CV.010 DATA CONVERSION REQUIREMENTS AND STRATEGY <Company Long Name> <Subject>
<Author> May 25, 1999 May 28, 1999 <Document Reference Number> DRAFT 1A
Document Control
Change Record
5
Date 25-May99
Author <Author>
Versio n Draft 1a
Reviewers
Name
Position
Distribution
Copy No. 1 2 3 4
Note To Holders: If you receive an electronic copy of this document and print it out, please write your name on the equivalent of the cover page, for document control purposes. If you receive a hard copy of this document, please write your name on the front cover, for document control purposes.
Acceptance Criteria
Contents
Document Control.......................................................................................ii Introduction................................................................................................1 Purpose................................................................................................. 1 Project Deliverables Audience...............................................................2 Benefits................................................................................................. 2 Scope.......................................................................................................... 3 Background........................................................................................... 3 Applications...........................................................................................3 Platforms............................................................................................... 4 Connectivity..........................................................................................5 Tools...................................................................................................... 6 Other Technologies...............................................................................6 Objectives................................................................................................... 7 Objectives............................................................................................. 7 Critical Success Factors.........................................................................7 Approach.................................................................................................... 8 Tasks and Deliverables.........................................................................8 Key Inputs............................................................................................. 9 Constraints and Assumptions................................................................9 Schedule/Critical Milestones...............................................................10 Required Resources............................................................................10 Conversion Team Organization...........................................................10 Roles and Responsibilities...................................................................13 Conversion Resource Requirements...................................................14 Conversion Strategy.................................................................................18 Conversion Approach..........................................................................19 Automated Tools.................................................................................21 Conversion Process Flows.........................................................................22 General Ledger Conversion Process Flow............................................23 Accounts Receivable Conversion Process Flow...................................24 Accounts Payable Conversion Process Flow........................................25 Inventory Conversion Process Flow.....................................................26 Bills of Material Conversion Process Flow............................................27 Work in Process Conversion Process Flow...........................................28 MRP Conversion Process Flow.............................................................29 Engineering Conversion Process Flow.................................................30 Purchasing Conversion Process Flow...................................................31 Order Entry Conversion Process Flow..................................................32 Project Standards......................................................................................33
<Subject> File Ref: 168083273.doc (v. DRAFT 1A ) Company Confidential - For internal use only Acceptance Criteria
Century Date Compliance...................................................................33 Tool Standards....................................................................................33 Deliverable Naming Standards............................................................34 Data Clean-up Process..............................................................................35 Data Clean-up.....................................................................................35 Key Data Translations.........................................................................35 Testing Strategy.......................................................................................36 Acceptance Criteria...................................................................................37 Delivery............................................................................................... 37 Data Acceptance.................................................................................37 Audit/Control.......................................................................................37 Issue Tracking Procedures........................................................................38 Issue Management Procedure.............................................................38 Issue Resolution..................................................................................38 Version Control Procedures.......................................................................39 Change Management................................................................................40 Quality Management................................................................................41 Conversion Requirements.........................................................................42 Business Object Conversion Selection Criteria.........................................48 Open and Closed Issues for this Deliverable.............................................49 Open Issues......................................................................................... 49 Closed Issues.......................................................................................49
Acceptance Criteria
Doc Ref:
Introduction
Purpose
This Data Conversion Requirements and Strategy document defines the requirements, scope, objectives, and strategy for the <Project Name> conversion effort. The Data Conversion Requirements and Strategy document is used as follows: The primary use of this document is to record and communicate the data conversion scope, objectives, approach, and requirements. The conversion team uses this document to communicate the strategy for successfully converting the legacy data to the new Oracle system(s). The conversion team uses this document as a road map for performing the conversion. All members of the team should understand and follow the same strategy. The project manager uses this document to understand how the conversion team plans to perform the conversion, and how the conversion effort may impact the overall project. Distribute and communicate the Data Conversion Requirements and Strategy to the: project manager from the implementation services provider client project manager, who should sign-off on the conversion requirements and strategy conversion team members other process leaders who are responsible for tasks that are prerequisites for conversion tasks, or whose tasks are dependent on output from conversion tasks Use the following criteria to ensure the quality of this deliverable:
Are the project scope and objectives clearly identified? Are specific critical success factors documented? Is the impact of each dependent task from other processes considered? Are the conversion requirements clearly defined, including all legacy applications and business objects? Do the definitions indicate the level of detail and history to be converted? Is a disposition path for every existing business object/data element clearly defined? Is the strategy understood by those on the distribution list for this deliverable?
(v. )
Doc Ref:
Are all assumptions, constraints, and risks that could impact the conversion stated, understood, and mitigated?
Benefits
By following the proven AIM conversion approach, the following benefits can be realized: faster data conversion through defined standards and procedures lower conversion cost leveraged from repetitive use of conversion programs centralized definition and maintenance of conversion practices, designs, and code minimized use of functional and technical resources to repetitively analyze, design, and deploy conversions minimized number of resources to support the conversion tasks
(v. )
Doc Ref:
Scope
This section identifies included and excluded conversion project scope.
Background
Below is a discussion of the following project features: single or multi-site conversion implementation single or multi-phased conversion implementation single or multiple data sources common definition of key data elements across multiple sites unique project/legacy system features Single or Multi-site Conversion Implementation
Common Definition of Key Data Elements Across Multiple Sites Common reference date:
Applications
This project includes conversion of the following application modules to the defined Oracle Application modules:
Acceptance Criteria Company Confidential - For internal use only
(v. )
Doc Ref: Oracle Application Financials General Ledger Payables Purchasing Fixed Assets Distribution Order Entry Receivables Inventory Manufacturing Bills of Material Master Scheduling/MRP Engineering Capacity Work in Process HR/Payroll Project Accounting Sales and Marketing Checkbox Documents Transaction s History
The following data will be converted to a Data Warehouse: The following legacy system applications will not be converted in this project to Oracle Applications:
Platforms
Legacy System The legacy systems currently operate on the following platforms/environment: Hardware/versions: Operating system/versions:
(v. )
Doc Ref:
Software/versions/module/manufacturer: Oracle Applications Target System The Oracle Applications will be running on the following platform/environment:
Connectivity
The following data connectivity/transfer methods are available: Transparent Gateways Procedural Gateways File Transfer Software PC-Based Transfer Tools ODBC Drivers
(v. )
Doc Ref:
Tools
The following automated tools will be available to facilitate the conversion project: Data Management Tools Data Modeling Tools Data Scrubbing Tools Data Transformation Tools Data Mapping Tools Database Utilities
Other Technologies
The following is a list of third party software to be considered in the scope of this conversion project:
File Ref: 168083273.doc (v. ) Acceptance Criteria Company Confidential - For internal use only
Doc Ref:
Objectives
Objectives
The key objectives of the conversion effort follow: Convert legacy and other related enterprise data to the Oracle Application suite of products.
(v. )
Doc Ref:
Approach
Tasks and Deliverables
The major tasks and corresponding deliverables provided in this conversion project are:
Task Define Data Conversion Requirements and Strategy Define Conversion Standards Prepare Conversion Environment Perform Conversion Data Mapping Description Analyze and document the conversion scope, objectives, approach, requirements, and the strategy for how the conversion will be performed. Document the standards that should be followed throughout the conversion effort. Prepare the conversion environment for the development and testing of the conversion programs. Map legacy data files and elements to the Oracle Application table(s) and columns. This map includes an explanation of business, translation, foreign key rules, and default settings. Define procedures for manually converting applicable business objects through Oracle Application forms. Design how the conversion programs should be coded using conventional programming techniques or built using an automated conversion tool. Specify test procedures to be followed for performing conversion unit, business object, and validation tests. Develop conversion programs based on the Conversion Program Design that have been coded or built using an automated conversion tool. Test the performance of each of the individual conversion program modules. Test how the converted data performs within the target application. Test how the converted data performs within the entire suite of target applications. Install the conversion programs that have been coded and tested. If an automated conversion tool is being used, the tool should remain installed until the final conversion is performed Convert data that has been verified by the users before commencement of production operations. Deliverable Data Conversion Requirements and Strategy Conversion Standards Conversion Environment Conversion Data Mapping
Perform Conversion Unit Tests Perform Conversion Business Object Tests Perform Conversion Validation Tests Install Conversion Programs
Unit-Tested Conversion Programs Business Object-Tested Conversion Programs Validation-Tested Conversion Programs Installed Conversion Programs
(v. )
Doc Ref:
Key Inputs
Key inputs to this conversion include: Statement of Work Documents outlining enterprise application and technology architecture strategy, requirements, and constraints Existing and required Business Data Flow Application and module configuration including code table definition, Oracle flexfield and descriptive flexfield definition, thirdparty and custom developed applications key field definitions, etc. Module Design Standards Module Build Standards Existing System Data Model Current Process Model Trained Users for testing Project Management Plan Project Workplan Project Quality Management Strategies, Standards, and Procedures
Resource Availability
(v. )
Doc Ref:
Schedule/Critical Milestones
Oracle and <Company Long Name> will review and approve each project milestone by using the standard acceptance criteria for each task deliverable produced. In addition to the conversion deliverables, the following project milestones have been identified:
Milestone Application Installation Configure Applications Complete legacy data cleanup Phase Operations Analysis Solution Design Transition Current Conversion Milestone Date November 30, 1999 December 10, 1999 March 31, 2000 Actual Conversion Milestone Date TBD TBD TBD
Required Resources
This conversion has the following resource requirements: Project Manager Client Project Manager Business Analyst Application Specialist Technical Analyst for data mapping and design Developer IS Manager Client Staff Member Tester Database Administrator System Administrator User
Doc Ref:
time estimate for conversion of each business object data reconciliation to be done by the users Based on the above criteria, the conversion team can have one or more groups as shown below.
Conversion Lead
Conversion Group 1 This group will be responsible for the following tasks: Conversion Group 2 This group will be responsible for the following tasks: Conversion Group 3 This group will be responsible for the following tasks: Conversion Group 4 This group will be responsible for the following tasks:
File Ref: 168083273.doc (v. ) Acceptance Criteria Company Confidential - For internal use only
Doc Ref:
(v. )
Doc Ref:
Conversi on Group #
Role
Business Analyst Database Administrator Client Staff Member Developer Technical Analyst User Tester System Administrator Applications Specialist
(v. )
Doc Ref:
(v. )
Doc Ref:
Experience/Training Requirements The staff involved with this conversion must have the background, experience, and training in the following areas:
Task ID CV.010 CV.020 CV.030 CV.040 CV.050 CV.060 CV.070 CV.080 CV.090 CV.100 CV.110 CV.120 CV.130 Conversion Task Define Data Conversion Requirements and Strategy Define Conversion Standards Prepare Conversion Environment Perform Conversion Data Mapping Define Manual Conversion Procedures Design Conversion Programs Prepare Conversion Test Plans Develop Conversion Programs Perform Conversion Unit Tests Perform Conversion Business Object Tests Perform Conversion Validation Tests Install Conversion Programs Convert and Verify Data Background/Experience
Below is a list of skills that the current conversion project team does not fulfill: Specialty Tools The risks associated with the skills that the conversion team does not currently have can be mitigated through training, outside resources, or by using specialty tools. Below is a list with descriptions of the specialty tools proposed for use on this conversion project:
Business Constraints This conversion must comply with the following business constraints: Hardware Availability Budget Constraints
Acceptance Criteria Company Confidential - For internal use only
(v. )
Doc Ref:
Legacy System Decommissioning Technical Standards and Architecture The project deliverables will be developed subject to: any governing <Company Short Name> technology platforms strategy and standards decisions made regarding the <Company Short Name> technical architecture plan architectural connectivity issues in linking local environments to the central or consolidation environment the Technical Architecture (TA) deliverables Risks and Contingencies Identified conversion risks include the following: incomplete definition of the conversion process lack of legacy resources to identify, document, and extract legacy data lack of tools to manage/manipulate data lack of understanding of project timelines and milestones poor data quality lack of understanding of required key data translation, clean-up, and transformation criteria lack of reliable mechanism for data transfer The contingency plans that should be put in place for the above risks follow: Project Metrics Key metrics for this conversion project follow: number of platforms: number of conversion business objects to design and build: number of database tables (may not be known):
(v. )
Doc Ref:
number of conversion modules that can be reused: number of source applications to convert from: volume of data to be converted and/or migrated: complexity of the data to be converted and/or migrated: number of legacy data sources: amount of required data cleanup: number of data translations:
(v. )
Doc Ref:
Conversion Strategy
This section provides a graphical description of the conversion approach that will be used to convert the legacy data to the Oracle Applications. An explanation of this strategy follows.
Legacy Systems
E n v i r o n m e n t
Client w/ browser
Client w/ browser
Mainframe
Application Server
Network
Legacy Data
S t o r a g e
Database Server
Application Tables
D a t a
ORACLE Database
P r o c e s s
Data Extract
Data Load
Data Interface
(v. )
Doc Ref:
Conversion Approach
1. Conversion Data Mapping The data mapping process provides detailed lists of the data sets and data elements that will need to be moved into the Oracle tables during the data conversion. During this process, some decisions will need to be made with regard to obtaining information needed by the target application that may not be present in the old system. Default settings, user input, and new data entries are some of the issues that must be addressed during this phase. The output of this activity is data mapping tables that show what is needed for the Oracle target application processing to meet business operational requirements and where these data elements will come from. Based on this mapping, a design of the legacy data extract is defined. 2. Download Programs These programs are used to extract the identified conversion data elements from the current systems in the form of an ASCII flat file. The tool that is used to accomplish this task is usually dependent on the abilities and training of the current system programmers . It is important to remember how the flat file will be structured (the order of the records as they are pulled) , type of delimitation used, number of records, etc. The flat files must match how the interim tables are set up. The output from a download program is an ASCII flat file as described in the next section. 3. ASCII Flat File Most database or file systems output data in text form. A comma or space delimited, variable or fixed format data file from the existing system should be generated. If you cannot find a way to produce clean text data, try generating a report to disk, using a text editor to format your data. One of the outputs of conversion data mapping is to identify the legacy data element data types and precision. After the conversion data mapping is complete, you should know if there are inconsistencies between the legacy data types and the requirements for the Oracle data types. If there are translations that need to take place, these translations can be performed on the legacy system prior to creating the extract or in an interface table. Also, if you are creating a fixed length extract file, you need to take into account the precision level of decimal numbers. 4. Upload Program Once data has been put into an ASCII EBCDIC flat file and physically moved onto the same computer that has the Oracle RDBMS, the next step is to load the data into a relational database environment. Programs must be written and run to move data, validate data, and insert/update standard values into default fields. Usually a single loader program is written for each data table being loaded.
File Ref: 168083273.doc (v. ) Acceptance Criteria Company Confidential - For internal use only
Doc Ref:
5a. Description of Interface Table The detailed technical description of any interface table that the data is placed into from the ASCII flat file is prepared. An interface table that mimics the production table into which the data will eventually be loaded into should be defined. This allows you to manipulate the data as needed before loading the legacy data into the production tables. 5b. Creation of Interface Table Before loading the Oracle Application production tables, the legacy data should first be loaded into temporary or interface tables. The interface tables provide a location for you to manipulate and translate the data as needed before validating the data and loading the application production tables. These temporary interface tables need to be built before you run the loader script to populate these tables. The interface tables may be standard Oracle Application interface tables or may be custom interface tables. 6. Translation Programs These scripts are developed to translate data from the existing system format into useful data for the Oracle target application. An example of this might be taking the date format that exists in the legacy system and converting it into an Oracle format. There may be several or no translation programs, depending on both the type of data coming across and the format of that data. 7. Interface Programs The interface program scripts are used to populate the production database. The purpose of the interface programs is not only to move the data to the target tables but also to validate the data that would be validated by the form in the target application if the data was converted manually. 8. Application Production Table This is the final production data table where the converted data resides. These tables are identified early on when doing the initial data mapping. These tables drive some of the translation programs that must ultimately ensure that 100% of the information that the target applications require is present in the final data structures. 9. Testing This test plan has been integrated into the entire conversion process so that, even during the pre-conversion steps, some type of validation reports are generated from the legacy systems, to be compared later with the converted data. The approach taken is to use as many standard reports as possible that are available in the legacy and target system for the final data validation. If no reports support the validation requirements, then custom scripts will need to be created for specific validation purposes.
(v. )
Doc Ref:
10. Write and Perform Conversion Execution Plan The conversion execution plan is the execution document that is to be followed when performing the actual conversion. This document is specifically tailored for the <Company Short Name> conversion.
Automated Tools
The following steps within the approach described above will be managed using the automated conversion tool described below:
(v. )
Doc Ref:
(v. )
Doc Ref:
Master Data
Transactional Data
GL
GL
Set of Books
Legend:
Standard Interface Custom Interface
Application Module
(v. )
Doc Ref:
Master Data
Transactional Data
GL Set of Books
AR
Debit Memos: Auto Invoice Sales Tax Rate: Sale Tax Rate I/F INV Items: Open Item Interface On Account Credit: Auto Invoice Customers: Customer Interface
Legend:
Standard Interface Custom Interface
Application Module
(v. )
Doc Ref:
Locations
Jobs
Employees
Vendors
Positions
Legend:
Standard Interface Custom Interface
Application Module
(v. )
Doc Ref:
Master Data
INV
Transactional Data
Item Catagories FND Common Lookup Lot Numbers MTL lot number I/F
Legend:
Standard Interface Custom Interface
Application Module
(v. )
Doc Ref:
Master Data
Transactional Data
Legend:
Standard Interface Custom Interface
Application Module
(v. )
Doc Ref:
Master Data
Transactional Data
Create WIP Discrete Jobs Open Jobs / Repetitive Schedule I/F WIP
Reschedule WIP Discrete Jobs Open Jobs / Repetitive Schedule I/F Create Resources Transaction: Open Resource Transaction Interface
INV Items: Open Item Interface Create Repetitive Schedules Open Jobs / Repetitive Schedule I/F
Legend:
Standard Interface Custom Interface
Application Module
(v. )
Doc Ref:
Master Data
Transactional Data
Legend:
Standard Interface Custom Interface
Application Module
(v. )
Doc Ref:
Master Data
BOM
Transactional Data
Legend:
Standard Interface Custom Interface
Application Module
(v. )
Doc Ref:
GL Set of Books
GL Code Combinations: Journal Import PO PER PO Puchase Orders: Custom Consulting Solution Locations
PO Lookups
Jobs
Employees
Positions
Legend:
Standard Interface Custom Interface
Application Module
(v. )
Doc Ref:
GL Set of Books OE
FND
OE
OE
OE
RMA
Legend:
Standard Interface Custom Interface
Application Module
(v. )
Doc Ref:
Project Standards
Century Date Compliance
In the past, two character date coding was an acceptable convention due to perceived costs associated with the additional disk and memory storage requirements of full four character date encoding. As the year 2000 approached, it became evident that a full four character coding scheme was more appropriate. In the context of the Application Implementation Method (AIM), the convention Century Date or C/Date support rather than Year2000 or Y2K support is used. Coding for any future Century Date is now considered the modern business and technical convention. Every applications implementation team needs to consider the impact of the century date on their implementation project. As part of the implementation effort, all customizations, legacy data conversions, and custom interfaces need to be reviewed for Century Date compliance. Programmatically converted legacy data must be translated to the appropriate century date state before being uploaded to the production tables. Manually converted legacy data must be keyed into the data entry forms using 4 digits for the year, where supported.
Tool Standards
A list of tool standards specific to the conversion effort follows: Application Tools
Conversion Tools
Source Control
Version Control
(v. )
Doc Ref:
Program Type Upload Module Download Module Interface Table Creation Module Translation Module Interface/Conversion Module Word Documents Other Project Deliverables
Format
Extensio n
Location/Directory
Example
(v. )
Doc Ref:
(v. )
Doc Ref:
Testing Strategy
The agreed upon conversion deliverables should be approved by the client representatives who are responsible for the success of the conversion. In addition, three levels of conversion testing have been identified and described in the Prepare Conversion Test Plans deliverable (CV.070). The following criteria should be considered while performing business object and conversion validation testing:
Application GL
Test Criteria Record Counts Hash Totals Balances Journal Debits and Credits
(v. )
Doc Ref:
Acceptance Criteria
This conversions acceptance criteria will be measured by the completion and sign-off of key deliverables as specified in the Project Management Plan [PJM.CR.010, initial complete], produced in task PJM.CR.030. For some projects, these deliverables will be subjected to a quality assurance review. Each deliverable in the conversion process will be reviewed and approved by the <Company Short Name> representative. Additionally, each business object conversion may be subject to thirdparty audit requirements.
Delivery
All conversions will be deemed to be delivered following successful business system testing.
Data Acceptance
Conversion data acceptance criteria should include the following: transactability ability to reconcile financial information definition and acceptance of account level variances
Audit/Control
The audit and control requirements that need to be met are listed below:
(v. )
Doc Ref:
Issue Resolution
All conversion issues will be resolved using the project issue resolution process.
(v. )
Doc Ref:
(v. )
Doc Ref:
Change Management
The scope and objectives of this conversion will be strictly controlled using the Oracle Project Management Method (PJM). A detailed discussion of change management is found in the Quality Management Strategies, Standards, and Procedures (PJM.QM.010). Change management should be adopted at the overall project level. Therefore, the conversion should use the same change management guidelines used by each of the other AIM processes. The following change management procedures will be followed: identify scope definition change review the identified scope change with management analyze the impact of the scope change on the schedule and conversion project estimate review the scope change and obtain approval from overall project manager incorporate the scope change into the project workplans and budgets Scope changes may be addressed and formalized for any of the reasons below: delayed delivery of legacy data extracts increased requirements for data-cleanup increased need for data translations between legacy data and target application data delayed receipt of application code delayed change in accounting flexfield structure and segment values
(v. )
Doc Ref:
Quality Management
It is part of the Quality Management Strategies, Standards, and Procedures (PJM.QM.010) scope to determine the governing quality system that will be in effect for its deliverables and to define quality management procedures in detail to satisfy the requirements of the quality system. At a minimum, an independent quality review will be provided to address two fundamentally different aspects of project activities: quality, completeness, and appropriateness of the project deliverables quality, completeness and appropriateness of project management, practices, and procedures The review participants are expected to be designated by both <Company Short Name> and Oracle in accordance with the detailed quality procedures developed by the overall project.
(v. )
Doc Ref:
Conversion Requirements
Disposition Type: M= Manual P= Programmatic A= Archival Business Object Type: R= Reference D= Document T= Transaction H= Historical A= Aggregation/Roll-up Business Ranking: M= Mandatory R= Preferred O= Optional W= Wish List
(1) Application Module (2) Sequence to be Converted (3) Business Object & Business Object Type (4) Business Ranking (5) Disposition Type (6) (7) (8) (9) Comments/Open Issues
Data Frequency: Standard Oracle Open Volumes/ One Time/ Interface Number of Periodic Legacy Sources
GL
1 2 3 4 5 6
Account Valid Values Code Combinations Journal Entries Balances-: Summary Balances: Detail Budgets (v. ) Journal Import Journal Import Journal import Journal Import Budget Upload Acceptance Criteria Company Confidential - For internal use only
Doc Ref: (1) Application Module (2) Sequence to be Converted (3) Business Object & Business Object Type (4) Business Ranking (5) Disposition Type (6) (7) (8) (9) Comments/Open Issues
Data Frequency: Standard Oracle Open Volumes/ One Time/ Interface Number of Periodic Legacy Sources
PO
1 2 3 4 5 6 7 7 8
Employees/ Buyers Vendors Items Purchase Agreements Quotations Requisitions Purchase Orders (Open) Purchase Orders (Closed) Receipts Employees Bank Accounts Vendors Invoices (Open) Invoices (Closed) Payments Prepayments Notes Mass Additions Production Budgets Salespersons Tax Codes & Rates Banks Sales Tax Rates Exchange Rate Adjustments Customers Invoices: Open Invoices: Closed Invoices: Partially paid Commitments Credit Memos (v. ) Sales Tax Rate Interface Mass Additions Interface Production Interface Budget Interface Invoice Import Invoice Import Requisitions Interface Open Item Interface
AP
1 2 2 4 4 5 5 6
FA
1 2 3
AR
1 1 1 1 1 2 3 3 3 3 4
Doc Ref: (1) Application Module (2) Sequence to be Converted (3) Business Object & Business Object Type (4) Business Ranking (5) Disposition Type (6) (7) (8) (9) Comments/Open Issues
Data Frequency: Standard Oracle Open Volumes/ One Time/ Interface Number of Periodic Legacy Sources AutoInvoice AutoInvoice AutoLockbox Open Item Interface
4 4 5 6
Debit Memos On-Account Credit Cash Receipts Invoice Adjustments Items Price Lists Salespersons Tax Locations and Rates Customers Sales Orders (Open) Sales Orders (Closed) Sales Order Notes Return Material Authorization Pick Release Subinventories Locators Items Inventory Receipts Returns and Adjustments Item Revisions Item Replenishment Item Costs Item Demand On-hand Quantities Resources Locations Departments Alternates Bills of Material Routings (v. )
OE
1 1 1 1 2 3 3 4 5 6
INV
1 1 2 3 3 3 3 3 3 3
Open Item Interface Open Transactions Interface Open Transactions Interface Open Replenishment Interface Open Demand Interface Open Transaction Interface
BOM
1 1 1 1 2 3
Bill of Material Interface Routings Interface Acceptance Criteria Company Confidential - For internal use only
Doc Ref: (1) Application Module (2) Sequence to be Converted (3) Business Object & Business Object Type (4) Business Ranking (5) Disposition Type (6) (7) (8) (9) Comments/Open Issues
Data Frequency: Standard Oracle Open Volumes/ One Time/ Interface Number of Periodic Legacy Sources
Employees
2 3 4
Forecasts Master Schedule Entries Master Schedule Relief Employees ECO Departments Engineering Items Eng. Item Revisions Item Cross Reference Engineering Change Notice Eng. Item BOM Eng. Routing Bill of Resources Bill of Resource Sets Resources Material (Serial Numbers & Lot Numbers) WIP Floor Transactions WIP Material Transactions WIP Completion Transactions Discrete Jobs Repetitive Schedules Project Templates Projects Tasks
Open Forecast Interface Open Master Schedule Interface Master Schedule Relief Interface
ENG
1 2 3 4 5 6 7 8
Capacity WIP
1 2 1 2
2 2 2 3 4
Open Resource Transaction Interface Material Transaction Interface/ Serial Number Interface and Lots Interface Open Move Transactions Interface Open Move Transactions Interface Open Move Transactions Interface Open Job and Repetitive Schedule Interface Open Job and Repetitive Schedule Interface
If you are using serial number or lot number control then use the Serial Number and / or Lot Number Interface.
Projects
1 2 3
(v. )
Doc Ref: (1) Application Module (2) Sequence to be Converted (3) Business Object & Business Object Type (4) Business Ranking (5) Disposition Type (6) (7) (8) (9) Comments/Open Issues
Data Frequency: Standard Oracle Open Volumes/ One Time/ Interface Number of Periodic Legacy Sources
4 5 6 7 8 9
Budgets Agreements Funding Expenditures Revenue Invoices Locations Organizations Jobs Grades Positions Employees Positions Pay Elements Pay Elements History Deductions Deductions History Sales Force
HR/Payroll
1 2 3 4 5 6 7 8 9 10 11
Companies Company Contacts Events Event Facilities Collateral Advertisements Sales Territories Action Items Marketing Programs Mail or Call Scripts Letters Forecasts
Product Literature
(v. )
Doc Ref:
(v. )
Doc Ref:
(v. )
Doc Ref:
ID
Issue
Resolution
Responsibility
Target Date
Impact Date
Closed Issues
ID
Issue
Resolution
Responsibility
Target Date
Impact Date
(v. )