4.1
Activity
Operation
High Voltage Substation & AC Distribution System AC/DC Converters, Reactive Power Compensators & Harmonic Filters Switching Networks, Discharge Circuits, DC Distribution & Instrumentation EC H&CD Power Supplies-Initial IC H&CD Power Supplies-Initial LH H&CD Power Supplies-Initial NB H&CD Power Supplies DNB Power Supplies Steady State Electrical Power Network Power Supply for TF Coils Cold Factory Tests Icon Cyclotron Launcher Icon Cyclotron Main Transmission Lines Icon Cyclotron RF Power Sources Equatorial Launcher Upper Launcher Transmission Lines RF Power Sources & Controls Assembly & Testing Beam Source & High Voltage Bushing Beamline Components Confinement & Shields Active Correction Compensation Coils Lower Hybrid Launcher Lower Hybrid Main Transmission Line Lower Hybrid RF Power Sources Diagnostics Magnetics Neutron Systems Optical Systems Bolometry Spectroscopic Systems Microwave Systems Operational Systems Standard Diagnostics Tokamak Complex & Tritium Building Laydown & RFH Assembly Building Hot Cell Building Radwaste Building AC Distribution Building EPS Building Control Diagnostic Tunnels & Bridges Equipment Foundations Concrete Tank Foundations Site Infrastructure Hot Basin ET Building Personnel & Access Control Building Magnet Power Supply Building North Mag Power Converter Building South Mag Power Converter Building NBI Power Supply Building 3.3 KV Power Supply Building Cryoplant Cold Box Building Cryoplant Compressor Building
5.1
Icon Cyclotron Heating & Current Drive System 10 20 30 Electron & Cyclotrone Heating & Current Drive System 11 12 20 30 Neutral Beam Heating & Current Drive System 10 20 30 40 50 Lower Hybrid Heating & Current Drive System 10 20 30 Diagnostics 10 20 30 40 50 60 70 80 Reinforced Concrete & Site Infrastructure Elements 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 Steel Frame Buildings 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08
5.2
5.3
5.4
5.5
6.2.P1
6.2.P2
9/2/03 10:08:12 AM
Page No 2 of 6
Item 2.09 2.10 6.2.P3 6.3 Heat Rejection System 3.01 Waste Treatment System 10 20 30 40 50 60 70 80 6.4 Radiology & Environmental Monitoring Systems 10 20 30 40 50 60 70 80
Activity Site Services Building Laboratory & Office Building Heat Rejection System Engineering Fabrication Factory Testing Packaging & Transport Installation Testing Documentation Spares Engineering Fabrication Factory Testing Packaging & Transport Installation Testing Documentation Spares