Labour Requirement For Various Building Works

The document provides recommended labor requirements for various construction works including: 1) Excavation, concrete work, reinforced concrete, brickwork, formwork, reinforcement, and plastering/pointing. 2) Labor requirements are specified as the number of workers (masons, laborers, etc.) needed per unit of work along with appropriate constants. 3) The constants aim to cover all typical tasks for each work item but may not include fair finishing in some cases.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (3 votes)
1K views4 pages

Labour Requirement For Various Building Works

The document provides recommended labor requirements for various construction works including: 1) Excavation, concrete work, reinforced concrete, brickwork, formwork, reinforcement, and plastering/pointing. 2) Labor requirements are specified as the number of workers (masons, laborers, etc.) needed per unit of work along with appropriate constants. 3) The constants aim to cover all typical tasks for each work item but may not include fair finishing in some cases.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

LABOUR REQUIREMENT FOR VARIOUS BUILDING WORKS: The table below shows the recommended labour requirement for

various civil engineering/building/construction works: Recommended S.No. 1) Description of work Excavation over areas (hard/dense soil),depth up to 1.5m and removal (up to one meter from edge) 2) Excavation in trenches (soft/ loose soil),for foundations not exceeding 1.5m in width and for shafts, wells, cesspits and the like, not exceeding 10m3 and on plan, depth up to 1.5m and removal(up to one meter away from edge) 3) Returning, filling and ramming of excavated earth in layers not exceeding 20 cm in depth, watering, well ramming and leveling, lead up to 50m 4) Concrete : Mixing by machine (mixer) at banker, cement concrete (with 20mm graded coarse aggregate) Bhisti Mixer operator 0.07 Mixer 5) Mixer mixed cement concrete M3 mason Labour 0.10 1.63 _ _ _ 0.10 0.07 _ _ M3 Labour Bhisti Labour 0.25 0.02 0.50 _ _ _ M3 Mate 0.02 _ Labour 0.50 _ M3 Mate 0.05 _ Labour 0.62 _ Unit M3 Labour Mate constant in days. 0.06 _ Remarks

bhisti mixer operator

0.70 0.07 0.07

_ _ _ _

mixer 0.07 vibrator 6) Reinforced cement concretein situ in foundations, footings, bases for columns, etc excluding form work and reinforcement Labour bhisti mixer operator 0.07 mixer 0.07 vibrator 7) Reinforced cement concretein situ in suspended floors/roofs excluding form work, and reinforcement. Labour bhisti mixer operator 0.07 mixer 0.07 vibrator 8) Mortars : Mixing by hand, cement mortar of any mix/proportions Bhisti 0.07 M3 Labour 0.75 Labour required will be approximately same for _ _ 2.50 0.90 0.07 _ _ _ M3 mason 0.24 _ 2.00 0.90 0.07 M3 mason 0.17 The constants for items include mixing, pouring, consolidating and curing. This does not include fair finish.

different mix proportions. 9) Brick work (straight walls) : Brick work in walls exceeding one brick thick, in cement / lime mortar Labour bhisti 1.80 0.20 M
3

mason

0.94

The constants include labour involved in scaffolding.

10)

Brick work in walls, one brick thick, in cement/lime mortar

M2

mason Labour bhisti

0.25 0.40 0.10

The constants could be adopted for brick work with any mix or mortar. _ _ _ _ _ _

11)

Formwork : a) fabrication and erection with all supports, struts, braces, etc, and dressing with oil as cleaning of formwork : 1) rectangular column and walls 2) suspended floors/roofs 3) sides and soffits of beam

M3 M
2

Carpenter Labour Carpenter Labour Carpenter Labour

0.25 0.20 0.23 0.20 0.30 0.20

M2

12)

Reinforcement: Bar reinforcement including cutting to length, hooked ends, cranking or bending, hoisting and placing in any position, binding wire and holding firmly so as not to be disturbed while placing and ramming of concrete

Quintal Bar bender Labour

1.00 1.00

_ _

13)

Plastering and pointing : a) 15mm thick cement plaster to

M2 M
2

mason

0.08

ceiling including mixing of mortar.

M2

Labour bhisti

0.10 0.10 0.06 0.10 0.10 0.10 0.15 0.10 0.10 0.10 0.01

_ _ _ _ _ _ _ _ _ _ _

b) 15mm thick cement plaster on brick walls (exterior) including mixing of mortar c) Tuck pointing to random rubble masonry in cement mortar including mixing mortar. mason Labour bhisti mason Labour bhisti 14) Damping proof course : a) Laying damp proof course 40mm thick cement concrete including form work and fair finishing to edges and mixing. Labour bhisti M3 Mason