loads during its respective life span. ECBC lists various transformer sizes of dry-type and oil-filled transformers and their associated losses at 50% and full load rating (Table 8.1 and Table 8.2 of ECBC).
70
Electrical Power
Table 8.1: Dry-Type Transformers (ECBC Table 8.1) Rating KVA Max. Losses at 50% loading1 [kW]
0.94 1.29 1.5 1.7 2 2.38 2.8 3.34 3.88 4.5 5.19 6.32 7.5 9.25
Up to 22 kV class
100 160 200 250 315 400 500 630 800 1000 1250 1600 2000 2500
33 kV class
1Total loss values given in above table are applicable for thermal classes E, B & F and have component of load loss at reference
temperature according to clause 17 of IS 2026: Part 11. i.e., average winding temperature rise as given in column 2 of Table 8.2 plus 30C. An increase of 7% on total for thermal class H is allowed.
Table 8.2: Oil Filled Transformers (ECBC Table 8.2) Rating KVA Max. Losses at 50% loading1 [kW]
0.52 0.77 0.89 1.05 1.10 1.45 1.60 2.00 3.00 3.60 4.50 5.40 6.50
Up to 11 kV class
100 160 200 250 315 400 500 630 1000 1250 1600 2000 2500
33 kV class
1Total loss values given in above table are applicable for thermal classes E, B & F and have component of load loss at reference
temperature according to clause 17 of IS 2026: Part 11. i.e., average winding temperature rise as given in column 2 of Table 8.2 plus 30C. An increase of 7% on total for thermal class H is allowed.
Electrical Power
72
Electrical Power
As per the Code: Motors shall comply with the following: a. All permanently wired polyphase motors of 0.375 kW or more serving the building and expected to operate more than 1,500 hours per year and all permanently wired polyphase motors of 50kW or more serving the building and expected to operate more than 500 hours per year shall have a minimum acceptable nominal full load motor efficiency not less than IS 12615 for energy-efficient motors. (Refer Table 8.3, Table 8.4, Table 8.5, and Table 8.6.) b. Motors of horsepower differing from those listed in the table shall have efficiency greater than that of the next listed kW motor c. Motor horsepower ratings shall not exceed 20% of the calculated maximum load being served (Refer Box 8-C) d. Motor nameplates shall list the nominal full-load motor efficiencies and the full-load power factor e. Motor users should insist on proper rewinding practices for any rewound motors. If the proper rewinding practices cannot be assured, the damaged motor should be replaced with a new, efficient one rather than suffer the significant efficiency penalty associated with typical rewind practices (Refer Box 8-D for more information) f. Certificates shall be obtained and kept on record indicating the motor efficiency. Whenever a motor is rewound, appropriate measures shall be taken so that the core characteristics of the motor is not lost due to thermal and mechanical stress during removal of damaged parts. After rewinding, a new efficiency test shall be performed and a similar record shall be maintained Table 8.3: Values of Performance Characteristic of Two Pole Energy-Efficient Induction Motors. Rated Output Frame Designation Full Load Speed
Min kW
(1) 0.37 0.55 0.75 1.1 1.5 2.2 3.7 5.5 7.5 9.3 11.0 15.0 18.5 22.0 30.0 37.0 45.0 55.0 75.0 90.0 (2) 71 71 80 80 90S 90L 100L 132S 132S 160M 160M 160M 160L 180M 200L 200L 225M 250M 280S 280M
Nominal Efficiency
Rev/min
(3) 2790 2760 2780 2790 2800 2810 2820 2830 2840 2840 2860 2870 2880 2890 2900 2900 2955 2960 2970 2970
Percent
(5) 170.0 170.0 170.0 170.0 170.0 170.0 160.0 160.0 160.0 160.0 160.0 160.0 160.0 160.0 160.0 160.0 160.0 160.0 160.0 160.0
Percent
(6) 600 600 600 600 600 650 650 650 650 650 650 650 650 650 650 650 650 650 650 650
Percent
(8) 66.0 70.0 73.0 76.2 78.5 81.0 84.0 85.7 87.0 87.7 88.4 89.4 90.0 90.5 91.4 92.0 92.5 93.0 93.6 93.9
Percent
(9) 70.2 74.0 77.0 82.8 84.1 85.6 87.5 88.6 89.5 90.0 90.5 91.3 91.8 92.2 92.9 93.3 93.7 94.0 94.6 95.0
73
Electrical Power
Note: Output to frame size relation is maintained in accordance with 1S 1231 for all motors, except those marked as 1), wherein the frame size indicated is preferred frame size. Source: IS 12615: 2004, Energy-Efficient Induction Motors --- Three-Phase Squirrel Cage (First Revision) Table 8.4: Values of Performance Characteristic of 4 Pole Energy-Efficient Induction Motors. Rated Output Frame Designation Full Load Speed
Min kW
(1) 0.37 0.55 0.75 1.1 1.5 2.2 3.7 5.5 7.5 9.3 11.0 15.0 18.5 22.0 30.0 37.0 45.0 55.0 75.0 90.0 110.0 125.0 132.01) 160.01) (2) 71 80 80 90S 90L 100L 112M 132S 132M 160M 160M 160L 180M 180L 200L 225S 225M 250M 280S 280M 315S 315M 315M 315L
Breakaway Breakaway Current in Terms Torque in Terms of Full of Full Current, Equal or Below Load Torque
Min
Nominal Efficiency
Percent
(5) 170.0 170.0 170.0 170.0 170.0 170.0 160.0 160.0 160.0 160.0 160.0 160.0 160.0 160.0 160.0 160.0 160.0 160.0 160.0 160.0 160.0 160.0 160.0 160.0
Percent
(6) 550 550 550 550 550 600 600 600 600 600 600 600 600 600 600 650 600 600 600 600 600 600 600 600
Percent
(7) 600 600 600 600 600 700 700 700 700 700 700 700 700 700 700 700 700 700 700 700 700 700 700 700
Percent
(8) 66.0 70.0 73.0 76.2 78.5 81.0 84.0 85.7 87.0 87.7 88.4 89.4 90.0 90.5 91.4 92.0 92.5 93.0 93.6 93.9 94.4 94.7 94.7 95.0
Percent
(9) 73.0 78.0 82.5 83.8 85.0 86.4 88.3 89.2 90.1 90.5 91.0 91.8 92.2 92.6 93.2 93.6 93.9 94.2 94.7 95.0 95.2 95.5 95.5 95.8
Note: Output to frame size relation is maintained in accordance with IS 1231 for all motors, except those marked as 1), wherein the frame size indicated is preferred frame size. Source: IS 12615: 2004, Energy-Efficient Induction Motors --- Three-Phase Squirrel Cage (First Revision)
74
Electrical Power
Table 8.5: Values of Performance Characteristic of 6 Pole Energy-Efficient Induction Motors. Rated Output Frame Designation Full Load Speed
Min
Nominal Efficiency
kW
(1) 0.37 0.55 0.75 1.1 1.5 2.2 3.7 5.5 7.5 9.3 11.0 15.0 18.5 22.0 30.0 37.0 45.0 55.0 75.0 90.0 110.01) 132.01) (2) 80 80 90S 90L 100L 112M 132S 132M 160M 160L 160L 180L 200L 200L 225M 250M 280S 280M 315S 315M 315M 315L
Rev/min
(3) 870 870 890 900 900 910 920 920 930 930 935 940 940 945 945 950 960 960 970 970 970 980
Amp
(4) 1.4 1.9 2.3 3.2 4.0 5.5 8.8 12.7 16.7 20.5 23.0. 30.5 37.5 44.0 59.0 72.0 87.0 107.0 145.0 175.0 214.0 257.0
Percent
(5) 160.0 160.0 160.0 160.0 160.0 150.0 150.0 150.0 150.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0
Percent
(6) 550 550 550 550 550 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600
Note: Output to frame size relation is maintained in accordance with IS 1231 for all motors, except those marked as 1), wherein the frame size indicated is preferred frame size. Source: IS 12615: 2004, Energy-Efficient Induction Motors --- Three-Phase Squirrel Cage (First Revision) Table 8.6: Values of Performance Characteristic of 8 Pole Energy-Efficient Induction Motors. Rated Output Frame Designation Full Load Speed
Min kW
(1) 0.37 0.55 0.75 1.1 (2) 90S 90L 100L 100L
Nominal Efficiency
Rev/min
(3) 640 640 650 660
Percent
(5) 150.0 150.0 150.0 150.0
Percent
(6) 550 550 550 550
Percent
(7) 600 600 600 600
Percent
(9) 66.8 71.1 73.8 76.2
75
Electrical Power
1.5 2.2 3.7 5.5 7.5 9.3 11.0 15.0 18.5 22.0 30.0 37.0 45.0 55.0 75.0 90.01) 110.01)
112M I32S 160M 160M 160L 180L 180L 200L 225S 225M 250M 280S 280M 315S 315M 315L 315L
670 680 690 690 695 700 700 705 705 710 710 710 720 720 730 730 730
4.5 6.1 9.8 14.2 19.0 23.0 26.0 35.0 45.0 52.0 70.0 86.0 99.0 118.0 153.0 182.0 218.0
150.0 140.0 140.0 140.0 140.0 140.0 140.0 130.0 130.0 130.0 130.0 130.0 130.0 130.0 130.0 130.0 130.0
550 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600 600
600 700 700 700 700 700 700 600 700 700 700 700 700 700 700 700 700
74.0 77.0 80.0 82.5 84.0 85.0 86.0 87.0 88.0 88.5 90.0 90.5 91.0 91.5 92.3 92.8 93.3
77.9 80.5 83.0 85.1 86.4 87.3 88.1 89.0 89.8 90.2 91.5 90.5 92.4 92.8 93.5 93.9 94.3
Note: Output to frame size relation is maintained in accordance with 1S 1231 for all motors, except those marked as 1), wherein the frame size indicated is preferred frame size. Source: IS 12615: 2004, Energy-Efficient Induction Motors --- Three-Phase Squirrel Cage (First Revision)
A general rule-of-thumb is that a one percentage point increase in efficiency is equivalent to about a one-third-point increase in slip a decrease in slip can therefore quickly negate even a significant energy efficiency improvement (Figure 8.3)
76
Electrical Power
To ensure the highest quality in repaired motors, the consistent use of test equipment and documentation procedures must be integral parts of the repair process, so that the efficiency of the motor and the quality of its components can be verified before the motor is put back into service. A critical task in most motor rebuilds is to remove the old windings without altering the adjacent laminated steel cores, and then to wrap new insulated wire around the old cores (Figure 8.4.)
Stator Core Back Iron Tooth Slot Air Gap Rotor Core Rotor Bar
Figure 8.4: Profile cutaway of an induction motor stator and rotor The old windings are commonly embedded in thick coats of varnish (used to glue the windings inside the core slots) which prevent their easy removal. Heat, chemicals, or mechanical force are commonly used to loosen and pull out old windings; excessive use of any of these can cause damage to the cores. Improper machining, replacement bearings, wire diameter, and winding technique can all compound, resulting in a rebuilt motor with poor performance and lower efficiency. Although it is technically possible to rebuild a motor to its original specifications, survey results of actual rewind practices show that this is seldom the case. On the average, rewound motors are less efficient than they were before rewinding. The magnitude of this problem can vary widely from one rewind shop to another, and can only be properly identified when efficiency measurements are taken before and after rewinding. Source: E- Source Technology Atlas Series Volume IV, Drive Power
77
Electrical Power
Minimized voltage drop in long cables. What are some ways to correct the power factor? Minimize operation of idling or lightly loaded motors Avoid operation of equipment above its rated voltage Replace standard motors as they burn out with energy-efficient motors. Even with energy-efficient motors, however, the power factor is significantly affected by variations in load. A motor must be operated near its rated capacity to realize the benefits of a high power factor design. Install capacitors in your AC circuit to decrease the magnitude of reactive power.
A significant barrier to achieving energy efficiency during the operation of a building is inadequate metering systems and monitoring plans. Building operators cannot be expected to manage energy if they cannot measure energy use. To improve a buildings energy performance over its operating life, and optimize the energy-efficient requirements, the Code requires that the buildings performance be measured. Metering is about having information that allows buildings energy managers to analyze and track changes in energy demand and, therefore, to manage their energy consumption more effectively. Energy metering is not a new concept and has been used by large energy-intensive buildings for many years to monitor energy consumption. The Code requires check-metering based on following three scenarios: a. Services exceeding 1000 kVA shall have permanently installed electrical metering to record demand (kVA), energy (kWh), and total power factor. The metering shall also display current (in each phase and the neutral), voltage (between phases and between each phase and neutral), and Total Harmonic Distortion (THD) as a percentage of total current b. Services not exceeding 1000 kVA but over 65 kVA shall have permanently installed electric metering to record demand (kW), energy (kWh), and total power factor (or kVARh) c. Services not exceeding 65 kVA shall have permanently installed electrical metering to record energy (kWh)
78
ertain terms, abbreviations, and acronyms are defined in this section for the purposes of this code. These definitions are applicable to all sections of this code. Terms that are not defined shall have their ordinarily accepted meanings within the context in which they are used. Websters Third New International Dictionary of the English Language, Unabridged, copyright 1986, shall be considered as providing ordinarily accepted meanings.
9.2 Definitions
Addition: an extension or increase in floor area or height of a building outside of the existing building envelope Alteration: any change, rearrangement, replacement, or addition to a building or its systems and equipment; any modification in construction or building equipment Annual fuel utilization efficiency (AFUE): an efficiency description of the ratio of annual output energy to annual input energy as developed in accordance with requirements of U.S. Department of Energy (DOE) 10CFR Part 430 Astronomical time switch: an automatic time switch that makes an adjustment for the length of the day as it varies over the year Authority having jurisdiction: the agency or agent responsible for enforcing this Code Automatic: self-acting, operating by its own mechanism when actuated by some non-manual influence, such as a change in current strength, pressure, temperature, or mechanical configuration. Automatic control device: a device capable of automatically turning loads off and on without manual intervention Balancing, air system: adjusting airflow rates through air distribution system devices, such as fans and diffusers, by manually adjusting the position of dampers, splitters vanes, extractors, etc., or by using automatic control devices, such as constant air volume or variable air volume boxes Balancing, hydronic system: adjusting water flow rates through hydronic distribution system devices, such as pumps and coils, by manually adjusting the position valves, or by using automatic control devices, such as automatic flow control valves Ballast: a device used in conjunction with an electric-discharge lamp to cause the lamp to start and operate under proper circuit conations of voltage, current, waveform, electrode heat, etc. Boiler: a self-contained low-pressure appliance for supplying steam or hot water Boiler, packaged: a boiler that is shipped complete with heating equipment, mechanical draft equipment, and automatic controls; usually shipped in one or more sections. A packaged boiler includes factory-built boilers manufactured as a unit or system, disassembled for shipment, and reassembled at the site. Building: a structure wholly or partially enclosed within exterior walls, or within exterior and party walls, and a roof, affording shelter to persons, animals, or property.
A.1
Building, existing: a building or portion thereof that was previously occupied or approved for occupancy by the Authority Having Jurisdiction Building complex: a group of buildings in a contiguous area under single ownership Building entrance: any doorway, set of doors, turnstiles, or other form of portal that is ordinarily used to gain access to the building by its users and occupants Building envelope: the exterior plus the semi-exterior portions of a building. For the purposes of determining building envelope requirements, the classifications are defined as follows: Building envelope, exterior: the elements of a building that separate conditioned spaces from the exterior Building envelope, semi-exterior: the elements of a building that separate conditioned space from unconditioned space or that enclose semi-heated spaces through which thermal energy may be transferred to or from the exterior, or to or from unconditioned spaces, or to or from conditioned spaces Building exit: any doorway, set of doors, or other form of portal that is ordinarily used only for emergency egress or convenience exit Building grounds lighting: lighting provided through a buildings electrical service for parking lot, site, roadway, pedestrian pathway, loading dock, and security applications Building material: any element of the building envelope through which heat flows and that heat is included in the component U-factor calculations other than air films and insulation Circuit breaker: a device designed to open and close a circuit by nonautomatic means and to open the circuit automatically at a predetermined over-current without damage to itself when properly applied within its rating Class of construction: for the building envelope, a subcategory of roof, wall, floor, slab-on-grade floor, opaque door, vertical fenestration, or skylight Coefficient Of Performance (COP) cooling: the ratio of the rate of heat removal to the rate of energy input, in consistent units, for a complete refrigerating system or some specific portion of that system under designated operating conditions Coefficient Of Performance (COP) heating: the ratio of the rate of heat delivered to the rate of energy input, in consistent units, for a complete heat pump system, including the compressor and, if applicable, auxiliary heat, under designated operating conditions Commercial building: all buildings except for multi-family buildings of three stories or fewer above grade and single-family buildings Construction documents: drawings and specifications used to construct a building, building systems, or portions thereof Control: to regulate the operation of equipment Control device: a specialized device used to regulate the operation of equipment Constant Volume System: a space-conditioning system that delivers a fixed amount of air to each space. The volume of air is set during the system commissioning. Cool roof: a property of a surface that describes its ability to reflect and reject heat. Cool roof surfaces have both a light color (high solar reflectance) and a high emittance (can reject heat back to the environment) Daylighted area: the daylight illuminated floor area under horizontal fenestration (skylight) or adjacent to vertical fenestration (window), described as follows: Effective Aperture: Visible Light Transmittance x Window-to-Wall Ratio (EA = VLT x WWR).
A.2
Horizontal Fenestration: the area under a skylight, monitor, or sawtooth configuration with an effective aperture greater than 0.001 (0.1%). The daylighted area is calculated as the horizontal dimension in each direction equal to the top aperture dimension in that direction plus either the floor-to-ceiling height (H) for skylights, or 1.5 H for monitors, or H or 2H for the sawtooth configuration, or the distance to the nearest 1000 mm (42 in) or higher opaque partition, or one-half the distance to an adjacent skylight or vertical glazing, whichever is least, as shown in the plan and section figures below.
Vertical Fenestration: the floor area adjacent to side apertures (vertical fenestration in walls) with an effective aperture greater than 0.06 (6%). The daylighted area extends into the space perpendicular to the side aperture a distance either two times the head height of the side aperture or to the nearest 1.35 m (54 in) or higher opaque partition, whichever is less. In the direction parallel to the window, the daylighted area extends a horizontal dimension equal to the width of the window plus either 1 m (3.3 ft) on each side of the aperture, the distance to an opaque partition, or one-half the distance to an adjacent skylight or window, whichever is least.
A.3
Dead band: the range of values within which a sensed variable can vary without initiating a change in the controlled process Demand: the highest amount of power (average KW over an interval) recorded for a building or facility in a selected time frame Design capacity: output capacity of a system or piece of equipment at design conditions Design conditions: specified environmental conditions, such as temperature and light intensity, required to be produced and maintained by a system and under which the system must operate Distribution system: a device or group of devices or other means by which the conductors of a circuit can be disconnected from their source of supply Door: all operable opening areas (which are not fenestration) in the building envelope, including swinging and rollup doors, fire doors, and access hatches. Doors that are more than one-half glass are considered fenestration. For the purposes of determining building envelope requirements, the classifications are defined as follows: Door, non-swinging: roll-up sliding, and all other doors that are not swinging doors. Door, swinging: all operable opaque panels with hinges on one side and opaque revolving doors. Door area: total area of the door measured using the rough opening and including the door slab and the frame. Dwelling unit: a single unit providing complete independent living facilities for one or more persons, including permanent provisions for living, sleeping, eating, cooking, and sanitation Economizer, air: a duct and damper arrangement and automatic control system that together allow a cooling system to supply outdoor air to reduce or eliminate the need for mechanical cooling during mild or cold weather Economizer, water: a system by which the supply air of a cooling system is cooled indirectly with water that is itself cooled by heat or mass transfer to the environment without the use of mechanical cooling Effective aperture: Visible Light Transmittance X Window-to-wall Ratio. (EA = VLT X WWR) Effective aperture, horizontal fenestration: a measure of the amount of daylight that enters a space through horizontal fenestration (skylights). It is the ratio of the skylight area times the visible light transmission divided by the gross roof area above the daylighted area. (See also daylighted area.) Effective aperture, vertical fenestration: a measure of the amount of daylight that enters a space through vertical fenestration. It is the ratio of the daylight window area times its visible light transmission plus half the vision glass area times its visible light transmission and the sum is divided by the gross wall area. Daylighted window area is located 2.2 m (7 ft) or more above the floor and vision window area is located above 1 m (3 ft) but below 2.2 m (7 ft). The window area, for the purposes of determining effective aperture shall not include windows located in light wells when the angle of obstruction () of objects obscuring the sky dome is greater than 70o, measured from the horizontal, nor shall it include window area located below a height of 1 m (3 ft). (See also daylighted area.) Efficacy: the lumens produced by a lamp/ballast system divided by the total watts of input power (including the ballast), expressed in lumens per watt Efficiency: performance at a specified rating condition Remittance: the ratio of the radiant heat flux emitted by a specimen to that emitted by a blackbody at the same temperature and under the same conditions Enclosed building: a building that is totally enclosed by walls, floors, roofs, and openable devices such as doors and operable windows
Energy Conservation Building Code (ECBC) User Guide A.4
Energy: the capacity for doing work. It takes a number of forms that may be transformed from one into another such as thermal (heat), mechanical (work), electrical, and chemical. Customary measurements are watts (W) Energy Efficiency Ratio (EER): performance of smaller chillers and rooftop units is frequently measured in EER rather than 1/ (kW/ton). It is the ratio of net cooling capacity in Btu/h to total rate of electric input in watts under designated operating conditions. The higher the EER, the more efficient the unit Energy Factor (EF): a measure of water heater overall efficiency Envelope performance factor: the trade-off value for the building envelope performance compliance option calculated using the procedures specified in Section 12-Appendix D. For the purposes of determining building envelope requirements the classifications are defined as follows: Base envelope performance factor: the building envelope performance factor for the base design Proposed envelope performance factor: the building envelope performance factor for the Proposed Design Equipment: devices for comfort conditioned, electric power, lighting, transportation, or service water heating including, but not limited to, furnaces, boilers, air conditioners, heat pumps, chillers, water heaters, lamps, luminaries, ballasts, elevators, escalators, or other devices or installations Equipment, existing: equipment previously installed in an existing building Faade area: area of the faade, including overhanging soffits, cornices, and protruding columns, measured in elevation in a vertical plane, parallel to the plane of the face of the building. Non-horizontal roof surfaces shall be included in the calculations of vertical faade area by measuring the area in a plane parallel to the surface. Fan system power: the sum of the nominal power demand (nameplate W or HP) of motors of all fans that are required to operate at design conditions to supply air from the heating or cooling source to the conditioned space(s) and return it to the source of exhaust it to the outdoors. Fenestration: all areas (including the frames) in the building envelope that let in light, including windows, plastic panels, clerestories, skylights, glass doors that are more than one-half glass, and glass block walls. Skylight: a fenestration surface having a slope of less than 60 degrees from the horizontal plane. Other fenestration, even if mounted on the roof of a building, is considered vertical fenestration. Fenestration area: total area of the fenestration measured using the rough opening and including the glazing, sash, and frame. For doors where the glazed vision area is less than 50% of the door area, the fenestration area is the glazed vision area. For all other doors, the fenestration area is the door area. Floor area gross: the sum of the floor areas of the spaces within the building including basements, mezzanine and intermediate-floored tiers, and penthouses with headroom height of 2.5 m (7.5 ft) or greater. It is measured from the exterior faces of exterior walls or from the centerline of walls separating buildings, but excluding covered walkways, open roofed-over areas, porches and similar spaces, pipe trenches, exterior terraces or steps, chimneys, roof overhangs, and similar features. Gross building envelope floor area: the gross floor area of the building envelope, but excluding slab-ongrade floors. Gross conditioned floor area: the gross floor area of conditioned spaces. Gross lighted floor area: the gross floor area of lighted spaces. Gross semi heated floor area: the gross floor area of semi heated spaces. Flue damper: a device in the flue outlet or in the inlet of or upstream of the draft control device of an individual, automatically operated, fossil fuel-fired appliance that is designed to automatically open the flue outlet during appliance operation and to automatically close the flue outlet when then appliance is in standby condition.
Energy Conservation Building Code (ECBC) User Guide A.5
Fossil fuel: fuel derived from a hydrocarbon deposit such as petroleum, coal, or natural gas derived from living matter of a previous geologic time. Fuel: a material that may be used to produce heat or generate power by combustion. Generally accepted engineer standard: a specification, rule, guide, or procedure in the field of engineering, or related thereto, recognized and accepted as authoritative. Grade: the finished ground level adjoining a building at all exterior walls. Guest room: any room or rooms used or intended to be used by a guest for sleeping purposes. Heat capacity: the amount of heat necessary to raise the temperature of a given mass 1C (1F). Numerically, the heat capacity per unit area of surface (W/m2K [Btu/ft2 -F]) is the sum of the products of the mass per unit area of each individual material in the roof, wall, or floor surface multiplied by its individual specific heat. Heat Pump: A heat pump consists of one or more factory-made assemblies that normally include indoor conditioning coil, compressor, and outdoor coil, including means to provide a heating function. Heat pumps provide the function of air heating with controlled temperature, and may include the functions of air cooling, air circulation, air cleaning, dehumidifying, or humidifying. Heating Seasonal Performance Factor (HSPF): the total heating output of a heat pump during its normal annual usage period for heating (in Btu) divided by the total electric energy input during the same period. Historic: a building or space that has been specifically designed as historically significant. HVAC system: the equipment, distribution systems, and terminals that provide, either collectively or individually, the processes of heating, ventilating, or air conditioned to a building or portion of a building. Infiltration: the uncontrolled inward air leakage through cracks and crevices in any building element and around windows and doors of a building caused by pressure differences across these elements due to factors such as wind, inside and outside temperature differences (stack effect), and imbalance between supply and exhaust air systems. Installed interior lighting power: the power in watts of all permanently installed general, task, and furniture lighting systems and luminaires. Integrated part-load value: a single number figure of merit based on part-load EER, COP, or 1/ (kW/ ton) expressing part-load efficiency for air-conditioning and heat pump equipment on the basis of weighted operation at various load capacities for the equipment. Kilovolt-ampere: where the term kilovolt-ampere (kVA) is used in this Code, it is the product of the line current (amperes) times the nominal system voltage (kilovolts) times 1.732 for three-phase currents. For single-phase applications, kVA is the product of the line current (amperes) times the nominal system voltage (kilovolts). Kilowatt: the basic unit of electric power, equal to 1000 W. Labeled: equipment or materials to which a symbol or other identifying mark has been attached by the manufacturer indicating compliance with specified standard or performance in a specified manner. Lamp: a generic term for man-made light source often called bulb or tube. Lighted floor area, gross: the gross floor area of lighted spaces. Lighting, decorative: lighting that is purely ornamental and installed for aesthetic effect. Decorative lighting shall not include general lighting. Lighting, emergency: lighting that provides illumination only when there is a general lighting failure. Lighting, general: lighting that provides a substantially uniform level of illumination throughout an area.
Energy Conservation Building Code (ECBC) User Guide A.6
General lighting shall not include decorative lighting or lighting that provides a dissimilar level of illumination to serve a specialized application or feature within such area. Lighting Efficacy (LE): the quotient of the total lumens emitted from a lamp or lamp/ballast combination divided by the watts of input power, expressed in lumens per watt. Lighting system: a group of luminaires circuited or controlled to perform a specific function. Lighting power allowance: Interior lighting power allowance: the maximum lighting power in watts allowed for the interior of a building Exterior lighting power allowance: the maximum lighting power in watts allowed for the exterior of a building Lighting Power Density (LPD): the maximum lighting power per unit of area of a building classification of space function. Low-rise residential: single-family houses, multi-family structures of three stories or fewer above grade, manufactured houses (mobile homes), and manufactured houses (modular). Lumen: It is the unit of total light output from a light source. If a lamp or fixture were surrounded by a transparent bubble, the total light flow through the bubble is measured in lumens. Lamps are rated in lumens, which is the total amount of light they emit, not their brightness and not the light level on a surface. Typical indoor lamps have light output ranging from 50 to 10,000 lumens. Lumen value is used for purchasing and comparing lamps and their outputs. Lumen output of a lamp is not related to the light distribution pattern of a lamp. Luminaries: a complete lighting unit consisting of a lamp or lamps together with the housing designed to distribute the light, position and protect the lamps, and connect the lamps to the power supply. Manual (non-automatic): requiring personal intervention for control. Non-automatic does not necessarily imply a manual controller, only that personal intervention is necessary. Manufacturer: the company engaged in the original production and assembly of products or equipment or a company that purchases such products and equipment manufactured in accordance with company specifications. Mean temperature: one-half the sum of the minimum daily temperature and maximum daily temperature. Mechanical cooling: reducing the temperature of a gas or liquid by using vapor compression, absorption, and desiccant dehumidification combined with evaporative cooling, or another energy-driven thermodynamic cycle. Indirect of direct evaporative cooling alone is not considered mechanical cooling. Metering: instruments that measure electric voltage, current, power, etc. Multifamily high-rise: multifamily structures of four or more stories above grade Multifamily low-rise: multifamily structures of three or less stories above grade Multiplication factor: indicates the relative reduction in annual solar cooling load from overhangs and/or side fins with given projection factors, relative to the respective horizontal and vertical fenestration dimensions.
A.7
Non-automatic: See definition of manual. Occupancy sensor: a device that detects the presence or absence of people within an area and causes lighting, equipment, or appliances to be regulated accordingly. Opaque: all areas in the building envelope, except fenestration and building service openings such as vents and grilles. Orientation: the direction an envelope element faces, i.e., the direction of a vector perpendicular to and pointing away from the surface outside of the element. For vertical fenestration, the two categories are northoriented and all other. Outdoor (outside) air: air that is outside the building envelope or is taken from the outside the building that has not been previously circulated through the building. Overcurrent: any current in excess of the rated current of the equipment of the capacity of the conductor. It may result from overload, short circuit, or ground fault. Packaged Terminal Air Conditioner (PTAC): a factory-selected wall sleeve and separate unencased combination of heating and cooling components, assemblies, or sections. It may include heating capability by hot water, steam, or electricity, and is intended for mounting through the wall to service a single room or zone. Party wall: a firewall on an interior lot line used or adapted for joint service between two buildings. Permanently installed: equipment that is fixed in place and is not portable or movable. Plenum: a compartment or chamber to which one or more ducts are connected, that forms a part of the air distribution system, and that is not used for occupancy or storage. A plenum often is formed in part or in total by portions for the building. Pool: any structure, basin, or tank containing an artificial body of water for swimming, diving, or recreational bathing. The terms include, but are not limited to, swimming pool, whirlpool, spa, hot tub. Process load: the load on a building resulting from the consumption or release of process energy. Projection factor, overhang: the ratio of the horizontal depth of the external shading projection divided by the sum of the height of the fenestration and the distance from the top of the fenestration to the bottom of the farthest point of the external shading projection, in consistent units. Projection factor, sidefin: the ratio of the horizontal depth of the external shading projection divided by the distance from the window jamb to the farthest point of the external shading projection, in consistent units. R-value (thermal resistance): the reciprocal of the time rate of heat flow through a unit area induced by
Energy Conservation Building Code (ECBC) User Guide A.8
a unit temperature difference between two defined surfaces of material or construction under steady-state conditions. Units of R are m2K/W (hft2F/Btu). For the prescriptive building envelope option, R-value is for the insulation alone and does not include building materials or air films. Readily accessible: capable of being reached quickly for operation, renewal, or inspections without requiring those to whom ready access is requisite to climb over or remove obstacles or to resort to portable ladders, chairs, etc. In public facilities, accessibility may be limited to certified personnel through locking covers or by placing equipment in locked rooms. Recirculating system: a domestic or service hot water distribution system that includes a close circulation circuit designed to maintain usage temperatures in hot water pipes near terminal devices (e.g., lavatory faucets, shower heads) in order to reduce the time required to obtain hot water when the terminal device valve is opened. The motive force for circulation is either natural (due to water density variations with temperature) or mechanical (recirculation pump). Reflectance: the ratio of the light reflected by a surface to the light incident upon it Resistance, electric: the property of an electric circuit or of any object used as part of an electric circuit that determines for a given circuit the rate at which electric energy is converted into heat or radiant energy and that has a value such that the product of the resistance and the square of the current gives the rate of conversion of energy Reset: automatic adjustment of the controller set point to a higher or lower value Residential: spaces in buildings used primarily for living and sleeping. Residential spaces include, but are not limited to, dwelling units, hotel/motel guest rooms, dormitories, nursing homes, patient rooms in hospitals, lodging houses, fraternity/sorority houses, hostels, prisons, and fire stations. Return Air: air from the conditioned area that is returned to the conditioning equipment for reconditioning. The air may return to the system through a series of ducts, plenums, and airshafts. Roof: the upper portion of the building envelope, including opaque areas and fenestration, that is horizontal or tilted at an angle of less than 60 from horizontal Roof area, gross: the area of the roof measured from the exterior faces of walls or from the centerline of party walls Service: the equipment for delivering energy from the supply or distribution system to the premises served Service water heating: heating water for domestic or commercial purposes other than space heating and process requirements Set point: point at which the desired temperature (C) of the heated or cooled space is set Shading Coefficient (SC): the ratio of solar heat gain at normal incidence through glazing to that occurring through 3 mm (1/8 in) thick clear, double-strength glass. Shading coefficient, as used herein, does not include interior, exterior, or integral shading devices Simulation program: a computer program that is capable of simulating the energy performance of building systems Single-zone system: an HVAC system serving a single HVAC zone Site-recovered energy: waste energy recovered at the building site that is used to offset consumption of purchased fuel or electrical energy supplies Skylight roof ratio (SRR): the ratio of the total skylight area of the roof, measured to the outside of the frame, to the gross exterior roof.
A.9
Slab-on-grade floor: that portion of a slab floor of the building envelope that is in contact with ground and that is either above grade or is less than or equal to 24 in below the final elevation of the nearest exterior grade Solar energy source: source of thermal, chemical, or electrical energy derived from direction conversion of incident solar radiation at the building site. Solar Heat Gain Coefficient (SHGC): the ratio of the solar heat gain entering the space through the fenestration area to the incident solar radiation, typically ranging from 0.9 to 0.1, where lower values indicate lower solar gain. Solar heat gain includes directly transmitted solar heat and absorbed solar radiation, which is then reradiated, conducted, or convected into the space. Space: an enclosed space within a building. The classifications of spaces are as follows for the purpose of determining building envelope requirements. Conditioned space: a cooled space, heated space, or directly conditioned space. Semi-heated space: an enclosed space within a building that is heated by a heating system whose output capacity is greater or equal to 10.7 W/m2 (3.4 Btu/h-ft2) of floor area but is not a conditioned space. Enclosed Space: space within a building that is not conditioned space or a semi-heated space. Crawlspaces, attics, and parking garages with natural or mechanical ventilation are not considered enclosed spaces. Standard Design: a computer representation of a hypothetical design based on the actual Proposed Design as per Appendix B Whole Building Performance Method Story: portion of a building that is between one finished floor level and the next higher finished floor level or the roof, provided, however, that a basement or cellar shall not be considered a story. Supply Air: air being conveyed to a conditioned area through ducts or plenums from a heat exchanger of a heating, cooling, absorption, or evaporative cooling system. Supply air is commonly considered air delivered to a space by a space-conditioning system. Depending on space requirements, the supply may be either heated, cooled or neutral. System: a combination of equipment and auxiliary devices (e.g., controls, accessories, interconnecting means, and terminal elements) by which energy is transformed so it performs a specific function such as HVAC, service water heating, or lighting. System, existing: a system or systems previously installed in an existing building. Terminal: a device by which energy form a system is finally delivered, e.g., registers, diffusers, lighting fixtures, faucets, etc. Thermal block: a collection of one or more HVAC zones grouped together for simulation purposes. Spaces need not be contiguous to be combined within a single thermal block. Thermal Zone: a term used in energy simulation to represent area catered to by one air conditioning unit. With the help of the zoning building plans are simplified to reduce the modelers work. Normally, within one zone usage pattern, set point temperature and other conditions are identical. Building spaces that would experience similar heating and cooling loads are generally grouped under one zone. Thermostat: an automatic control device used to maintain temperature at a fixed or adjustable set point. Tinted: (as applied to fenestration) bronze, green, or grey coloring that is integral with the glazing material. Tinting does not include surface applied films such as reflective coatings, applied either in the field or during the manufacturing process. Ton: one ton of cooling is the amount of heat absorbed by one ton of ice melting in one day, which is equivalent to 3.5136 KW or 3.516 thermal kW.
A.10
Transformer: a piece of electrical equipment used to convert electric power from one voltage to another voltage. U-factor (Thermal Transmittance): heat transmission in unit time through unit area of a material or construction and the boundary air films, induced by unit temperature difference between the environments on each side. Units of U are W/m2 -C (Btu/h ft2 F). Variable Air Volume (VAV) system: HVAC system that controls the dry-bulb temperature within a space by varying the volumetric flow of heated or cooled supply air to the space Vent damper: a device intended for installation in the venting system or an individual, automatically operated, fossil fuel-fired appliance in the outlet or downstream of the appliance draft control device, which is designed to automatically open the venting system when the appliance is in operation and to automatically close off the venting system when the appliance is in standby or shutdown condition. Ventilation: the process of supplying or removing air by natural or mechanical means to or from any space. Such air is not required to have been conditioned. Visible Light Transmittance (VLT): also known as the Visible Transmittance, is an optical property of a light transmitting material (e.g. window glazing, translucent sheet, etc.) that indicates the amount of visible light transmitted of the total incident light. Wall: that portion of the building envelope, including opaque area and fenestration, that is vertical or tilted at an angle of 60 from horizontal or greater. This includes above and below-grade walls, between floor spandrels, peripheral edges of floors, and foundation walls. Wall, above grade: a wall that is not below grade Wall, below grade: that portion of a wall in the building envelope that is entirely below the finish grade and in contact with the ground Wall area, gross: the overall area off a wall including openings such as windows and doors, measured horizontally from outside surface to outside service and measured vertically from the top of the floor to the top of the roof. If roof insulation is installed at the ceiling level rather than the roof, then the vertical measurement is made to the top of the ceiling. (Note that does not allow roof insulation to be located on a suspended ceiling with removable ceiling panels.) The gross wall area includes the area between the ceiling and the floor for multistory buildings.
Water heater: vessel in which water is heated and is withdrawn for use external to the system. Weather stripping: Materials, such as a strip of fabric, plastic, rubber or metal, or a device used to seal the openings, gaps or cracks of venting window and door units to prevent water and air infiltration.
A.11
Window Wall Ratio (WWR): the ratio of vertical fenestration area to gross exterior wall area. Gross exterior wall area is measured horizontally from the exterior surface; it is measured vertically from the top of the floor to the bottom of the roof.
Zone, HVAC: A space or group of spaces within a building with heating and cooling requirements that are sufficiently similar so that desired conditions (e.g., temperature) can be maintained throughout using a single sensor (e.g., thermostat or temperature sensor).
ASHRAE
British thermal unit British thermal units per hour British thermal units per square foot per degree Fahrenheit British thermal units per hour per square foot British thermal units per lineal foot per degree Fahrenheit British thermal units per hour per square foot per degree Fahrenheit
EC Act 2001 EF F ft h HC
Energy Factor Fahrenheit Foot Hour Heat capacity Hour per square foot per degree Fahrenheit per British thermal unit Hour per square meter per degree Celsius per Watt
Horsepower Heating seasonal performance factor Heating, Ventilation, and Air Conditioning
Inch-pound Inch
IPLV Integrated part-load value ISHRAE kVA kW kWh LE lin Indian Society of Heating, Refrigeration and Air-conditioning Engineers
Linear
LPD Lighting Power Density m mm Meter Millimeter National Appliance Energy Conservation Act
NAECA PF
PTAC R SC
SHGC SL
Standby loss
A.13
VAV VLT W
Variable air volume Visible light transmission Watt Watts per square feet Watts per square meter Watts per square meter per degree Celsius Watts per hour per square meter Watts per lineal meter per degree Celsius Watts per hour per square meter per degree Celsius
Watthour
A.14
10.1.1 Scope
In general, the WBP method may be used to show compliance with the ECBC for any project at the designers discretion, subject to the following caveats and exceptions. No HVAC System Use of the WBP method requires knowledge of the proposed HVAC system in order to create the Standard Design. Buildings with no HVAC system cannot use the WBP Method. In the case of a shell building, which might become conditioned in the future, trade-offs may still be made within the envelope system.
This chapter has been adapted from Appendix G and ECB chapter of ASHRAE User Manual
B.1
Alterations to Existing Buildings When the WBP method is used for an alteration of an existing building, some special rules apply. The WBP method is optional for this purpose; designers may use the calculation acceptable to the Authority Having Jurisdiction. Unless a building component is being altered, the Proposed Design and the Standard Design are identical for that component. Portions of the building that are being replaced shall be treated as new systems and these systems in the Standard Design shall be representative of the requirements in the ECBC. Alterations and Additions The basic rules for alterations and additions are discussed in the Administration and Enforcement Section (3) of the ECBC User Guide. There are some more rules that apply to cases where it is undesirable either to treat the addition as a stand-alone building or to fully model the entire existing building. It is often necessary with additions or alterations to model at least part of the existing building. For instance, if the existing buildings HVAC system is being extended to serve the new construction, then that system needs to be fully modeled in order to account for its energy performance. If, however, this system only serves a portion of the existing building and only part of that building is affected by the new work, then it is not necessary to model the entire existing building. Parts of Existing Buildings The rules for excluding parts of the existing building are as follows: If there is new construction that comes under the ECBC scope and it is part of the existing building but will be excluded from the Proposed Design, then those parts must comply with the Codes applicable prescriptive requirements. The excluded parts of the existing building must be served by HVAC systems that are completely independent of the systems or building components being modeled for the Proposed Building. There should not be any significant energy flows between the excluded parts of the building and the modeled parts. Rephrasing, the design space temperature, HVAC system operating set points, and operating and occupancy schedules on both sides of the boundary between the included and excluded parts must be the same. If the excluded portion of the building is a refrigerated warehouse and the included portion is an office, this condition would not be met, because there would be significant energy flows between them.
10.1.2 Compliance
Compliance of the Proposed Design with the requirements of the ECBC Whole Building Performance Method consists of the following steps: Developing a Standard Design simulation model Carrying out a valid energy simulation run using the Standard Design to predict its annual energy use Developing the Proposed Design simulation model for which compliance is being sought Carrying out a valid energy simulation run for the Proposed Design model and ensuring that the predicted annual energy use is less than or equal to the energy use in Standard Design The major consideration for generating the Standard Design simulation model is that it complies with the minimum performance requirements specified in the ECBC. Much of the remainder of this chapter is addressed towards the development of the Standard and Proposed Designs. The following sections describe how decisions are to be taken for each of the two designs, and how these two simulation runs are to be done, but the following rules always apply: Mandatory provisions of the Code mentioned in 4 through section 8 are met Both simulation runs must use the same simulation program
Energy Conservation Building Code (ECBC) User Guide B.2
Both simulation runs must use the same climate data Both simulation runs must use the same schedules of operation These rules ensure a fair comparison between the two runs, without introducing extraneous differences. For instance, if the runs used different simulation programs, then some portion of the differences between the resulting energy consumption would be due to differences in algorithms or calculation methodologies making it difficult to evaluate the impact of the two designs on energy use. The WBP method provides the building owner and design team with the flexibility to try out different design options, provided the end result is a building that does not have higher annual energy consumption than if it would have met all the prescriptive requirements. For example, the owner may decide to invest in a more efficient lighting system in place of larger glazing areas or invest in high performance glazing to avoid the cost of installing an economizer and get the benefits of daylighting.
B.3
Description of the internal loads in the building, e.g., lighting, equipment and people Description of the environmental control systems that operate to maintain comfortable conditions Description of schedules and controls to characterize the internal loads and environmental control systems
a) Building Model
Much of the effort in developing the model for an energy simulation analysis is in describing building geometry. This includes Describing the overall building envelope and geometry, ie., number of floors, orientation Describing physical and thermal properties for the construction of each building element Describing the location, size and the thermal, optical and solar properties of windows Describing permanent shading devices attached to the building, automatic window blinds and details of their operation Describing objects that might cast shadow on the building being simulated, e.g., surrounding buildings Describing spaces or thermal zones and their relative location, and relationship with the HVAC system design for the building
B.4
Economizers: Economizer cooling is an important efficiency measure under the Standard. Approved programs must have the capability to model both airside and waterside economizers with integrated control. Design Load Calculations: Approved programs must be capable of performing design load calculations to determine required HVAC equipment capacities and air and water flow rates for both the Proposed Design and the Standard Design. This is to ensure that the systems in both design simulations are properly sized, which avoids the problem of differing part-load performance characteristics between the two designs.
c) Modeling Exceptions
All the energy systems of the Proposed Design must be modeled. The Standard Design, however, does have some exceptions that may be applied only in rare, special cases. It is allowable to exclude some components or systems of the Proposed Design provided they do not affect the energy usage of the other systems being modeled for trade-off purposes. For example, if the service hot water heating system is not located in the conditioned space, and if it is not generating significant heat gains that affect the HVAC system, then it may be ignored in the model. All systems that are excluded on this basis, however, must still meet the prescriptive requirements that apply to them. This exception can help to simplify the modeling somewhat, but only in ways that will not affect the accuracy of the WBP method calculations.
B.5
energy source. For example, where recovered energy is used to heat water, then the backup water heater would be assumed to supply all the hot water for the Standard Design, and that would be part of the Standard Design method. If no backup energy source is specified for the Proposed Design, then the source is assumed to be electricity in the Standard Design.
c) Disclaimer
It is important for users of the WBP method, as well as the owners of the proposed buildings, to understand the WBP Methods intent and limitations. It is intended to provide a fair method of comparison between the estimated annual energy consumption of the Proposed Design and the Standard Design for purposes of compliance with the Code. The WBP Method is not intended to provide the most accurate prediction of actual energy consumption for the building as it is actually built. Although the designer is expected to model the future use of the building as closely as possible, there are many reasons why the actual building performance may differ from the design energy consumption. These include: Variations in Operation and Occupancy: The actual schedules of operation and occupancy may differ from those assumed in the WBP analysis. Variations in Control and Maintenance: The buildings energy systems may be controlled differently than assumed; the equipment may not be set up or maintained properly. Variations in Weather: The simulation runs use weather data that may not match the actual weather conditions; further, there is variability in weather conditions from year-to-year. Energy Uses not Included: The WBP method under certain conditions, may not require all building energy uses to be included in calculating the design energy consumption. Sometimes, there is additional energy-using equipment that is added to a building after it is built. Precision of the Simulation Program: Even the most sophisticated simulation programs approximate the actual energy flows and consumption in a building; further, the energy analyst will usually make simplifying assumptions. Both can be sources of error in the predictions of energy consumption.
10.3 Calculating the Energy Consumption of the Proposed Design and the Standard Design
10.3.1 The simulation model for calculating the Proposed Design and the Standard Design shall be developed in accordance with the requirements in Table 10.1
B.6
Table 10.1: Modeling Requirements for Calculating Proposed and Standard Design3 Proposed Design Standard Design as described in this table. Except as specifically instructed in this table, all building systems and equipment shall be modeled identically in the Standard Designs and Proposed Design.
Case
Design Model (a) The simulation model of the Proposed Design shall be consistent with the design The Standard Designs shall be developed by modifying the Proposed Design
documents, including proper accounting of fenestration and opaque envelope types and area; interior lighting power and controls; HVAC system types, sizes, and controls; and service water heating systems and controls. (b) When the whole building performance method is applied to buildings in which energyrelated features have not yet been designed (e.g., a lighting system), those yet-to-bedesigned features shall be described in the Proposed Design so that they minimally comply with applicable mandatory and prescriptive requirements from 4 through 8. (c) All conditioned spaces in the Proposed Design shall be simulated as being both heated and cooled even if no heating or cooling system is to be installed, and temperature and humidity control set points and schedules shall be the same for Proposed and Standard Designs. (d) All unconditioned and naturally ventilated occupied spaces in the Proposed Design shall be simulated and temperature and humidity control set points shall be specified per National Building Code (2005) or ASHRAE 55 (2004).
It is acceptable to predict performance using building models that exclude parts of the existing building provided that all of the following conditions are met: (a) Work to be performed in excluded parts of the building shall meet the requirements of 4 through 8. (b) Excluded parts of the building are served by HVAC systems that are entirely separate from those serving parts of the building that are included in the building model. (c) Design space temperature and HVAC system operating set points and schedules on either side of the boundary between included and excluded parts of the building are essentially the same.
The building type or space type classifications shall be chosen in accordance with 7.3.2 or 7.3.3. More than one building type category may be used in a building if it is a mixed-use facility.
Schedules capable of modeling hourly variations in occupancy, lighting power, miscellaneous equipment power, thermostat set points, and HVAC system operation shall be used. The schedules shall be typical of the proposed building type as determined and approved by the Authority Having Jurisdiction. HVAC Fan Schedules that provides outdoor air for ventilation shall run continuously whenever spaces are occupied and shall be cycled on and off to meet heating and cooling loads during unoccupied hours. Exceptions: (a) Where no heating and/or cooling system is to be installed and a heating or cooling system is being simulated only to meet the requirements described in this table, heating and/or cooling system fans shall not be simulated as running continuously during occupied hours but shall be cycled on and off to meet heating and cooling loads during all hours.
(b) HVAC fans shall remain on during occupied and unoccupied hours in spaces that have health and safety mandated minimum ventilation requirements during unoccupied hours.
B.7
The table has been enhanced to provide additional details to develop Standard and Proposed Design.
Energy Conservation Building Code (ECBC) User Guide Lighting power in the Standard Designs shall be determined using the same categorization procedure (building area or space function) and categories as the Proposed Design with lighting power set equal to the maximum allowed for the corresponding method and category in either 7.3.2 or 7.3.3. Power for fixtures not included in the lighting power density calculation shall be modeled identically in the Proposed and Standard Design. No automatic lighting controls (e.g. programmable or automatic controls for daylight utilization) shall be modeled in the Standard Design, as the lighting schedules used are understood to reflect the mandatory control requirements in the Code.
Building Envelope
All components of the building envelope in the Proposed Design shall be modeled as The Standard Designs shall have identical conditioned floor area and identical exterior dimensions and orientations as the Proposed Design, except as noted below. shown on architectural drawings or as installed for existing building envelopes. Exceptions: The following building elements are permitted to differ from architectural (a) Orientation: The standard building performance shall be generated by simulating the building with its actual orientation and again after rotating the entire building 90, 180, 270 degrees, then drawings. averaging the results. The building shall be modeled so that it does not shade itself. Opaque (a) Any envelope assembly that covers less than 5% of the total area of that assembly assemblies such as roof, floors, doors, and walls shall be modeled as having the same heat type (e.g., exterior walls) need not be separately described. If not separately decapacity as the Proposed Design and U-factor comply with requirements of 4.3.1 and 4.3.2. scribed, the area of an envelope assembly must be added to the area of the adjacent (b) Fenestration areas shall equal that in the Proposed Design or 40% of gross above grade wall assembly of that same type. area, whichever is smaller, and shall be distributed uniformly in horizontal bands across the four orientations. No shading projections are to be modeled; fenestration shall be (b) Exterior surfaces whose azimuth orientation and tilt differ by no more than 45 assumed to be flush with the exterior wall or roof. Manually operated fenestration shading degrees and are otherwise the same may be described as either a single surface or devices such as blinds or shades shall not be modeled. Fenestration U-factor shall comply by using multipliers. with Table 4.3, and the SHGC shall comply with Table 4.3 and 4.4 of the Code. (c) For exterior roofs other than roofs with ventilated attics, the reflectance and emit- (c) Roof Albedo: All roof surfaces shall be modeled with a reflectivity of 0.30. tance of the roof surface shall be modeled. For exterior roofs, the roof surface may (d) Skylights: Skylight area shall be equal to that in the Proposed Design or 5% of the gross be modeled with a reflectance of 0.45 if the reflectance of the Proposed Design roof roof area that is part of the building envelope, whichever is smaller. If the skylight is greater than 0.70 and its emittance is greater than 0.75. All other roof surfaces area of the Proposed Design is greater than 5% of the gross roof area, baseline skylight shall be modeled with a reflectance of 0.30.The reflectance and emittance shall be area shall be decreased by an identical percentage in all roof components in which tested in accordance with 4.3.1.1. skylights are located to reach the 5% skylight-to-roof ratio. Skylight orientation and tilt shall be the same as in the Proposed Design. Skylight U-factor and SHGC properties (d) Manually operated fenestration shading devices such as blinds or shades shall not shall match the appropriate requirements for climate and orientation. be modeled. Permanent shading devices such as fins, overhangs, and light shelves shall be modeled. (e) Existing Buildings. For existing building envelopes, the Standard Designs shall reflect existing conditions prior to any revisions that are part of the scope of work being evaluated.
Lighting
Lighting power in the Proposed Design shall be determined as follows: (a) Where a complete lighting system exists, the actual lighting power shall be used in the model. (b) Where a lighting system has been designed, the LPD should match the design which shall be determined in accordance with either 7.3.2 or 7.3.3. (c) Where no lighting exists or is specified, lighting power shall be determined in accordance with the 7.3.2 for the appropriate building type. (d) Lighting system power shall include all lighting system components shown or provided for on plans (including lamps, ballasts, task fixtures, and furniture-mounted fixtures). (e) Exception: For multifamily dwelling units, hotel/motel guest rooms, and other spaces in which lighting systems are connected via receptacles and are not shown or provided for on building plans, assume identical lighting power for the Proposed and Standard Designs in the simulations. (f) Lighting power for parking garages and building facades shall be modeled. (g) Credit may be taken for the use of automatic controls for daylight utilization but only if their operation is either modeled directly in the building simulation or modeled in the building simulation through schedule adjustments determined by a separate daylighting analysis approved by the Authority Having Jurisdiction.
B.8
Where HVAC zones are defined on HVAC design drawings, each HVAC zone shall be Same as Proposed Design. modeled as a separate thermal zone.
Exception: Different HVAC zones may be combined to create a single thermal zone, provided that all of the following conditions are met: (a) The space use classification is the same throughout the thermal zone.
(b) All HVAC zones in the thermal zone that are adjacent to glazed exterior walls face the same orientation or their orientations vary by less than 45 degrees.
(c) All of the zones are served by the same HVAC system or by the same kind of HVAC system.
Where the HVAC zones and systems have not yet been designed,thermal zones shall be Same as Proposed Design. defined based on similar internal load densities, occupancy, lighting, thermal and space temperature schedules, and in combination with the following guidelines:
(a) Separate thermal zones shall be assumed for interior and perimeter spaces. Interior spaces shall be those located greater than 5 m from an exterior wall. Perimeter spaces shall be those located within 5 m of an exterior wall.
(b) Separate thermal zones shall be assumed for spaces adjacent to glazed exterior walls; a separate zone shall be provided for each orientation, except that orientations that differ by less than 45 degrees may be considered to be the same orientation. Each zone shall include all floor area that is 5 m or less from a glazed perimeter wall, except that floor area within 5 m of glazed perimeter walls having more than one orientation shall be divided proportionately between zones.
(c) Separate thermal zones shall be assumed for spaces having floors that are in contact with the ground or exposed to ambient conditions from zones that do not share these features.
(d) Separate thermal zones shall be assumed for spaces having exterior ceiling or roof assemblies from zones that do not share these features.
HVAC Systems
The HVAC system type and all related performance parameters, such as equipment The HVAC system type and related performance parameters for the Standard Designs shall be determined from Table 10.2. Equipment performance shall meet the requirements capacities and efficiencies, in the Proposed Design shall be determined as follows: of 5. (a) Where a complete HVAC system exists, the model shall reflect the actual system type using actual component capacities and efficiencies.
(b) Where an HVAC system has been designed, the HVAC model shall be consistent with design documents. Mechanical equipment efficiencies shall be adjusted from actual design conditions to the standard rating conditions specified in 5, if required by the simulation model.
(c) Where no heating system exists or no heating system has been specified, the heating system shall be modeled as electric resistance. The system characteristics shall be identical to the system modeled in the Standard Designs.
(d) Where no cooling system exists or no cooling system has been specified, the cooling system shall be modeled as an air-cooled single-zone system, one unit per thermal zone. The system characteristics shall be identical to the system modeled in the Standard Designs.
B.9
The service hot water system type and all related performance parameters, such as The water heating system shall be of the same type of the Proposed Design. For residential equipment capacities and efficiencies, in the Proposed Design shall be determined as facilities, hotels and hospitals the Standard Designs shall have a solar system capable of follows: meeting 20% of the design load. Systems shall meet the efficiency requirements of 6.2.2, the pipe insulation requirements of 6.2.4 and incorporate heat traps in accordance with (a) Where a complete service hot water system exists, the Proposed Design shall reflect 6.2.5. the actual system type using actual component capacities and efficiencies.
(b) Where a service hot water system has been specified, the service hot water model shall be consistent with design documents.
(c) Where no service hot water system exists or has been specified but the building will have service hot water loads, a service hot water system shall be modeled that matches the system in the Standard Designs and serves the same hot water loads.
(d) For buildings that will have no service hot water loads, no service hot water system shall be modeled.
Miscellaneous Receptacle and process loads, such as those for office and other equipment, shall be Receptacle, motor and process loads shall be modeled the same as the Proposed Design. estimated based on the building type or space type category and shall be assumed to be Loads
identical in the proposed and Standard Designss, except as specifically authorized by the Authority Having Jurisdiction. These loads shall be included in simulations of the building and shall be included when calculating the standard building performance and proposed building performance.
If the simulation program cannot model a component or system included in the Proposed Design, one of the following methods shall be used with the approval of the Authority Having Jurisdiction: (a) Ignore the component if the energy impact on the trade-offs being considered is not significant.
Other systems, such as motors covered by 8 and miscellaneous loads shall be modeled as identical to those in the Proposed Design including schedules of operation and control of the equipment. Where there are specific efficiency requirements in 8, these systems or components shall be modeled as having the lowest efficiency allowed by those requirements. Where no efficiency requirements exist, power and energy rating or capacity of the equipment shall be identical between the Standard Building and the Proposed (b) Model the component substituting a thermodynamically similar component mod- Design with the following exception: variations of the power requirements, schedules, or control sequences of the equipment modeled in the Standard Building from those el. in the Proposed Design may be allowed by the rating authority based upon documentation (c) Model the HVAC system components or systems using the Standard Designss HVAC that the equipment installed in the Proposed Design represents a significant verifiable system in accordance with 5. departure from documented conventional practice. The burden of this documentation Whichever method is selected, the component shall be modeled identically for both the is to demonstrate that accepted conventional practice would result in Standard Building equipment different from that installed in the Proposed Design. Occupancy and occupancy Proposed Design and Standard Designs models. schedules may not be changed.
B.10
c) Schedules
Schedules are used to describe the percentage of a maximum design value of an internal load that is applicable during a particular time period, usually one hour, i.e., lighting power density, miscellaneous equipment (plug load) power density, occupant load or any other significant load thermostat set point (s) applicable in this time period, or the availability (on/off), and control operation of a system or system component, e.g., cooling systems, fans, chillers, or pumps.
B.11
Schedules have a large impact on the overall energy consumption. Designers are required to specify Weekday, Saturday, Sunday, and Holiday operation in each schedule. An example for Weekday schedules in an office building is shown below. The ECBC allows designers to select reasonable or typical schedules for the building. In all cases, the schedules for the Proposed Design and the Standard Design shall be identical. This means that the Proposed Design may not take advantage of scheduling changes. It further means that any equipment in the Proposed Design that saves energy by altering operating patterns or profiles must be modeled explicitly; it is not sufficient simply to assume a schedule change and use that to account for the electricity savings. An example is daylighting controls, which reduce lighting power when daylight is available in a space. The Proposed Design must simulate the actual performance of the daylighting control in response to daylight availability, rather than the simulator simply assuming some schedule change that arbitrarily reduces lighting power during daylight hours. Another example of equipment that must not be modeled by reducing operating hours in the Proposed Design are occupancy-sensing controls that turn off equipment when not needed. While this type of equipment might well be installed because of the owners conviction that it is a good investment, there is no credit for it under the WBP method. In selecting the schedules, it is prudent to consider the likely long-term operation of the building. For example, if a new school will initially operate on a traditional schedule, but the school district has a policy of shifting its schools over to year-round operation, then it would be prudent to apply a year-round schedule in the WBP method modeling. The selected schedules should likewise not intentionally misrepresent the operation of the building. If a grocery store chain keeps its stores open 24 hours a day, it would be inappropriate to use a 12-hour-a-day operating schedule in the modeling.
d) Building Envelope
The building footprint and overall geometry must be identical for both the Standard and Proposed Designs, and must use the design shown on the final architectural drawings, including building shape, dimensions, surface orientations, opaque construction assemblies, glazing assemblies, etc. That is, they must have the identical plan, conditioned floor area, number of floors, floor-to-floor distances, wall and roof areas, surface tilts and orientation. In some cases, the building envelope may already exist, as in the case of newly conditioned space or a tenant build-out of a shell building; in these cases, the existing building envelope is modeled. The Standard Design will have the maximum allowable window-to-wall-ratio (WWR) in each orientation, but
Energy Conservation Building Code (ECBC) User Guide B.12
the Proposed Design may exceed this limit, provided compliance is achieved. Opaque assemblies like walls, roofs and floors must be described by material layer as per the architectural drawings. For the Standard Design, the characteristics (U-factor) of these envelope components are set to the prescriptive values specified in ECBC 4.0. The heat capacities for each assembly type must match the heat capacities of the Proposed Design. This is because heat capacities may have a significant effect on the performance of envelope components, which shows up in the simulation runs but they are not a requirement of the ECBC. Heat capacity is modeled to be the same in both the Proposed Design and the Standard Design simulation runs, and so is energy neutral under the WBP method. For the Standard Design, exterior roof surfaces, other than those with ventilated attics, must be modeled assuming a surface reflectance value of 0.30 (Refer ECBC Table 10.1). If a Proposed Design calls for a reflective roof surface, however, the model may assume a long-term average reflectance of 0.45, which results in the lower heat absorption of the reflective surface and makes a conservative allowance for degradation of the reflectivity over its lifetime. For this exception to be allowed the specified reflectance of the roof in the Proposed Design must exceed 0.70 and its emittance must exceed 0.75. (As per ASHRAE 90.1, 2004) i) Windows /Fenestration The solar, thermal, and optical performance of windows systems are defined by the combination of four main parameters, i.e., the area as defined by the window-to-wall ratio, thermal transmittance (U-factor), Solar Heat Gain Coefficient (SHGC), and Visible Light Transmission (VLT). Fenestration Area Fenestration areas and performance are strong drivers of energy use in buildings. Therefore, the ECBC places great emphasis in how these values are calculated and applied for compliance. ECBC 4.3.3 sets the prescriptive upper limits on vertical fenestration area and skylight area. If the fenestration areas for the Proposed Design are less than these limits, the Standard Design shall have the same areas and orientations as the Proposed Design. If the fenestration areas in the Proposed Design exceed these limits, then the corresponding areas in the Standard Design must be adjusted down to these limits AND corresponding increases made to opaque areas so that the gross wall area and gross roof area are the same for both the Proposed Design and the Standard Design. ECBCs prescriptive envelope requirements do not provide an exception for street-level, street-side vertical fenestration (e.g., store display windows). Thus, such fenestration must be modeled identically for the Proposed Design and the Standard Design simulation runs so that the representation of these types of fenestration is energy neutral. U-Factors The U-factor for the Standard Design is set to the minimum required for the climate, as specified in ECBC Table 4.3. The minimum U-factor is a function of the percentage of glazing (WWR) in a wall or roof, as described above. Solar Heat Gain Coefficient The solar heat gain coefficient value for the fenestration applied in the Standard Design is set to the maximum required for the climate and for each orientation, as specified in ECBC Table 4.3. The maximum SHGC is a function of the glazing percentage of wall or roof, which is based on the Proposed Design as described above. If the vertical fenestration to be used is unrated, then the SHGC values in ECBC Table 11.1 must be used. ii) Shading of Fenestration Glazing installed in the Standard Design must be modeled as being flush with its wall or roof surface, and without any external shading devices. This ruling allows the Proposed Design to use to its advantage shading from window recesses, overhangs, side fins, or other permanent shading devices that reduce solar gains on the glazing.
B.13
Interior shading devices, if not automatic, should not be modeled in the Proposed Design. In Standard Design, no shading should be modeled. Exceptions for Envelope Any simulation program necessarily relies on a somewhat simplified description of the building envelope. It is usually time-consuming and difficult to explicitly detail every minor variation in the envelope design, and if good engineering judgment is applied, these simplifications wont result in a significant decline in accuracy. Three exceptions, where more substantial simplifications may be made, are:
Minor Assemblies: Frequently, there will be small areas on the building envelope with unique thermal characteristics. The ECBC exempts any envelope assembly that covers less than 5% of the total area of a given assembly type (e.g., exterior walls or roofs) from being treated as a separate envelope component. Instead, that area may be added to an adjacent assembly of the same type. For example, if there is an exterior wall constructed of load-bearing masonry, but there are small wood-framed infill areas, the infill areas may be treated as if the entire wall is of masonry. Note that the gross wall area is unchanged, and no areas are left out of the model. Different Tilt or Azimuth: This exception, primarily intended to address curved surfaces, specifies the minimum
number of orientations into which these surfaces must be split up. The Standard allows similarly oriented surfaces to be grouped under a single tilt or azimuth, provided they are of similar construction and provided the tilt or azimuth of the surfaces are within 45 degree of each other. They may be grouped as a single surface or a multiplier may be used.
Fenestration: Interior and/or exterior shading devices in the Proposed Design shall not be modeled unless they are automatically controlled. In the Standard Design, shades of any kind are not modeled. When the window area in the Proposed Design exceeds the prescriptive maximum, the window area in the Standard Design is set to the prescriptive maximum area and representative opaque wall area replaces any excess window area. Thus the overall wall area (opaque wall + window area) is the same for both standard and proposed buildings. The window area in Standard Design is decreased uniformly in each orientation so that the fraction of total window area in each direction is the same in both Standard Design and Proposed Design simulation models.
e) Lighting Systems
Under the WBP method, lighting systems are a very important part of overall building performance for most non-residential building types. Any lighting system efficiency improvements or reductions are reflected as energy savings in the WBP method. The description of lighting systems in building energy simulation models must incorporate the following two characteristics: Application of a lighting power density (LPD) for each space or thermal zone of the building model. This may be determined using one of the two methods defined in 7.3.2 (building area method) or 7.3.3 (space function method). An operational schedule for the lighting system which describes the percentage of the maximum LPD value that is energized during a particular hour There are further requirements if the electric lighting system is to be controlled in response to the amount of daylight in perimeter zones of the building. In such cases, the building simulation program must be able to explicitly model daylight levels in each perimeter space that has daylight linking. Light sensors must be modeled in these zones, and a control strategy must be applied that modulates electrical energy output from the electric lighting system. Typically there are at least three daylight linked control schemes to modulate electrical energy output: Stepped control: in this control scheme, the electrical lighting system can respond to the presence of daylight in defined steps Linear control: the lighting system modulates its output in a linear function to a prescribed minimum level, and
B.14
Linear/off: the lighting system modulates its output in a linear function and will switch off (use zero electrical energy) when there is sufficient daylight in the space Either the building area or space function method may be used, but the categorization of spaces must be identical between the Standard Design and the Proposed Design. The LPD for the Proposed Design is taken from the design documents for the building. If a lighting system already exists, then the lighting system design for Proposed Design will be based on the actual lighting power density of the existing system. In the special case where no lighting system or design exists, as in a shell building where the lighting will be installed by a future tenant, then a default lighting power density must be assumed, based on the building area method for the appropriate building type. If no building type is known, then an office building is assumed, (refer ECBC Table 10.1) Exterior lighting systems as defined in ECBC 7.2.3 refers to grounds luminaires which operate at greater than 100W. They shall contain lamps having a minimum efficacy of 60 lm/W unless, the luminaire is controlled by a motion sensor or exempt under 7.1, as mentioned below: Emergency lighting that is automatically off during normal building operation and is powered by battery, generator, or other alternate power source Lighting in dwelling units
f) HVAC
Incorporating HVAC systems into whole building energy simulation models is a complex process. It requires knowledge of how buildings respond to climate, in addition to knowledge of the configuration of HVAC systems and appropriate control strategies. For the purpose of building energy simulation it is useful to think of the building model as having three HVAC type components, ZONES, SYSTEMS and PLANT. i) HVAC Zoning A key task in developing both of the simulation models is to divide the Proposed Design into a series of spaces or thermal zones to be input to the energy simulation program. Due care and consideration needs to be taken to divide the building into an appropriate number of thermal zones. There are several considerations for this division, and some of these considerations can be conflicting. The following are some of the considerations that need to be thought through when dividing the building for simulation analysis. Building areas that are thermodynamically similar spaces and whose heating and cooling loads can be satisfied through use of a single thermostat (or other type of temperature control) can be combined in a single thermal zone. Since this requires mapping of the HVAC system design into the simulation model, the simulator needs to work interactively with the services consultant. Building areas that perform a similar function in the building design may be combined to form a thermal zone for example, some open plan office areas, or retail shop areas that have similar loads and operate similar hours may be combined. These areas would have identical schedules applied for operation of internal loads and HVAC systems. Building areas that have the same lighting power density may be combined, i.e. the use of space use classifications. The choice of space use classifications is taken from one of the two lighting tables in the ECBC, either Table 7.1 (Interior Lighting Power-Building area method) or Table 7.2 (Interior Lighting Power-Space Function method). The designer may choose either classification scheme but may not mix the schemes by using one for part of the building and the other for the rest of the building. Building in this context refers to the space encompassed by a single building permit application, which may be less than the complete building. The secondary support areas associated with each of the major building types would be included in each building type. For example, if a building included both office and retail areas, the corridors and restrooms associated with the office occupancy would be included in the office area and the storage or/and dressing room areas associated with the sales floor would be included in the retail area.
B.15
HVAC Zones are identical to the thermal zones or spaces discussed earlier. An HVAC designer will consider the internal and external loads on each zone to calculate a design day cooling and heating load, and the maximum outside air ventilation required. He or she may combine two or more thermal zones into a thermal block designed to be conditioned by a single HVAC SYSTEM, for example, an Air Handling Unit (AHU) or an DX system. If the building uses central air-conditioning systems (as opposed to DX systems, see Chapter 5), then a series of HVAC SYSTEMS may be served by one or more HVAC PLANT component (chillers, pumps, cooling towers etc). For the WBP method using building energy simulation analysis, HVAC ZONES must be described to be identical in both the Standard Design and the Proposed Design Models. This rule ensures consistency with the requirement that the shape and area of the building envelope for the Standard Design be the same as for the Proposed Design, and that the space use classifications be the same. HVAC Zoning Based On HVAC Design As noted earlier, building areas that are thermodynamically similar spaces and whose heating and cooling loads can be satisfied through use of a single thermostat (or other type of temperature control) can be combined in a single thermal zone. The outside air flow quantities, and control strategies applicable to the duct outlets or other terminal units controlled by this single thermostats may be part of the HVAC ZONE description. Clearly, this process requires mapping of the HVAC SYSTEM design into the simulation model, and the simulator needs to work interactively with the services consultant. Use of HVAC Zone Multiplier In some simulation programs, the interior HVAC ZONES of a multi-story building, which may be physically separate zones on each floor can be reasonably combined and treated as a single thermal zone with a multiplier. Use of a multiplier allows simplification of the calculation of electricity consumption for the whole building without having to repeatedly describe many similar or identical zones in the simulation model, thus saving time and effort without significant loss of accuracy. However, a cafeteria or computer room in an office building would need to be modeled separately, as would lower-floor retail uses. The following conditions must be met to be able to use the multiplier option: All of the space use classifications must be the same throughout the thermal zone. This ensures that they have the same load and schedule characteristics. For exterior (or perimeter) HVAC ZONES with glazing, the glazing for all zones included in the thermal block must have the same orientation or at least their orientations must be within 45 degrees of each other. This ensures that they have the same solar heat gain characteristics. This is not to say that the zones may not have two or more glazing orientations a corner office could easily have two but that the zones must have similar orientations. It would be acceptable, for example, to group all of the northeast corner offices on the intermediate floors of an office tower into a single thermal block. All of the HVAC ZONES in different floors must be served either by the same HVAC SYSTEM or by the same kind of HVAC SYSTEM. This is so that the simulation program can accurately model the performance of the system (s) serving the zones. HVAC Zoning When No HVAC Design Exists In a situation where an HVAC ZONING plan has not been designed, then a configuration of thermal blocks must be assumed for the WBP method. This situation is quite common in commercial buildings where the future tenants will determine the zoning of spaces in the building. In this case, the building must be divided into thermal zones based on similar internal load densities and lighting power densities, operational schedules, occupancy patterns, space temperature schedules, etc. There are several guidelines that should be followed in this situation, as described below. Zoning Based on Perimeter and Interior Spaces In situations when no HVAC design has been developed, divide the floor plate into perimeter spaces than are within 5 meters of an exterior wall, and interior spaces that are more than 5 meters from an exterior wall.
Energy Conservation Building Code (ECBC) User Guide B.16
Zoning Based on Glazing Orientation Glazed exterior walls should be assigned to different perimeter thermal zones for each major orientation. Orientations within 45 degrees of each other may be combined. Spaces with two or more glazed orientations, such as corner offices, should be divided proportionately between zones having the different orientations. Zoning Based on Floor Levels Spaces exposed to ambient conditions, such as the top floor or an overhanging floor, and spaces in contact with the ground, such as the ground floor, must be zoned separately from zones that are not exposed to ambient conditions, such as intermediate floors in a multi-story building. Therefore, a multi-storey tower office building could be divided into a top floor, a typical middle floor with the appropriate floor multiplier, and a bottom floor. Thermal Zones For Multi-Family Residential Buildings Multifamily residential buildings are another special case. In general, the residential spaces must be treated as separate thermal zones, except that some combinations are allowed. Units all facing the same orientation, and having similar conditions at the top, bottom, and sides, may be combined. Similar corner units may be combined, and units with similar roof or floor loads may be combined. ii) HVAC Systems Defining HVAC systems for use with whole building simulation programs is complex, and there are many interrelated rules. Some of the rules that govern the description of HVAC SYSTEMS for the ECBC whole building performance method are: The HVAC SYSTEM described in the Standard Design Model should just meet the prescriptive requirements of the ECBC. These requirements are deemed representative of current standard practice that meets the ECBC. Where possible, the HVAC SYSTEM is to be conceptualized as completely as possible on the actual system designed for the Proposed Design. This includes the system type, equipment capacities and efficiencies, controls, ancillary features (such as economizers), etc. The equipment efficiencies may need to be adjusted to meet the needs of the simulation program. While efficiencies may be most accurately specified at the buildings design conditions, most simulation programs require efficiencies to be specified at standard rating conditions, such as those given in ECBC 5.0. Where the entire HVAC SYSTEM design is not known, as in the case of a shell-and-core design, the unknown parts of the system are assumed to just meet the prescriptive requirements of the ECBC and to be energy neutral. This strategy prevents gamesmanship with the undefined system components. Gamesmanship is the practice of artificially reducing the efficiency of the Standard Design in order to increase the apparent relative efficiency of the Proposed Design4. Where the complete HVAC SYSTEM exists, the Proposed Design and Standard Design are based on the existing HVAC system for example, fit out of an existing speculative building for a tenant. The subject of the building permit is primarily the interior construction and lighting system and does not include the HVAC system because it has already been built and permitted. Both simulation models would also include the existing building envelope. Where no HEATING SYSTEM exists, a default heating system must be assumed and modeled. It should be a simple heating system that burns fossil fuel, sized with sufficient capacity to meet the design heating loads for the Proposed Design. An identical system (with sizing adjustments) must be assumed for the Standard Design.
4 The WBP method is more vulnerable to this sort of abuse, which is why the rules for constructing the Standard Design must be so specific. The WBP modeling rules for part-load efficiency and system sizing are intended to minimize these effects on the trade-off calculations for the other measures in the building. For example, electricity consumption differences cannot be gained for a difference between a properly sized HVAC system in the Proposed Design and an improperly sized HVAC system for the Standard Design. The modeling rules are discussed individually in the following sections:
B.17
Where no COOLING SYSTEM exists, a default cooling system must be assumed and modeled for both the Standard Design and Proposed Design. Minimum Efficiencies The minimum efficiencies for HVAC equipment (5.2.2) and for service hot water heating equipment (6.2.2) must be used for the applicable equipment in the Standard Design. This includes any part-load efficiencies, if these are specified. These efficiency requirements set the baseline for equipment trade-offs under the WBP method. The actual equipment efficiency of the Proposed Design is then used to calculate the Standard Design. Since mechanical and service hot-water heating equipment efficiency is a prescriptive requirement, if the equipment is covered by these equipment requirements, the equipment efficiency in the Proposed Design must be equal to or greater than the prescriptive equipment efficiency. If mechanical or service hot water heating equipment falls outside of those listed in the efficiency tables, the standard equipment efficiency shall be equal to the efficiency of the equipment in the Proposed Design. Thus the only trade-off available for equipment efficiency is to specify higher efficiencies than those called for in the ECBC, which would give electricity consumption savings for the design. Equipment Capacities The equipment capacities for the Standard Design shall be based on sizing runs for each orientation (per Table 10.1) and shall be oversized by 15% for cooling and 25% for heating; i.e., the ratio between the capacities used in the annual simulations and the capacities determined by the sizing runs shall be 1.15 for cooling and 1.25 for heating. Unmet load hours for the Proposed Design or Standard Designs shall not exceed 300 (of the 8,760 hours simulated), and unmet load hours for the Proposed Design shall not exceed the number of unmet load hours for the Standard Design by more than 50. If unmet load hours in the Proposed Design exceed the unmet load hours in the Standard Design by more than 50, simulated capacities in the Standard Design shall be decreased incrementally and the building re-simulated until the unmet load hours are within 50 of the unmet load hours of the Proposed Design. If unmet load hours for the Proposed Design or Standard Design exceed 300, then simulated capacities shall be increased incrementally, and the building with unmet loads re-simulated until unmet load hours are reduced to 300 or less. Sizing Runs Weather conditions used in sizing runs to determine Standard equipment capacities may be based either on hourly historical weather files containing typical peak conditions or on design days developed using 99.6% heating design temperatures and 1% dry-bulb and 1% wet-bulb cooling design temperatures. Preheat Coils If the HVAC system in the Proposed Design has a preheat coil and a preheat coil can be modeled in the Standard system, the Standard system shall be modeled with a preheat coil controlled in the same manner as the Proposed Design. Fan System Operation Supply and return fans shall operate continuously whenever spaces are occupied and shall be cycled to meet heating and cooling loads during unoccupied hours. If the supply fan is modeled as cycling and fan energy is included in the energy-efficiency rating of the equipment, fan energy shall not be modeled explicitly. Ventilation Minimum outdoor air ventilation rates shall be the same for the Proposed and Standard Designs.
Exception: When modeling demand-control ventilation in the Proposed Design when its use is not required by
Ventilation Controls for High-Occupancy Areas. Systems with design outdoor air capacities greater than 1400 L/s serving areas having an average design occupancy density exceeding 100 people per 100 m2 shall include means to automatically reduce outdoor air intake below design rates when spaces are partially occupied. Design Air Flow Rates System design supply air flow rates for the Standard Design shall be based on a supply-air-to-room-air temperature difference of 11C. If return or relief fans are specified in the Proposed Design, the Standard Design shall also be
B.18
modeled with fans serving the same functions and sized for the Standard system supply fan air quantity less the minimum outdoor air, or 90% of the supply fan air quantity, whichever is larger. Supply Fan Power System fan electrical power for supply, return, exhaust, and relief (excluding power to fan powered VAV boxes) shall be calculated using the following formulas:
Pfan: 746 /(1 - e[ -0.2437839 ln( bhp ) - 1.685541 ]) bhp Where Pfan: electric power to fan motor (watts) bhp: brake horsepower of Standard fan motor from the table below, where cfm represents design supply flow rate.
Exception: If systems in the Proposed Design require air filtering systems with pressure drops in excess of 1 in. w.c. when filters are clean, the allowable fan system power in the Standard Design system serving the same space may be increased using the following pressure credit: Pressure Credit (watts): CFMfilter * (Spfilter 1)/4.984 where CFMfilter: supply air volume of the proposed system with air filtration system in excess of 250 Pa
Spfilter: air pressure drop of the filtering system in w.g. when the filters are clean.
Exhaust Air Energy Recovery Individual fan systems that have both a design supply air capacity of 2400 L/s or greater and have a minimum outdoor air supply of 70% or greater of the design supply air quantity shall have an energy recovery system with at least 50% recovery effectiveness. 50% energy recovery effectiveness shall mean a change in the enthalpy of the outdoor air supply equal to 50% of the difference between the outdoor air and return air at design conditions. Provision shall be made to bypass or control the heat-recovery system to permit air economizer operation, where applicable. Piping Losses Piping losses shall not be modeled in either the proposed or Standard Designs for hot water, chilled water, or steam piping. Type and Number of Chillers Electric chillers shall be used in the Standard Design regardless of the cooling energy source, e.g., direct fired absorption, absorption from purchased steam, or purchased chilled water. The Standard Designs chiller plant shall be modeled with chillers having the number and type as indicated in table below as a function of building conditioned floor area. Table 10.3: Type and Number of Chillers Building Peak Cooling Load
300 tons > 300 tons and < 600 tons 600 tons
B.19
Chilled Water Design Supply Temperature (System Type: RHFS /ECBC Table 10.2) Chilled water design supply temperature shall be modeled at 6.7C and return water temperature at 13C. Chilled Water Supply Temperature Reset (System Type: RHFS /ECBC Table 10.2) Chilled water supply temperature shall be reset based on outdoor dry-bulb temperature using the following schedule: 7C at 27C and above, 12C at 16C and below, and ramped linearly between 7C and 12C at temperatures between 16C and 27C. Chilled Water Pumps (System Type: RHFS from ECBC Table 10.2) The Standard Design pump power shall be 349 kW/1000 L/s. Chilled water systems serving 11,148 m2 or more shall be modeled as primary/secondary systems with variable-speed drives on the secondary pumping loop. Chilled water pumps in systems serving less than 11,148 m2 shall be modeled as a primary/secondary system with secondary pump riding the pump curve. Heat Rejection (System Type: RHFS /ECBC Table 10.2) The heat rejection device shall be an axial fan cooling tower with two speed fans. Condenser water design supply temperature shall be 29C or 5.6C approach to design wet-bulb temperature, whichever is lower, with a design temperature rise of 5.6C. The tower shall be controlled to maintain a 21C leaving water temperature where weather permits, floating up to leaving water temperature at design conditions. The Standard Design condenser water pump power shall be 310 kW/1000 L/s. Each chiller shall be modeled with separate condenser water and chilled water pumps interlocked to operate with the associated chiller. Supply Air Temperature Reset (System Type: RHFS /ECBC Table 10.2) Supply air temperature shall be reset based on zone demand from the design temperature difference to a 5.6C temperature difference under minimum load conditions. Design air flow rates shall be sized for the reset supply air temperature, i.e., a 5.6C temperature difference. VAV Minimum Flow Set points (System Type: ECBC Table 10.2) Minimum volume set points for VAV reheat boxes shall be 2.15 L/sm2 of floor area served. Fan Power (System Type: RHFS /ECBC Table 10.2) Fans in parallel VAV fan-powered boxes shall be sized for 50% of the peak design flow rate and shall be modeled with 0.74 W per L/s fan power. Minimum volume set points for fan-powered boxes shall be equal to 30% of peak design flow rate or the rate required to meet the minimum outdoor air ventilation requirement, whichever is larger. The supply air temperature setpoint shall be constant at the design condition. VAV Fan Part-Load Performance (System Type: RHFS /ECBC Table 10.2) VAV system supply fans shall have variable speed drives, and their part-load performance characteristics shall be modeled using either Method 1 or Method 2 mentioned in table below. Table 10.4: Part-Load Performance for VAV Fan Systems Method 1 Part-Load Fan Power Data
Fan Part-Load Ratio
0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70
B.20
Hot Water Supply Temperature (System Type: ECBC Table 10.2) Hot water design supply temperature shall be modeled as 82C and design return temperature as 54C. Hot Water Supply Temperature Reset (System Type: ECBC Table 10.2) Hot water supply temperature shall be reset based on outdoor dry-bulb temperature using the following schedule: 82C at 7C and below, 66C at 10C and above, and ramped linearly between 82C and 66C at temperatures between 7C and 10C. Hot Water Pumps (System Type: ECBC Table 10.2) The Standard Design hot water pump power shall be 301 kW/1000 L/s. The pumping system shall be modeled as primary- only with continuous variable flow. Hot water systems serving 11,148 m2 or more shall be modeled with variable speed drives, and systems serving less than 11,148 m2 shall be modeled as riding the pump curve.
h) Miscellaneous Loads:
Proposed Design If there are significant energy-related systems, besides those discussed in above sections, that generate internal heat gains or otherwise interact with the other energy systems, then they should be modeled as part of the
B.21
proposed and Standard Designs. For example, most nonresidential buildings have substantial plug loads and some have process loads. These should be modeled using the best available information about their energy characteristics from the design drawings or, when applicable, from the existing systems already in place. Systems that do not interact substantially with other energy systems, such as elevators or parking garage fans, may be neglected in the Proposed Building modeling. (Refer ECBC Table 10.1) Standard Design The WBP method does not Electricity consumption savings for non-HVAC motors or for other miscellaneous energy-related equipment in a building, such as elevators, conveyors, autoclaves, etc. Where these systems contribute significant loads to the building, they should be modeled, but they must be identical in the proposed and standard runs. (Refer ECBC Table 10.1) Table 10.5: HVAC Systems Map (ECBC Table 10.2) Residential More than 3 stories Less than 3 floors or less than 7,500 m
PSZb
Packaged rooftop air conditioner Constant volume Direct expansion Electric resistance
Nonresidential 4 or 5 floors or less More than 5 floors than 7,500 m or 5 or more than floors or less and 15,000 m 7,50015,000 m
RHFS
Central cooling plant with constant volume AHU for each zone Constant volume air handler for each zone Chilled waterc Electric resistance
PTACa
Packaged terminal air conditioner Constant volume Direct expansion Electric resistance
RHFS
Central cooling plant with variable air volume AHU for each zone Variable air volume air handler Chilled waterc Electric resistance
a PTAC equipment efficiency shall be per Table 10.6. A PTAC unit is a factory selected wall sleeve and separate un-encased combination
of heating and cooling components, assemblies, or sections. It may include heating capability by hot water, steam, or electricity and is intended for mounting through the wall to serve a single room or zone.
b PSZ c If
the proposed building has an air cooled chiller/system then the budget building shall have Air-cooled chiller otherwise the budget case shall have water cooled centrifugal chillers. If the building has a mix of air and water cooled chillers then, the Standard Design shall have the mix of air and water cooled chillers in the same proportion. Chiller Efficiencies shall be as per Table 5.1 of the Code.
Table 10.6: Electrically Operated Packaged Terminal Air Conditioners Single-Package Vertical Air Conditioners Minimum Efficiency Requirements
Equipment Type
PTAC (Cooling Mode) New Construction PTAC (Cooling Mode) Replacementsa
Minimum Efficiency
3.66 (0.213 Cap/1000)b COP 3.19 (0.213 Cap/1000)b COP
a Replacement units must be factory labeled as follows: Manufactured for Replacement Applications Only; not to be Installed in New Construction
Projects. Replacement efficiencies apply only to units with existing sleeves less than 16 in. high and less than 42 in. wide.
b Cap means the rated cooling capacity of the product in Btu/h. If the units capacity is less than 7000 Btu/h, use 7000 Btu/h in the calculation. If the units capacity is greater than 15,000 Btu/h, use 15,000 Btu/h in the calculation.
B.22
Percentage Improvement The formula below demonstrates a percentage performance improvement in the proposed and Standard Design per ECBC by a whole building performance using building performance rating method used in chapter 10 of ECBC. The minimum energy saving percentage applicable to LEED-India and GRIHA rating systems is, as under. % Improvement = 100 (Energy Use in Standard Design - Energy Use in Proposed Design)/Energy Use in Standard Design
B.23
Case Study
To demonstrate ECBC compliance for building design using WBP method, building energy simulation models need to be developed. This document uses two important terms to understand the process Standard Design and the Proposed Design. To evaluate energy performance of the Proposed Design and to see if it is compliant with ECBC, one needs to build a hypothetical simulation model based on the methodology described in Appendix B of the Guide (also explained in this Guide). This hypothetical model is called Standard Design. Sometimes Standard Design is also referred to as Base Case. Energy consumption in the Standard Design is compared with the energy consumption in the Proposed Design. If the energy consumption in the Proposed Design is more than that of the Standard Design, one needs to incorporate energy conservation measures (ECMs) to improve the energy performance of the Proposed Design for achieving ECBC compliance. Hence in this case study after analyzing the design inputs and incorporating the ECMs, the Proposed Design model has been created. The process of creating the Standard Design model and the Proposed Design model, their inputs for simulations and their results are discussed and explained in this case study. The hypothetical building used in the case study is located in Ahmedabad, Gujarat, India. The steps involved for ECBC compliance using WBP method are: 1. Ensure that the building design conforms to the local building bye laws and regulations 2. Comply with the mandatory requirements of the ECBC 3. Create the Proposed Design model 4. Create the Standard Design model 5. Compare the energy consumption of the Proposed Design with that of the Standard Design 6. If the energy consumption of the Proposed Design is more than that of Standard Design, incorporate additional ECMs in the Proposed Design 7. Ensure that the Standard Design created in Step 4 is still valid. If necessary, revise the Standard Design 8. Repeat step 5 through 7 till energy consumption in the Proposed Design is less than or equal to the energy consumption in Standard Design 9. Prepare the compliance documents All the above steps are dealt with in detail in this chapter. Before commencing with the data input process for the model, the project should refer to Appendix E Climate Zone Map of India in the Code to check the climate zone in which the site is located. The Guide also lists various cities and their corresponding climate zones. Weather files for 58 cities from India are available at: http://www.eere.energy.gov/buildings/energyplus/cfm/weather_data3.cfm/region=2_asia_wmo_region_2/ country=IND/cname=India. This weather data is ready to be used in EnergyPlus simulation software but can be customized for other simulation tools using appropriate weather file converter program. The building proposed for the case study is in Ahmedabad, which is classified under hot and dry climate. The building should then be classified either as a 24-hour activity building or a daytime activity building because the ECBC specifications for the U-factors of the building envelope are mandated according to the climate zone and the occupancy type of the building. However, before going into the details of ECBC compliance, it is necessary to describe the case study used for demonstration. Building Description a. The building proposed for the case study is in Ahmedabad, which is classified under hot and dry climate as per Appendix E of the Code.
B.24
b. The building in this case study is a daytime use building. c. The building used in this case study is a square building with one side measuring 39.62 m. The building has ten floors with identical plan. The entire building is conditioned space with a total conditioned area of 15,717 sq m (all ten floors). The building is exposed on all the four sides. Windows on all four sides together constitute a WWR of 45%. There are permanent external shading devices designed for the proposed building. d. The HVAC design and consequently zoning for the proposed building have not been finalized hence according to Table 10.1 for each floor a simple core-perimeter zoning pattern, as shown in the Figure 10.1, has to be considered. The depth of perimeter zones is 5m as per guidance provided in this chapter. All the five zones are considered to be conditioned office areas.
Figure 10.1: Five zone floor plate showing the perimeter and core zoning
e. Construction consists of typical reinforced cement concrete (RCC) column and beam structure with flat slab. External wall is made of brick with cement plaster. 45% of all faade area comprises of glazing that is flush with the external wall. Internal partition walls are designed as brick construction with cement plaster on both sides. No insulation is used in the roof and walls. f. Water-cooled centrifugal chillers are proposed to meet the cooling requirements of the building. All the spaces in the building will be served with variable air volume (VAV) air handlers. The system consists of chilled water circulation with evaporator, condenser and a chilled water circulation pump. Two chillers, each of 262 tons and with COP of 5.55 are proposed to meet the cooling requirements of the building. The fenestration consists of a double-glass unit in aluminum frame with the following properties: Table 10.7: Fenestration Summary Faade
North South East West
WWR
62% 25% 35% 55%
SHGC
0.36 0.36 0.23 0.36
The building design includes the following features, which incorporate some passive design methods to reduce energy consumption of the building in hot and dry climate (Ahmedabad) and still strive for a high WWR on certain facades to take advantage of daylight: The WWR on the northern faade is 65%. In a city like Ahmedabad, which is 23 N latitude, the sun rarely goes to the north of the building, hence there will be almost no direct light coming into the building from the North. North glazing brings in diffused light, which is preferred for office activity. The building has a WWR of 25% on the East side and a WWR of 55% on the West side.
B.25
Ahmedabad being in a hot climate, the solar heat gain coefficient of the glass plays an important role. In this regard, the windows on East faade (where horizontal and vertical shading devices would not be very effective) of the building are proposed with a double glazed unit of low SHGC value of 0.23. Windows on the South, North and West facades have a double glazed unit with SHGC of 0.36. On the south faade of the building, overhangs of 0.6 m depth have been designed to reduce the direct light coming inside the building. To reduce high solar heat gain from the West side, vertical louvers/fins of 0.6 m width at a gap of 1.5 m are proposed. To take advantage of the high visible transmittance (0.62) of double glazed unit and high WWR in the North and the West facades, perimeter zones in these directions are equipped with daylight sensors that can dim the internal lighting in these zones. Steps for ECBC Compliance
Step 1: Ensure that the building design conforms to the local building bye laws and regulations
It is recommended to ensure that the building design conforms to the local building bye laws and regulations. The design team should request clear guidance from the local authorities on the following issues: Applicability of ECBC to the project Submittal requirements and procedure to apply for ECBC compliance Any local amendments to the ECBC that need to be followed Acceptability of the weather file to the authorities
In this case study, the external wall section in the Proposed Design is a 230 mm brick wall with cement plaster on either side. If the manufacturer provides the material properties, they should, after verification, be used to calculate the final U-factor of the construction assembly. However, in this case study it is assumed that no data was available from the manufacturer. Thermo-physical properties of construction materials can be obtained from two sources: Appendix C of ECBC Libraries included in the simulation program For this case study, the properties of the specified materials were derived from the simulation software library, which were assembled to form the building envelope. The resultant U-factor of the wall works out to be 2.02 W/m2K. Similarly, U-factor of the roof, which is an un-insulated RCC slab, works out to be 1.618 W/m2K. While modeling the facades of the building, the windows need to be modeled separately if the building uses daylight controls. Otherwise they can be combined (if they are in the same zone) into a larger effective window. Manually operated window-shading devices such as blinds or shades should not be modeled. However, any permanent shading devices such as fins, overhangs, and light-shelves have to be modeled as they have significant impact on the overall heat gain as well as daylight in the building. Since, India presently does not have a labeling program certifying the U-factor of the windows, the projects Proposed Design needs to comply with the requirement of the ECBC (for unrated vertical fenestration) as specified in Table 11.1 of Appendix C. As per this table, the U-factor of the window assembly of the case study model is 5.1 W/m2K. Manufacturer has however provided the SHGC (0.36 and 0.23 for two types of glazing used in the building) and Visible Light Transmittance values (0.62 and 0.41 for two types of glazing). For exterior roofs other than roofs with ventilated attics, the reflectance and emittance of the proposed roof surface, which can be derived from building material specifications, should also be modeled. For the case study, the roof surface has been modeled with a reflectance of 0.45 since the reflectance and emittance of the roof surface is exceeding the Code requirements as specified in Table 10.1 (Building Envelope) of the Guide. Schedules Office schedule with varying occupancy from 7 am to 12 mid-night has been proposed for the building. Normal office schedule will be from 9 am to 6 pm. Lighting For the Proposed Design: The design electric lighting power should be modeled accurately for the purpose of simulation. The lighting system power should include all lighting system components shown or provided for in the plans (including lamps, ballasts, task fixtures, and furniture-mounted fixtures). In cases where the electrical design includes lighting controls, they should be included in the simulation model. For the case study: An LPD value of 8.61 W/m2has been used in the office areas. Daylight sensors are proposed in the design of the lighting systems on the North and West facades. HVAC Zoning Where a complete HVAC system has been designed, the simulation model should be consistent with the design
Energy Conservation Building Code (ECBC) User Guide B.27
documents. It should reflect the actual zoning scheme. For the case study: Since the HVAC zoning has not been designed/finalized, the ECBC User Guide mandates that a simple perimeter and core zoning should be done. The perimeter areas are modeled with a depth of 5 meters from exterior wall for four cardinal directions along with a central core area.
Figure 10.2: Simplified Zoning of the Case Study Building when HVAC Zoning is Not Designed
HVAC Systems For the Proposed Design: The HVAC system should be specified according to the mechanical layout of the design. All the inputs should be as per the designs, which include the fan and equipment efficiencies, static pressure, pump heads, etc. None of the default values by the software should be considered as input values for the above parameters unless they match the actual proposed values. When the HVAC system is designed, the system type and all actual component capacities and efficiencies should be modeled as per the actual system design. Any HVAC specific energy-efficiency features, for example, economizers, variable-air-volume drives etc., should also be included in the simulation model as per the specifications in the design documents. For the case study, The building is served by VAV air-handling units, which are connected to the centrifugal chillers. Watercooled centrifugal chillers are proposed to meet the cooling requirements of the building. The system consists of chilled water circulation with evaporator, condenser and a chilled water circulation pump. Two chillers, each of 262 tons and with COP of 5.55 are proposed to meet the cooling requirements of the building. All the power and efficiencies of the system fan match with the Standard Design specifications. No savings is taken in the HVAC system design except the variable speed fan used in the water-cooled condenser in place of the two-speed fan in the Standard Design as the complete HVAC system is not designed in the case study.
B.28
Miscellaneous Loads For the case study, an internal equipment load of 21.6 W/m2 has been considered for both the Proposed Design.
should be categorized based on their position within the building. Appendix A of the Code, deals with the definitions of various kinds of walls in a building. The wall construction must comply with the prescriptive requirements of Section 4.3.2 of the Code. For the case study, since the building is in hot and dry climate and is a daytime use building, according to Table 4.3.2 of the Code, the U-factor of the wall shall be 0.44 W/m2K.
Roof: The roof construction must comply with the prescriptive requirements of Section 4.3.1 and 4.3.2 of the Code. For the case study, a mass construction roof with a U-factor of 0.409 W/m2K has been specified in the Standard Design model. Table 10.1 provides guidance on how to model the reflectivity of the roof. Windows:
In the Standard Design: Windows in all the directions have the same prescriptive requirements for SHGC and the U-factor. Windows should be equally distributed on all the sides. U-factor and the SHGC requirements depend on the window wall ratio (WWR) and the climate zone. The U-factor, SHGC and Visible Light Transmittance of the glass must meet the requirements set forth in Section 4.3.3 of the Code. Shading should not be modeled, whether internal or external. Self-shading of the building too shouldnt be modeled as per Table 10.1 (Building Envelope). For the case study: Since the Proposed Design has a WWR of 45%, as per Table 10.1 (Building Envelope) of the Guide, the WWR in the Standard Design shall be limited to 40%. All the windows in the Standard Design shall have a U-factor of 3.3 W/m2K and SHGC of 0.25 as per Table 4.3 of the Code.
B.29
Space Use According to Appendix A of ECBC, the floor area of a building is categorized as conditioned-space, semiheated /cooled space or un-conditioned space. ECBC defines conditioned space as a cooled space, heated space, or directly conditioned space in the building. A semi-heated space is defined as an enclosed space within a building that is heated by a heating system whose output capacity is greater than or equal to 10.7 W/m2 of floor area but is not a conditioned space. An un-conditioned space is one that is not a conditioned space or a semi-heated space. Crawl spaces, attics, and parking garages with natural or mechanical ventilation are not considered as enclosed spaces. For the case study, the entire floor plate is assumed to be conditioned space. Lighting For the Standard Design: The lighting power density (LPD) should be specified using either the Building Area method or the Space Function method. In Building Area method (Table 7.1 of ECBC) an average LPD value is defined for the entire building, whereas, in Space Function method (Table 7.2 of ECBC), individual spaces are assigned with different LPD values based on the activity within that space. For the case study: The Building Area method has been followed in the case study. A LPD of 10.8 W/m2 is considered in all the office areas as per Table 7.1 of ECBC, assuming all the areas to be office. HVAC Zoning This zoning pattern is the same for both Proposed Design and the Standard Design model. HVAC Systems For the Standard Design: As specified in Table 10.2 of Appendix B of the Code, the HVAC system of the Standard Design model is based on: The building type: residential or non-residential The total built-up area excluding the parking area of the building For the case study: Based on the above two categories, the heating system of the Standard Design model is served by the Reheat Fan System (RHFS) Since the Proposed Design has a water cooled chiller, the Standard Design will also have water cooled centrifugal chiller as specified in the footnote of Table 10.2 of Appendix B of the Code. In the Proposed Design there is no heating system provided for the building. However, since the Standard Design should also be modeled with heating, the same kind of provision is assumed for the Proposed Design simulation model as well. The Standard Design, consists of a centrifugal chiller which is water cooled with a variable air volume (VAV) AHU for each zone. The cooling type is chilled water and the heating is provided by electric resistance. Fans and controls: As specified in the mandatory provisions given in Section 5.2.3 of the Code, all the mechanical cooling and heating systems should be controlled by respective schedules and set-point temperatures. The supply fans should be controlled by variable speed drives as specified in Section 5.3.2.
B.30
Number of Chillers and Sizing: For the Standard Design: The size of the chiller, which decides the COP of the chiller as per Table 5.1 of the Code is given in accordance with the following table. To decide the size of the chiller, a sizing run for the Standard Design is performed. The sizing ratios for this model would be 15% oversized for the cooling and 25% oversized for the heating unit as mentioned in the Code. . In cases, where HVAC efficiency values are not specified in the Code, they should be referred to Appendix Go of ASHRAE 90.1-2004. If values are specified neither in ECBC nor in ASHRAE 90.12004, they should be taken from the Proposed Design. For the case study: Table 10.3 of the Guide has been followed for determining the number of the chillers and their sizes in the case study building. The system consists of chilled water circulation with evaporator, condenser and a chilled water circulation pump. Two chillers, each of 232 tons and with COP of 5.55 are proposed to meet the cooling requirements of the building Service Hot Water When there is service hot water supply for the Proposed Design, similar system must be modeled in the Standard Design model. In this case study, since the Proposed Design is not a residential, hotel or hospital building, 20% of design loads are not required to be met by solar hot water system. The system efficiencies shall be as per Section 6.2.2 of the Code. Miscellaneous Loads The equipment loads in the Standard and the Proposed Design shall be modeled in the same way.
Step 5: Compare the Energy consumption in the Proposed Design with that of Standard Design
A review of the detailed inputs of both the Standard Design model and the Proposed Design model shows that the building does not meet the U-factor requirements for the wall as specified in the prescriptive table of ECBC. Since the fenestration is unlabeled, the resultant U-factor of the complete window assembly is also high when compared with the U-factor of the Standard Design simulation model. However the internal lighting load is 20% less in the Standard Design model. A glass of higher SHGC has been used on the West, South and North side of the building and a glass of SHGC lesser than the base case has been used on the East facade. The windows are designed in such a way that mainly diffused light get into the building from the North faade. West faade has a high WWR of 55% but because there is good shading provided in the form of vertical fins, the effect of high WWR has been compensated to a certain extent. Also, as the building is a daytime office use building, the effect of West sun would be mainly in the unoccupied hours. Both the Proposed Design Model and the Standard Design models are simulated and the results are analyzed to check for errors, if any. In some cases, there are instances when either the cooling set-point or the heating set-point temperatures are not met by the HVAC system or the plant. They are normally categorized as either system unmet or plant unmet hours, which state the number of hours the system or the plant was unable to meet the cooling or heating load. The maximum allowable unmet hours either for the Proposed Design or the for the Standard Design are 300 hours as per Appendix B of the Code and if the number of hours that loads are unmet by either the system or plant shows a difference of more than 50 hours between the Standard and Proposed Design models, the simulation results are not accepted as valid. The best way to deal with this issue is to confirm that the sizing method of both the Standard and Proposed Design is similar. It could also be the case that some part of the HVAC system is undersized and may require redesign. These models are refined and re-run and checked for all the compliance clauses again and if found in order, prepared for compliance documentation checks.
Energy Conservation Building Code (ECBC) User Guide B.31
Some key differences in modeling the Standard Design and the Proposed Design model are as follows: The Standard Design may differ from the Proposed Design model in the specification of building envelope U-factors, glazing SHGC, lighting power density and mechanical efficiency of HVAC system. The other major difference is in the modeling of the glazing. In the Standard Design the glazing WWR is spread on all the faades equally, as specified in the Building Envelope of Table 10.1 of Appendix B. Moreover, there is no self-shading of the building allowed as specified in Table 10.1. No assumed efficiency measures should be modeled over the Proposed Design to meet or to perform better than Standard Design. However efficiency options, which are designed for implementation in the proposed building can be included in the Proposed Design simulation model.
Step 6: Not needed Step 7: Not needed Step 8: Not needed Step 9: Prepare the compliance documents
For the project to finally comply with the Code, the required compliance documents should be prepared and filed as submittals to show that the Proposed Design consumes energy less than or equal to the Standard Design model. Table 10.8 provides Whole Building Performance compliance report making it easier for users to show compliance. Table 10.8: Building Energy Model Information Whole Building Performance Method Compliance Report
Project Name Project Address Designer of Record: Contact person: City: Weather Data: Climate Zone:
IT Park
Advisory messages
Proposed Design Number of hours of heating loads unmet (system/plant) Number of hours of cooling loads unmet (system/plant) Number of warnings Number of errors Number of defaults overridden
0 hours 52 hours 12 0
Standard Design
0 hours 44 hours 12 0
Difference
0 hours 8 hours 0 0
B.32
Comparison of Input Parameters in Proposed Design and Standard Design Standard Design Input Proposed Design Input
U value 2.02 W/m2 .K ( 230 mm thick wall + Cement motar either side) U value 1.618 W/m2 .K (150 mm RCC slab+ Cement motar either side) NA NA 40% U factor=5.1 W/m2K SHGC1 = 0.23, SHGC2= 0.36 VLT1 = 0.41, VLT2= 0.62 0.6 m fixed overhangs on South & 0.6 m wide vertical fins on West side None U value 0.44 W/m2 .K ( 230 mm thick wall + Insulation) (outside to inside) U value 0.409 W/m2 .K (Insulation +150 mm RCC slab) (outside to inside) NA NA 45% U factor =3.3 W/m2K SHGC = 0.25 NA None None
Exterior Floor Construction Slab-on-Grade Construction Window-to-Gross Wall Ratio Fenestration Type(s) Fenestration Assembly U Factor Fenestration Assembly SHGC Fenestration Visual Light Transmittance Fixed Shading Devices Automated Movable Shading Devices
Hot Water Loop and Pump Parameters Domestic Hot Water pump Parameters
B.33
End use
Standard Design - End Use Summary 0 rotation 90 rotation 180 rotation 270 rotation
Energy Energy Peak Energy Peak Energy Peak Energy Type (kWh) (kW) (kWh) (kW) (kWh) (kW) (kWh) Peak (kW)
152.1 -
Average
Energy (kWh)
492,303 -
Peak (kW)
152.1 -
Interiors Lighting Interior lighting (Process) Exterior Lighting Space heating (Fuel 1) Space heating (Fuel 2) Space Cooling Pumps Heat Rejection Fans Interior Fans Parking garage Service Water Heating (Fuel 1) Service Water Heating (Fuel 2) Receptacle Equipment Refrigeration (Food, etc.,) Cooking (commercial, fuel 1) Cooking (commercial, fuel 2) Elevators and Escalators Other Process Total Building Consumption/ Demand Total Process Energy
Elec Elec Elec Natural Gas Elec Elec Elec Elec Elec Elec Natural Gas Elec
492,303 -
152.1 -
492303 --
152.1 -
492303 -
152.1 -
492303 -
11,324
4.4
11,324
4.4
11,324
4.4
11,324
4.4
11,324
4.4
984,607 -
304.2 -
984,607 -
304.2 -
984,607 -
304.2 -
984,607 -
304.2 -
984,607 -
304.2 -
Elec
2626180
1091.1
2623743
1091.5
2624623
1091.925
1092.8 2623864
1092.3 2624703
Elec
984607
304.2
984607
304.2
984607
304.2
984607
304.2
984607
304.2
Energy Type
Electricity Electricity Electricity Natural gas
Energy (kWh)
328,049
Energy (kWh)
492,303
Peak (kW)
152.1
Energy (%)
33.36%
B.34
Space Heating (fuel 2) Space Cooling Pumps Heat Rejection Fans - Interior Fans-Parking Garage Service Water Heating (fuel 1) Service Water Heating (fuel 2) Receptacle Equipment Refrigeration (food, etc.,) Cooking (commercial, fuel 1) Cooking (commercial, fuel 2) Elevators and Escalators Other Process
Electricity Electricity Electricity Electricity Electricity Electricity Natural Gas Electricity Electricity Electricity Natural Gas Electricity Electricity Electricity
109.25 338.1 4.5 16.2 163.17 4.4 304.2 1091.9 -9.86% -9.64% -7.23% -14.68% 0% 0% 1.55%
Proposed Design
Type Nonrenewable (Regulated & Unregulated)
Electricity Natural Gas Steam or Hot water Chilled Water Other Total Nonrenewable Regulated & Unregulated) 2583,826 2583,826
Standard Design
Energy Use (kWh)
2624,623 2624,623
Percentage Improvement
Energy Use (%)
1.55% 1.55%
B.35
f. 8.3 of ISO 15099 addresses convective film coefficients on the interior and exterior of the window product. In 8.3.1 of ISO 15099, simulations shall use the heat transfer coefficient based on the center of glass temperature and the entire window height; this film coefficient shall be used on all indoor surfaces, including frame sections. In 8.3.2 of ISO 15099, the formula from this section shall be applied to all outdoor exposed surfaces g. 8.4.2 of ISO 15099 presents two possible approaches for incorporating the impacts of self-viewing surfaces on interior radiative heat transfer calculations. Products shall use the method in 8.4.2.1 of ISO 15099 (Two-Dimensional Element to Element View Factor Based Radiation Heat Transfer Calculation). The alternate approach in 8.4.3 of ISO 15099 shall not be used
C.1
11.2 Default U-factors and Solar Heat Gain Coefficients for Unrated Fenestration Products
All fenestration with U-factors, SHGC, or visible light transmittance determined, certified, and labeled in accordance ISO 15099 shall be assigned those values.
Glazing Type
Single Glazing Double Glazing
VLT
0.76 0.64 0.66
UTypical Insulation : U-factor of the effective insulation from Table 11.2 Table 11.2: Defaults for effective U-Factor for Exterior Insulation layers (under review) Thickness
15 mm (0.5) 20 mm (0.75) 25 mm (1.0) 40 mm (1.5) 50 mm (2.0) 65 mm (2.5) 75 mm (3.0)
R-value
0.70 (4) 1.06 (6) 1.41 (8) 2.11 (12) 2.82 (16) 3.52 (20) 3.70 (21)
U-factor (W/m2K)
1.420 0.946 0.710 0.568 0.406 0.284 0.270
C.2
Table 11.3: Defaults for effective U-factor for Exterior Insulation Layers (under review) Thickness
15 mm (0.5) 20 mm (0.75) 25 mm (1.0) 40 mm (1.5) 50 mm (2.0) 65 mm (2.5) 75 mm (3.0)
R-value
0.70 (4) 1.06 (6) 1.41 (8) 2.11 (12) 2.82 (16) 3.52 (20) 3.70 (21)
U-factor (W/m2K)
1.262 0.874 0.668 0.454 0.344 0.277 0.264
C.3
where EPFRoof : Envelope performance factor for roofs. Other subscripts include walls and fenestration. As, Aw : The area of a specific envelope component referenced by the subscript s or for windows the subscript w. SHGCw : The solar heat gain coefficient for windows (w). SHGCs refers to skylights. Mw Us : A multiplier for the window SHGC that depends on the projection factor of an overhang or sidefin. : The U-factor for the envelope component referenced by the subscript s
CRoof : A coefficient for the Roof class of construction CWall : A coefficient for the Wall C1 Fenest : A coefficient for the Fenestration 1 C2 Fenest : A coefficient for the Fenestration 2 Values of c are taken from Table 12.1 through Table 12.5 for each class of construction. Table 12.1: Envelope Performance Factor Coefficients-Composite Climate (under review) Daytime Occupancy
U-factor
Mass Walls Curtain Walls, Other Roofs North Windows 6.01 15.72 11.93 -1.75
24-Hour Occupancy
U-Factor
13.85 20.48 24.67 -4.56
SHGC
40.65
SHGC
58.15
D.1
-1.25 -96.35
54.51 311.71
0.68 -294.66
86.57 918.77
Table 12.2: Envelope Performance Factor Coefficients-Hot Dry Climate (under review) Daytime Occupancy
U-factor
Mass Walls Curtain Walls, Other Roofs North Windows Non-North Windows Skylights 5.48 6.38 11.14 -2.40 -1.86 -96.27
24-Hour Occupancy
U-Factor
15.01 22.06 25.98 -1.49 1.187 -295.81
SHGC
36.57 46.79 309.33
SHGC
56.09 81.79 923.01
Table 12.3: Envelope Performance Factor Coefficients-Hot Humid Climate (under review) Daytime Occupancy
U-factor
Mass Walls Curtain Walls, Other Roofs North Windows Non-North Windows Skylights 6.42 14.77 9.86 -1.58 -1.00 -96.11
24-Hour Occupancy
U-Factor
9.60 19.71 14.11 -7.29 -6.48 -295.45
SHGC
34.95 43.09 305.45
SHGC
64.19 76.83 893.55
Table 12.4: Envelope Performance Factor Coefficients-Moderate Climate (under review) Daytime Occupancy
U-factor
Mass Walls Curtain Walls, Other Roofs North Windows Non-North Windows Skylights 2.017 2.72 5.46 -3.10 -2.98 -96.21
24-Hour Occupancy
U-Factor
3.11 4.11 5.86 -11.95 -11.62 -294.12
SHGC
29.66 34.86 298.82
SHGC
62.14 68.45 876.70
Table 12.5: Envelope Performance Factor Coefficients-Cold Climate (under review) Daytime Occupancy
U-factor
Mass Walls Curtain Walls, Other Roofs North Windows Non-North Windows Skylights 5.19 6.76 5.69 1.55 -1.13 -93.44
24-Hour Occupancy
U-Factor
5.19 6.76 5.67 1.55 -1.13 -93.44
SHGC
9.13 16.32 283.18
SHGC
9.13 16.32 283.18
D.2
Coefficient
A B A B
North
0.16 -0.61 0.23 -0.74
South
0.21 -0.83 0.12 -0.59
East/West
0.10 -0.58 0.14 -0.52
Building size: 40m length, breadth 25m, 3m height, having 10sqm fenestration on each faade. Location: Hot and dry climatic zone Step 1: Determination of upper limit of envelope performance factor (EPF) for wall, roof and fenestration using prescriptive values: a) Us (from table 4.1) As (as per geometry) CRoof (from table 12.2) EPFRoof b) (In this case it has been assumed that there is no curtain wall) Us (from table 4.2) As (as per geometry) CWall (from table 12.2) EPFWall = 0.440 = 390 m2 = 15.01 = 15.01 0.44 390 = 2575.71 = 0.261 (for 24 hr building) = 40 25 = 1000 m2 = 25.98 (for 24 hr building in hot and dry climate) = 25.98 0.261 1000 = 6780.78
D.3
c)
(Assuming there is no skylight and no shading device used on windows) UW (from table 4.3) SHGC (from table 4.3) MW = 3.3 = 0.25 (since WWR < 40%) = 1 (for no overhang case, in case of overhang, MW is to be calculated using table 12.6) and equation 12.2 of ECBC = 56.09 = -1.49
C1 Fenest, North (from table 12.2) C2 Fenest, North (from table 12.2)
C1 Fenest,Non North(from table 12.2) = 81.79 C2 Fenest, Non North (from table 12.2) = 1.187 EPFFenest EPFTotal = 56.09 0.25 10 + (-1.49) 3.3 10 + 81.79 0.25 30 + 1.187 3.3 30 = 821.98 = EPFRoof + EPFwall + EPFFenest = 6780.78 + 2575.71 + 821.98 = 10178.47
Step 2: Determination of EPF of proposed building using actual U-factors and SHGC. Assuming that in place of using Uroof of 0.261, the roof of proposed building has U-factor of 0.3. EPFroof new = 25.98 0.3 1000 = 7794
Similarly if U-factor of wall/fenestration and SHGC are different from prescriptive requirement, new EPFwall, EPFFenest are to be calculated. In this case, let us first assume that the wall and fenestration meet the prescriptive requirements. The EPF of proposed building is: EPFTotal new = 7794 + 2575.71 + 821.98 = 11191.69
Step 3: Comparison of EPF through perspective route and EPFnew through actual specifications show the later is higher than the EPFperspective. Hence the building is not complying with the ECBC. Step 4: Now even with the roof having inferior U- value (0.4 against the requirement of 0.261), the EPF is to be brought down to the level of EPFperspective i.e. 10178.47 in this case. This may be done by several options related to wall or fenestration.
D.4
In the example given above, through back calculation, it can be found that for bringing down the EPFnew to the level of EPFprescriptive= 10178.47 and with EPFRoof being 7794, and no change in fenestration, (EPFFenest =821.98), the maximum EPFWall can be: EPFWall new = 10178.47 7794 -821.98 = 1562.02
Step 5: For the target EPFWall new =1562.02, the required UWall new can be calculated through back calculation:EPFwall Uwall = =
This means that due to certain limitation if in place of having U-factors of roof equal to 0.261, it is kept as 0.3, as one option, U-factor of wall can be improved from 0.44 to 0.266 for complying with the code. Similar to the method of calculating revised U-factor for wall, other alternatives such as change in SHGC or change in UFenest can also be explored. Important: Change in specification through trade-off method would vary from case-to-case and therefore need to be calculated separately for individual building and for individual solution.
D.5
E.1
Table 13.1: Classifications of Different Climate Zones in India Mean Temperature (C)
Summer Summer Winter midday night midday (High) (Low) (High)
40 to 45 20 to 30 5 to 25 0 to 10 15 to 20 Very Low 25-40% Low <500 mm/ yr. Cloudless skies with high solar radiation, causing glare Overcast (cloud cover ranging between 40 and 80%), causing unpleasant glare
Climate Zone
Winter night (Low) Diurnal Variation
Description
Places
High temperature | Low humidity and rainfall | Intense solar radiation and a generally clear sky | Hot winds during the day and cool winds at night | Sandy or rocky ground with little vegetation |Low underground water table and few sources of surface water. 30 to 35 25 to 30 25 to 30 20 to 25 5 to 8 High 70 to 90% High > 1200 mm/yr.
Temperature is moderately high during day and night | Very high humidity and rainfall | Diffused solar radiation if cloud cover is high and intense if sky is clear | Calm to very high winds from prevailing wind directions | Abundant vegetation | Provision for drainage of water is required 30 to 34 17 to 24 27 to 33 16 to 18 8 to 13 High 60 to 85% High > 1000 mm/yr
Kerela, Tamilnadu, Costal parts of Orissa and Andhra Pradesh etc. Mainly clear, Bangalore, Goa occasionally and parts of the Deccan overcast with dense low clouds in summer Clear with cloud cover < 50% / Overcast for most of the year Jammu &Kashmir, Ladakh, Himachal Pradesh, Uttaranchal, Sikkim, Arunachal Pradesh
Energy Conservation Building Code (ECBC) User Guide 17 to 24/20 to 30 4 to 11/17 to 21 (-7) to 8 /4 to 8 (-14) to 0 /(-3) to 4 25 to 25 /5 Low: 10Low: < to 15 50% /High: 200 mm/ 70-80% yr /Moderate 1000mm/yr 32 to 43 27 to 32 10 to 25 4 to 10 35 to 22 Variable Dry Periods= 20-50% Wet Periods= 50-95% Variable 5001300 mm/yr, during monsoon reaching 250 mm in the wettest month Variable Overcast and dull in the monsoon Uttar Pradesh, Haryana, Punjab, Bihar, Jharkhand, Chattisgarh, Madhya Pradesh etc.
Temperate
Moderate temperature | Moderate humidity and rainfall | Solar radiation same throughout the year and sky is generally clear | High winds during summer depending on topography | Hilly or high plateau region with abundant vegetation
Moderate summer temperatures and very low in winter | Low humidity in cold/sunny and high humidity in cold/cloudy | Low precipitation in cold/ sunny and high in cold/cloudy | High solar radiation in cold/sunny and low in cold/cloudy | Cold winds in winter | Very little vegetation in cold/sunny and abundant vegetation in cold/cloudy
Composite This applies when 6 months or more do not fall within any of the above categories | High temperature in summer and cold in winter | Low humidity in summer and high in monsoons | High direct solar radiation in all seasons except monsoons high diffused radiation | Occasional hazy sky Hot winds in summer, cold winds in winter and strong wind in monsoons | Variable landscape and seasonal vegetation
Sources: Bansal and Minke (1988) Climatic zones and rural housing in India
Krishan et al. (2001). Climate responsive architecture: A design handbook for Energy-Efficient Buildings
E.2
Table 13.2: Climate Zone of the Major Indian Cities Indian Cities and their respective Climatic Zones
City
Ahmedabad Allahabad Amritsar Aurangabad Bangalore Barmer Belgaum Bhagalpur Bhopal Bhubaneshwar Bikaner Bombay Calcutta Chitradurga Dehra Dun Dibrugarh Gauhati Gorakhpur Gwalior Hissar Hyderabad Imphal Indore Jabalpur Jagdelpur Jaipur Jaisalmer Jamnagar Jodhpur
Climatic Zone
Hot & Dry Composite Composite Hot & Dry Temperate Hot & Dry Warm & Humid Warm & Humid Composite Warm & Humid Hot & Dry Warm & Humid Warm & Humid Warm & Humid Composite Warm & Humid Cold Composite Composite Composite Composite Warm & Humid Composite Composite Warm & Humid Composite Hot & Dry Warm & Humid Hot & Dry
City
Jorhat Kota Kurnool Lucknow Madras Manglore Nagpur Nellore New Delhi Panjim Patna Pune Raipur Rajkot Ramgundam Ranchi Ratnagiri Raxaul Saharanpur Shillong Sholapur SunderNagar Surat Tezpur Tiruchchirapalli Trivandrum Tuticorin Veraval Vishakhapatnam
Climatic Zone
Warm & Humid Hot & Dry Warm & Humid Composite Warm & Humid Warm & Humid Composite Warm & Humid Composite Warm & Humid Composite Warm & Humid Composite Composite Warm & Humid Composite Warm & Humid Warm & Humid Composite Warm & Humid Hot & Dry Cold Hot & Dry Warm & Humid Warm & Humid Warm & Humid Warm & Humid Warm & Humid Warm & Humid
E.3
F.1
* ECBC implementing agencies may adapt the compliance form to suit their requirement
G.1
G.2
G.3
G.4
G.5
G.6
Proposed Design Number of hours of heating loads unmet (system/plant) Number of hours of cooling loads unmet (system/plant) Number of warnings Number of errors Number of defaults overridden
Standard Design
Difference
Comparison of Input Parameters in Proposed Design and Standard Design Building Element Standard Design Input Proposed Design Input
Envelope
Above Grade Wall Construction(s) Below Grade Wall Construction Roof Construction Exterior Floor Construction Slab-on-Grade Construction Window-to-Gross Wall Ratio Fenestration Type(s) Fenestration Assembly U Factor Fenestration Assembly SHGC Fenestration Visual Light Transmittance Fixed Shading Devices Automated Movable Shading Devices
G.7
End use
Standard Design - End Use Summary 0 rotation 90 rotation 180 rotation 270 rotation
Energy Energy Peak Energy Peak Energy Peak Energy Peak Type (kWh) (kW) (kWh) (kW) (kWh) (kW) (kWh) (kW)
Average
Energy (kWh) Peak (kW)
Interiors Lighting Interior lighting (Process) Exterior Lighting Space heating (Fuel 1) Space heating (Fuel 2) Space Cooling Pumps Heat Rejection Fans Interior Fans Parking garage Service Water Heating (Fuel 1) Service Water Heating (Fuel 2) Receptacle Equipment Refrigeration (Food, etc.,) Cooking (commercial, fuel 1)
Elec Elec Elec Natural Gas Elec Elec Elec Elec Elec Elec Natural Gas Elec Elec Elec Elec
G.8
Cooking (commercial, fuel 2) Elevators and Escalators Other Process Total Building Consumption/ Demand Total Process Energy
Elec
Elec
Standard Design Peak (kW) Energy (kWh) Peak (kW) Energy (%)
Energy Type
Electricity Electricity Electricity Natural gas Electricity Electricity Electricity Electricity Electricity Electricity Natural Gas Electricity Electricity Electricity Natural Gas Electricity Electricity Electricity
Energy (kWh)
Proposed Design
Type Energy Use (kWh)
2583,826 2583,826
Standard Design
Energy Use (kWh)
2624,623 2624,623
Percentage Improvement
Energy (%)
1.55% 1.55%
G.9
China
N.A. N.A. N.A., in a separate standard N.A.
Content Credit: M Evans, B Shui, A Delgado, Pacific Northwest National Laboratory (PNNL), USA. This report is primarily based on a series of country reports describing building energy codes in the Asia-Pacific region that the Pacific Northwest National Laboratory prepared with U.S. Department of Energy support under the Asia-Pacific Partnership on Clean Development and Climate. Some countries refer to their building energy regulations as codes and others call them standards. Please see www.energycodes.gov for details. Jens Lausten. 2008. Energy Efficiency Requirements in Building Codes, Energy Efficiency Policies for New Buildings. International Energy Agency, Paris.
H.1
Not all standards and codes cover the same types of buildings either. For example, in India, the Energy Conservation Building Code (ECBC) covers commercial and multi-family residential buildings, but not small residential buildings; this is also true of the standards in Russia, Ukraine, and Kazakhstan, for example. In Japan, there are standards for both residential and commercial buildings, but the buildings must have at least 2,000 square meters of floor space to be covered. Most countries that regulate both commercial and residential construction for energy efficiency have separate standards for each, although countries categorize the buildings differently. In India, Australia, Canada, and the U.S., the codes consider commercial buildings to include multifamily residential buildings, while in China and Japan, the residential standards regulate such multi-family residences. This difference is important because typically the commercial building requirements are somewhat more complex and cover more issues than those for residential buildings. Specific Requirements The actual efficiency requirements for new buildings vary between countries. While it would not be possible to highlight the full range of variation in a summary of this size, a few examples may help to illustrate this point. The table below highlights differences between the requirements for several building components in India, Australia, China and the U.S. Snapshot of Building Energy Efficiency: Maximum U-Factors and Lighting Power Densities in the U.S., China and India [Units: W/(mK) for U-factors] Building Components
Roof Wall Vertical Glass Windows (SHGC) Lighting Power Density (W/m)
U.S.
Miami
0.358 0.642 to 3.293 0.25 10.8
China
Hainan
0.9 1.5 0.35 to 0.60 11
India
New Delhi
0.409 for most buildings; 0.261 for 24-hr buildings 0.44 0.20 to 0.25 10.8
Australia
Darwin
0.313 0.556 0.09 7 or 10
Notes: This table assumes that we are comparing a 10-story commercial office building in similar climate zones in each country. The representative cities used for the comparison are Miami in the U.S., Hainan Province in China, and New Delhi in India. SHGC stands for solar heat gain coefficient and it represents the ratio of solar heat that can penetrate through a window. WWR stands for window to wall ratio. Sources: ASHRAE 90.1-2007, ECBC 2007, Chinas Design Standards for Energy Efficiency of Public Buildings 2005 and the Building Code of Australia 2007. In general, the lower the number represented in this chart, the more efficient the component will be. However, because this chart is looking at one building type in one climate zone, extrapolating these results to a national level requires some care. For example, the U.S. U-factors shown are quite different than the requirements applicable in other U.S. climate zones, where more efficient envelopes are mandatory. Means of Attaining Compliance Building energy standards typically provide property owners with some degree of flexibility in meeting the energy efficiency requirements. This is important because it means that the standard can be more stringent without impinging too severely on the ability of property owners to adapt buildings to their needs. There are several approaches to providing this flexibility. In many countries, including India, the U.S., Canada and Australia, the codes have four classes of requirements. The first are mandatory requirements that must be satisfied regardless of any other factors for a building to be considered in compliance. The majority of these codes are then made of up prescriptive requirements, which are similar to the mandatory requirements in that they provide specific values and details. However, building designers may be allowed to trade-off some of the prescriptive requirements with others regarding the building envelope. The codes then provide rules on what can be traded-off and how. Finally, these codes also provide an option for compliance based on building energy performance instead of the prescriptive requirements. This last option would allow a building designer to install
H.2
less efficient windows but a more efficient air conditioning system if the total designed energy use falls within the required norms. There are several approaches to establishing the baseline for comparison under the building energy performance method. The UK uses a total carbon footprint of the building (called the Carbon Index Rating)6, the U.S. uses the cost as its reference metric, while some other countries define the characteristics of a reference building for the comparison. Korea takes a different approach, establishing mandatory requirements and points for a whole range of energy issues related to buildings. Each new building must have a minimum of 60 points. Buildings that exceed the minimum point requirement may be eligible for certain benefits, such as relaxation of certain zoning rules. Enforcement Systems Enforcement is critical for the standard to have an effect. Not all countries have mandatory building energy standards. India, for example, has a voluntary code. Japans standard is also technically voluntary, although Japan has recently adopted penalties for non-compliance that blur this distinction. The U.S., Canada, and Australia all adopt building standards at the local level. Not all jurisdictions in the U.S. and Canada have adopted their nations model building energy code. Some important issues regarding enforcement and the related impact of the code on energy use include: the point of compliance (design and/or construction stage), how buildings are checked and by whom, penalties and other incentives for compliance, training and information on the code, compliance tools such as code compliance software and inspection checklists, equipment and material testing and ratings. In the U.S., Canada, Australia, and Korea, for example, the building design must be approved and inspectors check the building for compliance at least once during construction. In Japan, parts of Europe, and the former Soviet Union, the checks only occur at the building design stage. China uses a combination of government employees and certified companies to check building designs and inspect the buildings for compliance. There is no single answer as to which system produces the highest level of compliance. For example, Japanese officials believe that Japan attains a high level of compliance in actual construction because Japan has a very well developed system of training and information dissemination on the building energy standards. Studies in the U.S. have shown that there, physical inspections result in much higher compliance rates. The stringency of the national system for testing materials and equipment for their energy efficiency properties can also have a marked impact on the final energy consumption of a building. Most countries have a system of certified laboratories that test materials and equipment (like windows and air conditioners), and rate them for efficiency. These ratings then determine if the equipment in a building meets the building energy standard. Testing procedures vary between countries, and there is anecdotal evidence that even in countries with well established systems, ratings can differ by 10% or more based on the testing procedures. Building energy standard compliance rates vary significantly between countries. What constitutes compliance may also vary, and not all countries consistently publish compliance data. That said, countries usually have lower compliance rates soon after they adopt or revise a standard, and when their enforcement system is not fully developed. Options for India to Consider India has taken a purposeful step toward improved building energy efficiency in adopting the Energy Conservation Building Code. The next step is implementing this code, which could require concerted efforts both at the state and national levels. States would need to decide to adopt the code. The national government could also help with this learning process by requiring that all new government buildings meet the building energy code. For example the national government might provide tools to help states and local jurisdictions with enforcement. India has a well-developed system to enforce other types of building codes, and it might use this system for enforcing the building energy code as well. Building energy inspectors at the local level might need training, and local jurisdictions could hire some staff to handle the additional workload. India could also try to simplify the implementation task by developing code compliance software that allows building developers and inspectors to
6 R.E. Horne et al. 2005. International Comparison of Building Energy Performance Standards. Centre for Design, RMIT University, Melbourne, Australia.
H.3
easily check the building design for compliance. Such software could also be designed to automatically develop inspection checklists. As India gains experience with implementing its code, it might want to modify the code periodically. Many countries have found that establishing a regular timetable for such modifications can allow many stakeholders to have input into the process, which in turn, makes the code more feasible to implement. Indian consumers could benefit from this process as the energy costs in new buildings decline at the same time that the environmental footprint of these buildings grows smaller.
H.4
Appendix I: References
I.1
USAID ECO-III Project International Resources Group AADI Building, Lower Ground Floor 2,Balbir Saxena Marg, Hauz Khas, New Delhi-110016, India Phone: +91-11-4597-4597; Email: [email protected]; Web Site: www.eco3.org