Labour Requirement For Various Building Works
Labour Requirement For Various Building Works
various civil engineering/building/construction works: Recommended S.No. 1) Description of work Excavation over areas (hard/dense soil),depth up to 1.5m and removal (up to one meter from edge) 2) Excavation in trenches (soft/ loose soil),for foundations not exceeding 1.5m in width and for shafts, wells, cesspits and the like, not exceeding 10m3 and on plan, depth up to 1.5m and removal(up to one meter away from edge) 3) Returning, filling and ramming of excavated earth in layers not exceeding 20 cm in depth, watering, well ramming and leveling, lead up to 50m 4) Concrete : Mixing by machine (mixer) at banker, cement concrete (with 20mm graded coarse aggregate) Bhisti Mixer operator 0.07 Mixer 5) Mixer mixed cement concrete M3 mason Labour 0.10 1.63 _ _ _ 0.10 0.07 _ _ M3 Labour Bhisti Labour 0.25 0.02 0.50 _ _ _ M3 Mate 0.02 _ Labour 0.50 _ M3 Mate 0.05 _ Labour 0.62 _ Unit M3 Labour Mate constant in days. 0.06 _ Remarks
_ _ _ _
mixer 0.07 vibrator 6) Reinforced cement concretein situ in foundations, footings, bases for columns, etc excluding form work and reinforcement Labour bhisti mixer operator 0.07 mixer 0.07 vibrator 7) Reinforced cement concretein situ in suspended floors/roofs excluding form work, and reinforcement. Labour bhisti mixer operator 0.07 mixer 0.07 vibrator 8) Mortars : Mixing by hand, cement mortar of any mix/proportions Bhisti 0.07 M3 Labour 0.75 Labour required will be approximately same for _ _ 2.50 0.90 0.07 _ _ _ M3 mason 0.24 _ 2.00 0.90 0.07 M3 mason 0.17 The constants for items include mixing, pouring, consolidating and curing. This does not include fair finish.
different mix proportions. 9) Brick work (straight walls) : Brick work in walls exceeding one brick thick, in cement / lime mortar Labour bhisti 1.80 0.20 M
3
mason
0.94
10)
M2
The constants could be adopted for brick work with any mix or mortar. _ _ _ _ _ _
11)
Formwork : a) fabrication and erection with all supports, struts, braces, etc, and dressing with oil as cleaning of formwork : 1) rectangular column and walls 2) suspended floors/roofs 3) sides and soffits of beam
M3 M
2
M2
12)
Reinforcement: Bar reinforcement including cutting to length, hooked ends, cranking or bending, hoisting and placing in any position, binding wire and holding firmly so as not to be disturbed while placing and ramming of concrete
1.00 1.00
_ _
13)
M2 M
2
mason
0.08
M2
Labour bhisti
0.10 0.10 0.06 0.10 0.10 0.10 0.15 0.10 0.10 0.10 0.01
_ _ _ _ _ _ _ _ _ _ _
b) 15mm thick cement plaster on brick walls (exterior) including mixing of mortar c) Tuck pointing to random rubble masonry in cement mortar including mixing mortar. mason Labour bhisti mason Labour bhisti 14) Damping proof course : a) Laying damp proof course 40mm thick cement concrete including form work and fair finishing to edges and mixing. Labour bhisti M3 Mason