SAIC-D-2007 Rev 2

This document is a checklist for inspecting the alignment and elevation of equipment such as vertical and horizontal vessels. It lists acceptance criteria and tolerances for items like the location and foundation of the vessel, the alignment of flange faces and bolt holes, the punching and orientation lines, and the levelness and locations of supports. The inspector is to verify that these items meet standards such as SAES-D-001 and process industry practices VEFV1100/1102 by checking if each item passes, fails, or is not applicable. Saudi Aramco and contractor representatives must sign off to verify the inspection and quality of the work.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
361 views4 pages

SAIC-D-2007 Rev 2

This document is a checklist for inspecting the alignment and elevation of equipment such as vertical and horizontal vessels. It lists acceptance criteria and tolerances for items like the location and foundation of the vessel, the alignment of flange faces and bolt holes, the punching and orientation lines, and the levelness and locations of supports. The inspector is to verify that these items meet standards such as SAES-D-001 and process industry practices VEFV1100/1102 by checking if each item passes, fails, or is not applicable. Saudi Aramco and contractor representatives must sign off to verify the inspection and quality of the work.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 4

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - December 2005)

Rev 2 SAIC NUMBER

SAUDI ARAMCO INSPECTION CHECKLIST


Equipment Installation - Alignment & Elevation Check (Vertical & Horizontal Vessels)
PROJECT TITLE

31-Dec-05 DATE APPROVED QR NUMBER

SAIC-D-2007
WBS / BI / JO NUMBER

1-Dec-06

MECH-

CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) LAYOUT DRAWING NUMBER SCHEDULED INSPECTION DATE & TIME SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO INSPECTION LEVEL

EQUIPMENT DESCRIPTION REV. NO. PURCHASE ORDER NUMBER

EQPT CODE

SYSTEM ID.

PLANT NO.

EC / PMCC / MCC NO. QUANTITY INSP. MH's SPENT TRAVEL TIME

ACTUAL INSPECTION DATE & TIME SAUDI ARAMCO ACTIVITY NUMBER CONTRACTOR INSPECTION LEVEL

SAUDI ARAMCO USE ONLY


WORK PERMIT REQUIRED?

ITEM No. A.

ACCEPTANCE CRITERIA

REFERENCE

PASS

FAIL

N/A

RE-INSP DATE

GENERAL REQUIREMENTS: See Note 1 & Attachment 1 (Use PIPs) Vessel location and foundation were verified to conform with the coordinates and elevation in the plan drawing. Alignment of flange face of nozzles shall be within 1/2 degree of the specified plane. (PIP-VEFV1100/1102, Page 1, Note 7) Bolt holes are within 1/8" of the specified location. (PIP-VEFV1100/1102, Page 1, Note 28) VERTICAL VESSELS Vertical centerlines and base line of vertical vessel are punched and circled with paint. (VEFV1100/1102Page 1, Note 25) Orientation line for vertical vessels is based on a directional centerline (e.g.;North, South, etc.) and as referenced on the construction drawings. (VEFV1100/1102, Page 2) Distance of bottom of base support to the base line of vertical vessel shall be within the tolerance of +0 , -1/32" per foot of vessel diameter to a maximum of 1/2". (PIP-VEFV1100/1102, Pg 1, Note 12) Supports are level or are with in the following tolerances: + 1/8" or + 0.02" per foot of vessel diameter, but not to exceed 3/8". (PIP-VEFV1100/1102 Page 1, Note 26) Supports located are within the following tolerances: +0", -1/32" per foot of vessel diameter with max of 1/2". (VEFV1100/1102 Page 1, Note 13) HORIZONTAL VESSELS Orientation line for horizontal vessels is based on the vertical centerline. (PIP-VEFV1100/1102, Page 2) Centerlines (orientation lines) are punch marked and circled with paint. (PIP-VEFV1100/1102, Page 1, Note 25) Supports of horizontal vessel are located within the tolerance of +0", + 1/8" from the horizontal centerlines. (PIP-VEFV1100/1102, Page 1, Note 22) Supports are level or are with in the following tolerances: + 1/8" or + 0.02" per foot of vessel diameter, but not to exceed 3/8". (PIP-VEFV1100/1102, Page 1, Note 26) SAES-D-001, Par. 3.2 SAES-D-001, Par. 3.2 SAES-D-001, Par. 3.2 SAES-D-001, Par. 3.2 SAES-D-001, Par. 3.2

A1

IFC Drawings SAES-D-001, Par. 3.2 SAES-D-001, Par. 3.2

A2

A3

B.

B1

B2

B3

SAES-D-001, Par. 3.2

B4

SAES-D-001, Par. 3.2

B5

SAES-D-001, Par. 3.2

C.

C1

C2

C3

C4

SAES-D-001, Par. 3.2

Page 1 of 4

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - December 2005)

Rev 2 SAIC NUMBER

SAUDI ARAMCO INSPECTION CHECKLIST


Equipment Alignment & Elevation Check
PROJECT TITLE

31-Dec-05 DATE APPROVED QR NUMBER

SAIC-D-2007
WBS / BI / JO NUMBER

1-Dec-06

MECH-

CONTRACTOR / SUBCONTRACTOR

ITEM No. REMARKS:

ACCEPTANCE CRITERIA

REFERENCE

PASS

FAIL

N/A

RE-INSP DATE

NOTES: Use PIPs during Equipment Alignment & Elevation Checks in the field. See Attachment 1. Use PIP VEFV1100. ATTACHMENTS: ATTACHMENT 1 - VEFV1102 - Vessel Tolerances (Elevation) REFERENCE DOCUMENTS: 1- SAES-D-001 -- Design Criteria for Pressure Vessels, 31 December 2001 2- VEFV1100/1102 -- Process Industry Practices (Fabrication/Installation Details), 21 April 1999

Contractor / Third-Party
Construction Representative*
Work is Complete and Ready for Inspection: Name, Initials and Date: Name, Initials and Date:

Saudi Aramco
PMT Representative
T&I Witnessed QC Record Reviewed Work Verified

QC Inspector
Performed Inspection Name, Initials and Date: Work / Rework May Proceed

PID Representative
T&I Witnessed Name, Initials and Date: QC Record Reviewed Work Verified

QC Supervisor
Quality Record Approved: Name, Sign and Date: *Person Responsible for Completion of Quality Work / Test

Proponent and Others


Name, Organization, Initials and Date: T&I Witnessed QC Record Reviewed Work Verified

Y = YES

N = NO F = FAILED

Page 2 of 4

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 2 (Standards Cutoff - December 2005)

REV 2 SAIC NUMBER

SAUDI ARAMCO INSPECTION CHECKLIST


Equipment Alignment & Elevation Check

31-Dec-05 DATE APPROVED QR NUMBER

SAIC-D-2007

1-Dec-06

MECH-

ATTACHMENT 1 - VEFV1102 - Vessel Tolerances (Elevation)