Design of Combined Footing
Design of Combined Footing
General information
Take rho = rmin = 0.002
fyk =
Concrete grade =
fck =concrete grade/1.25 =
fctd = 0.21*((fck)^0.67)/1.5 =
Allowable punching resistance of concrete,
Vup(KPa)
Allowable wide beam shear resistance of
2
concrete, Vud (KN/m )
Allowable bearing pressure, Pall (KPa)
Foundation depth, fd (m)
3
300
25
20.00
1.04
= 390.71
250
3.00
18.00
0.30
0.30
Sizing the footing
F6
272.00
0.60
= 2*(r + a1/2 + e)
11.33
= 0.25fctd(1+50*rho)
= P1 + P2
fcd= 0.85*fck/1.5
= 781.41
Resultant force, R
Distance b/n the two columns, x
Centroid of the footing from P1, e
260.87
= 0.5fctd(1+50*rho)
Footing group
Loads: P1 (lighter) and P2 (heavier) (KN)
fyd= fyk/1.15
440.00
=
712.00
0.62
2.74
1.00
= (P2 * x)/R
= D - 0.05
= Pall-[D*c+ (fd-D)*s]
= R/Pnet
0.25
=
=
193.90
3.67
= A/L
= P1-Pnet (a1+d)^2
= P2-Pnet (a2+d)^2
= Vp1/(4(a1+d)*d)
=
=
=
= Vp2/(4(a2+d)*d)
= P2-Pnet[(r+2e+(a1+a2)/2+d-x)W]
= Vw2/(b*d)
Longitudinal reinforcement
136.00
= (Md*10^6/fcd*b*d^2)
= 1 -(1 - 2*N)^0.5
= B*fcd*b*d/fyd
= 0.5/fyk*b*d
1.34
213.35
381.35
= 387.90
= 693.36
= 79.32
= 317.29
=
0.19
= 0.22
= 2336.70
= 416.67
20.00
= 3.14*^2/4
= Asing*1000/As
= Asing*1000/Asmin
Final
314.29
=
=
134.50
754.29
= 0.5*(P2/(1*W)) ((W-a2)/2)^2
= (Md*10^6/fcd*b*d^2)
= 1 -(1 - 2*N)^0.5
= B*fcd*b*d/fyd
= 0.5/fyk*b*d
Diameter (mm)
Asing
Spacing for As
Spacing for Asmin
= 3.14*^2/4
= Asing*1000/As
= Asing*1000/Asmin
Final
Use 2.80m
0.30
=
=
=
=
44.51
0.06
0.06
705.31
416.67
14.00
154.00
= 218.34
= 369.60
use 14 c/c 200
Use 1.40m