TMP 11 B9
TMP 11 B9
History:
Date
Name
Details
Version
<date>
<name>
<description>
1.0
Table of Contents
1
2.1
2.2
2.3
Design Specifications....................................................................................................................................................... 4
4.1
4.2
4.3
Page 2
1 Project Purpose/Vision
Add a brief description of business requirement, project scope, objectives, problems addressed and final product.
2 Functional Requirements
2.1 Flow Chart - Optional
For a process-based project, show current state of process sequence and intended future state (use alternate colors
within same chart or separate chart) of process and/or user navigation. Standard flow chart shapes may be found in MS
Visio or MS PowerPoint.
Green elements = new components added to process
Red elements = existing components removed from process
Page Name
Page Name
Page Name
Page Name
Page Name
Click Submit
Decision?
NO
Page Name
YES
Click Submit
Manual input
Page Name
Manual input
Optional
procedure
System process
Page Name
New system
process
System process
Page Name
Page 3
4 Design Specifications
4.1 User Interface Changes if applicable
An enumeration of the UI changes required. Add mock-ups as needed to complete the description.
(1) xxxx
(2) xxxx
[MOCK-UP TITLE and MOCK-UP IMAGE]
Page 4
Page 5