100% found this document useful (5 votes)
4K views

Primavera Tutorial

The document is a manual for using Primavera software to schedule and manage projects. It contains 10 chapters that describe how to set up and customize the software, enter project data, define attributes, assign resources and predecessors, generate reports, and use additional features like the resource graph and PERT charting. The chapters cover topics such as starting a new project file, customizing calendar and schedule settings, entering activities, durations and other attributes, linking activities with predecessors, and generating reports to track project progress.

Uploaded by

Viral Soni
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (5 votes)
4K views

Primavera Tutorial

The document is a manual for using Primavera software to schedule and manage projects. It contains 10 chapters that describe how to set up and customize the software, enter project data, define attributes, assign resources and predecessors, generate reports, and use additional features like the resource graph and PERT charting. The chapters cover topics such as starting a new project file, customizing calendar and schedule settings, entering activities, durations and other attributes, linking activities with predecessors, and generating reports to track project progress.

Uploaded by

Viral Soni
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 93

PRIMAVERA

BY – Soni Viral S.
M.Tech CPM, CEPT University, 
Ahmedabad.
[email protected]

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
INDEX
Chapter No.
No Discription
1 Starting  Primavera
2 Before Actual Project
3 Data  Entry
4 Defining Attributes
5 Assigning Attributes
g g
6 Improving Aesthetics
7 Merging Project
8 Filt /  Grouping
Filter /  G i
9 Generating Reports
10 Miscellaneous  features

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
Chapter 1. Starting Primavera

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
1. Starting Primavera

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
2. Creating New File

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
3. Blank File

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
Chapter 2. Before Actual 
Project work

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
2.1. Defining Days per week

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
2.2. Defining Start Date

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
2.3. Customizing Calendar

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
2.3. Customizing Calendar

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
Chapter 3. Data Entry

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
3.1 Activity ID 

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
3.2 Activity Discription

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
3.3 Duration

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
Chapter 4. Defining Attributes

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
4.1 Defining Resources

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
4.1 Defining Resources

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
4.2 Defining Normal/Max limits 
& Price

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
4.3 Defining Responsibility

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
4.3 Defining Responsibility

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
4.4 Defining Area/Department

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
4.4 Defining Area/Department

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
Chapter 5. Assigning Attributes

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
5.1 Assigning Responsibility

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
5.1 Assigning Responsibility

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
5.2 Assigning Area

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
5.2 Assigning Area

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
5.2 Assigning Area

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
5.3 Assigning Resources

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
5.3 Assigning Resources

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
5.3 Assigning Resources

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
5.4 Assigning Predecessor

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
Chapter 6 Improving Aesthetics

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
6.1 Editing Bars

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
6.1 Editing Bars

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
6.1 Editing Bars

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
6.2 Editing Time scale

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
6.2 Editing Time scale

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
6.3 Editing Grid lines

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
6.3 Editing Grid lines

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
6.3 Editing Screen colors

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
6.3 Editing Screen colors

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
6.3 Editing Screen colors

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
6.4 Editing Text

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
6.5 Editing text

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
6.6 Showing Relationship

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
Chapter 7 Merging Project

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
7.1. Create two project in same 
folder

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
7.2. Save n Close host file

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
7.4 Merge a file to host file

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
7.4 Merging to host file 

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
7.4 Merging to Host file

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
7.5 Creating Different Activity 
ID

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
7.5 Opening Host file

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
7.6 Host file after merging

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
7.7 Connecting Host n Merging 
File

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
Chapter 8 Filters / Groups

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
8.1 Filters

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
8.1 Filters 

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
8.1 Filters

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
8.2 Groups

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
8.2 Groups

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
8.2 Groups

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
8.2 Groups

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
Chapter 9 Generating Reports 

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
9.1 Generating Reports

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
9.2 Generating Report

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
9.2 Generating Report

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
9.3 Running Report

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
9.4 Matrix Report

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
9.4 Matrix Report

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
9.4 Matrix Report

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
9.4 Matrix Report

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
9.4 Matrix Report

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
9.4 Matrix Report

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
9.4 Matrix Report

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
9.4 Matrix Report

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
9.5 Running Matrix report

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
Chapter 10. Miscellaneous

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
10.1 Resource graph

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
10.2 PERT

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
10.3 Scheduling

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
10.4 Scheduling

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
10.5 Schedule automaticaly

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
10.6 saving/opening as layout

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
10.6 saving/opening as layout

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
10.7 Opening layout

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
10.8 Copying Project

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
10.8 Copying Project

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad
FILES SUBMITTED

ƒ Main Host file Name‐
M i  H  fil  N CP
CP15
ƒ Path – E:\...\CP1507\cp15
ƒ Merged files‐ blc1,blc2,blc3

Soni Viral S., M.Tech Construction & Project Management, CEPT University, Ahmedabad

You might also like