Calculation
Calculation
Date
Made By
SKS
Checked By
PSK
Rev. No.
Approved By
SAK
Drg. Ref.
INDEX
DESCRIPTION
PAGE NO.
1.0 INTRODUCTION
1 - 2
3 - 8
LOAD CALCULATION
10 - 12
3.2
STAAD ANALYSIS
13 - 22
3.3
23 - 25
3.4
SETTLEMENT CHECK
26 - 27
3.5
28 - 37
3.6
38 - 47
3.7
48 - 57
LOAD CALCULATION
59 - 61
4.2
62 - 71
4.3
72 - 74
4.4
SETTLEMENT CHECK
75 - 76
4.5
77 - 86
4.6
RC WALL DESIGN
87 - 96
LOAD CALCULATION
98 - 99
100 - 103
104 - 109
110 - 115
116 - 120
121 - 122
123 - 127
Page 1
INTRODUCTION
Page 2
Project
33/11kV Package Unit Substation in Sir Baniyas
ADDC
Client
Main
RANYA CONTRACTING ESTABLISHMENT
DERBY DESIGN Contractor
Structure
33/11 KV Package Unit Substation
Abu Dhabi
Date
Made By
SKS
Checked By
PSK
Rev. No.
Approved By
SAK
Drg. Ref.
INTRODUCTION
This Document covers the structural analysis and design calculations for 33/11kV Package unit,
15/20 Mva Power Transformer and 100 kva Auxiliary Transformer. The foundations has been
designed for all possible loadings including earth pressure, surcharge pressure, wind loads and their
combinations.
Page 3
Page:
Made by:
Date:
Ref No:
Office:
Page 4
1
SKS
21.04.2011
1328
Kb=2
ho=0.1 m
lh=LOG(H/ho)/LOG(10)
=LOG(3.8/0.1)/LOG(10)
=1.58
Dynamic Augmentation Factor
Cr=(Kb*(H/ho)^0.75)/800/lh
=(2*(3.8/0.1)^0.75)/800/1.58
=0.02422
Since Dynamic Augmentation Factor Cr is less than or equal to 0.25
then this structure is not dynamic.
Standard wind loads.
Basic wind speed
Vb=25 m/sec
Structure is not located at the crest of a hill or escarpment and the
topography is not significant.
Site altitude above mean sea level deltaS=10 m
Altitude factor
Sa=1+0.001*deltaS
=1+0.001*10
=1.01
Direction factor
Sd=1
The building is permanent or exposed to the wind for a continuous
period of more than 6 months.
Seasonal factor
Ss=1.0
The basic wind speed has an annual risk of being exceeded of Q=0.02
Probability factor
Sp=1
Since site is in the country with the closest distance to the sea
being 10 Km, then
From Table 4 Terrain & building factor Sb=1.482
Site wind speed @ height He
Vs=Vb*Sa*Sd*Ss*Sp
=25*1.01*1*1*1
=25.25 m/sec
DESIGN
SUMMARY
Page:
Made by:
Date:
Ref No:
2
Page 5
SKS
28.02.11
Office: 1328
Ve=Vs*Sb=25.25*1.482=37.42 m/sec
qs=0.613*Ve^2/1000
=0.613*37.42^2/1000
=0.8584 kN/m 2
Effective height
Altitude factor
Sa
Direction factor
Sd
Seasonal factor
Ss
Probability factor
Sp
Dynamic wind pressure
3.8 m
1.01
1
1
1
qs 0.8584 kN/m 2
No702
Page 6
Date
25-Apr-11
ADDC
Made
SKS
Checked
PSK
Rev. No.
Approved
SAK
33/11kV SWITCHGEAR
Rev.Date
Page
Project
Client
Main
contractor
DERBY DESIGN Structure
Wind Load
kN/m2
m
m
m
=
=
=
=
1.25
8.45
10.5
3.8
=
=
10.5 m
3.8 m
D =
H =
D/H =
8.45 m
3.8 m
2.22
Fig 12 BS-6399-2
=
=
=
= +0.2 or -0.3
0.6
0.85
-0.5
(pressure)
(pressure)
(suction)
Wind
+Z
Wind
0.2
0.85
0.3
0.3
0.5
0.85
0.2
Wind-ward side
Net pressure
Therefore max wind pressure coefficient
on wind-ward side
Max wind pressure on wind-ward side
Lee-ward side
Net pressure
= 0.85 + 0.3
= 1.15
= 1.15
Case-2
Net pressure
= 0.85-0.2
= 0.65
Net pressure
= 0.2 + 0.5
= 0.70
= 1.15 x 1.25
=
1.438 kN/m2
= 0.5 - 0.3
= 0.20
= 0.70
= 0.7 x 1.25
=
0.88 kN/m2
0.5
Page 7
Date
25-Apr-11
Page
ADDC
Made
SKS
Checked
PSK
Rev. No.
Approved
SAK
33/11kV SWITCHGEAR
Rev.Date
Project
Client
Main
contractor
DERBY DESIGN Structure
+Z
Wind
Wind
0.2
0.5
0.3
0.3
0.85
0.5
0.2
Case-1
Wind-ward side
Net pressure
Therefore max wind pressure coefficient
Max wind pressure on wind-ward side
Lee-ward side
Net pressure
Therefore max wind pressure coefficient
Max wind pressure
Case-2
=
=
=
=
=
0.85+0.3
1.15
1.15
1.15 x 1.25
1.438 kN/m2
Net pressure
= 0.85-0.2
= 0.650
=
=
=
=
=
0.5-0.3
0.20
0.70
0.7 x 1.25
0.88 kN/m2
Net pressure
= 0.5+0.2
= 0.70
Fig 12 BS-6399-2
=
=
8.45 m
3.8 m
D =
H =
D/H =
10.5 m
3.8 m
2.76
=
=
0.85
-0.5
(pressure)
(suction)
= +0.2 or -0.3
+Z
0.5
0.5
0.3
0.2
0.3
0.2
0.85
0.85
0.85
Page 8
Date
25-Apr-11
Page
ADDC
Made
SKS
Checked
PSK
Rev. No.
Approved
SAK
33/11kV SWITCHGEAR
Rev.Date
Project
Client
Main
contractor
DERBY DESIGN Structure
Wind-ward side
Net pressure
Case-1
= 0.85+0.3
= 1.15
= 1.15
= 1.15 x 1.25
=
1.438 kN/m2
Lee-ward side
Net pressure
= 0.5-0.3
= 0.20
= 0.70
= 0.7 x 1.25
=
0.875 kN/m2
Net pressure
Case-2
= 0.85-0.2
= 0.65
Net pressure
= 0.2+0.5
= 0.70
+Z
0.85
0.85
0.3
0.2
0.3
0.2
0.5
0.5
Wind-ward side
Net pressure
Case-1
= 0.85+0.3
= 1.15
= 1.15
= 1.15 x 1.25
=
1.438 kN/m2
Lee-ward side
Net pressure
= 0.5-0.3
= 0.20
= 0.70
= 0.7 x 1.25
=
0.875 kN/m2
Net pressure
Case-2
= 0.85-0.2
= 0.65
Net pressure
= 0.2+0.5
= 0.70
Page 9
33/11kV SWITCHGEAR
Page 10
LOAD CALCULATION
DERBY DESIGN
25-Apr
Page 11
Project:
Date
Client:
ADDC
Page
Design
SKS
Checked
PSK
Main
contractor:
Rev No.
Approved
SAK
Structure:
33/11KV SWITCHGEAR
Rev Date
LOAD CALCULATION
a) DEAD LOAD
Dead Loads are considerd by the program itself.
b) LIVE LOAD
Load of equipment (160+140+90kN = 390 KN, Say = 400 KN) is applied on top of wall as a UDL
(See Attached Input)
2.703 kN Each node
400 / 148 Nodes
=
c) EARTH PRESSURE
Earth Pressure due to Soil
18.9
kN/m2
0.5 x 18 x 2.1
0.5 x 33.33
= 16.67 kN/m2
=
=
=
=
=
2.5 x Ca x I x W / R
2.5 x 0.12x1 x W /5.5
0.0545 W
400 x 0.0545 / 148
0.147 kN Each node
=
=
=
=
=
=
=
=
=
=
=
=
13.47 / 24
0.56 kN
46.17 / 24
1.92 kN
=
=
28.26 / 24
1.18 kN
d) SURCHARGE PRESSURE
Surcharge pressure from SLW60 loading
e) SEISMIC LOAD
Seismic Loads to UBC 1997
Maximum base Shear, Vmax
f) WIND LOAD
Wind load on X-direction
Load on windward direction
Load on leeward direction
Moment
Vertical push/pull due to the moment
Page 12
=
=
=
=
=
=
=
=
=
=
=
=
20.79 / 30
0.69 kN
57.38 / 30
1.91 kN
=
=
35.11 / 30
1.17 kN
=
=
(46.17+28.26) x (3.8/2+2.4)
320.05 kNm
=
=
(8.75x10.8x0.35x25)+(2x10.5x0.25x2.25x25)+
(4x8.45x0.25x2.25x25)
1597.5 kN
Resisting Moment
=
=
1597.5 x 10.50 / 2
8387 kNm
Factor of safety
=
=
8387 / 320.05
26.2
>
1.5
Hence Safe
Overturning Moment
=
=
(57.38+35.11) x (3.8/2+2.4)
397.71 kNm
1597.5 kN
Resisting Moment
=
=
1597.5 x 8.45 / 2
6750 kNm
Factor of safety
=
=
6750 / 397.71
16.97
>
Hence Safe
1.5
Page 13
STAAD ANALYSIS
Page 14
Job Title
Job No
Part 33/11kV
ADDC
Rev
SWITCHGEAR
Ref
By
Client
Sheet No
File
SKS
33kv.std
Date19
Jan-11
Date/Time
Chd
PSK
21-Apr-2011 16:14
Y
X
Z
Print Run 1 of 4
Page 15
Job Title
Job No
Part 33/11kV
ADDC
Rev
SWITCHGEAR
Ref
By
Client
Sheet No
File
SKS
33kv.std
Date19
Chd
Jan-11
Date/Time
PSK
21-Apr-2011 16:14
Y
X
Z
Load 2
LIVE LOAD
Print Run 2 of 4
Page 16
Job Title
Job No
Part 33/11kV
ADDC
Rev
SWITCHGEAR
Ref
By
Client
Sheet No
File
SKS
33kv.std
Date19
Chd
Jan-11
Date/Time
PSK
21-Apr-2011 16:14
Y
X
Z
Load 3
EARTH PRESSURE
Y
X
Z
Load 4
SURCHARGE PRESSURE
Print Run 3 of 4
Page 17
Job Title
Job No
Part 33/11kV
ADDC
Rev
SWITCHGEAR
Ref
By
Client
Sheet No
File
SKS
33kv.std
Date19
Chd
Jan-11
Date/Time
PSK
21-Apr-2011 16:14
Y
X
Z
Load 5
Y
X
Z
Load 7
Print Run 4 of 4
Page 1 of 13
1. STAAD SPACE
INPUT FILE: 33kv.STD
2. START JOB INFORMATION
3. JOB NAME 33/11KV PACKAGE UNIT SUBSTATION IN SIR BANIYAS
4. JOB CLIENT ADDC
5. JOB PART 33/11KV SWITCHGEAR
6. JOB REV 0
7. ENGINEER NAME SKS
8. CHECKER NAME PSK
9. APPROVED NAME SAK
10. ENGINEER DATE 19 JAN-11
11. END JOB INFORMATION
12. INPUT WIDTH 79
13. SET ECHO OFF
1246. START GROUP DEFINITION
1247. ELEMENT
1248. _BASESLAB 1 TO 70 155 TO 416 429 TO 529 608 TO 841 2205 TO 2312
1249. _WALL 842 TO 897 912 TO 939 954 TO 961 964 TO 967 970 TO 1021 1035 TO 1060 1250. 1074 TO 1125 1139 TO 1164 1178 TO 1185 1188 TO 1191 1194 TO 1249 1251. 1264 TO 1291 1306 TO 1310 1317 TO 1339 1346 TO 1368 1375 TO 1397 1252. 1404 TO 1421 1451 TO 1455 1462 TO 1484 1491 TO 1508 1538 TO 1555 1253. 1562 TO 1584 1591 TO 1613 1620 TO 1642 1649 TO 1653 1683 TO 1700 1254. 1707 TO 1729 1736 TO 1740 1770 TO 1787 1794 TO 1816 1823 TO 1845 1255. 1852 TO 1874 1881 TO 1885 1915 TO 1932 1939 TO 1961 1968 TO 1972 1256. 2002 TO 2019 2026 TO 2048 2055 TO 2077 2084 TO 2106 2113 TO 2117 1257. 2147 TO 2164 2171 TO 2193 2200 TO 2204
1258. END GROUP DEFINITION
1259. ELEMENT PROPERTY
1260. 1 TO 70 155 TO 416 429 TO 529 608 TO 841 2205 TO 2312 THICKNESS 0.35
1261. 842 TO 897 912 TO 939 954 TO 961 964 TO 967 970 TO 1021 1035 TO 1060 1074 1262. 1075 TO 1125 1139 TO 1164 1178 TO 1185 1188 TO 1191 1194 TO 1249 1264 TO 1291 1263. 1306 TO 1310 1317 TO 1339 1346 TO 1368 1375 TO 1397 1404 TO 1421 1264. 1451 TO 1455 1462 TO 1484 1491 TO 1508 1538 TO 1555 1562 TO 1584 1265. 1591 TO 1613 1620 TO 1642 1649 TO 1653 1683 TO 1700 1707 TO 1729 1266. 1736 TO 1740 1770 TO 1787 1794 TO 1816 1823 TO 1845 1852 TO 1874 1267. 1881 TO 1885 1915 TO 1932 1939 TO 1961 1968 TO 1972 2002 TO 2019 1268. 2026 TO 2048 2055 TO 2077 2084 TO 2106 2113 TO 2117 2147 TO 2164 1269. 2171 TO 2193 2200 TO 2204 THICKNESS 0.25
1270. DEFINE MATERIAL START
1271. ISOTROPIC CONCRETE
1272. E 2.7E+007
****************************************************
*
*
*
STAAD.Pro
*
*
Version 2005
Bld 1001.US
*
*
Proprietary Program of
*
*
Research Engineers, Intl.
*
*
Date=
APR 21, 2011
*
*
Time=
16:15:28
*
*
*
*
USER ID: [ LZ0 + LND ]
*
****************************************************
PAGE NO.
-- PAGE NO.
POISSON 0.2
DENSITY 25
ALPHA 1E-005
DAMP 0.05
END DEFINE MATERIAL
CONSTANTS
MATERIAL CONCRETE MEMB 1 TO 70 155 TO 416 429 TO 529 608 TO 897 912 TO 939 954 TO 961 964 TO 967 970 TO 1021 1035 TO 1060 1074 TO 1125 1139 TO 1164 1178 TO 1185 1188 TO 1191 1194 TO 1249 1264 TO 1291 1306 TO 1310 1317 TO 1339 1346 TO 1368 1375 TO 1397 1404 TO 1421 1451 TO 1455 1462 TO 1484 1491 TO 1508 1538 TO 1555 1562 TO 1584 1591 TO 1613 1620 TO 1642 1649 TO 1653 1683 TO 1700 1707 TO 1729 1736 TO 1740 1770 TO 1787 1794 TO 1816 1823 TO 1845 1852 TO 1874 1881 TO 1885 1915 TO 1932 1939 TO 1961 1968 TO 1972 2002 TO 2019 2026 TO 2048 2055 TO 2077 2084 TO 2106 2113 TO 2117 2147 TO 2164 2171 TO 2193 2200 TO 2312
SUPPORTS
*SUBGRADE FROM SOIL REPORT = 8000 KN/M^3
1 TO 70 155 TO 416 429 TO 529 608 TO 841 2205 TO 2311 2312 PLATE MAT DIRECT Y SUBGRADE 10800
LOAD 1 DL
SELFWEIGHT Y -1
LOAD 2 LL
**LOAD OF EQUIPMENT (400KN) IS APPLIED ON TOP OF WALL AS UDL
*400/148 NODES = 2.702KN EACH
JOINT LOAD
999 TO 1013 1039 1040 1120 TO 1132 1229 TO 1242 1267 1268 1354 TO 1367 1549 1550 TO 1553 1560 TO 1576 1773 TO 1790 1797 TO 1800 1997 TO 2014 2021 TO 2024 2221 TO 2238 2245 TO 2248 FY -2.703
LOAD 3 EARTHPRESSURE
ELEMENT LOAD
*CONSIDER EARTH PRESSURE AT REST DUE TO SOIL.
*=0.50X20X2.1=21.0KN/M^2
842 TO 855 954 955 970 TO 982 1074 TO 1086 1178 1179 1194 TO 1207 1306 TO 1310 1317 TO 1334 1538 TO 1555 1562 TO 1566 TRAP Y 18.9 14.94
856 TO 869 956 957 983 TO 995 1087 TO 1099 1180 1181 1208 TO 1221 1335 TO 1339 1346 TO 1363 1567 TO 1584 1591 TO 1595 TRAP Y 14.94 10.98
870 TO 883 958 959 996 TO 1008 1100 TO 1112 1182 1183 1222 TO 1235 1364 TO 1368 1375 TO 1392 1596 TO 1613 1620 TO 1624 TRAP Y 10.98 7.11
884 TO 897 960 961 1009 TO 1021 1113 TO 1125 1184 1185 1236 TO 1249 1393 TO 1397 1404 TO 1421 1625 TO 1642 1649 TO 1653 TRAP Y 7.11 3.15
912 TO 925 964 965 1035 TO 1047 1139 TO 1151 1188 1189 1264 TO 1277 1451 TO 1455 1462 TO 1479 1683 TO 1700 1707 TO 1711 TRAP Y 3.15 0.01
*************************************
LOAD 4 SURCHARGE PRESSURE
ELEMENT LOAD
*SURCHARGE PRESSURE DUE TO SLW60 WHEEL LOADS
*0.5*33.333=16.667KN/M^2
1306 TO 1310 1317 TO 1339 1346 TO 1368 1375 TO 1397 1404 TO 1421 1451 TO 1455 1462 TO 1479 PR 16.67
1538 TO 1555 1562 TO 1584 1591 TO 1613 1620 TO 1642 1649 TO 1653 1683 TO 1700 1707 TO 1711 PR 16.67
1074 TO 1125 1139 TO 1151 1178 TO 1185 1188 1189 1194 TO 1249 1264 TO 1276 1277 PR 16.67
842 TO 897 912 TO 925 954 TO 961 964 965 970 TO 1021 1035 TO 1047 PR 16.67
LOAD 5 WL+ X
1273.
1274.
1275.
1276.
1277.
1278.
1279.
1280.
1281.
1282.
1283.
1284.
1285.
1286.
1287.
1288.
1289.
1290.
1291.
1292.
1293.
1294.
1295.
1296.
1297.
1298.
1299.
1300.
1301.
1302.
1303.
1304.
1305.
1306.
1307.
1308.
1309.
1310.
1311.
1312.
1313.
1314.
1315.
1316.
1317.
1318.
1319.
1320.
1321.
1322.
1323.
1324.
1325.
1326.
1327.
1328.
STAAD SPACE
Page 2 of 13
Page 18
-- PAGE NO.
JOINT LOAD
1000 1367 1549 TO 1553 1560 TO 1576 FX 1.92
1132 1230 1773 TO 1790 1797 TO 1800 FX 1.18
1000 1367 1549 TO 1553 1560 TO 1576 FY 0.56
1132 1230 1773 TO 1790 1797 TO 1800 FY -0.56
*CONSIDER A WIND LOAD OF 1.25KN/M^2 ON A CONSERVATIVE SIDE.
*TOTAL WIND ON CONTAINER=1.25X10.45X8.45=110.38KN
*LOAD ON EACH NODE=110.38/148 NODES = 0.745KN EACH
LOAD 6 WL- X
JOINT LOAD
1132 1230 1773 TO 1790 1797 TO 1800 FX -1.92
1000 1367 1549 TO 1553 1560 TO 1576 FX -1.18
1132 1230 1773 TO 1790 1797 TO 1800 FY 0.56
1000 1367 1549 TO 1553 1560 TO 1576 FY -0.56
LOAD 7 WL +Z
JOINT LOAD
999 TO 1013 1039 1040 1120 TO 1132 FZ 1.91
1229 TO 1242 1267 1268 1354 TO 1367 FZ 1.17
999 TO 1013 1039 1040 1120 TO 1132 FY 0.69
1229 TO 1242 1267 1268 1354 TO 1367 FY -0.69
LOAD 8 WL -Z
JOINT LOAD
1229 TO 1242 1267 1268 1354 TO 1367 FZ -1.91
999 TO 1013 1039 1040 1120 TO 1132 FZ -1.17
1229 TO 1242 1267 1268 1354 TO 1367 FY 0.69
999 TO 1013 1039 1040 1120 TO 1132 FY -0.69
******************************************************************
*LOAD COMBINATIONS
******************
*SERVICE LOAD COMBINATIONS
*
LOAD COMB 10 1.0DL+1.0LL
1 1.0 2 1.0
LOAD COMB 11 1.0DL+1.0LL+1.0EP
1 1.0 2 1.0 3 1.0
LOAD COMB 12 1.0DL+1.0LL+1.0EP+1.0SP
1 1.0 2 1.0 3 1.0 4 1.0
*
LOAD COMB 13 1.0DL+1.0LL+1.0EP+1.0WL+X
1 1.0 2 1.0 3 1.0 5 1.0
LOAD COMB 14 1.0DL+1.0LL+1.0EP+1.0WL-X
1 1.0 2 1.0 3 1.0 5 -1.0
LOAD COMB 15 1.0DL+1.0LL+1.0EP+1.0WL+Z
1 1.0 2 1.0 3 1.0 6 1.0
LOAD COMB 16 1.0DL+1.0LL+1.0EP+1.0WL-Z
1 1.0 2 1.0 3 1.0 6 -1.0
*
LOAD COMB 17 1.0DL+1.0LL+1.0EP+1.0SP+1.0WL+X
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0
LOAD COMB 18 1.0DL+1.0LL+1.0EP+1.0SP+1.0WL-X
1 1.0 2 1.0 3 1.0 4 1.0 5 -1.0
LOAD COMB 19 1.0DL+1.0LL+1.0EP+1.0SP+1.0WL+Z
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0
LOAD COMB 20 1.0DL+1.0LL+1.0EP+1.0SP+1.0WL-Z
1 1.0 2 1.0 3 1.0 4 1.0 6 -1.0
*************************************************
1329.
1330.
1331.
1332.
1333.
1334.
1335.
1336.
1337.
1338.
1339.
1340.
1341.
1342.
1343.
1344.
1345.
1346.
1347.
1348.
1349.
1350.
1351.
1352.
1353.
1354.
1355.
1356.
1357.
1358.
1359.
1360.
1361.
1362.
1363.
1364.
1365.
1366.
1367.
1368.
1369.
1370.
1371.
1372.
1373.
1374.
1375.
1376.
1377.
1378.
1379.
1380.
1381.
1382.
1383.
1384.
STAAD SPACE
Page 3 of 13
1385.
1386.
1387.
1388.
1389.
1390.
1391.
1392.
1393.
1394.
1395.
1396.
1397.
1398.
1399.
1400.
1401.
1402.
1403.
1404.
1405.
1406.
1407.
1408.
1409.
1410.
1411.
1412.
1413.
1414.
1415.
1416.
1417.
1418.
1419.
1420.
1421.
1422.
1423.
1424.
1425.
1426.
1427.
1428.
STAAD SPACE
-- PAGE NO.
Page 4 of 13
Page 19
-- PAGE NO.
P R O B L E M
S T A T I S T I C S
-----------------------------------
STAAD SPACE
Page 5 of 13
( KN
METE ) SUMMARY (LOADING
=
0.00
=
-1693.00
=
0.00
1)
8925.88
1 )
-8925.88
1 )
( KN
=
=
=
2 )
2135.83
2 )
-2135.83
-- PAGE NO.
STAAD SPACE
Page 6 of 13
Page 20
2)
( KN
=
=
=
3)
0.00
3 )
0.00
3 )
( KN
=
=
=
0.00
4 )
-- PAGE NO.
STAAD SPACE
Page 7 of 13
4)
0.00
4 )
( KN
=
=
=
5)
174.96
5 )
-174.96
5 )
-- PAGE NO.
STAAD SPACE
Page 8 of 13
Page 21
( KN
=
=
=
6)
-174.96
6 )
174.96
6 )
( KN
=
=
=
0.00
7 )
0.00
7 )
-- PAGE NO.
STAAD SPACE
Page 9 of 13
7)
( KN
=
=
=
8)
0.00
8 )
0.00
8 )
1429. FINISH
-- PAGE NO.
STAAD SPACE
10
Page 10 of 13
Page 22
Page 23
Page 24
Job Title
Job No
Part 33/11kV
Rev
SWITCHGEAR
Ref
By
Client
Sheet No
File
ADDC
SKS
33kv.std
Date19
Jan-11
Date/Time
Chd
PSK
21-Apr-2011 16:14
L/C
FX
FY
FZ
(kN/m2)
(kN/m2)
(kN/m2)
Max FX
10:1.0DL+1.0LL
0.000
23.213
0.000
Min FX
10:1.0DL+1.0LL
23.213
0.000
Max FY
2315
16:1.0DL+1.0LL
0.000
0.000
26.414
0.000
Min FY
2261
17:1.0DL+1.0LL
0.000
0.000
Max FZ
10:1.0DL+1.0LL
0.000
18.334
23.213
Min FZ
10:1.0DL+1.0LL
0.000
23.213
0.000
0.000
Print Run 1 of 1
Page 25
Job Title
Job No
Part 33/11kV
SWITCHGEAR
Ref
File
ADDC
Rev
By
Client
Sheet No
SKS
33kv.std
Date19
Jan-11
Date/Time
Chd
PSK
21-Apr-2011 16:14
Base Pressure
Y
kN/m2
<= 18.9
19.4
19.8
20.3
20.8
21.2
21.7
22.2
22.6
23.1
23.6
24.1
24.5
25
25.5
25.9
>= 26.4
Load 16
BASE PRESSURE
Print Run 1 of 1
Page 26
SETTLEMENT CHECK
Page 27
Job Title
Job No
Part 33/11kV
Rev
SWITCHGEAR
Ref
By
Client
Sheet No
File
ADDC
Date19
SKS
Jan-11
Date/Time
33kv.std
Chd
PSK
21-Apr-2011 16:14
L/C
Resultant
rX
rY
rZ
(mm)
(mm)
(mm)
(mm)
(rad)
(rad)
(rad)
Max X
1566
17:1.0DL+1.0LL
2.242
-1.782
-0.000
2.864
-0.000
0.000
Min X
1783
19:1.0DL+1.0LL
-1.887
-0.000
2.919
-0.000
-0.000
0.001
Max Y
2260
17:1.0DL+1.0LL
-2.227
0.000
-1.698
-0.000
1.698
0.000
-0.000
-0.000
-0.000
-0.001
Min Y
2315
16:1.0DL+1.0LL
-0.000
2.446
0.000
-0.000
1006
18:1.0DL+1.0LL
-0.057
-2.446
-2.170
-0.000
Max Z
0.510
2.230
0.000
-0.000
0.000
Min Z
1360
18:1.0DL+1.0LL
-0.057
-2.170
2.230
-0.000
0.000
0.000
Max rX
931
18:1.0DL+1.0LL
-0.018
-2.167
-0.510
0.153
2.173
0.000
-0.000
0.000
Min rX
1290
18:1.0DL+1.0LL
-0.018
-2.167
-0.153
2.173
0.000
0.000
Max rY
1798
19:1.0DL+1.0LL
-0.756
-1.896
-0.000
2.041
-0.000
0.000
0.001
0.000
Min rY
1775
19:1.0DL+1.0LL
-0.756
-1.896
0.000
2.041
-0.000
0.000
Max rZ
1783
19:1.0DL+1.0LL
-2.227
-1.887
-0.000
2.919
-0.000
-0.001
-0.000
Min rZ
1565
17:1.0DL+1.0LL
2.242
-1.782
0.000
2.864
0.000
-0.000
Max Rst
1783
19:1.0DL+1.0LL
-2.227
-1.887
-0.000
2.919
-0.000
-0.000
-0.001
0.001
0.001
Allowable settlement = 25 mm
Maximum support settlement from staad = 2.446 mm
As 2.446 mm < 25 mm
Hence Safe
Print Run 1 of 1
Page 28
Page 29
Job Title
Job No
Part 33/11kV
Rev
SWITCHGEAR
Ref
By
Client
Sheet No
File
ADDC
Date19
SKS
Chd
Jan-11
Date/Time
33kv.std
PSK
21-Apr-2011 16:14
L/C
Qx
Qy
Sx
Membrane
Sy
Sxy
Mx
Bending
My
Mxy
(N/mm2)
(N/mm2)
(N/mm2)
(N/mm2)
(N/mm2)
(kNm/m)
(kNm/m)
(kNm/m)
Max Qx
239
68:1.4DL+1.4E
0.154
0.000
-0.000
-0.000
0.000
-49.828
-9.611
-0.000
Min Qx
698
68:1.4DL+1.4E
0.000
-0.000
-0.000
-0.000
-49.242
-9.528
-0.000
0.122
-0.000
-0.000
0.000
-5.522
-28.530
-0.752
-0.122
0.000
-0.000
-0.000
-0.000
-5.522
-28.530
0.752
0.000
0.000
-0.000
-0.027
0.662
-0.000
Max Qy
68:1.4DL+1.4E
-0.155
-0.002
Min Qy
400
68:1.4DL+1.4E
-0.002
Max Sx
2269
68:1.4DL+1.4E
0.003
Min Sx
698
68:1.4DL+1.4E
-0.155
0.000
-0.000
-49.242
-9.528
-0.000
2235
68:1.4DL+1.4E
-0.007
-0.005
-0.000
0.000
-0.000
Max Sy
0.000
-0.000
0.151
-0.153
-0.416
Min Sy
68:1.4DL+1.4E
-0.002
0.122
-0.000
0.000
-5.522
-28.530
-0.752
Max Sxy
2278
68:1.4DL+1.4E
0.008
-0.063
0.000
-0.000
0.000
0.000
-0.451
-1.152
3.743
Min Sxy
2260
68:1.4DL+1.4E
0.008
0.063
0.000
0.000
-0.450
-1.152
-3.743
Max Mx
245
67:1.4DL+1.4E
0.006
0.000
0.000
-0.000
-0.000
-0.000
Min Mx
239
68:1.4DL+1.4E
0.154
0.000
-0.000
-0.000
0.000
Max My
217
52:1.2DL+1.2LL
-0.001
0.004
0.000
-0.000
Min My
400
68:1.4DL+1.4E
-0.002
-0.122
-0.000
-0.000
Max Mxy
366
52:1.2DL+1.2LL
0.025
-0.009
-0.000
0.000
0.000
Min Mxy
30
52:1.2DL+1.2LL
0.025
0.009
-0.000
0.000
-0.000
21.230
9.844
-0.000
-9.611
-0.000
-0.000
-49.828
19.844
-0.000
-5.522
10.045
-0.119
0.186
-28.530
-0.214
8.223
0.186
-0.214
-8.223
0.752
Print Run 1 of 1
Page 30
DERBY DESIGN
Project:
Date
Client:
ADDC
Design
SKS
Checked
PSK
Rev No.
Approved
SAK
Main
RANYA CONTRACTING ESTABLISHMENT
contractor:
Structure: 33/11kV SWITCHGEAR
25-Apr Page
Rev Date
MAIN REINFORCEMENT
OUTER / INNER
Mx DIRECTION
Main Steel
2
fcu
35
N/mm
fy
420
N/mm2
Mu
50
kNm
b
D
c
= 1000 mm
= 350 mm
=
75
mm
dm
16
mm
ds
16
mm
Effective depth
= D-c-dm/2
= 267 mm
Load case :
68
2
K = M / ( b x d x fcu )
= 0.020
= 260.92 mm
0.95 x d
Since 0.95xd,
200
200
= 253.65 mm
= 253.65
2
539
mm
=
mm c/c
mm c/c
455
mm
1005 mm
Hence OK.
Reinforcement Summary:
Provide horizontal reinforcement T16 @ 200 mm c/c.
Page 31
Job Title
Job No
Part 33/11kV
SWITCHGEAR
Ref
File
ADDC
Rev
By
Client
Sheet No
SKS
Date19
Jan-11
Date/Time
33kv.std
Chd
PSK
21-Apr-2011 16:14
MX
kNm/m
<= -49.8
-45.7
-41.7
-37.6
-33.5
-29.4
-25.4
-21.3
-17.2
-13.1
-9.04
-4.96
-0.883
3.2
7.27
11.4
>= 15.4
Load 68
Mx
Print Run 1 of 1
Page 32
DERBY DESIGN
Project:
Date
Client:
ADDC
Design
SKS
Checked
PSK
Rev No.
Approved
SAK
Main
RANYA CONTRACTING ESTABLISHMENT
contractor:
Structure: 33/11kV SWITCHGEAR
25-Apr
Page
Rev Date
SECONDARY REINFORCEMENT
OUTER / INNER
My DIRECTION
Secondary Steel
2
fcu
35
N/mm
fy
420
N/mm2
Mu
29
kNm
b
D
c
=
=
=
1000
75
mm
mm
mm
dm
16
mm
ds
16
mm
Effective depth
= D-c-dm-ds/2
=
251
mm
Load case :
68
350
2
K = Mu / ( b x d x fcu )
= 247.28 mm
0.95 x d
Since 0.95xd,
200
200
0.013
= 238.45 mm
= 238.45
2
333
mm
=
mm c/c
mm c/c
455
mm
1005 mm
Hence OK.
Reinforcement Summary:
Provide vertical reinforcement T16 @ 200 mm c/c.
Page 33
Job Title
Job No
Part 33/11kV
SWITCHGEAR
Ref
File
ADDC
Rev
By
Client
Sheet No
SKS
33kv.std
Date19
Jan-11
Date/Time
Chd
PSK
21-Apr-2011 16:14
MY
kNm/m
<= -28.5
-26.3
-24.1
-21.9
-19.7
-17.5
-15.3
-13.1
-10.8
-8.64
-6.43
-4.22
-2.01
0.205
2.42
4.63
>= 6.84
Load 68
My
Print Run 1 of 1
Page 34
DERBY DESIGN
Project:
Date
Client:
ADDC
Design
SKS
Checked
PSK
Main
contractor:
Rev No.
Approved
SAK
Structure:
33/11kV SWITCHGEAR
Rev Date
Main steel
0.155 N/mm
Load case:
698
Thickness of Raft
Clear cover
25-Apr Page
68
350 mm
75 mm
16 mm
200 mm c/c
16 mm
200 mm c/c
267 mm
Effective depth
% of steel provided
=
=
As
0.155 N/mm
35 N/mm
0.38 %
<
0.57 N/mm
SAFE
Page 35
Job Title
Job No
Part 33/11kV
ADDC
Rev
SWITCHGEAR
Ref
By
Client
Sheet No
File
SKS
33kv.std
Date19
Jan-11
Date/Time
Chd
PSK
21-Apr-2011 16:14
SQX
N/mm2
<= -0.155
-0.136
-0.117
-0.097
-0.078
-0.059
-0.039
-0.020
-0.001
0.019
0.038
0.057
0.077
0.096
0.115
0.135
>= 0.154
Load 68
SQx
Print Run 1 of 1
Page 36
DERBY DESIGN
Project:
Date
Client:
ADDC
Design
SKS
Checked
PSK
Main
contractor:
Rev No.
Approved
SAK
Structure:
33/11kV SWITCHGEAR
Rev Date
Secondary steel
0.122 N/mm
Load case:
Thickness of Raft
Clear cover
25-Apr Page
68
350 mm
75 mm
16 mm
200 mm c/c
16 mm
200 mm c/c
251 mm
Effective depth
% of steel provided
=
=
As
0.122 N/mm
35 N/mm
0.40 %
<
0.59 N/mm
SAFE
Page 37
Job Title
Job No
Part 33/11kV
SWITCHGEAR
Ref
File
ADDC
Rev
By
Client
Sheet No
SKS
Date19
Jan-11
Date/Time
33kv.std
Chd
PSK
21-Apr-2011 16:14
SQY
N/mm2
<= -0.122
-0.107
-0.092
-0.076
-0.061
-0.046
-0.031
-0.015
0
0.015
0.031
0.046
0.061
0.076
0.092
0.107
>= 0.122
Load 68
SQy
Print Run 1 of 1
Page 38
Page 39
Job Title
Job No
Part 33/11kV
Rev
SWITCHGEAR
Ref
By
Client
Sheet No
File
ADDC
Date19
SKS
Chd
Jan-11
Date/Time
33kv.std
PSK
21-Apr-2011 16:14
L/C
Qx
Qy
Sx
Membrane
Sy
Sxy
Mx
Bending
My
Mxy
(N/mm2)
(N/mm2)
(N/mm2)
(N/mm2)
(N/mm2)
(kNm/m)
(kNm/m)
(kNm/m)
Max Qx
1480
55:1.2DL+1.2LL
0.281
-0.050
-0.152
-0.022
-0.024
-32.346
-4.897
Min Qx
1508
55:1.2DL+1.2LL
-0.050
-0.152
-0.022
0.024
-32.346
-4.897
4.873
Max Qy
1323
68:1.4DL+1.4E
-0.281
0.000
0.290
-0.046
-0.224
-0.000
-8.471
-44.149
0.000
-4.873
Min Qy
1683
57:1.2DL+1.2LL
0.153
-0.042
0.038
-27.604
-6.469
-5.721
1955
67:1.4DL+1.4E
0.000
-0.147
0.001
-0.163
Max Sx
0.213
-0.058
-0.000
-0.972
-0.113
-0.000
0.516
Min Sx
1190
68:1.4DL+1.4E
-0.020
0.012
0.015
-14.494
-1.536
1306
52:1.2DL+1.2LL
-0.013
0.062
-0.436
0.041
-0.082
Max Sy
0.059
0.010
0.333
-1.362
1.093
Min Sy
1549
68:1.4DL+1.4E
-0.000
0.289
-0.045
-0.000
-8.390
-43.888
-0.000
0.148
-3.093
-16.661
-5.236
-0.148
-0.006
-3.093
-16.661
5.236
13.072
1.924
-0.300
Max Sxy
1541
68:1.4DL+1.4E
-0.057
0.154
-0.044
-0.226
-0.120
Min Sxy
1563
68:1.4DL+1.4E
0.057
0.154
-0.044
-0.120
Max Mx
933
68:1.4DL+1.4E
0.004
-0.024
-0.297
-0.056
Min Mx
1291
55:1.2DL+1.2LL
-0.158
0.090
-0.351
-0.094
-0.030
-2.119
891
68:1.4DL+1.4E
0.000
0.026
-0.197
-0.102
-0.021
-35.508
9.604
-3.795
Max My
8.281
-0.298
Min My
1323
68:1.4DL+1.4E
0.000
0.290
-0.046
-0.224
-0.000
-8.471
Max Mxy
1708
57:1.2DL+1.2LL
-0.036
-0.009
-0.098
-0.038
-0.037
0.410
-44.149
-0.731
11.874
Min Mxy
1686
57:1.2DL+1.2LL
0.036
-0.009
-0.098
-0.038
0.037
0.410
-0.731
-11.874
0.000
Print Run 1 of 1
Page 40
DERBY DESIGN
Project:
Date
Client:
ADDC
Design
SKS
Checked
PSK
Rev No.
Approved
SAK
Main
RANYA CONTRACTING ESTABLISHMNET
contractor:
Structure: 33/11kV SWITCHGEAR
25-Apr
Page
Rev Date
WALL DESIGN
Location
VERTICAL REINFORCEMENT
OUTER / INNER
My DIRECTION
Main Steel
2
fcu
35
N/mm
fy
420
N/mm2
Mu
45
kNm
b
D
c
=
=
=
1000
75
mm
mm
mm
dm
16
mm
ds
16
mm
Effective depth
= D-c-dm/2
=
167
mm
Load case :
68
250
2
K = Mu / ( b x d x fcu )
= 157.96 mm
0.95 x d
Since 0.95xd,
150
150
0.046
= 158.65 mm
= 157.96
2
780
mm
=
mm c/c
mm c/c
500
mm
1340 mm
Hence OK.
Reinforcement Summary:
Provide vertical reinforcement T16 @ 150 mm c/c.
Page 41
Job Title
Job No
Part 33/11kV
ADDC
Rev
SWITCHGEAR
Ref
By
Client
Sheet No
File
SKS
33kv.std
Date19
Jan-11
Date/Time
Chd
PSK
26-Apr-2011 14:43
MY
kNm/m
<= -44.1
-40.9
-37.6
-34.3
-31
-27.8
-24.5
-21.2
-17.9
-14.7
-11.4
-8.1
-4.83
-1.55
1.73
5
>= 8.28
Y
X
Z
Load 68
My
Print Run 1 of 1
Page 42
DERBY DESIGN
Project:
Date
Client:
ADDC
Design
SKS
Checked
PSK
Rev No.
Approved
SAK
Main
RANYA CONTRACTING ESTABLISHMNET
contractor:
Structure: 33/11kV SWITCHGEAR
25-Apr Page
Rev Date
WALL DESIGN
Location
HORIZONTAL REINFORCEMENT
OUTER / INNER
Mx DIRECTION
Secondary Steel
2
fcu
35
N/mm
fy
420
N/mm2
Mu
36
kNm
b
D
c
= 1000 mm
= 250 mm
=
75
mm
dm
16
mm
ds
16
mm
Effective depth
= D-c-dm-ds/2
= 151 mm
Load case :
55
2
K = M / ( b x d x fcu )
= 0.045
= 143.01 mm
0.95 x d
Since 0.95xd,
= 143.45 mm
= 143.01
=
689
mm
= 312.5 mm2
mm c/c
mm c/c
=
1340 mm
Hence OK.
Reinforcement Summary:
Provide horizontal reinforcement T16 @ 150 mm c/c.
Page 43
Job Title
Job No
Part 33/11kV
ADDC
Rev
SWITCHGEAR
Ref
By
Client
Sheet No
File
SKS
33kv.std
Date19
Jan-11
Date/Time
Chd
PSK
26-Apr-2011 14:43
MX
kNm/m
<= -35.5
-32.5
-29.6
-26.6
-23.6
-20.6
-17.7
-14.7
-11.7
-8.73
-5.76
-2.78
0.193
3.17
6.14
9.12
>= 12.1
Y
X
Z
Load 55
Mx
Print Run 1 of 1
Page 44
DERBY DESIGN
Project:
Date
Client:
ADDC
Design
SKS
Checked
PSK
Main
contractor:
Rev No.
Approved
SAK
Structure:
33/11kV SWITCHGEAR
Rev Date
Main steel
0.29 N/mm
Load case:
1323
Thickness of Wall
Clear cover
25-Apr Page
68
250 mm
75 mm
16 mm
150 mm c/c
16 mm
150 mm c/c
167 mm
Effective depth
% of steel provided
=
=
As
0.290 N/mm
35 N/mm
0.80 %
<
0.82 N/mm
SAFE
Page 45
Job Title
Job No
Part 33/11kV
ADDC
Rev
SWITCHGEAR
Ref
By
Client
Sheet No
File
SKS
33kv.std
Date19
Jan-11
Date/Time
Chd
PSK
26-Apr-2011 14:43
SQY
N/mm2
<= -0.104
-0.079
-0.055
-0.030
-0.005
0.019
0.044
0.068
0.093
0.118
0.142
0.167
0.191
0.216
0.241
0.265
>= 0.290
Y
X
Z
Load 68
SQy
Print Run 1 of 1
Page 46
DERBY DESIGN
Project:
Date
Client:
ADDC
Design
SKS
Checked
PSK
Main
contractor:
Rev No.
Approved
SAK
Structure:
33/11kV SWITCHGEAR
Rev Date
Secondary steel
0.281 N/mm
Load case:
1480
Thickness of Wall
Clear cover
25-Apr Page
55
250 mm
75 mm
16 mm
150 mm c/c
16 mm
150 mm c/c
151 mm
Effective depth
% of steel provided
=
=
As
0.281 N/mm
35 N/mm
0.89 %
<
0.87 N/mm
SAFE
Page 47
Job Title
Job No
Part 33/11kV
ADDC
Rev
SWITCHGEAR
Ref
By
Client
Sheet No
File
SKS
33kv.std
Date19
Jan-11
Date/Time
Chd
PSK
26-Apr-2011 14:43
SQX
N/mm2
<= -0.281
-0.246
-0.211
-0.176
-0.141
-0.105
-0.070
-0.035
0
0.035
0.070
0.105
0.141
0.176
0.211
0.246
>= 0.281
Y
X
Z
Load 55
SQx
Print Run 1 of 1
Page 48
Page 49
Job Title
Job No
Part 33/11kV
Rev
SWITCHGEAR
Ref
By
Client
Sheet No
File
ADDC
Date19
SKS
Chd
Jan-11
Date/Time
33kv.std
PSK
26-Apr-2011 14:43
L/C
Qx
Qy
Sx
Membrane
Sy
Sxy
Mx
Bending
My
Mxy
(N/mm2)
(N/mm2)
(N/mm2)
(N/mm2)
(N/mm2)
(kNm/m)
(kNm/m)
(kNm/m)
Max Qx
1915
68:1.4DL+1.4E
0.017
0.024
-0.219
-0.060
-0.012
-4.279
-0.879
1.085
Min Qx
1943
68:1.4DL+1.4E
0.024
-0.219
-0.060
0.012
-4.279
-0.879
-1.085
0.539
Max Qy
1770
53:1.2DL+1.2LL
-0.017
-0.015
Min Qy
1771
58:1.2DL+1.2LL
0.008
Max Sx
1955
67:1.4DL+1.4E
0.000
0.025
0.013
-0.006
0.078
0.461
-0.419
-0.021
0.001
-0.036
-0.021
0.039
0.059
1.284
0.683
0.213
-0.058
-0.000
-0.972
-0.113
-0.000
-1.291
Min Sx
1885
68:1.4DL+1.4E
-0.016
0.023
0.001
-4.010
-0.938
2204
65:1.0DL+1.0E
-0.001
-0.003
-0.229
0.023
-0.075
Max Sy
0.007
0.014
0.468
0.124
0.107
Min Sy
1781
67:1.4DL+1.4E
-0.000
0.002
-0.029
0.000
-0.466
-1.923
-0.000
0.112
-0.009
-0.552
0.814
-0.009
-0.552
-0.814
4.065
0.875
0.838
-0.879
-1.085
1.661
-0.871
0.315
-1.580
Max Sxy
1801
67:1.4DL+1.4E
-0.006
0.005
-0.008
-0.214
-0.092
Min Sxy
1825
67:1.4DL+1.4E
0.006
0.005
-0.008
-0.092
Max Mx
2175
68:1.4DL+1.4E
0.016
-0.019
-0.176
-0.052
-0.112
0.036
Min Mx
1943
68:1.4DL+1.4E
-0.017
0.024
-0.219
-0.060
0.012
Max My
1796
68:1.4DL+1.4E
-0.001
-0.019
-0.043
-0.047
-0.084
-4.279
0.234
Min My
1779
52:1.2DL+1.2LL
0.000
0.003
-0.025
-0.188
0.035
-0.515
Max Mxy
1829
68:1.4DL+1.4E
0.011
-0.014
-0.185
-0.047
0.034
-1.924
-2.120
-0.514
Min Mxy
1855
68:1.4DL+1.4E
-0.011
-0.014
-0.185
-0.047
-0.034
-1.924
-0.514
1.580
Print Run 1 of 1
Page 50
DERBY DESIGN
Project:
Date
Client:
ADDC
Design
SKS
Checked
PSK
Rev No.
Approved
SAK
Main
RANYA CONTRACTING ESTABLISHMNET
contractor:
Structure: 33/11kV SWITCHGEAR
26-Apr
Page
Rev Date
WALL DESIGN
Location
VERTICAL REINFORCEMENT
OUTER / INNER
My DIRECTION
Main Steel
2
fcu
35
N/mm
fy
420
N/mm2
Mu
kNm
b
D
c
=
=
=
1000
50
mm
mm
mm
dm
12
mm
ds
12
mm
Effective depth
= D-c-dm/2
=
194
mm
Load case :
52
250
2
K = Mu / ( b x d x fcu )
= 193.51 mm
0.95 x d
Since 0.95xd,
150
150
0.002
184.3
mm
= 184.30
2
45
mm
=
mm c/c
mm c/c
500
mm
754 mm
Hence OK.
Reinforcement Summary:
Provide vertical reinforcement T12 @ 150 mm c/c.
Page 51
Job Title
Job No
Part 33/11kV
ADDC
Rev
SWITCHGEAR
Ref
By
Client
Sheet No
File
SKS
33kv.std
Date19
Jan-11
Date/Time
Chd
PSK
26-Apr-2011 14:43
MY
kNm/m
<= -2.12
-1.95
-1.78
-1.62
-1.45
-1.28
-1.11
-0.947
-0.78
-0.612
-0.444
-0.277
-0.109
0.058
0.226
0.393
>= 0.561
Y
X
Z
Load 52
My
Print Run 1 of 1
Page 52
DERBY DESIGN
Project:
Date
Client:
ADDC
Design
SKS
Checked
PSK
Rev No.
Approved
SAK
Main
RANYA CONTRACTING ESTABLISHMNET
contractor:
Structure: 33/11kV SWITCHGEAR
26-Apr Page
Rev Date
WALL DESIGN
Location
HORIZONTAL REINFORCEMENT
OUTER / INNER
Mx DIRECTION
Secondary Steel
2
fcu
35
N/mm
fy
420
N/mm2
Mu
b
D
c
= 1000 mm
= 250 mm
=
50
mm
dm
12
mm
ds
12
mm
Effective depth
= D-c-dm-ds/2
= 182 mm
Load case :
kNm
68
2
K = M / ( b x d x fcu )
= 0.004
= 181.12 mm
0.95 x d
Since 0.95xd,
= 172.9 mm
= 172.90
=
79
mm
= 312.5 mm2
mm c/c
mm c/c
=
754 mm
Hence OK.
Reinforcement Summary:
Provide horizontal reinforcement T12 @ 150 mm c/c.
Page 53
Job Title
Job No
Part 33/11kV
ADDC
Rev
SWITCHGEAR
Ref
By
Client
Sheet No
File
SKS
33kv.std
Date19
Jan-11
Date/Time
Chd
PSK
26-Apr-2011 14:43
MX
kNm/m
<= -4.28
-3.76
-3.24
-2.71
-2.19
-1.67
-1.15
-0.629
-0.107
0.414
0.936
1.46
1.98
2.5
3.02
3.54
>= 4.06
Y
X
Z
Load 68
Mx
Print Run 1 of 1
Page 54
DERBY DESIGN
Project:
Date
Client:
ADDC
Design
SKS
Checked
PSK
Main
contractor:
Rev No.
Approved
SAK
Structure:
33/11kV SWITCHGEAR
Rev Date
Main steel
0.025 N/mm
Load case:
1770
Thickness of Wall
Clear cover
26-Apr Page
53
250 mm
50 mm
12 mm
150 mm c/c
12 mm
150 mm c/c
194 mm
Effective depth
% of steel provided
=
=
As
0.025 N/mm
35 N/mm
0.39 %
<
0.62 N/mm
SAFE
Page 55
Job Title
Job No
Part 33/11kV
ADDC
Rev
SWITCHGEAR
Ref
By
Client
Sheet No
File
SKS
33kv.std
Date19
Jan-11
Date/Time
Chd
PSK
26-Apr-2011 14:43
SQY
N/mm2
<= -0.004
-0.003
-0.001
0.001
0.003
0.005
0.006
0.008
0.010
0.012
0.014
0.016
0.017
0.019
0.021
0.023
>= 0.025
Y
X
Z
Load 53
SQy
Print Run 1 of 1
Page 56
DERBY DESIGN
Project:
Date
Client:
ADDC
Design
SKS
Checked
PSK
Main
contractor:
Rev No.
Approved
SAK
Structure:
33/11kV SWITCHGEAR
Rev Date
Secondary steel
0.017 N/mm
Load case:
1915
Thickness of Wall
Clear cover
26-Apr Page
68
250 mm
50 mm
12 mm
150 mm c/c
12 mm
150 mm c/c
182 mm
Effective depth
% of steel provided
=
=
As
0.017 N/mm
35 N/mm
0.41 %
<
0.64 N/mm
SAFE
Page 57
Job Title
Job No
Part 33/11kV
ADDC
Rev
SWITCHGEAR
Ref
By
Client
Sheet No
File
SKS
33kv.std
Date19
Jan-11
Date/Time
Chd
PSK
26-Apr-2011 14:43
SQX
N/mm2
<= -0.017
-0.015
-0.013
-0.011
-0.009
-0.006
-0.004
-0.002
0
0.002
0.004
0.006
0.009
0.011
0.013
0.015
>= 0.017
Y
X
Z
Load 68
SQx
Print Run 1 of 1
Page 58
Page 59
LOAD CALCULATION
DERBY DESIGN
25-Apr
Page 60
Project:
Date
Client:
ADDC
Design
SKS
Page
Checked
PSK
Main
contractor:
Rev No.
Approved
SAK
Structure:
Rev Date
LOAD CALCULATION
DEAD LOAD
Self Weight for Plinth
= 2.25 x 25
=
Say
= 0.2 x 20
=
=
=
Say
LIVE LOAD
Load of Transformer (conservatively)
Live Load for Plinth
= 450/(3.670 x 1.770)
=
=
Say
=
=
=
=
Say
56.25 kN/m2
60 kN/m2
0.5 kN/m2
4 kN/m2
4.5 kN/m2
5 kN/m2
450
69.27
70
5
kN
kN/m2
kN/m2
2
kN/m
11000
13.45
817.84
8.5
Kg
m2
2
Kg/m
kN/m2
EARTH PRESSURE
Earth Pressure due to soil
= 0.5 x 18 x 2.1
18.9
kN/m
= 0.5 x 33.33
16.67
kN/m
SURCHARGE PRESSURE
Surcharge pressure due to SLW60 loading
SEISMIC LOAD
Seismic Loads to UBC 1997
Maximum base Shear, Vmax
=
=
=
=
=
2.5 x Ca x I x W / R
2.5 x 0.12x1 x W /5.5
0.0545 W
450 x 0.0545 / 60
0.409 kN Each node
1.25 kN/m2
=
=
=
=
24.61 x (3.75/2+2.40)
105.21 kNm
=
=
105.21 / 1.77
59.44 kN
WIND LOAD
Page 61
Pressure on X - direction
=
=
59.44 / (1.77/2*3.67)
18.3 kN/m2
=
=
=
=
19.875 x (3.750/2+2.40)
84.97 kNm
=
=
84.97 / 3.670
23.15 kN
Pressure on Z - direction
=
=
Base Shear due to wind is more than seismic.
23.15 / (3.67/2*1.77)
7.13 kN/m2
105.21 kNm
=
=
(6.72x4.17x0.35x25)+(2x3.87x0.25x2.25x25)+
(2x6.42x0.25x2.25x25)+(3.67x1.77x2.25x25)
900 kN
Resisting Moment
=
=
900x 3.870 / 2
1741.5 kNm
Factor of safety
=
=
1741.5 / 105.21
16.55
> 1.5
Hence Safe
Overturning Moment
84.97 kNm
900 kN
Resisting Moment
=
=
900x 6.420 / 2
2889 kNm
Factor of safety
=
=
2889 / 84.97
34 > 1.5
Hence Safe
Page 62
STAAD ANALYSIS
(POWER TRANSFORMER)
Page 63
Job Title
POWER TRANSFORMER
Job No
Part Power
ADDC
Rev
Transformer
Ref
By
Client
Sheet No
File
SKS
Pwr Txr.std
Date19-Jan-11
Date/Time
Chd
PSK
25-Apr-2011 11:54
Y
X
Z
POWER TRANSFORMER
Print Run 1 of 4
Page 64
Job Title
POWER TRANSFORMER
Job No
Part Power
ADDC
Rev
Transformer
Ref
By
Client
Sheet No
File
SKS
Pwr Txr.std
Date19-Jan-11
Date/Time
Chd
PSK
25-Apr-2011 11:54
Y
X
Z
Load 1
DEAD LOAD
Y
X
Z
Load 2
LIVE LOAD
Print Time/Date: 25/04/2011 12:29
Print Run 2 of 4
Page 65
Job Title
POWER TRANSFORMER
Job No
Part Power
ADDC
Rev
Transformer
Ref
By
Client
Sheet No
File
SKS
Pwr Txr.std
Date19-Jan-11
Date/Time
Chd
PSK
25-Apr-2011 11:54
Y
X
Z
Load 3
EARTH PRESSURE
Y
X
Z
Load 4
SURCHARGE PRESSURE
Print Time/Date: 25/04/2011 12:29
Print Run 3 of 4
Page 66
Job Title
POWER TRANSFORMER
Job No
Part Power
ADDC
Rev
Transformer
Ref
By
Client
Sheet No
File
SKS
Pwr Txr.std
Date19-Jan-11
Date/Time
Chd
PSK
25-Apr-2011 11:54
Y
X
Z
Load 5
Y
X
Z
Load 6
Print Run 4 of 4
Page 1 of 11
1. STAAD SPACE
INPUT FILE: Pwr Txr.STD
2. START JOB INFORMATION
3. JOB NAME 33/11KV PACKAGE UNIT SUBSTATION IN SIR BANIYAS
4. JOB CLIENT ADDC
5. JOB PART POWER TRANSFORMER
6. JOB REV 0
7. ENGINEER NAME SKS
8. CHECKER NAME PSK
9. APPROVED NAME SAK
10. ENGINEER DATE 19-JAN-11
11. END JOB INFORMATION
12. INPUT WIDTH 79
13. SET ECHO OFF
478. START GROUP DEFINITION
479. ELEMENT
480. _BASESLAB 1 TO 6 10 TO 20 24 TO 34 38 TO 48 52 TO 62 66 TO 70 155 TO 160 164 481. 165 TO 174 178 TO 188 192 TO 202 206 TO 210 267 TO 272 276 TO 286 290 TO 300 482. 304 TO 314 318 TO 328 332 TO 342 346 TO 356 360 TO 370 374 TO 384 483. 388 TO 398 402 TO 406 2018 TO 2036
484. _WALL 842 TO 847 851 TO 861 865 TO 875 879 TO 889 893 TO 903 907 TO 917 921 485. 922 TO 925 1194 TO 1198 1202 TO 1212 1216 TO 1226 1230 TO 1240 1244 TO 1254 486. 1258 TO 1268 1272 TO 1277 1306 TO 1310 1317 TO 1320 1325 TO 1339 487. 1346 TO 1349 1354 TO 1368 1375 TO 1378 1383 TO 1397 1404 TO 1407 488. 1412 TO 1426 1433 TO 1436 1441 TO 1455 1462 TO 1465 1470 TO 1479 489. 1770 TO 1779 1784 TO 1787 1794 TO 1808 1813 TO 1816 1823 TO 1837 490. 1842 TO 1845 1852 TO 1866 1871 TO 1874 1881 TO 1895 1900 TO 1903 491. 1910 TO 1924 1929 TO 1932 1939 TO 1949 1953 TO 1962 1966 TO 1980 492. 1985 TO 2004 2009 TO 2017
493. _PAD 60 TO 62 66 67 158 TO 160 164 165 172 TO 174 178 179 186 TO 188 192 193 494. 200 TO 202 206 207 270 TO 272 276 277 284 TO 286 290 291 298 TO 300 304 305 495. 312 TO 314 318 319 326 TO 328 332 333 340 TO 342 346 347
496. END GROUP DEFINITION
497. ELEMENT PROPERTY
498. 1 TO 6 10 TO 20 24 TO 34 38 TO 48 52 TO 62 66 TO 70 155 TO 160 164 TO 174 499. 178 TO 188 192 TO 202 206 TO 210 267 TO 272 276 TO 286 290 TO 300 500. 304 TO 314 318 TO 328 332 TO 342 346 TO 356 360 TO 370 374 TO 384 501. 388 TO 398 402 TO 406 2018 TO 2081 THICKNESS 0.35
502. 842 TO 847 851 TO 861 865 TO 875 879 TO 889 893 TO 903 907 TO 917 921 TO 925 503. 1194 TO 1198 1202 TO 1212 1216 TO 1226 1230 TO 1240 1244 TO 1254 504. 1258 TO 1268 1272 TO 1277 1306 TO 1310 1317 TO 1320 1325 TO 1339 -
****************************************************
*
*
*
STAAD.Pro
*
*
Version 2005
Bld 1001.US
*
*
Proprietary Program of
*
*
Research Engineers, Intl.
*
*
Date=
APR 25, 2011
*
*
Time=
12:21:55
*
*
*
*
USER ID: [ LZ0 + LND ]
*
****************************************************
PAGE NO.
-- PAGE NO.
1346 TO 1349 1354 TO 1368 1375 TO 1378 1383 TO 1397 1404 TO 1407 1412 TO 1426 1433 TO 1436 1441 TO 1455 1462 TO 1465 1470 TO 1479 1770 TO 1779 1784 TO 1787 1794 TO 1808 1813 TO 1816 1823 TO 1837 1842 TO 1845 1852 TO 1866 1871 TO 1874 1881 TO 1895 1900 TO 1903 1910 TO 1924 1929 TO 1932 1939 TO 1949 1953 TO 1962 1966 TO 1980 1985 TO 2004 2009 TO 2017 THICKNESS 0.25
DEFINE MATERIAL START
ISOTROPIC CONCRETE
E 2.7E+007
POISSON 0.2
DENSITY 25
ALPHA 1E-005
DAMP 0.05
END DEFINE MATERIAL
CONSTANTS
MATERIAL CONCRETE MEMB 1 TO 6 10 TO 20 24 TO 34 38 TO 48 52 TO 62 66 TO 70 155 TO 160 164 TO 174 178 TO 188 192 TO 202 206 TO 210 267 TO 272 276 TO 286 290 TO 300 304 TO 314 318 TO 328 332 TO 342 346 TO 356 360 TO 370 374 TO 384 388 TO 398 402 TO 406 842 TO 847 851 TO 861 865 TO 875 879 TO 889 893 TO 903 907 TO 917 921 TO 925 1194 TO 1198 1202 1203 TO 1212 1216 TO 1226 1230 TO 1240 1244 TO 1254 1258 TO 1268 1272 TO 1277 1306 TO 1310 1317 TO 1320 1325 TO 1339 1346 TO 1349 1354 TO 1368 1375 TO 1378 1383 TO 1397 1404 TO 1407 1412 TO 1426 1433 TO 1436 1441 TO 1455 1462 TO 1465 1470 TO 1479 1770 TO 1779 1784 TO 1787 1794 TO 1808 1813 TO 1816 1823 TO 1837 1842 TO 1845 1852 TO 1866 1871 TO 1874 1881 TO 1895 1900 TO 1903 1910 TO 1924 1929 TO 1932 1939 TO 1949 1953 TO 1962 1966 TO 1980 1985 TO 2004 2009 TO 2081
SUPPORTS
1 TO 6 10 TO 20 24 TO 34 38 TO 48 52 TO 62 66 TO 70 155 TO 160 164 TO 174 178 TO 188 192 TO 202 206 TO 210 267 TO 272 276 TO 286 290 TO 300 304 TO 314 318 TO 328 332 TO 342 346 TO 356 360 TO 370 374 TO 384 388 TO 398 402 TO 406 2018 TO 2081 PLATE MAT DIRECT Y SUBGRADE 10800
LOAD 1 DL
SELFWEIGHT Y -1
ELEMENT LOAD
*SELFWEIGHT OF PLINTH = 1.65 X 25 = 42 KN/SQM
**GRATING / GRAVEL AREA
****SELFWEIGHT OF GRATINGS/GRAVEL
****100X40THK GRATING = .5 KN/M^2(MAX)
****200MM THK GRAVEL = 0.2X20 = 4KN/M^2
****TOTAL = .5 + 4 =5KN/M^2 APPROX
1 TO 6 10 TO 20 24 TO 34 38 TO 48 52 TO 59 68 TO 70 155 TO 157 166 TO 171 180 TO 185 194 TO 197 199 208 TO 210 267 TO 269 278 TO 283 292 TO 297 306 307 TO 311 320 TO 325 334 TO 339 348 TO 356 360 TO 370 374 TO 384 388 TO 398 402 TO 406 PR GY -5
60 TO 62 66 67 158 TO 160 164 165 172 TO 174 178 179 186 TO 188 192 193 200 201 TO 202 206 207 270 TO 272 276 277 284 TO 286 290 291 298 TO 300 304 305 312 TO 314 318 319 326 TO 328 332 333 340 TO 342 346 347 PR GY -60
LOAD 2 LL
ELEMENT LOAD
* TOTAL LOAD ON THE PLINTH=460KN
* PRESSURE ACTING ON THE PLINTH=460/(4.45*2.06)=50.2KN/M2.
SAY 55KN/M2.
60 TO 62 66 67 158 TO 160 164 165 172 TO 174 178 179 186 TO 188 192 193 200 201 TO 202 206 207 270 TO 272 276 277 284 TO 286 290 291 298 TO 300 304 305 312 TO 314 318 319 326 TO 328 332 333 340 TO 342 346 347 PR GY -70
*LIVE LOAD ON BASE SLAB= 5KN/M2.
505.
506.
507.
508.
509.
510.
511.
512.
513.
514.
515.
516.
517.
518.
519.
520.
521.
522.
523.
524.
525.
526.
527.
528.
529.
530.
531.
532.
533.
534.
535.
536.
537.
538.
539.
540.
541.
542.
543.
544.
545.
546.
547.
548.
549.
550.
551.
552.
553.
554.
555.
556.
557.
558.
559.
560.
STAAD SPACE
Page 2 of 11
Page 67
-- PAGE NO.
Page 3 of 11
1 TO 6 10 TO 20 24 TO 34 38 TO 48 52 TO 59 68 TO 70 155 TO 157 166 TO 171 180 TO 185 194 TO 199 208 TO 210 267 TO 269 278 TO 283 292 TO 297 306 TO 311 320 TO 325 334 TO 339 348 TO 356 360 TO 370 374 TO 384 388 TO 398 402 TO 406 PR GY -5
*OIL LOAD
*MASS OF INSULATION OIL = 10530 KG
*AREA OF TRENCH EXCLUDING PLINTH = 28.53 M2
*LOAD ON BASE SLAB = 10530/28.53 = 369 KG/M2
SAY 4 KN/M2
1 TO 6 10 TO 20 24 TO 34 38 TO 48 52 TO 59 68 TO 70 155 TO 157 166 TO 171 180 TO 185 194 TO 199 208 TO 210 267 TO 269 278 TO 283 292 TO 297 306 TO 311 320 TO 325 334 TO 339 348 TO 356 360 TO 370 374 TO 384 388 TO 398 402 TO 406 PR GY -8.5
LOAD 3 EARTHPRESSURE
ELEMENT LOAD
* EARTH PRESSURE DUE TO SOIL=0.5*20*1.65=16.5KN/M2.
912 TO 917 921 TO 925 1264 TO 1268 1272 TO 1277 1451 TO 1455 1462 TO 1465 1470 TO 1479 1915 TO 1924 1929 TO 1932 1939 TO 1943 TRAP Y 3.15 0.01
898 TO 903 907 TO 911 1250 TO 1254 1258 TO 1263 1422 TO 1426 1433 TO 1436 1441 TO 1450 1886 TO 1895 1900 TO 1903 1910 TO 1914 TRAP Y 6.3 3.15
884 TO 889 893 TO 897 1236 TO 1240 1244 TO 1249 1393 TO 1397 1404 TO 1407 1412 TO 1421 1857 TO 1866 1871 TO 1874 1881 TO 1885 TRAP Y 9.45 6.3
870 TO 875 879 TO 883 1222 TO 1226 1230 TO 1235 1364 TO 1368 1375 TO 1378 1383 TO 1392 1828 TO 1837 1842 TO 1845 1852 TO 1856 TRAP Y 12.6 9.45
856 TO 861 865 TO 869 1208 TO 1212 1216 TO 1221 1335 TO 1339 1346 TO 1349 1354 TO 1363 1799 TO 1808 1813 TO 1816 1823 TO 1827 TRAP Y 15.75 12.6
842 TO 847 851 TO 855 1194 TO 1198 1202 TO 1207 1306 TO 1310 1317 TO 1320 1325 TO 1334 1770 TO 1779 1784 TO 1787 1794 TO 1798 TRAP Y 18.9 15.75
***********************************
LOAD 4 SURCHARGEPRESSURE
ELEMENT LOAD
*SURCHARGE PRESSURE DUE TO SLW60 WHEEL LOADS
*0.5*33.333=16.667KN/M^2
842 TO 847 851 TO 861 865 TO 875 879 TO 889 893 TO 903 907 TO 917 921 TO 924 925 PR 16.67
1194 TO 1198 1202 TO 1212 1216 TO 1226 1230 TO 1240 1244 TO 1254 1258 TO 1268 1272 TO 1277 PR 16.67
1770 TO 1779 1784 TO 1787 1794 TO 1808 1813 TO 1816 1823 TO 1837 1842 TO 1845 1852 TO 1866 1871 TO 1874 1881 TO 1895 1900 TO 1903 1910 TO 1924 1929 TO 1932 1939 TO 1943 PR 16.67
1306 TO 1310 1317 TO 1320 1325 TO 1339 1346 TO 1349 1354 TO 1368 1375 TO 1378 1383 TO 1397 1404 TO 1407 1412 TO 1426 1433 TO 1436 1441 TO 1455 1462 TO 1465 1470 TO 1479 PR 16.67
LOAD 5 WL X
ELEMENT LOAD
60 61 158 159 172 173 186 187 200 201 270 271 284 285 298 299 312 313 326 327 340 341 PR GY 18.3
1972 TO 1980 1985 TO 2004 2009 TO 2017 PR GX 1.25
62 66 67 160 164 165 174 178 179 188 192 193 202 206 207 272 276 277 286 290 291 300 304 305 314 318 319 328 332 333 342 346 347 PR GY -18.3
* DESIGN WIND PRESSURE=1.25KN/M2.
* LOAD ON EACH NODE=1.25*7.95*5.56/74=0.75KN.
LOAD 6 WL Z
ELEMENT LOAD
60 TO 62 66 67 158 TO 160 164 165 172 TO 174 178 179 186 TO 188 192 193 200 201 TO 202 206 207 270 TO 272 276 277 PR GY -7.13
272 284 TO 286 290 291 298 TO 300 304 305 312 TO 314 318 319 326 TO 328 332 -
561.
562.
563.
564.
565.
566.
567.
568.
569.
570.
571.
572.
573.
574.
575.
576.
577.
578.
579.
580.
581.
582.
583.
584.
585.
586.
587.
588.
589.
590.
591.
592.
593.
594.
595.
596.
597.
598.
599.
600.
601.
602.
603.
604.
605.
606.
607.
608.
609.
610.
611.
612.
613.
614.
615.
616.
STAAD SPACE
333 340 TO 342 346 347 PR GY 7.13
1944 TO 1949 1953 TO 1962 1966 TO 1971 PR GZ 1.25
* DESIGN WIND PRESSURE=1.25KN/M2.
* LOAD ON EACH NODE=1.25*7.95*5.56/74=0.75KN.
********************************************
*LOAD COMBINATIONS
******************
*SERVICE LOAD COMBINATIONS
*
LOAD COMB 10 1.0DL+1.0LL
1 1.0 2 1.0
LOAD COMB 11 1.0DL+1.0LL+1.0EP
1 1.0 2 1.0 3 1.0
LOAD COMB 12 1.0DL+1.0LL+1.0EP+1.0SP
1 1.0 2 1.0 3 1.0 4 1.0
*
LOAD COMB 13 1.0DL+1.0LL+1.0EP+1.0WL+X
1 1.0 2 1.0 3 1.0 5 1.0
LOAD COMB 14 1.0DL+1.0LL+1.0EP+1.0WL-X
1 1.0 2 1.0 3 1.0 5 -1.0
LOAD COMB 15 1.0DL+1.0LL+1.0EP+1.0WL+Z
1 1.0 2 1.0 3 1.0 6 1.0
LOAD COMB 16 1.0DL+1.0LL+1.0EP+1.0WL-Z
1 1.0 2 1.0 3 1.0 6 -1.0
*
LOAD COMB 17 1.0DL+1.0LL+1.0EP+1.0SP+1.0WL+X
1 1.0 2 1.0 3 1.0 4 1.0 5 1.0
LOAD COMB 18 1.0DL+1.0LL+1.0EP+1.0SP+1.0WL-X
1 1.0 2 1.0 3 1.0 4 1.0 5 -1.0
LOAD COMB 19 1.0DL+1.0LL+1.0EP+1.0SP+1.0WL+Z
1 1.0 2 1.0 3 1.0 4 1.0 6 1.0
LOAD COMB 20 1.0DL+1.0LL+1.0EP+1.0SP+1.0WL-Z
1 1.0 2 1.0 3 1.0 4 1.0 6 -1.0
**************************************************
*ULTIMATE LOAD COMBINATIONS
*
LOAD COMB 51 1.2DL+1.2LL+1.2EP+1.2WL+X
1 1.2 2 1.2 3 1.2 5 1.2
LOAD COMB 52 1.2DL+1.2LL+1.2EP+1.2WL-X
1 1.2 2 1.2 3 1.2 5 -1.2
LOAD COMB 53 1.2DL+1.2LL+1.2EP+1.2WL+Z
1 1.2 2 1.2 3 1.2 6 1.2
LOAD COMB 54 1.2DL+1.2LL+1.2EP+1.2WL-Z
1 1.2 2 1.2 3 1.2 6 -1.2
*
LOAD COMB 55 1.2DL+1.2LL+1.2EP+1.2SP+1.2WL+X
1 1.2 2 1.2 3 1.2 4 1.2 5 1.2
LOAD COMB 56 1.2DL+1.2LL+1.2EP+1.2SP+1.2WL-X
1 1.2 2 1.2 3 1.2 4 1.2 5 -1.2
LOAD COMB 57 1.2DL+1.2LL+1.2EP+1.2SP+1.2WL+Z
1 1.2 2 1.2 3 1.2 4 1.2 6 1.2
LOAD COMB 58 1.2DL+1.2LL+1.2EP+1.2SP+1.2WL-Z
1 1.2 2 1.2 3 1.2 4 1.2 6 -1.2
*
LOAD COMB 59 1.4DL+1.4EP+1.4WL+X
1 1.4 3 1.4 5 1.4
617.
618.
619.
620.
621.
622.
623.
624.
625.
626.
627.
628.
629.
630.
631.
632.
633.
634.
635.
636.
637.
638.
639.
640.
641.
642.
643.
644.
645.
646.
647.
648.
649.
650.
651.
652.
653.
654.
655.
656.
657.
658.
659.
660.
661.
662.
663.
664.
665.
666.
667.
668.
669.
670.
671.
672.
STAAD SPACE
-- PAGE NO.
Page 4 of 11
Page 68
P R O B L E M
S T A T I S T I C S
-----------------------------------
-- PAGE NO.
NUMBER OF JOINTS/MEMBER+ELEMENTS/SUPPORTS =
728/
693/
308
ORIGINAL/FINAL BAND-WIDTH=
726/
41/
252 DOF
TOTAL PRIMARY LOAD CASES =
6, TOTAL DEGREES OF FREEDOM =
4368
SIZE OF STIFFNESS MATRIX =
1101 DOUBLE KILO-WORDS
REQRD/AVAIL. DISK SPACE =
27.7/ 10124.3 MB
673.
674.
675.
676.
677.
678.
679.
680.
681.
682.
683.
684.
685.
686.
687.
688.
689.
690.
691.
692.
693.
694.
STAAD SPACE
Page 5 of 11
( KN
METE ) SUMMARY (LOADING
=
0.00
=
-1024.15
=
0.00
1)
3575.91
1 )
-3575.91
1 )
( KN
=
=
=
2 )
2308.34
2 )
-2308.34
-- PAGE NO.
STAAD SPACE
Page 6 of 11
Page 69
2)
( KN
=
=
=
3)
0.00
3 )
0.00
3 )
( KN
=
=
=
0.00
4 )
-- PAGE NO.
STAAD SPACE
Page 7 of 11
4)
0.00
4 )
( KN
=
=
=
5)
147.75
5 )
-147.75
5 )
-- PAGE NO.
STAAD SPACE
Page 8 of 11
Page 70
( KN
=
=
=
6)
14.36
6 )
-14.36
6 )
-- PAGE NO.
695. FINISH
STAAD SPACE
Page 9 of 11
STAAD SPACE
-- PAGE NO.
10
Page 10 of 11
Page 71
Page 72
Page 73
Job Title
POWER TRANSFORMER
Job No
Part Power
Rev
Transformer
Ref
By
Client
Sheet No
File
ADDC
SKS
Pwr Txr.std
Date19-Jan-11
Date/Time
Chd
PSK
25-Apr-2011 12:31
L/C
FX
FY
FZ
(kN/m2)
(kN/m2)
(kN/m2)
Max FX
10:1.0DL+1.0LL
0.000
59.223
0.000
Min FX
10:1.0DL+1.0LL
59.223
0.000
Max FY
317
17:1.0DL+1.0LL
0.000
0.000
66.037
0.000
Min FY
2099
18:1.0DL+1.0LL
0.000
0.000
Max FZ
10:1.0DL+1.0LL
0.000
53.335
59.223
Min FZ
10:1.0DL+1.0LL
0.000
59.223
0.000
0.000
Print Run 1 of 1
Page 74
Job Title
POWER TRANSFORMER
Job No
Part Power
Transformer
Ref
File
ADDC
Rev
By
Client
Sheet No
Date19-Jan-11
SKS
Pwr Txr.std
Date/Time
Chd
PSK
25-Apr-2011 12:31
Base Pressure
Y
kN/m2
<= 54.1
54.8
55.6
56.3
57.1
57.8
58.6
59.3
60.1
60.8
61.6
62.3
63
63.8
64.5
65.3
>= 66
Load 17
BASE PRESSURE
Print Run 1 of 1
Page 75
SETTLEMENT CHECK
Page 76
Job Title
POWER TRANSFORMER
Job No
Part Power
Rev
Transformer
Ref
By
Client
Sheet No
File
ADDC
Date19-Jan-11
SKS
Date/Time
Pwr Txr.std
Chd
PSK
25-Apr-2011 12:31
L/C
Resultant
rX
rY
rZ
(mm)
(mm)
(mm)
(mm)
(rad)
(rad)
(rad)
Max X
2035
17:1.0DL+1.0LL
1.771
-5.188
-0.050
5.482
-0.000
-0.000
-0.001
Min X
2058
18:1.0DL+1.0LL
-5.105
-0.047
5.369
-0.000
0.000
0.001
Max Y
2099
18:1.0DL+1.0LL
-1.663
-0.000
-4.938
0.000
4.938
-0.000
0.000
0.001
Min Y
317
17:1.0DL+1.0LL
-0.000
-0.000
6.114
0.000
-0.000
0.000
Max Z
2024
19:1.0DL+1.0LL
0.053
-6.114
-5.473
0.137
5.475
0.000
-0.000
-0.000
Min Z
1999
20:1.0DL+1.0LL
0.053
-5.561
-0.000
0.000
-0.000
387
19:1.0DL+1.0LL
0.000
-5.649
-0.231
0.000
5.566
Max rX
5.649
0.000
-0.000
-0.000
Min rX
72
20:1.0DL+1.0LL
0.000
-5.565
-0.000
5.565
0.000
-0.000
Max rY
2046
17:1.0DL+1.0LL
0.905
-5.218
-0.030
5.296
-0.000
-0.000
0.001
-0.000
Min rY
2029
17:1.0DL+1.0LL
0.916
-5.136
-0.067
5.218
-0.000
-0.000
-0.001
0.000
Max rZ
1866
18:1.0DL+1.0LL
-0.496
-5.108
-0.013
5.132
-0.000
-0.001
0.000
Min rZ
1423
17:1.0DL+1.0LL
0.529
-5.191
-0.013
5.218
-0.000
-0.000
Max Rst
317
17:1.0DL+1.0LL
-0.000
-6.114
-0.000
6.114
0.000
-0.000
0.001
Print Run 1 of 1
Page 77
Page 78
Job Title
POWER TRANSFORMER
Job No
Part Power
Rev
Transformer
Ref
By
Client
Sheet No
File
ADDC
Date19-Jan-11
SKS
Chd
Date/Time
Pwr Txr.std
PSK
25-Apr-2011 12:31
L/C
Qx
Qy
Sx
Membrane
Sy
Sxy
Mx
Bending
My
Mxy
(N/mm2)
(N/mm2)
(N/mm2)
(N/mm2)
(N/mm2)
(kNm/m)
(kNm/m)
(kNm/m)
Max Qx
278
67:1.4DL+1.4E
0.202
0.002
-0.000
0.000
-0.000
-22.326
-17.728
0.450
Min Qx
269
67:1.4DL+1.4E
0.001
-0.000
0.000
0.000
-22.573
-17.958
-0.452
Max Qy
2040
68:1.4DL+1.4E
-0.201
0.024
0.279
0.000
-0.000
-0.000
-1.159
-0.823
-17.082
Min Qy
2052
68:1.4DL+1.4E
0.025
0.000
-0.000
0.000
-1.298
-0.998
17.348
Max Sx
2046
68:1.4DL+1.4E
-0.006
-0.282
-0.009
0.000
-0.000
-0.000
1.323
-0.209
0.536
Min Sx
280
68:1.4DL+1.4E
0.077
0.001
0.000
-0.000
-20.266
-8.214
0.808
Max Sy
2037
68:1.4DL+1.4E
0.137
0.139
-0.000
-0.000
0.000
-0.000
-6.320
-9.715
-7.816
Min Sy
68:1.4DL+1.4E
0.000
-0.031
0.000
-1.897
9.870
-0.141
2080
68:1.4DL+1.4E
-0.060
0.047
-0.000
-0.000
-0.000
0.000
Max Sxy
0.000
-5.616
-4.900
-3.482
Min Sxy
2081
68:1.4DL+1.4E
0.060
0.048
-0.000
-0.000
-4.934
3.504
280
67:1.4DL+1.4E
0.105
0.000
-0.000
0.000
-0.000
0.000
-5.656
Max Mx
3.295
-2.762
0.527
Min Mx
272
68:1.4DL+1.4E
0.001
0.003
-0.000
0.000
0.000
-41.157
0.000
Max My
384
67:1.4DL+1.4E
0.000
0.057
0.000
-0.000
0.000
-73.074
-5.758
12.214
0.099
Min My
272
68:1.4DL+1.4E
0.001
0.003
-0.000
0.000
0.000
-73.074
Max Mxy
364
68:1.4DL+1.4E
-0.027
0.022
-0.000
-0.000
0.000
-12.622
-41.157
-3.043
25.750
Min Mxy
351
68:1.4DL+1.4E
0.027
0.022
-0.000
-0.000
-0.000
-12.568
-3.040
-25.585
0.000
Print Run 1 of 1
Page 79
DERBY DESIGN
Project:
Date
Client:
ADDC
Design
SKS
Checked
PSK
Rev No.
Approved
SAK
Main
RANYA CONTRACTING ESTABLISHMENT
contractor:
Structure: POWER TRANSFORMER
25-Apr Page
Rev Date
MAIN REINFORCEMENT
OUTER / INNER
Mx DIRECTION
Main Steel
2
fcu
35
N/mm
fy
420
N/mm2
Mu
74
kNm
b
D
c
= 1000 mm
= 350 mm
=
75
mm
dm
16
mm
ds
16
mm
Effective depth
= D-c-dm/2
= 267 mm
Load case :
68
2
K = M / ( b x d x fcu )
= 0.030
= 257.89 mm
0.95 x d
Since 0.95xd,
200
200
= 253.65 mm
= 253.65
2
798
mm
=
mm c/c
mm c/c
455
mm
1005 mm
Hence OK.
Reinforcement Summary:
Provide main reinforcement T16 @ 200 mm c/c.
Page 80
Job Title
POWER TRANSFORMER
Job No
Part Power
Transformer
Ref
File
ADDC
Rev
By
Client
Sheet No
SKS
Pwr Txr.std
Date19-Jan-11
Date/Time
Chd
PSK
25-Apr-2011 12:31
MX
kNm/m
<= -73.1
-68.4
-63.8
-59.1
-54.5
-49.8
-45.2
-40.5
-35.9
-31.2
-26.6
-21.9
-17.3
-12.6
-7.97
-3.32
>= 1.33
Load 68
Mx
Print Run 1 of 1
Page 81
DERBY DESIGN
Project:
Date
Client:
ADDC
Design
SKS
Checked
PSK
Rev No.
Approved
SAK
Main
RANYA CONTRACTING ESTABLISHMENT
contractor:
Structure: POWER TRANSFORMER
25-Apr
Page
Rev Date
SECONDARY REINFORCEMENT
OUTER / INNER
My DIRECTION
Secondary Steel
2
fcu
35
N/mm
fy
420
N/mm2
Mu
42
kNm
b
D
c
=
=
=
1000
75
mm
mm
mm
dm
16
mm
ds
16
mm
Effective depth
= D-c-dm-ds/2
=
251
mm
Load case :
68
350
2
K = Mu / ( b x d x fcu )
= 245.57 mm
0.95 x d
Since 0.95xd,
200
200
0.019
= 238.45 mm
= 238.45
2
482
mm
=
mm c/c
mm c/c
455
mm
1005 mm
Hence OK.
Reinforcement Summary:
Provide seconday reinforcement T16 @ 200 mm c/c.
Page 82
Job Title
POWER TRANSFORMER
Job No
Part Power
Transformer
Ref
File
ADDC
Rev
By
Client
Sheet No
SKS
Pwr Txr.std
Date19-Jan-11
Date/Time
Chd
PSK
25-Apr-2011 12:31
MY
kNm/m
<= -41.2
-37.9
-34.7
-31.5
-28.3
-25.1
-21.8
-18.6
-15.4
-12.2
-8.95
-5.72
-2.5
0.718
3.94
7.16
>= 10.4
Load 68
My
Print Run 1 of 1
Page 83
DERBY DESIGN
Project:
Date
Client:
ADDC
Design
SKS
Checked
PSK
Main
contractor:
Rev No.
Approved
SAK
Structure:
POWER TRANSFORMER
Rev Date
Main steel
0.202 N/mm
Load case:
278
Thickness of Raft
Clear cover
25-Apr Page
67
350 mm
75 mm
16 mm
200 mm c/c
16 mm
200 mm c/c
267 mm
Effective depth
% of steel provided
=
=
As
0.202 N/mm
35 N/mm
0.38 %
<
0.57 N/mm
SAFE
Page 84
Job Title
POWER TRANSFORMER
Job No
Part Power
Transformer
Ref
File
ADDC
Rev
By
Client
Sheet No
SKS
Pwr Txr.std
Date19-Jan-11
Date/Time
Chd
PSK
25-Apr-2011 12:31
SQX
N/mm2
<= -0.201
-0.176
-0.151
-0.125
-0.100
-0.075
-0.050
-0.025
0
0.026
0.051
0.076
0.101
0.126
0.151
0.176
>= 0.202
Load 67
SQx
Print Run 1 of 1
Page 85
DERBY DESIGN
Project:
Date
Client:
ADDC
Design
SKS
Checked
PSK
Main
contractor:
Rev No.
Approved
SAK
Structure:
POWER TRANSFORMER
Rev Date
Secondary steel
0.282 N/mm
Load case:
2052
Thickness of Raft
Clear cover
25-Apr Page
68
350 mm
75 mm
16 mm
200 mm c/c
16 mm
200 mm c/c
251 mm
Effective depth
% of steel provided
=
=
As
0.282 N/mm
35 N/mm
0.40 %
<
0.59 N/mm
SAFE
Page 86
Job Title
POWER TRANSFORMER
Job No
Part Power
Transformer
Ref
File
ADDC
Rev
By
Client
Sheet No
SKS
Date19-Jan-11
Date/Time
Pwr Txr.std
Chd
PSK
25-Apr-2011 12:31
SQY
N/mm2
<= -0.282
-0.247
-0.212
-0.177
-0.142
-0.107
-0.072
-0.037
-0.002
0.033
0.068
0.103
0.138
0.173
0.208
0.244
>= 0.279
Load 68
SQy
Print Run 1 of 1
Page 87
WALL DESIGN
Page 88
Job Title
POWER TRANSFORMER
Job No
Part Power
Rev
Transformer
Ref
By
Client
Sheet No
File
ADDC
Date19-Jan-11
SKS
Chd
Date/Time
Pwr Txr.std
PSK
25-Apr-2011 12:31
L/C
Qx
Qy
Sx
Membrane
Sy
Sxy
Mx
Bending
My
Mxy
(N/mm2)
(N/mm2)
(N/mm2)
(N/mm2)
(N/mm2)
(kNm/m)
(kNm/m)
(kNm/m)
Max Qx
1236
68:1.4DL+1.4E
0.233
0.051
-0.245
-0.213
-0.029
-25.686
-4.142
3.010
Min Qx
897
68:1.4DL+1.4E
0.052
-0.246
-0.217
0.030
-25.818
-4.161
-3.017
Max Qy
1320
68:1.4DL+1.4E
-0.234
-0.002
0.231
-0.030
0.061
-0.019
-1.345
-14.494
-2.076
Min Qy
1770
68:1.4DL+1.4E
0.072
-0.234
-0.541
-0.021
-4.513
2.416
-5.056
0.001
-0.005
0.011
-4.079
-0.530
0.626
-0.003
-0.001
21.025
2.763
-0.311
0.085
-0.003
2.039
5.803
-0.188
-0.021
-4.513
2.416
-5.056
0.142
-3.992
4.483
1.300
-3.899
4.512
-1.350
Max Sx
1994
66:1.0DL+1.0E
-0.029
-0.225
-0.005
Min Sx
2004
68:1.4DL+1.4E
0.005
-0.029
Max Sy
1779
67:1.4DL+1.4E
0.000
0.053
-0.407
-0.014
Min Sy
1770
68:1.4DL+1.4E
0.072
-0.225
-0.234
Max Sxy
855
68:1.4DL+1.4E
-0.114
-0.122
-0.199
-0.541
-0.492
Min Sxy
842
68:1.4DL+1.4E
0.113
-0.121
-0.199
-0.479
Max Mx
2004
68:1.4DL+1.4E
0.005
-0.029
-0.407
-0.003
-0.140
-0.001
Min Mx
1957
68:1.4DL+1.4E
-0.104
0.128
-0.258
-0.066
-0.023
Max My
861
68:1.4DL+1.4E
-0.000
0.040
-0.156
0.041
Min My
1325
68:1.4DL+1.4E
0.001
0.230
-0.030
0.067
Max Mxy
1360
68:1.4DL+1.4E
-0.018
0.063
-0.176
Min Mxy
1802
68:1.4DL+1.4E
0.018
0.063
-0.176
21.025
2.763
-0.311
-3.237
-3.696
-0.000
-31.750
6.744
0.001
-1.385
-0.078
0.051
-0.079
-0.053
12.533
0.061
1.431
-14.560
1.379
12.801
1.436
1.410
-12.829
0.359
Print Run 1 of 1
Page 89
DERBY DESIGN
Project:
Date
Client:
ADDC
Design
SKS
Checked
PSK
Rev No.
Approved
SAK
Main
RANYA CONTRACTING ESTABLISHMENT
contractor:
Structure: POWER TRANSFORMER
25-Apr
Page
Rev Date
WALL DESIGN
Location
VERTICAL REINFORCEMENT
OUTER / INNER
My DIRECTION
Main Steel
2
fcu
35
N/mm
fy
420
N/mm2
Mu
15
kNm
b
D
c
=
=
=
1000
75
mm
mm
mm
dm
16
mm
ds
16
mm
Effective depth
= D-c-dm/2
=
167
mm
Load case :
68
250
2
K = Mu / ( b x d x fcu )
= 164.10 mm
0.95 x d
Since 0.95xd,
0.015
= 158.65 mm
= 158.65
=
=
mm c/c
mm c/c
=
259
mm
312.5
mm
1340 mm
Hence OK.
Reinforcement Summary:
Provide vertical reinforcement T16 @ 150 mm c/c.
Page 90
Job Title
POWER TRANSFORMER
Job No
Part Power
ADDC
Rev
Transformer
Ref
By
Client
Sheet No
File
SKS
Pwr Txr.std
Date19-Jan-11
Date/Time
Chd
PSK
25-Apr-2011 12:31
MY
kNm/m
<= -14.6
-12.9
-11.2
-9.48
-7.79
-6.09
-4.4
-2.71
-1.01
0.68
2.37
4.07
5.76
7.45
9.15
10.8
>= 12.5
Y
X
Z
Load 68
My
Print Run 1 of 1
Page 91
DERBY DESIGN
Project:
Date
Client:
ADDC
Design
SKS
Checked
PSK
Rev No.
Approved
SAK
Main
RANYA CONTRACTING ESTABLISHMENT
contractor:
Structure: POWER TRANSFORMER
25-Apr Page
Rev Date
WALL DESIGN
Location
HORIZONTAL REINFORCEMENT
OUTER / INNER
Mx DIRECTION
Secondary Steel
2
fcu
35
N/mm
fy
420
N/mm2
Mu
32
kNm
b
D
c
= 1000 mm
= 250 mm
=
75
mm
dm
16
mm
ds
16
mm
Effective depth
= D-c-dm-ds/2
= 151 mm
Load case :
68
2
K = M / ( b x d x fcu )
= 0.040
= 143.94 mm
0.95 x d
Since 0.95xd,
150
150
= 143.45 mm
= 143.45
2
610
mm
=
mm c/c
mm c/c
500
mm
1340 mm
Hence OK.
Reinforcement Summary:
Provide horizontal reinforcement T16 @ 150 mm c/c.
Page 92
Job Title
POWER TRANSFORMER
Job No
Part Power
ADDC
Rev
Transformer
Ref
By
Client
Sheet No
File
SKS
Pwr Txr.std
Date19-Jan-11
Date/Time
Chd
PSK
25-Apr-2011 12:31
MX
kNm/m
<= -31.8
-28.5
-25.2
-21.9
-18.6
-15.3
-12
-8.66
-5.36
-2.06
1.23
4.53
7.83
11.1
14.4
17.7
>= 21
Y
X
Z
Load 68
Mx
Print Run 1 of 1
Page 93
DERBY DESIGN
Project:
Date
Client:
ADDC
Design
SKS
Checked
PSK
Main
contractor:
Rev No.
Approved
SAK
Structure:
POWER TRANSFORMER
Rev Date
Main steel
0.231 N/mm
Load case:
1320
Thickness of Raft
Clear cover
25-Apr Page
68
250 mm
75 mm
16 mm
150 mm c/c
16 mm
150 mm c/c
167 mm
Effective depth
% of steel provided
=
=
As
0.231 N/mm
35 N/mm
0.80 %
<
0.82 N/mm
SAFE
Page 94
Job Title
POWER TRANSFORMER
Job No
Part Power
ADDC
Rev
Transformer
Ref
By
Client
Sheet No
File
SKS
Pwr Txr.std
Date19-Jan-11
Date/Time
Chd
PSK
25-Apr-2011 12:31
SQY
N/mm2
<= -0.225
-0.196
-0.168
-0.139
-0.111
-0.082
-0.054
-0.025
0.003
0.032
0.060
0.089
0.117
0.146
0.174
0.203
>= 0.231
Y
X
Z
Load 68
SQy
Print Run 1 of 1
Page 95
DERBY DESIGN
Project:
Date
Client:
ADDC
Design
SKS
Checked
PSK
Main
contractor:
Rev No.
Approved
SAK
Structure:
POWER TRANSFORMER
Rev Date
Secondary steel
0.234 N/mm
Load case:
897
Thickness of Raft
Clear cover
25-Apr Page
68
250 mm
75 mm
16 mm
150 mm c/c
16 mm
150 mm c/c
151 mm
Effective depth
% of steel provided
=
=
As
0.234 N/mm
35 N/mm
0.89 %
<
0.87 N/mm
SAFE
Page 96
Job Title
POWER TRANSFORMER
Job No
Part Power
ADDC
Rev
Transformer
Ref
By
Client
Sheet No
File
SKS
Pwr Txr.std
Date19-Jan-11
Date/Time
Chd
PSK
25-Apr-2011 12:31
SQX
N/mm2
<= -0.234
-0.205
-0.176
-0.147
-0.117
-0.088
-0.059
-0.030
-0.001
0.029
0.058
0.087
0.116
0.145
0.175
0.204
>= 0.233
Y
X
Z
Load 68
SQx
Print Run 1 of 1
Page 97
Page 98
LOAD CALCULATIONS
Page 99
DERBY DESIGN
Project:
Date
Client:
ADDC
25-Apr
Page
Design
SKS
Checked
PSK
Main
contractor:
Rev No.
Approved
SAK
Structure:
AUXILIARY TRANSFORMER
Rev Date
Load calculation
Weight of Transformer
20 kN
91 kN
111 kN
Wind Pressure
1.00 kN/m2
=
=
90 kN/m2
90 x 1.25
=(1.0x1.4x2.6)x25
=
Dimension of the tank =
kN/m2
1.75 kN
5.64 kNm
=1.753.225
Eccentricity
=5.64375/111
e=M/P
112.5
0.051 m
=P/A M/Z
=111/(11.4)+(5.64375/(1.41^2/6))
103.47 kN/m
875
mm2
5.64
kNm
Resisting moment
77.70
kNm
14
Factor of safety
=78/6
Hence ok
Page 100
DESIGN OF GRATING
Page 101
Project
Date
Made By
SKS
Checked By
PSK
Rev. No.
Approved By
SAK
Drg. Ref.
i ) Grating Design
Thickness of gravel
Weight of gravel
=
=
Live Load
5.00
kN/m2
Total Load
9.00
kN/m2
Grating type
Allowable load
>
200.00
mm
(200 / 1000) x 20
4.00 kN/m2
16.55
Actual load
Hence OK
L / 200
L
=
L / 200 =
1270.00
6.35
mm
mm
7.50
mm
2
For actual load of 9.0 kN/m , deflection
Actual deflection
=
=
<
(7.50 / 16.55) x 9
4.08 mm
Allowable deflection
Hence OK
Page 102
Page 103
Page 104
Page 105
Project
Client
Main
DERBY DESIGN Contractor
Structure
Abu Dhabi
Date
Made By
SKS
Checked By
PSK
Rev. No.
Approved By
SAK
POWER TRANSFORMER
Drg. Ref.
0.2 x 20 =
4.00
kN/m2
0.50
kN/m2
Total Load
4.50
kN/m
= 1.27/2+1.05/2 =
1.16
= 4.5 x 1.16
5.22
kN/m
0.23
kN/m
=
say =
5.45
5.50
kN/m
kN/m
=
say =
5.80
6.00
kN/m
kN/m
Live Load
Live load on beam for 1.16m spacing
= 5 x 1.16
1.125 m
B
BEAM
Page:
Made by:
Date:
Ref No:
Office:
1
Page 106
SKS
25.04.11
1328
<
>
Beam span
Young's modulus
L=1.125 m
E=205 kN/mm 2
Section properties
Section size
203 x 102 x 23 Universal Beam
Depth of steel section
D=203.2 mm
Width of steel section
B=101.8 mm
Thickness of web
t=5.4 mm
Thickness of flange
T=9.3 mm
Root radius
r=7.6 mm
Inertia about major axis
Ix=2105 cm 4
Inertia about minor axis
Iy=164 cm 4
Plastic modulus about major axis Sx=234 cm 3
Torsional constant
J=7.02 cm 4
Area of section
A=29.4 cm 2
Radius gyration about minor axis ry=SQR(Iy/A)=SQR(164/29.4)=2.3618 cm
Dead load factor
Imposed load factor
gamd=1.4
gami=1.6
Lau
Lbu
>
>
Lau(1)=0 m
Lbu(1)=1.125 m
Gku(1)=5.5 kN/m
Qku(1)=6 kN/m
Page:
Made by:
Date:
Ref No:
Office:
BMs at 20th points, from left to right (sagging is positive)
2
Page 107
SKS
25.04.11
0.52001
0.98529
2.299
2.4906
2.7095
2.6274
1.7516
1.3958
Maximum span bending moment
1.3958
2.6274
2.4906
0.98529
2.7369 kNm
1.7516
2.7095
2.299
0.52001
1328
2.0527
2.7369
2.0527
0
End shears
Shear force at left hand end
Shear force at right hand end
Shear force
9.7313 kN
9.7313 kN
Fv=Rlhe=9.7313 kN
Unfactored
Unfactored
Unfactored
Unfactored
3.0938 kN
3.375 kN
3.0938 kN
3.375 kN
dead shear at
imposed shear
dead shear at
imposed shear
LHE
at LHE
RHE
at RHE
Midspan deflections
Unfactored dead load deflection
Unfactored imposed load deflectn
Total DL & imposed deflection
Span:defln ratio for dead load
Span:defln ratio for imposed load
Span:defln ratio for total load
From Table 5
Limiting deflection (non-brittle)
0.026583 mm
0.029 mm
0.055583 mm
42320
38793
20240
DELlim=L*1000/200
=1.125*1000/200
=5.625 mm
Since imposed load deflection <= DELlim ( 0.029 mm <=5.625 mm )
deflection within limiting value.
Strength of steel
Clause 3.1.1
py=275 N/mm 2
Section classification
Constant (Table 7 Note 3)
e=(275/py)^0.5
=(275/275)^0.5
=1
Outstand
b=B/2=101.8/2=50.9 mm
Ratio
b'T=b/T=50.9/9.3=5.4731
Compact limiting value of ratio
b'Tlim=9.5*e=9.5*1=9.5
b/T ratio within limiting value of 9.5e.
Compact limiting value of ratio
d'tlim=98*e=98*1=98
Page:
Made by:
Date:
Ref No:
Office:
d=D-2*(T+r)
=203.2-2*(9.3+7.6)
=169.4 mm
Ratio
d't=d/t=169.4/5.4=31.37
d/t ratio within limiting value of 98e.
Therefore section is compact.
3
Page 108
SKS
25.04.11
1328
Buckling resistance
Since the beam is subject to possible lateral torsional buckling, the
buckling resistance moment Mb is first considered rather than the
moment capacity Mc as a guide to selection. A conservative analysis
is adopted, taking the worst moment with the greatest effective length.
Equivalent uniform moment
Mbar=M=2.7369 kNm
Greatest effective length
Le=1.125 m
Slenderness of section
lambda=(Le*1000)/(ry*10)
=(1.125*1000)/(2.3618*10)
=47.633
Torsional index
x=0.566*((D-T)/10)*(A/J)^0.5
=0.566*((203.2-9.3)/10)*(29.4
/7.02)^0.5
=22.459
Ratio
ratio=lambda/x=47.633/22.459=2.1208
Factor
N=0.5
Slenderness factor
v=TABLE 14 for ratio=2.1208, N=0.5
=0.95396
Factor from Table 13
n=1.0
Appendix B.2 is used to calculate the buckling resistance moment.
Buckling parameter
u=(4*Sx^2*(1-Iy/Ix)/(A^2*((D-T)
/10)^2))^0.25
=(4*234^2*(1-164/2105)/(29.4^2
*((203.2-9.3)/10)^2))^0.25
=0.88788
Equivalent slenderness
lamlt=n*u*v*lambda
=1*0.88788*0.95396*47.633
=40.345
Bending strength
pb=TABLE 11 for lamlt=40.345, py=275
=261.17 N/mm 2
Buckling resistance
Mb=Sx*pb/10^3
=234*261.17/10^3
=61.114 kNm
Since Mbar<Mb ( 2.7369 kNm < 61.114 kNm ) section O.K. for
lateral torsional buckling resistance.
Page:
Made by:
Date:
Ref No:
Office:
4
Page 109
SKS
25.04.11
1328
Shear capacity
Avx=D*t=203.2*5.4=1097.3 mm 2
Pv=0.6*py*Avx/1000
=0.6*275*1097.3/1000
=181.05 kN
Since Fv <= Pv ( 9.7313 kN <=181.05 kN ) shear force in web within
shear capacity.
Shear area
Shear capacity
Moment capacity
Elastic modulus
Zx=Ix/(D/20)
=2105/(203.2/20)
=207.19 cm 3
Mc=py*Sx/10^3
=275*234/10^3
=64.35 kNm
Limiting value of moment capac
Mclim=1.2*py*Zx/1000
=1.2*275*207.19/1000
=68.371 kNm
Mc is within limiting value, therefore no reduction.
Since M <= Mc ( 2.7369 kNm <=64.35 kNm ) applied moment within
moment capacity.
N.B. Buckling resistance is less than moment capacity and therefore
buckling resistance controls the design.
UNIVERSAL BEAM
DESIGN
SUMMARY
Page 110
Page 111
Customer No.:
Page:
Location:
Quotation:
Hilti AG
FL-9494 Schaan
Project:
1 of 4
GHANTOOT
List No.:
HAP v3.3c
Phone:
Date:
Resp.: PSK
Positioning
Anchoring plate:
lx=250 mm ly=300 mm
s1=150 mm s2=200 mm
s2
Anchor
Anchor in slotted hole
s1
3
Vy
Concrete
Compressive class: C35/45
Compression zone / uncracked concrete
Thickness of base material: 250 mm
no edge reinforcement
close reinforcement (close reinforcement (s <= 15 cm))
Data and results must be checked for agreement with the actual existing conditions and for plausibility!
HAP v3.3c 2003 Hilti AG, FL-9494 Schaan
27-01-2009
Page 112
Customer No.:
2 of 4
Page:
Location:
Quotation:
Hilti AG
FL-9494 Schaan
Project:
GHANTOOT
List No.:
HAP v3.3c
Phone:
Date:
27-01-2009
Resp.: PSK
HSA-M12
Tension Load N
Anchor
Design value of tension load
NSd,i
NSd = NSd,i
1
0.0 kN
2
0.0 kN
3
0.0 kN
4
0.0 kN
n
g
= 0.0 kN
i=1
Steel failure
Characteristic value for one anchor
Partial safety factor
NRk,s = -- Ms = 1.00
NRd,s =
NRk,s
Ms
= ---
Check
NSd
= 0.00
NRd,s
Check
NSd
= 0.00
NRd,p
Pullout failure
Characteristic value for one anchor
Partial safety factor
NRk,p = -- Mp = 1.00
NRd,p =
NRk,p
Mp
= ---
NRk,c
= ---
Ac,N
= ---
0
c,N
= ---
s,N
= 1.00
re,N = 1.00
eN,x
ec,N,x = 1.00
ucr,N = 1.00
= 0 mm
eN,y
= 0 mm
ec,N,y = 1.00
NRk,c = NRk,c
Ac,N
0
Ac,N
Mc = 1.00
NRd,c =
NRk,c
Mc
Data and results must be checked for agreement with the actual existing conditions and for plausibility!
HAP v3.3c 2003 Hilti AG, FL-9494 Schaan
= ---
Check
NSd
= 0.00
NRd,c
Page 113
Customer No.:
3 of 4
Page:
Location:
Quotation:
Hilti AG
FL-9494 Schaan
Project:
GHANTOOT
List No.:
HAP v3.3c
Phone:
Date:
27-01-2009
Resp.: PSK
HSA-M12
Shear Load V
Anchor
Design value of shear in x
VSd,x,i
1
0.0 kN
2
0.0 kN
3
0.0 kN
4
0.0 kN
VSd,y,i
-2.5 kN
-2.5 kN
-2.5 kN
-2.5 kN
g
Sd,x
= VSd,x,i = 0.0 kN
g
Sd,y
= VSd,y,i = -10.0 kN
i=1
VSd,i
i=1
2.5 kN
2.5 kN
2.5 kN
2.5 kN
VRk,s = 23.0 kN
Ms = 1.62
VRd,s =
VRk,s
Ms
= 14.2 kN
Check
VSd
= 0.18
VRd,s
VRk,c
= ---
Ac,V
= 0 mm
0
c,V
= 0 mm
s,V
= 1.00
h,V
= 1.00
,V
= 1.00
eV,x
= 0 mm
ec,V,x = 1.00
ucr,V = 1.0
eV,y
= 0 mm
ec,V,y = 1.00
VRk,c = VRk,c
Ac,V
0
Mc= 1.00
VRk,c,x = ---
Ac,V
Design value of resistance
VRd,c =
VRk,c
Mc
Data and results must be checked for agreement with the actual existing conditions and for plausibility!
HAP v3.3c 2003 Hilti AG, FL-9494 Schaan
= ---
Check
VSd
= 0.00
VRd,c
Page 114
Customer No.:
Page:
Location:
Quotation:
Hilti AG
FL-9494 Schaan
HAP v3.3c
Project:
GHANTOOT
List No.:
Phone:
Date:
Resp.: PSK
VRk,c = 225.3 kN
Mc = 1.80
27-01-2009
HSA-M12
VRd,c =
VRk,c
Mc
Data and results must be checked for agreement with the actual existing conditions and for plausibility!
HAP v3.3c 2003 Hilti AG, FL-9494 Schaan
4 of 4
= 125.2 kN
Check
VSd
= 0.08
VRd,c
Page 115
DERBY DESIGN
Project:
25-Apr
Client:
ADDC
Design
SKS
Checked
PSK
Main
contractor:
Rev No.
Approved
SAK
Structure:
POWER TRANSFORMER
Rev Date
a) Shear
Basic requirement
V=
n=
db =
tp =
10
2
kN
12
mm
12
mm
lp =
e2 =
300
mm
50
mm
py =
Pbs =
275
N/mm2
460
N/mm2
Pvp =
0.6 py Av
Av =
=
Dh =
Av =
0.9Anet
0.9 tp (lp - 2 Dh)
14
mm
Pvp =
V/2 =
2635.2
434.8
mm2
kN
b) Bearing
Basic requirement
db tp pbs =
1/2 e2 tp pbs =
Check, db tp pbs <= 1/2 e2 tp pbs =
66.24
kN
138
kN
Pbs =
Pbs =
=
V/2 =
66.24
Check Ok.
kN
n Pbs
132.48
5
kN
Page
Page 116
INPUT DRAWING
Page 117
Page 118
Page 119
Page 120
Page 121
SOIL REPORT
Page 122
Page 123
STRUCTURAL DRAWINGS
Page 124
Page 125
Page 126
Page 127