Pdms Commands
Pdms Commands
9. Q STEXT
21. BY U 500
22. BY D 500
23. BY E 500
24. BY W 500
25. BY S 500
26. BY N 500
27. Q NAME
28. ROTATE BY 45 (Rotated command) 29. ROT BY 90 ABOUT Z THRO ID@ (Rotated) 30. Q PARA (To check nozzle size) 31. Q CATREF (To See nozzle Rating) 32. Q POS IN WORLD 33. CH CE (check current element) 34. Q SPREF (check piping Spec) 35. Q ORI (To see the orientation) 36. DIR D (Direction Down) U E W N S (For elbow, tee, valve) 37. Q P1/P2/P3 (To see pipe Bore Direction Connection type and Position)
38. Q HBORE 39. Q TBORE 40. Q LBORE 41. NEW BRA COPY PREV BY E/W/S/N/U/D 100 42. Q U (To see the elevation) 43. Q ANGLE (For change the angle) 44. THRO NEXT (To connect element to next component) 45. Q LTLE (To cheek pipe length) 46. Q MEM 47. Q RTEX OF DETREF (To see element type and detail) 48. CONN IDP@ TO IDP Q CE 49. Q PL (For Direction and position) 50. BRA CONN PH TO FIST MEM 51. BRA CONN PT TO NOZZ ID@ 52. BRA CONN PT TO LAST 53. RAD 500 (Control Valve Radius) 54. HEI 500 (Control Valve Height)
55. BACK (Backward) 56. FORW (Forward) 57. For Drain pipe a. ADD ATT (For isometric note) b. Q ATT c. TCONN OPEN d. Q STEXT e. STEXT DRAIN POINT 58. For Slope Line /Rotated Elbow a. FORWARDS (Select in piping components) b. DIR TOW NEXT c. BACKWARDS (Select in piping components) d. DIR TOW NEXT 59. MTOC DOTD (Do not want in bill of material) You can see the Doted DOTD 60. MTOC ON (Want in bill of material) 61. MTOC OFF (Dont Want in bill of material) 62. Q PA BOP/TOP (To see the pipe BOP/TOP)
63. Q LSTUBE (To Change the spec Brake) 64. Q PSPEC (To see the pipe spec) 65. CONN PH TO P3 OF ID@ ( AND SELECT THE PIPE P3) 66. CONN PT TO LAS MEM