The BBR Network is recognized as the leading group of specialized engineering contractors in the field of post-tensioning, stay cable and related construction engineering. The innovation and technical excellence, brought together in 1944 by its three Swiss founders Antonio Brandestini, Max Birkenmaier and Mirko Robin Ros continues, more than 60 years later, in that same ethos and enterprising style. From technical headquarters in Switzerland, the BBR Network reaches out around the globe and has at its disposal some of the most talented engineers and technicians, as well as the very latest internationally approved technology.
THE GLOBAL BBR NETWORK
Within the Global BBR Network, established traditions and strong local roots are combined with the latest thinking and leading edge technology. BBR grants each local BBR Network member access to the latest technical knowledge and resources and facilitates the exchange of information on a broad scale and within international partnering alliances. Such global alliances and co-operations create local competitive advantages in dealing with, for example, efficient tendering, availability of specialists and specialized equipment or transfer of technical know-how.
ACTIVITIES OF THE NETWORK
All BBR Network members are well-respected within their local business communities and have built strong connections in their respective regions. They are all structured differently to suit the local market and offer a variety of construction services, in addition to the traditional core business of post-tensioning.
BBR TECHNOLOGIES
BBR technologies have been applied to a vast array of different structures such as bridges, buildings, cryogenic LNG tanks, dams, marine structures, nuclear power stations, retaining walls, tanks, silos, towers, tunnels, wastewater treatment plants, water reservoirs and wind farms. The BBR brands and trademarks CONA, BBRV, HiAm, DINA, SWIF and CONNAECT are recognized worldwide. The BBR Network has a track record of excellence and innovative approaches with thousands of structures built using BBR technologies. While BBRs history goes back over 60 years, the BBR Network is focused on constructing the future with professionalism, innovation and the very latest technology.
BBR VT International Ltd is the Technical Headquarters and Business Development Centre of the BBR Network located in Switzerland. The shareholders of BBR VT International Ltd are: BBR Holding Ltd (Switzerland), a subsidiary of the Tectus Group (Switzerland); KB Spennteknikk AS (Norway), BBR Polska Sp. z o.o. (Poland) and VORSPANN-TECHNIK GmbH & Co. KG (Austria / Germany), all members of the KB Group (Norway); BBR Pretensados y Tcnicas Especiales, S.L. (Spain), a member of the FCC Group (Spain).
www.bbrnetwork.com
Peak of perfection
BBR VT CEO on Swiss quality and a return to tr ue values
With the world financial crisis dominating the news in recent months, you might expect business confidence to be at a low ebb everywhere but within the BBR Network, we are ready! We believe that any crisis also presents opportunities on this occasion, there are many accelerated infrastructure projects coming up in various countries to which our technology and skills are ideally suited.
The BBR Network approaches each new challenge with continued professionalism and yet more innovative solutions based on the finest Swiss technology as you will discover when you turn the pages of this edition of CONNAECT. Clients all around the world are now experiencing and appreciating the benefits of our very latest and most stringently tested technology and when this comes together with the skill of BBR Network members, BBR becomes a compelling brand. Our brand is further strengthened by the sharing of knowledge and resources between BBR Network members the joint ventures and collaborations during the past 12 months have delivered some outstanding results. Through our people and technology, we can help to deliver certainty of outcome not only for main contractors and their clients, but also for the communities for whom the structures are created. With our dedicated teams working together around the world and our always up to date and fully certified technology the BBR Network is in a very strong and competitive position as the world begins to feel the effects of this recession.
Bruno Valsangiacomo
Chairman BBR VT International Ltd
Marcel Poser
CEO BBR VT International Ltd
CONNCT
P11
P63
Part of a major pan-European highway, the new River Bug Bridge in northern eastern Poland was a complex free cantilever construction requiring two sets of form travelers.
Calatrava's elegant new masterpiece in Spain provides not only a focal point for Valencia, but also reassurance that the very latest technology has been applied the BBR HiAm CONA Stay Cable system.
Contents
Talking BBR
4 7 10
PEAK OF PERFECTION BBR VT CEO on Swiss quality and a return to true values SWISS QUALITY ASSURANCE World record breaking BBR testing, quality systems and technologies CONFERENCE NEWS Conference report including news of the 2009 Global BBR Network conference and Project of the Year 2008
16 18 19 20
ECONOMIES WITH MOVABLE COUPLERS A9 Motorway Bridges, Austria CROSS-BORDER LAUNCH Albury-Wodonga Bridge, Australia NOTABLE AND COMMENDED Zallaq Bridge, Kingdom Of Bahrain IMPROVING SAFETY & TRAFFIC FLOW Railway Overbridge, Hamilton, New Zealand BRIDGE OVER LIVE TRACKS Lipa-tore Bridge, Croatia SPEEDY INFRASTRUCTURE PARTNERSHIP E18 Motorway Bridges, Langker Bommestad, Norway BRIDGE DECK ENGINEERING Second Vivekananda Bridge Project, India LAUNCHING DOWNHILL St Andreu de la Vola and Eix del Llobregat Bridges, Spain SHAPING A SOLUTION Zarqa College Bridge, Jordan
28
DELIVERING CERTAINTY
Kampong Pandan Flyover, Kuala Lumpur, Malaysia
Buildings
31 35 36 37 37 38 39 42
THE REAL THING Coca Cola Amatil Storage & Distribution Facilities, Sydney, Australia INDIAN FIRST FOR PT WITH STEEL Multi-level Car Park, Pune, Maharastra, India TOWARDS ZERO WASTE Recycling Plant, Auckland, New Zealand SHAPING THE MUMBAI SKYLINE Oberoi Commercial Tower 1, Mumbai, India VIBRANT GEM BY THE BAY Floating Stadium, Marina Bay, Singapore PROOF OF PT VERSATILITY Burjuman Centre Extension, Dubai, United Arab Emirates RING OF CONFIDENCE Sports Arena, dz, Poland RACE AGAINST TIME Warehouse at Pioneer Walk, Singapore
21 22
Bridges
11 14
BRIDGES LINKING EUROPE Wyzskw Bridge, Poland FIRST USE OF BBR VT CONA CMI IN WESTERN AUSTRALIA Perth Bunbury Highway Bridges, City of Mandurah, Australia PT FULFILLS VISION Bridges, Blauwe Stad, Netherlands REDUCING TRAFFIC VOLUMES Bridge BU2, Burgdorf, Germany
23 24 24 26
15 15
P39
P70
P79
P73
2 CONNCT
P62
P55
P31
P52
The Grmpental Bridge in Germany features the longest concrete arch for a railway bridge in Europe realized with heavy lifting know-how from the BBR team.
Structural Systems the BBR Network member in Australia has been playing a major role in the realization of two stateof-the-art distribution centers for Coca Cola Amatil (CCA).
The Shurovo Cement Works in Russia has three new silos. They were constructed using European approved BBR VT CONA CMI technology.
43 43 44 44 45 46
HIDDEN STRENGTH The Lofts, Burj Dubai Development, United Arab Emirates CANALSIDE INNOVATION Clancy Quay, Dublin, Ireland LARGEST JOINT-FREE PT SLAB Business Park Warehouse, Auckland, New Zealand AN ARCHITECTS DREAM Radisson SAS Hotel, Dubrovnik, Croatia TOWERING TECHNOLOGY Caja Madrid Tower, Spain GREEN AND LEAN New Commonwealth Bank Campus, Sydney, Australia
Special Applications
55 58
LONGEST IN EUROPE Grmpental Bridge, Germany ACCOMMODATING TOMORROWS LEADERS Ground stabilization, Wellington, New Zealand EXTENDING OIL PRODUCTION Sleipner B Compression, North Sea SOLUTION FOR DEEP VERTICAL EXCAVATION Deep Excavation, Bangalore, India BRIDGE FOR THE COMMUNITY John Paul II Bridge, Pulawy, Poland NEW SENSING TECHNOLOGY BBR WIGAbloc MAKING MOVES Church Relocation, Raaba, Austria
70 72
COLLABORATION FOR NZ FIRST Cable Stay Bridge, Auckland, New Zealand SOLUTION OF CHOICE Rio Seco Bridge, Castelln, Spain
59 59 60 61 62
MRR
73 76 77
MOVING WITH THE TIMES Bridge Seismic Strengthening, New Zealand ELEGANT RETROFIT SOLUTION Westfield London Development, UK PRESERVING THE PAST FOR THE FUTURE Seismic Strengthening, Christchurch, New Zealand SYSTEM IN TRANSIT ITTS Bearing Replacement, Gatwick Airport, UK
78
Stay Cables
63 67 68 69
STAYING POWER IN VALENCIA Serrera Bridge, Valencia, Spain UNIQUELY ENGINEERED Installation of locked coil rope stays, Crdoba & Zaragoza, Spain COMPLEX CHALLENGE Dunajec River Bridge, Brezna, Poland OVERNIGHT INSTALLATION Fort Hatry Railway Bridge, Belfort, France
Landmark Structures
79 84
HIGHEST TENSION Sky Tower, Auckland, New Zealand SCALING NEW HEIGHTS Sydney Tower, Australia
86
CONNCT
arcel Poser, BBR VT Internationals CEO shares his thoughts about the excellent reputation of Swiss technology, his views on the current world financial crisis and the way forward not only for BBR, but also for the global community as a whole.
4 CONNCT
Peak of
LIKE MOST COMPANIES IN SWITZERLAND, WEVE ATTRACTED A RANGE OF INTERNATIONAL TALENT ONTO OUR TEAM AND WHEN YOU ADD THE FEEDBACK AND SUPPORT OF OUR GLOBAL NETWORK, IT BECOMES A POWERFUL COMBINATION INTERNATIONAL EXPERTISE AND KNOWLEDGE MANAGEMENT, SWISS TECHNOLOGY AND WORLD CLASS PRODUCTS.
DOWN THE YEARS, THE SWISS HAVE ALWAYS PRODUCED INNOVATIVE, PRECISE AND RELIABLE TECHNOLOGY, ITS SOMETHING WE DO WELL HERE WE ALWAYS SEEK TO ACHIEVE THE PEAK OF PERFECTION.
Per fection
CONNCT
TALKING BBR
Q: BUT WHAT ABOUT SHARING KNOWLEDGE WITHIN THE CONSTRUCTION INDUSTRY AS A WHOLE?
MP: Actually, I make a point of taking part in industry dialogues and fundamental technical committees personally. You have to drive these things from the highest level and, despite the time this takes, its an investment in future success. And its only in this way that a companys technologies and services can be thoroughly understood, regulated and promoted.
costs, it should never be by simple and blind cost-cutting. Although it sounds harsh, sometimes you first have to spend one dollar to make two. If you try to make one dollar without spending anything, at best you will end up where you were before and at worst there will be negative results in the shortto-medium term, this will all backfire. There needs to be a finely tuned balance between spending where you have to spend and optimizing where you can optimize. This doesnt just apply to money, but to effort as well if you put a lot in, youll get a lot back. This is especially valid for times like these. And there are definitely areas where you can optimize, but this must be done carefully!
Within the BBR Network we have always walked the walk first, before we have talked the talk marketing is good, but if you scratch the surface you might discover that companies havent actually done the work. You only have to look at the testing weve completed and we actually did more than was required to know that there is substance behind our claims ... and lots of engineering work! We also invest in the BBR Network. We encourage and facilitate the sharing of knowledge and resources between members.
6 CONNCT
CONNCT
TALKING BBR
Over recent months, the team has performed tests on a variety of sizes and configurations of BBR VT CONA CMX anchorages ranging from 1 to 73 strands. So far, we have carried out 122 static, 78 fatigue and 33 load transfer tests and were still counting! In addition to the mandatory tests, we have successfully performed a large number of special installation, stressing, deviator / saddle and grouting tests. Today, we have the best technology available backed by the European Technical Approval (ETA) and the associated Certificate of Conformity (CE) we have secured.
The BBR VT CONA CMX range consists of five systems which cover the entire spectrum of posttensioning needs:
u u u u u
BBR VT CONA CMI internal post-tensioning system BBR VT CONA CMM unbonded posttensioning system BBR VT CONA CME external posttensioning system BBR VT CONA CMF flat anchorage posttensioning system BBR VT CONA CMB band post-tensioning system
STATE-OF-THE-ART POST-TENSIONING
The BBR Network offers a complete range of post-tensioning (PT) systems which have been applied to a vast array of different structures such as bridges, buildings, tanks, dams, power stations and just about any other structure you can think of. In addition to the BBRV wire PT technology and BBR CONA strand systems that have been used successfully for many decades, we have created some completely new technology the BBR VT CONA CMX family which incorporates current market needs with all the advances and knowledge gained over the past 60 years by the BBR Network.
BBR products continue to promote faster construction programs through early strength concrete stressing which reduce the construction cycle time. BBR technologies remain the benchmark for compactness in the anchor zone. Furthermore, a wide product range and size offering promotes the use of only what is really needed.
ASSURING QUALITY
BBR E-Trace is an integral part of the BBR VT CONA CMX quality assurance. The internetbased software links all members of the BBR Network including BBR PT Specialist Companies, BBR component manufacturers and BBR headquarters. This comprehensive web platform fulfils the vision of e-commerce. It covers supply chain management, procurement and communication, as well as providing an engineering database and quality management system which includes traceability and document control.
8 CONNCT
STAYING POWER
The BBR HiAm CONA parallel strand stay cable system is unrivalled anywhere on the planet. Developed by our own engineers in Switzerland, its high static strength, leak tightness and superior fatigue resistance HiAm stands for high amplitude fatigue resistance makes it attractive for the most challenging of projects and thus it appeals to engineers and clients alike. The BBR DINA/HiAm wire stay cable system composed of 7 mm wires and the BBR Carbon system complement the stay cable family of BBR. To assure the highest quality product, all of the system components are subjected to the most stringent testing and quality assurance procedures, based internationally recognized codes and recommendations.
TALKING BBR
International networking
a perfect time to be in that great city which is sure to inspire some productive discussions and knowledge-sharing. BBR Network members will be presenting information about challenging applications and the team from BBR Headquarters will give updates on commercial and technological developments. Of course, several social events will complement the conference.
Every year, the BBR Network meets at an annual conference providing both a forum for the exchange of information and an opportunity to get to know other BBR Network members informally.
SYDNEY 2008
In 2008, the BBR Network got together in Sydney, Australia where, besides a number of BBR technology updates, the international BBR family participated in a charity golf tournament and still
had the energy to climb the Sydney Harbor Bridge! The conference reached its climax with the formal BBR dinner during which the winner of the 2008 BBR Project of the Year award was announced.
Among the vast number of applicants, the Ross River Dam project convinced the jury most because the project so perfectly demonstrates the long-standing capability of the BBR Network in the use of specialist large capacity tendons for the upgrading of dams around the world. As a result of their excellent work on this project, Structural Systems have recently been awarded the contract for upgrading the Catagunya Dam in Tasmania where the task will feature the installation of permanent anchors with the highest breaking load ever installed in Australia!
10 CONNCT
CONNCT 11
BRIDGES
he S8 Express road in northeastern Poland is part of panEuropean transit passageway linking the Baltic countries and Finland with Poland and the rest of Europe. The growing volume of traffic has necessitated widening of the road to increase capacity.
The task, consisted of three parts modernization of a two lane road, widening of the existing road and a most important part of the task building the Wyszkw bypass and, by the free cantilever method, constructing a bridge over the River Bug.
DESIGN CONCEPT
Two independent structures were designed as a continuous nine span beam with a total length of 600 m. Three main spans (80 m + 136 m + 80 m) were built using the free cantilever method and were cast in-situ, while the side spans were built using traditional formwork. The height of the box girder is 7.5 m at the top of the piers and 3.1 m in midspan. All tendons have been designed as internal, 19-150 type and the steel used weighed in at a total of 518 t. The 38 tendons for
12 CONNCT
negative moments during the cantilevering phase are located in the deck slab and post-tensioning for the final stage was laid out to accommodate the bending moment.
TEAM & TECHNOLOGY OWNER GDDKiA, Warsaw MAIN CONTRACTOR PRM Mosty dz S.A. DESIGNER Profil Sp. z o.o. TECHNOLOGY BBR CONA internal Balanced cantilever BBR NETWORK MEMBER BBR Polska Sp. z o.o. (Poland)
BRIDGES
winter, forced the contractor to take additional measures with regard to the concrete special tents and heating machines were used. And, despite freezing night-time temperatures, work continued around the clock. Concreting of the bridge superstructure was completed in spring 2008.
TO DATE, ALL FREE CANTILEVER BRIDGES BUILT IN POLAND SINCE 1998 HAVE BEEN CONSTRUCTED WITH THE EXPERTISE OF THE BBR TEAM.
The Southern Gateway Alliance is an alliance between Government, consultants GHD and Leighton Contractors. The scheme had four incrementally launched bridges in which we were involved. The design was changed to incorporate the new BBR VT CONA CMI multistrand system. The project consists of two bridges over the Serpentine River and two over the Murray River with individual bridges for each direction of traffic. Each of the Serpentine bridges consisted of seven segments giving them an overall length of approximately 110 m. Four sets of launching jacks were used for the incremental launching, as each bridge was constructed and launched in tandem. The Serpentine bridges had approximately 100 t of post-tensioning with 1206, 1906 and 3106 anchorages and couplers. The Murray River bridges started shortly after the completion of the Serpentine River bridges. Each
of these bridges consists of 18 segments with an overall length of approximately 280 m. The launching equipment from the Serpentine
bridges was re-located and used for the launching of the Murray bridges. The Murray bridges had approximately 170 t of post-tensioning with 1206, 1906 and 2206 anchorages and couplers. l
TEAM & TECHNOLOGY OWNER Main Roads Western Australia MAIN CONTRACTOR Southern Gateway Alliance DESIGNER Wyche Consulting TECHNOLOGY BBR VT CONA CMI internal Launching BBR NETWORK MEMBER Structural Systems Limited (Australia)
14 CONNCT
PT fulfills vision
This area, formerly reclaimed from the North Sea for agriculture, is now being developed for recreational use and 800 ha will be used for water storage, as well as for water recreation. Adjacent to this, five different housing areas will be created with a total of 1,500 houses on plots of up to 7,500 m2 each. Construction will be realized in different stages and is part of a wider ecological infrastructure plan in which, with the prospect of climate change, water storage will play an important role. For such a visionary development, the use of the very latest technology in the field of post-tensioning the CE-marked BBR VT CONA CMI system was specified. Two lightweight prestressed bridges are being built within this project to take a new road over the waterways. To meet the demands of heavy PT forces within a lower concrete density, we chose to use the BBR VT CONA CMI 2206 system. Materials supply, installation and construction were carried out in accordance with the European Technical Approval Guidelines (ETAG) 013 and were well appreciated by the clients who were delighted that their innovative project had an equally innovative PT system which fulfilled the latest demands. For Spanstaal, this was our first use of the system in compliance with ETA guidelines and we were also happy about the very positive experience gained! l
panstaal, the BBR Network member for the Netherlands, Belgium and Luxembourg, reports on the post-tensioning of two bridges for the Blauwe Stad (Blue City) project a newly developed recreation area in the north east of the Netherlands, between the cities of Scheemda and Winschoten.
TEAM & TECHNOLOGY OWNER Projectorganisation Blauwestad MAIN CONTRACTOR Ballast Nedam Infra North-East DESIGNER D.H.V. TECHNOLOGY BBR VT CONA CMI internal BBR NETWORK MEMBER Spanstaal B.V. (Netherlands)
TEAM & TECHNOLOGY OWNER Niederschs. LB fr Strassenbau und Verkehr MAIN CONTRACTOR Mlders Baugesellschaft mbh DESIGNER Mlders Baugesellschaft mbh TECHNOLOGY BBR VT CONA CMI internal BBR NETWORK MEMBER Spankern GmbH (Germany)
CONNCT 15
BRIDGES
Built in the early 1980s, the A9 links the A2 South Motorway with the A1 West Motorway. The motorway has already been upgraded to cope with increased traffic by widening and, for some bridges, additional decks have been constructed alongside existing ones.
DECK ERECTION
The deck structure is erected on conventional formwork, span-by-span and has 20 sections in total. For each section, the first stage involves concreting the bottom slab and in the second stage, the two webs together with the top slab are concreted.
POST-TENSIONING
The post-tensioning for the structure is provided by BBR VT CONA CMI 1206-150 1770 bonded
16 CONNCT
tendons, as outlined in ETA-06/0147, with eight tendons per web. In order to obtain consistency in the distribution of the compression forces within the structure, half of the tendons are stressed at the construction joints and elongated by fixed couplers, while the other tendons are elongated by moveable couplers, situated about two meters from the joint. The latter tendons are stressed and elongated by fixed couplers at the next construction joint. The only alternative solution would be to produce tendons of a length equal to that of the two construction sections, without movable couplers. The advantage of moveable couplers is that the additional handling and intermediate storage of the long tendons which protrude from the construction joint, ready for stressing at the end of the next section can be avoided.
Unstressed tendon
TEAM & TECHNOLOGY OWNER ASFINAG MAIN CONTRACTOR Massivbau GmbH DESIGNER Schimetta Consult TECHNOLOGY BBR VT CONA CMI internal BBR VT CONA CMI moveable coupler BBR NETWORK MEMBER VORSPANN-TECHNIK GmbH & Co. KG (Austria)
CONNCT 17
BRIDGES
Cross-border launch
he Albury-Wodonga Murray River Bridge crosses the Murray River at the border between Victoria and New South Wales in Australia. Andrew Kiker from Structural Systems, the BBR Network member in Australia, reports on the construction of the twin bridges which were incrementally launched across the river.
Each segment consisted of: u 4 x 31 strands in bottom flange for the launching tendons u 2 x 31 strands in each wall for the continuity tendons (4 in total) u 12 x 5 strands for the longitudinal tendons u 11 x 5 strands for the transverse tendons All tendons were 15.2 mm diameter, the multistrand system was the BBR CONA internal 3106. Coupling in the launching tendons was the 3106, Type K and the slab system was our own 506 post-tensioning system.
The project was initiated to increase traffic flow through the border and reduce traffic congestion in the urban surrounds of Albury and Wodonga.
OVERVIEW
The Albury-Wadonga Murray River Bridge is a twin bridge with a main span of 50 m over 11 spans. The total length of the north bridge is 197 m and the south bridge is 210 m. It is a concrete in-situ bridge, forming part of the Hume Freeway, which consists of box girders that were incrementally launched from the south side of the river in Victoria, towards the northern side in New South Wales. The project was funded by both the RTA and Victoria Roads and cost approximately A$ 15 million.
PT METHODOLOGY
The launching tendons and longitudinal tendons were coupled at the end of each segment. To
CONSTRUCTION
AbiGroup Contractors Pty Ltd were the main contractor and we were subcontracted to Fitzgerald Constructions Pty Ltd to perform posttensioning design and installation and fixing of passive reinforcement. The bridge was incrementally launched, with post-tensioning being adopted to assist in the launching of each segment and provide long term durability with its longitudinal continuity and trensverse tendons.
18 CONNCT
optimize construction cycles for each segment, it was decided to prefabricate the launching tendons and roll them over a purpose-built handrail that could accommodate the temporary storage of such tendons. The transverse tendons were prefabricated on the ground and stored in a 15 m crate which was lifted by a crane and placed on the deck for easy installation of each tendon. The launching tendons were prefabricated and placed over handrails. Once the previous segment had been launched, the tendons were already in place for the next segment. The continuity tendons were installed at one time, with 31 strands traveling the length of the bridge and then hooked up to the main group of strands which were laid in full along the ground. An articulated all terrain crane then pulled the dummy strand, with the main tendon, back through the bridge.
TIMELY COMPLETION
A high level of cohesion and understanding between such elements of post-tensioning and reinforcement meant Structural Systems was the best subcontractor for the job. As a result, one segment per week was cast and essentially the main bridge structure was completed within 12 months. This method of construction ensured the project was completed on time for the official opening. It was a very public affair with thousands of onlookers witnessing the historic occasion. AbiGroup were delighted by the professionalism and efficiency of its subcontractors and it proves once again that post-tensioning is a most viable option in bridge construction. l
TEAM & TECHNOLOGY OWNER Victoria Roads & RTA MAIN CONTRACTOR AbiGroup Contractors Pty Ltd DESIGNER Hyder Consulting Ltd (UK) TECHNOLOGY BBR CONA internal Launching BBR NETWORK MEMBER Structural Systems Limited (Australia)
CONNCT 19
The New Zealand Transport Agency is constructing the new State Highway 1 Avalon Drive Bypass in Hamilton to reduce congestion, improve safety, and separate inter-regional state highway traffic away from internal city traffic. The new free-flowing high capacity route will reduce travel times, improve trip reliability and at the same time improve the surrounding residential and retail environment.
20 CONNCT
TEAM & TECHNOLOGY OWNER ONTRACK MAIN CONTRACTOR Brian Perry Civil DESIGNER ONTRACK TECHNOLOGY BBR CONA internal BBR NETWORK MEMBER BBR Contech (New Zealand)
CONNCT 21
BRIDGES
he Second Vivekananda Bridge near the Dakshineswar Temple, Kolkatta, West Bengal is Indias first six lane, single plane supported extradosed bridge. Kamalakar Naidu, Regional Manager of BBR (India) Pvt Ltd, the BBR Network member in India, reports on the deck construction of the bridge and BBRs involvement.
TEAM & TECHNOLOGY OWNER Statens vegvesen MAIN CONTRACTOR Skanska DESIGNER Norconsult/Interconsult TECHNOLOGY BBR CONA internal BBR NETWORK MEMBER KB Spennteknikk AS (Norway)
The new bridge connects the NH2 / NH6 on Howrah side with the NH34 on the Kolkatta side. The 6.1 km bridge consists of an 880 m long main span, with a 1560 m long approach span on the Kolkata side and 3670 m of approach span on the Howrah side. The total project cost was estimated at Rs.6,400 million. We were involved in the construction of the main span bridge where deck posttensioning with the BBR CONA internal system was adopted.
BRIDGE OVERVIEW
The 880 m long main-span over the River Hoogly is a six lane segmental box structure, with seven spans of 110 m each and two end spans of 55 m. The bridge is a two span continuous structure having expansion joints every 220 m. The 28.6 m wide carriageway has permanent PT bars coupled through the main bridge along with internal and external tendons.
22 CONNCT
SEGMENT ERECTION
Two precast parts of the pylon / pier segments were positioned and fixed to the pier, making a monolithic structure. The stage-by-stage pylon construction was carried out simultaneously with segment erection, using balanced cantilever construction methods. The segments were erected on either side of the pier with the help of movable form travelers placed over the pier segment. The erected segments were coupled with permanent posttensioned bars and then glued with epoxy to the previous segments. Later, the permanent posttensioned bars were stressed to allow the release of the form traveler. After completing the tensioning of the internal PT tendons, the form traveler was moved to the next CONNCT 23
BRIDGES
Launching downhill
alfway between the Mediterranean Sea and the Pyrenees and only seventy miles from Barcelona, two steel motorway bridges have been constructed. Gustavo Delgado Martn of BBR PTE the BBR Network member in Spain describes the innovative solution for composite steel bridges with a downward gradient.
motorway. It was built using the incremental launching method. The bridge deck is 156 m long, divided into four spans (33 m + 2 x 45 m + 33 m) with a gradient of 2.68%. The launching was executed downhill from the top abutment in two phases the first one for a length of 75.5 m and the second one for a length of 80.5 m. The total weight to be launched downwards was 3826 kN. Meanwhile, Eix del Llobregat bridge is a composite structure located in Puig-Reig, also in Catalua, on the C-16 Barcelona-Puig Cerda motorway. The whole bridge was constructed by two methods: u Installation by crane (340 m) u Launching method (107 m) The bridge deck launched was 107 m long, divided in two spans (60 m + 47 m) with a gradient of 1.00%. The launching was carried out downwards from the top abutment and in only one phase. The total weight launched was 7289 kN. The deck connection operation occurred approximately 16 m from the center pier.
The diversity of Cataluas terrain, which alternates between very mountainous areas and plains, led the designers to choose the incremental launching method as their preferred construction method.
TWO BRIDGES
The Sant Andreu de la Vola bridge is a composite structure in Manlleu, Catalua, on the Vic-Olot
LAUNCHING METHODOLOGY
Both bridges were launched with two heavy lifting pulling jacks and one heavy lifting retaining jack. We used the same equipment for both bridges. The pulling and retaining jacks have a capacity of 850 kN, with seven compacted steel strands and the stroke of each jack is 400 mm. With this stroke capacity, we reached launching speeds of seven meters per hour. All jacks were synchronized by means of programmable logic controllers. A retaining force was set and, once
TEAM & TECHNOLOGY (St Andreu de la Vola) OWNER Generalitat GISA MAIN CONTRACTOR JV Tunel De Bracons (FCC + Guinovart) DESIGNER Technical Services, FCC Construccion TECHNOLOGY Launching BBR NETWORK MEMBER BBR PTE (Spain)
Shaping a ...
This structure is located over the road connecting the capital city, Amman, with the second largest city in Jordan. Zarqa College Bridge is an overpass which passes above one of the busiest highways in Jordan. The Zarqa College Bridge consists of two separate bridges, each one is 10.2 m wide and, due to local planning restrictions, Zarqa College Bridge had to have a 45 degree skew angle with 40 and 42.40 meter spans respectively. For the design of this bridge, considerations of economy and aesthetics, as well as more practical matters relating to speedy construction, were of great importance. Accordingly, the designer came up with this innovative deck shape which allowed the whole 82.40 m of deck to be poured in one operation. The parabolic shape provided the aesthetic appeal and the skew angle and
24 CONNCT
the pulling force reached the retaining force plus the friction force between the structure and the supports, the bridge started to move. The movement of the pulling jacks was synchronized in displacement. All the jacks were anchored to an auxiliary steel structure to the abutment, and the steel strands end in PT anchorages which were connected to the bridge by means of an auxiliary structure. Launching was performed by sliding the bottom flanges of the two metal girders over temporary
neoprene-teflon sliding bearings. These bearings were provided with longitudinal guides to prevent the bridge from decentering during launching. The underside of the metal flanges was treated with a special paint to reduce friction and, for each launching phase, was lubricated in front of each bearing to prevent excessive friction. l
TEAM & TECHNOLOGY (Eix del Llobregat) OWNER CEDINSA MAIN CONTRACTOR JV Eix Bergueda (FCC + COPCISA + COPISA + COMSA) DESIGNER CESMA + Technical Services, FCC Construccion TECHNOLOGY Launching BBR NETWORK MEMBER BBR PTE (Spain)
facilitated the single pouring operation which speeded the construction operation. For BBR VT CONA CMI technology, this bridge represented a first in Jordan for three reasons: u the shape of the deck u the use of 31 strands in each cable u the construction with a European Approved (CE-marked) PT system Both bridge decks were successfully completed in four months.
TEAM & TECHNOLOGY OWNER Ministry of Public Works & Housing, Jordan MAIN CONTRACTOR Marwan Al Kurdi & Part.ners Co. Ltd DESIGNER Tros Engineering Ltd TECHNOLOGY BBR VT CONA CMI internal BBR NETWORK MEMBER Marwan Al Kurdi & Partners Co. Ltd (Jordan)
... solution
CONNCT 25
BRIDGES
ith new road systems being built, interfacing these with the existing infrastructure creates many challenges that require carefully engineered solutions. Mark Sinclair reports how Structural Systems the BBR Network member in Australia recently completed the sliding operations to move a new rail bridge into position in just a few hours, during a railway shutdown. This important rail bridge, located in Melbournes Eastern Suburbs, was a crucial component in the US$ 2bn+ Eastlink project
DEVELOPING LAUNCH SYSTEM
Our expertise was sought to develop and operate the lateral launching system. The clients initial concept was to set up a frame with relocatable hydraulic jacks to ratchet along and push each of the two bridges individually into position. This required eight jacks acting in unison to launch the four spans of the first bridge, then these were set-up again to jack the second bridge. Our proposal was technically different, in that pulling tendons would be set up in five locations, with adjacent spans temporarily linked together saving three jacking points and the linking of both the single line bridges together, such that both bridges were launched simultaneously. Thiess John Holland, our client, was very supportive of this proposal as it saved a separate launching operation. The penalty costs for delaying the reopening of the railway were US$ 1,200 per minute!
TEAM & TECHNOLOGY OWNER Eastlink MAIN CONTRACTOR Thiess John Holland DESIGNER CW-DC / Baigents & Structural Systems (launching system only) TECHNOLOGY BBR CONA internal Bars Launching BBR NETWORK MEMBER Structural Systems Limited (Australia)
The new 39 km long Eastlink motorway runs from Donvale in the north to Frankston in the south via Dandenong, through Melbournes Eastern suburbs. Where the new freeway meets the very busy existing Lilydale and Belgrave railway lines, a crossing was required. The existing twin track rail line was on an embankment and the proposed motorway was to pass underneath the live railway. The chosen solution was to build a new rail bridge adjacent to the tracks and slide it into position one weekend during a possession. The alternative a road tunnel under the railway was not possible because of the shallow depth available. Structural Systems worked on several structures for this mammoth project which included complete substructure construction to selected bridges and specialist post-tensioning operations. At Ringwood, the rail bridge consists of twin steel structures of four simply supported spans, with a total length of 106 m. Each of the twin single track bridges has a weight of 920 t. Our works, under a separate package, involved the provision and stressing of 75 mm bars for 1800 mm piles, which connect through 17 m long 130 t precast headstocks these were fitted in earlier rail possessions using a 500 t capacity crane. The five headstocks were post-tensioned on site, in stages to match the construction loadings.
26 CONNCT
OPERATION PHASE
The operation phase was separately awarded to Structural Systems, and required two launches, which included a trial launch approximately one month ahead of the main launch. The trial launch of 3 m was to prove the reliability of many items, including the jacking system. Some adjustment to the sliding bearings was undertaken as their performance during the trial launch was marginal. A window of five hours was allocated for the launching process. In order to guarantee a trouble-free operation, spare jacks, a pump, generator, and specialist hydraulic service team were on site should they be required. Like much of Australia, Melbourne was in drought until the weekend of the launch when persistent rain was the order of the day. Some 8,000 m3 of embankment was moved with a fleet of earth-moving gear and final preparations were completed to allow for the launching works. Launching of the 16.25 m was completed in under four hours with no difficulties or requirement to use the pull back system although it was ready to bring into action. Subsequent works were completed and the railway reopened comfortably ahead of schedule. l
CONNCT 27
BRIDGES
As part of the design package, temporary connection details were required to allow the steel bridge to connect to the launching system, but also to the substructure to allow for reaction of the jacking loads. Considerable detailed methodology was developed and reviewed by numerous parties, given the criticality of the launch and the high penalties should delays occur.
LAUNCHING OF THE 16.25 M WAS COMPLETED IN UNDER FOUR HOURS WITH NO DIFFICULTIES OR REQUIREMENT TO USE THE PULL BACK SYSTEM ALTHOUGH IT WAS READY TO BRING INTO ACTION.
Delivering certainty
hang Chee Cheong, General Manager of BBR Construction Systems the BBR Network member in Malaysia describes how BBR technology and expertise delivered certainty for a critical highway flyover scheme in Kuala Lumpur where there were risks from interfaces with other projects.
ELIMINATING RISK
By adopting an alternative design, based on balanced cantilever construction using form travelers, the sequence of construction could be changed according to availability of piers giving the advantage of both flexibility and economics. BBR Malaysia, through the use of form travelers and prestressing technology, combined with CEPAS finely-tuned and well-proven design expertise, optimized the design and construction method for the superstructure. The owners requirements were to maintain the span lengths, shape and outer dimensions of the bridge superstructure. tendons, the strands were coupled using Kcouplers to construct the next span. Part B was carried out using the balanced cantilever method because of the busy traffic at the roundabout and existing Tun Razak flyover. The superstructure consists of two single cell box girders of varying depth from 3.2 m to 2.4 m. The two box girders are structurally independent of each other by a gap of 200 mm. Each box has a 9.45 m deck width, designed to carry two carriageways.
This project was for the construction of a flyover above the existing Jalan Tun Razak bridge and roundabout. It connects the busy commercial area at Jalan Sultan Ismail with the housing area of Jalan Kampong Pandan and the scheme objectives were to improve traffic circulation and access to the roundabout.
CONSTRUCTION INTERFACES
At the same time, there were two other projects in progress the SMART tunnel and KL-Putrajaya Highway Ramps. The original method of construction was detailed as precast segmental construction span-by-span, using an expensive overhead launching gantry. If the handing over of a pier were to be delayed due to other contractors, the launching gantry could not advance forward.
BRIDGE SUPERSTRUCTURE
The flyover is a multi-span bridge structure consisting of 12 spans with an overall length of 568 m. u Part A: 40 m + 56 m + 56 m + 40 m Total = 192 m u Part B: 40 m + 56 m + 56 m +48 m + 40 m Total = 240 m u Part C: 40 m + 56 m + 40 m Total = 136 m Parts A and C were built using conventional staging over existing median. After stressing the longitudinal BBR CONA 1906
28 CONNCT
CONNCT 29
being in the midst of other ongoing projects. The prestressed diaphragm crosshead over a single pier to carry two box girders provided an elegant and effective way to carry the loads to the substructure. l
TEAM & TECHNOLOGY OWNER Public Works Department (Malaysia) MAIN CONTRACTOR Syarikat Muhibah Perniagaan & Perdagangan DESIGNER CEPAS Plan AG TECHNOLOGY BBR CONA internal Balanced cantilever BBR NETWORK MEMBER BBR Construction Systems (M) Sdn Bhd (Malaysia)
THIS IS A FINE EXAMPLE OF THE BENEFITS OF THE INTERNATIONAL BBR NETWORK BEING ABLE TO SHARE SUCH RESOURCES.
30 CONNCT
tructural Systems the BBR Network member in Australia has been playing a major role in the realization of two state-of-the-art distribution centers for Coca Cola Amatil (CCA). The aim of CCAs Project Jupiter is to consolidate and optimize the companys distribution. This state-of-the-art high-bay warehouse features a fullyautomated materials handling solution which will cater for the bulk distribution needs of large retailers, while smaller customers, such as pubs and clubs, will be serviced by a new distribution centre at Eastern Creek.
CONNCT 31
BUILDINGS
CCA currently has multiple-pick facilities and seven warehouses scattered around Sydney, covering over 125,000 m2 of space. Project Jupiter will consolidate and significantly simplify the management of this process. The combined capacity of the two new facilities will reach 90,000 pallet positions with room to expand.
THE CONSTRUCTION METHODOLOGY RESULTED IN MINIMAL DISTURBANCE TO THE HAZARDOUS MATERIAL AND SAVED THE CONTRACTOR SIGNIFICANT REHABILITATION AND CONSOLIDATED WORKS.
32 CONNCT
IN ADDITION TO THE SAVINGS FOR CONSTRUCTION, THE POSTTENSIONED SLABS RESULTED IN LARGE JOINT-FREE SPACES AND ALSO PROVIDED EARLIER ACCESS FOR COMPLETION OF THE STRUCTURE.
Working closely with main contractor, Vaughan Constructions, Structural Systems has been implementing innovative post-tensioned solutions for CCAs new Northmead storage and distribution center, as well as their distribution center at Eastern Creek.
UNIQUE FACILITY
Shaun Sullivan reports that Structural Systems was awarded 5500 m2 of suspended slab on ground in the internal and external staging areas for the 32 m high warehouse at Northmead, New South Wales part of Coca Cola Amatils premier manufacturing site in Sydney which boasts Australias most advanced warehousing and distribution operation. Constructed in two stages on an area of reclaimed land adjacent to a creek, the conforming reinforced solution required several meters of soil to be removed and then clean fill compacted in its place. As hazardous material, such as asbestos, was known to be in the sub-base soil, removal would have been time consuming and its safe disposal had significant cost implications.
TEAM & TECHNOLOGY OWNER Coca Cola Amatil (Northmead) Goodman International (Eastern Creek) MAIN CONTRACTOR Vaughan Constructions Pty Ltd DESIGNER Structural Systems Limited (Northmead) OPRA Architects and Costin & Roe Consulting Engineers (Eastern Creek) TECHNOLOGY BBR CONA flat BBR NETWORK MEMBER Structural Systems Limited (Australia)
stressed through the precast panels. The 28,000 m2 of floor was divided into 14 pours and were completed in nine weeks. Due to be operational in early 2009, the distribution centre will be a landmark in the field of green industrial buildings. l
INNOVATION
The use of innovative edge details to eliminate pour strips, reduce construction costs and improve the surface finish of the floor allowed the post-tensioned tendons to be
34 CONNCT
Indian first
Infosys Technologies Ltd urgently needed some 2200 car parking spaces for staff on their software development campus in Pune.
the webs. Special prefabricated steel anchorage blocks were also developed to accommodate the barrel and wedge system to facilitate the stressing of strands using monostrand jacks.
STRESSING OPERATION
The four stage stressing was carried out by a BBR U-16 monostrand pulling jack. Before concreting the slab, 50% of design load was induced in two stages of 25% each. Props were introduced for the main and secondary beams and then the slab decks were cast. Next, the remaining 50% design load was induced in a further two stages of 25% each. The concrete was allowed to set for seven days and floor finishing was carried out later.
CONNCT 35
BUILDINGS
s environmental sustainability becomes increasingly important to people and businesses worldwide, Keith Snow of BBR Contech the BBR Network member in New Zealand describes the creation of the most technologically advanced materials recovery facility (MRF) in the Southern Hemisphere.
Capable of sorting more than 80,000 tonnes of recyclable waste a year and converting more than 95% into reusable products, the new MRF is sited appropriately on top of a former landfill!
driven into the rock underneath the former landfill. Created in four pours on-site, it has a sub-base of 100 mm diameter chunks of crushed concrete, which enables any gases rising from the landfill to escape freely although not into the plant, as the floors undersurfaces are lined with an impermeable polyethylene membrane. Meanwhile, the floors elevation and suspended design enables the ground to settle with no impact on the MRF building and its operations. Suspended floors like these are ideal for soft ground conditions as they enable businesses like the MRF to use land effectively for the long term.
TEAM & TECHNOLOGY OWNER Visy Recycling New Zealand MAIN CONTRACTOR Mainzeal Property and Construction Ltd CONSULTANT Day Consultants (structural engineer) BBR Contech (slab design) TECHNOLOGY BBR CONA flat BBR NETWORK MEMBER BBR Contech (New Zealand)
36 CONNCT
slabs. The post-tensioned structure was a shallow depth band beam the flat geometry has the advantage of allowing maximum eccentricity of the tendon in the shallow section.
EASE OF APPLICATION
The stressing kit for flat tendons is small and light thus easy to handle and ideal for working with floor levels of different heights. The installation of flat tendons within the band beam reinforcement is also easier and the anchors are also smaller, making them well-suited to the limited depth of the beam or slab at the stressing edge. The schemes success has resulted in a further four projects of a similar type in the surrounding area. l
TEAM & TECHNOLOGY OWNER M/s Oberoi Constructions MAIN CONTRACTOR L&T ARCHITECT Hellmuth, Obata+Kassabaum, INC STRUCTURAL ENGINEER M/s Sterling Engineering Consultancy Services Pvt. Ltd TECHNOLOGY BBR CONA flat BBR NETWORK MEMBER BBR (India) Pvt Ltd
designed with a post-tensioned one-way beam slab scheme across spans between 8 m and 11 m. The whole viewing gallery is supported on reinforced concrete columns. Beam dimension varies between 0.2 m 0.25 m wide by 0.4 m to 0.6 m deep. Four strand ducts were used in a typical beam. As well as the annual National Day Parade, the Grandstand provided spectator seating for the inaugural night race of the Formula One motor racing series that was held in Singapore last September putting it in the spotlight of world attention. l
TEAM & TECHNOLOGY OWNER URA / Spore Sports Council MAIN CONTRACTOR China Construction (South Pacific) Development CONSULTANT De Consultants (S) TECHNOLOGY BBR CONA internal BBR NETWORK MEMBER BBR Construction Systems Pte Ltd (Singapore)
CONNCT 37
BUILDINGS
Proof of PT versatility
arwick Ironmonger describes the successful contribution of his company, NASA (BBR) Structural Systems LLC, the BBR Network member based in the United Arab Emirates, in providing a complete design, supply and construct package for the post-tensioned floor systems for the mixed-use Burjuman Centre Extension project.
Located in the heart of Dubai, this 162,000 m2 scheme consists of 4.5 floors of retail podium, a 29-storey office tower and two apartment towers of 21- and 25-storeys. Post-tensioned floor systems were used throughout each of these structures.
RETAIL LEVELS
Post-tensioned band beams and slabs were provided throughout the retail levels to achieve economy and offer a minimum depth solution that could deal with the significant loads and spans which ranged from 8.8 m to in excess of 16 m, transfer the numerous floating columns, and cater for the varied and complex floor geometry. The irregular column positions between floors and the combination of steel composite columns supporting the overlying steel and glass atrium roofs were meticulously integrated into the post-tensioned design. The podium levels, approximately 250 m x 85 m in plan, were each split into ten different slab areas using a variety of corbel and dowelled movement joints with a total of 18 individual concrete pours per floor. Each retail floor was comprised of a mixture of flat slabs, ribbed slabs, one-way slabs supported by band beams and transfer beams all post-tensioned to achieve open plan retail areas.
OFFICE TOWER
The supports to the elliptical shaped 29-storey office tower consisted of only a central core and perimeter columns. A posttensioned solution was implemented whereby 450 mm deep posttensioned ribbed beams spanned the 10 m between the central core and perimeter post-tensioned beams which, in turn, spanned between the perimeter columns. The post-tensioning was used most effectively to support the 6.5 m long cantilevers at each end of the building creating the illusion of the structure floating in the air and to permit column-free office space on each of the typical floors.
APARTMENT TOWERS
The luxury apartment blocks, above the retail levels, each have 525800 mm deep post-tensioned beams, spanning 8.5-12.5 m between cores and intermediate shear walls to support the 150-200 mm deep conventionally reinforced concrete slabs spanning between the beams. The successful application of the BBR CONA flat post-tensioning system to solve the many structural challenges that resulted from the ambitious architectural plans for this mixed-use project is a testament to the versatility of post-tensioning and the expertise of both Structural Systems and the wider BBR Network. l
TEAM & TECHNOLOGY OWNER Al Ghurair Group, Dubai, UAE MAIN CONTRACTOR Al Habtoor Murray & Roberts, Dubai, UAE DESIGNER Buro Happold / Dar Al Handasah, Dubai, UAE TECHNOLOGY BBR CONA flat BBR NETWORK MEMBER NASA (BBR) Structural Systems LLC (United Arab Emirates)
Ring of confidence
The City of dz Office had decided to build a new 10,000-seat sporting and entertainment venue within the complex of one of the citys sports clubs dzki Klub Sportowy. The arena is adjacent to the existing football stadium which is home to the former Polish football league champions.
THE BUILDING
The round sports hall has a concrete structure with a steel roof and steel cover wall. The arena level is approximately six meters below the surrounding ground level. The hall is surrounded with a type of moat, over which there are bridges leading to the entrances. Inside, will be the main arena plus all the usual facilities and a full size basketball court. The roof of this huge arena is supported by a post-tensioned concrete ring an icon of modern engineering techniques, constructed by BBR Polska.
THE BRIEF
Our brief was to evaluate the detailed design for tendon layout and the bearing system for the roof ring, as well as for carrying out the work which included delivery of stressing system components, plus the complex post-tensioning of the roof ring and delivery and installation of the bearings. In addition, we undertook further complex works for a posttensioned beam.
THE RING
The roof support ring rests on 16 concrete columns (spaced every 26 m) at around 15 m above arena level. It is a massive concrete structure which, in cross-section, is a concrete box shaped like a leaning rectangle with 0.5 m thick walls. On the outer side of the CONNCT 39
BUILDINGS
roof ring, there is a huge gutter made of prefabricated concrete elements permanently fixed to the ring structure. The box is strengthened with cross-walls every eight meters, where steel roof girders are supported on the ring.
THE TENDONS
The box-shaped concrete structure of the ring is post tensioned with 28 BBR CONA 1906 internal tendons (72 t of strands) and 88 BBR CONA 706 external tendons (12 t of strands). The internal tendons spaced equally on the cross-section of the ring, with seven tendons in one section take horizontal forces from main loads (dead loads), while external tendons placed in appropriate numbers wherever needed, as dictated by the bending moments diagram take bending moments from excess loads. Because the ring is so very long, it is divided into four quarters resulting in an internal tendon length of around 120 m. The internal tendons are anchored in four specially designed anchor blocks inside the ring. The external tendons are anchored in cross-walls the longest tendon was some 25 m long.
THE PT SEQUENCE
The post-tensioning sequence assumed that first all internal tendons were tensioned. Then, we started tensioning all external tendons. The round shape of the structure meant that it was extremely important to apply stressing force equally around the perimeter, as well as on the cross-section of the ring. Therefore, we used two stressing sets which operated on opposite sides of the ring. Due to high values of loss of stressing force because of friction on curves it was necessary
40 CONNCT
to stress all internal tendons from both ends. This all resulted in much time and effort being spent on moving and preparing the stressing sets and operations. The stressing sequence of the external tendons was also developed so that equal stressing force was applied to the structure. All the work inside the ring box was carried out by hand it was not possible to use a crane as there were no openings in the top of the ring structure and cross-walls precluded the use of a small crane to operate inside the ring box.
THE BEAM
The 25 m span post tensioned beam supports a floor slab. The development of a basketball court meant that a few columns were replaced with hangers attached to the beam originally these were support only to the girders for the arena seating. The high loads and low acceptable deflection indicated that a PT beam was the only solution. The beam was post tensioned with six BBR VT CONA CMI 1206 tendons (3 t of strands).
TEAM & TECHNOLOGY OWNER City of dz Office CONTRACTOR Skanska S.A. DESIGNER ATJ Archikekci / KiP Sp. z o.o. TECHNOLOGY BBR CONA internal BBR CONA external BBR VT CONA CMI internal BBR NETWORK MEMBER BBR Polska Sp. z o.o. (Poland)
CONNCT 41
BUILDINGS
BBR POLSKA COMPLETED THE WORK WITH A HIGH STANDARD OF PROFESSIONALISM AND TO A HIGH TECHNICAL STANDARD .... CITY OF DZ OFFICE
This extremely demanding posttensioning task was finished in May 2008 two weeks ahead of schedule. This superb result is due largely to the excellent working relationships which developed between the BBR Polska team and the main contractor. Investor satisfaction is a priority for us and the reference letter received from our client, the City of dz Office, was a great reward for our efforts. This was the first time that BBR Polska had executed such a challenging and unusual stressing operation we are looking forward to post-tensioning another stadium soon! l
ocated in the industrial region in the western part of Singapore, this development consists of six storeys, with two mezzanine floors and ancillary office. Miss Foo from BBR Construction Systems Pte Ltd, the BBR Network member in Singapore, takes up the story.
PROJECT DETAILS
The post-tensioned flat slab thickness for the warehouse area is typically 330 mm for an 11 m by 11 m grid, with 700 mm thick drop panels. For the sixth storey, the flat slab thickness is 380 mm with 750 mm thick drop panels. Typical loading for the second to fifth storey warehouse area is 20.0 kN/m2 (live) and 0.3 kN/m2 (superimposed dead). The machinery to be placed in the sixth storey warehouse area is heavier, hence the loading there is significantly higher at 30 kN/m2 (live) and 1.8 kN/m2 (superimposed dead). The strength of concrete used in the design is 35 N/mm2. The arrangement of the tendons is such that it is banded and distributed in both directions, as required by the consultant. Tendon spacing varies between 300-400 mm for column strips and 1000-1250 mm for middle strips.
Race
against time
Divided into two phases, Phase 1 includes half of the warehouse area, driveway, loading / unloading bay and ramp. The other half of the warehouse area, office and roof, together make up Phase 2. The loading / unloading bay and the ramp are located right in the centre, flanked by the warehouse area on both sides. The special feature of this building is that there are ramps and loading / unloading bays on every level enabling easy access to the warehouse area, especially for heavy vehicles. Post-tensioning was used to construct almost the entire building.
TIGHT SCHEDULE
To meet the owners requirements, Phase 1 is scheduled for completion before Phase 2. Hence, the race against time started right from Day One. One of the great advantages of using posttensioning for flat slabs comes into full play here enhanced construction speed. The usage of posttensioning facilitates the earlier removal of formwork, resulting in a shorter floor-to-floor cycle time, thus reducing the construction time significantly. This enabled a smooth handover of Phase 1, meeting the time challenge set by the client. With the BBR post-tensioning system in place, the high performance and effective floor slabs create a smooth appearance, with a minimal number of joints in addition to other valueadded benefits, such as long-term durability and low maintenance. l
TEAM & TECHNOLOGY OWNER Ascendas MAIN CONTRACTOR Jian Huang Construction Co Pte Ltd DESIGNER Tham & Wong Consultant TECHNOLOGY BBR CONA internal BBR CONA flat BBR NETWORK MEMBER BBR Construction Systems Pte Ltd (Singapore)
42 CONNCT
Canalside innovation
THE LOFTS, BURJ DUBAI DEVELOPMENT, UNITED ARAB EMIRATES
Hidden strength
T
he Lofts project is part of EMAAR Properties prestigious Burj Dubai Development home of the worlds tallest structure, the Burj Dubai. Warwick Ironmonger of BBR Network member NASA (BBR) Structural Systems reports on his companys involvement in the project.
beams. The inclusion of post-tensioning allowed slab thickenings to be utilized in the pool support structure, and ensured the usability of the floors immediately below the pool support structure was not compromised. Throughout the project, Structural Systems actively contributed to the main contractors Dont Walk By safety initiative, effectively creating and maintaining a safe working environment. l
Clancy Quay is a mixed-use development located in Dublin City. Structural Systems (UK) Ltd the BBR Network member in the UK was awarded the contract for 20,000 m2 of PT slabs based on an alternative proposal to the existing reinforced concrete scheme.
The project consists of an underground 200 mm car park slab and a ground level 600 mm transfer slab, supporting seven levels of superstructure on a 7.5 m square grid. Pre-cast construction, utilised in the superstructure of the five residential blocks, resulted in substantial transfer loadings at ground floor level. Local planning regulations dictated a drained underground car park hence the top surface of the car park slab is laid to falls. Reinforced concrete slabs would have required complicated setting out of the top reinforcement mat. The PT system removes this complication by varying the highest chair heights along the column lines to the required surface level. The key factor in securing this project was the comparative savings offered over the reinforced concrete scheme. Reducing the excavation by 300 mm on a site with a high water table was also beneficial to the building works. l
This significant part of the Burj Dubai Development consists of nine podium levels, covering an area of approximately 160 m x 60 m, providing a common area and linking the three residential towers which rise out of the podium for a further 30 floors forming The Lofts. The top four podium levels and all of the tower floors were posttensioned by NASA Structural Systems. We were responsible for the design and construction of the post-tensioned slabs, including the structural floor design, the supply of specialist materials and equipment, together with the posttensioning shop drawings, installation, stressing and grouting of the tendons. The top four podium floors and all of the tower floors were based upon 3 m floor-to-floor heights, making it virtually essential to adopt a flat plate construction of the floor slabs to maximize floor-to-ceiling heights. The use of BBR CONA flat posttensioning offered an economical solution for this type of floor system and assisted the construction progress to ensure the earliest possible completion of the structure. The PT floor system also made it possible to support the large transfer loads from the two pool structures on the uppermost podium level without the need for deep transfer
TEAM & TECHNOLOGY OWNER EMAAR Properties, Dubai-UAE MAIN CONTRACTOR Al-Futtaim Carillion LLC, Dubai-UAE DESIGNER NORR, Dubai, UAE TECHNOLOGY BBR CONA flat BBR NETWORK MEMBER NASA (BBR) Structural Systems LLC (United Arab Emirates)
TEAM & TECHNOLOGY OWNER Clancy Quay Developments MAIN CONTRACTOR P Elliot & Company TECHNOLOGY BBR CONA flat BBR NETWORK MEMBER Structural Systems (UK) Ltd
CONNCT 43
BUILDINGS
An architects dream
adisson SAS, the worldwide chain of hotels, is planning to open a new resort on the Adriatic Sea coast in the historic city of Dubrovnik a UNESCO World Heritage Site. BBR Network member BBR Adria d.d. was commissioned to provide and install BBR tendons for 11 slabs which cover an area of more than 35,000 m2. Despite the complexities of the structure, many supporting beams could be eliminated by the use of PT technology and this allowed more freedom
44 CONNCT
Towering technology
The Caja Madrid tower is located at the Paseo de la Castellana, in Madrid, close to the former training facilities of the Real Madrid soccer team. It belongs to the Spanish bank, Caja Madrid, and is part of the new business area being developed on the northern side of the city. The buildings structure is comprised of two reinforced concrete cores connected to each other at three different levels by two steel trusses which also bear the weight of the twelve floors above them. The loads are, therefore, transfered to the two cores which ultimately carry the weight of the whole tower down to the foundations. Different BBR solutions have been applied to this project such as multiple strand tendons, stressed bars with diameters of up to 75 mm or SWIF couplers for rebars. Addditionally, based on the pair strand / wedge technique, a number of complex heavy-lifting operations have been performed. The post-tensioning technology has primarily been applied in two different areas the main trusses and the core slabs. The high altitudes, as well as the core construction method, posed major challenges for the posttensioning activities as a result, innovative systems had to be conceived. Thus, for the shortest tendons, the lack of space dictated that the strands should be cut on the ground, lifted by crane and pushed into the sheaths by hand, one at a time. For the longest ones, the pushing machine had to be placed in the only spot available, guiding the strand through PE flexible pipe down to the plate front. For stressing the strands, jacks weighing 1000 kg
were used. However, the unavailability of a crane added to the challenges, the engineers had to come up with a different approach to raising the jacks temporary support beams connected to the sliding formwork above. The BBR team faced yet another challenge in the installation and stressing of the bars. Since the space was limited, very small cylinders were used, requiring very high pressures up to 1200 bar in order to attain the 2400 kN necessary.
HEAVY LIFTING
The heavy lifting operations far exceeded the complexity of the previous tasks. In fact, the upper structure linking the two concrete cores could only be built 35 m below and had to be lifted into its final position, 250 m above ground level. Four hydraulic jacks were placed on cantilevered decks connected to the top of the cores. First of all, the structure had to be slightly elevated in order to finish the assembly of the last parts. Once completed, the whole structure had to be raised to the top. Despite the hazards and difficulties, BBR technology and its qualified staff provided the client with practical solutions which played a significant role in delivering this project at a minimum cost. l
TEAM & TECHNOLOGY OWNER Caja Madrid Bank MAIN CONTRACTOR FCC CONSTRUCCION, S.A. Dragados JV ARCHITECT Foster & Partners STRUCTURAL ENGINEER Halvorson and Partners TECHNOLOGY SWIF BBR CONA internal Heavy lifting BBR NETWORK MEMBER BBR PTE (Spain)
CONNCT 45
BUILDINGS
uan Linero and Gustavo Delgado of BBR PTE the BBR Network member in Spain report on how BBR technology has contributed to the creating of this 250 m high, state-of-the-art tower.
he New Commonwealth Bank Campus Project is the newest office development in the business district of the Sydney Olympic Park venue in Homebush Bay. Paul Maleszka of Structural Systems explains how the New Commonwealth Bank Campus is set to be one of the most sought after office spaces in the region.
The Campus Project is being developed by Colonial First State funds, Commonwealth Property Fund and Direct Property Investment Fund. This fast growing area is attracting the high end clients wanting a modern space with excellent facilities outside the crowded Sydney CBD.
COST SAVINGS
The office space itself comprised five basement levels, podium, and two towers with eight levels each. Overall, the structure has 66,000 m2 of stressed area. Originally, we were only engaged to supply and install the posttensioning with a structural consultant designing and detailing. With our vast experience in design and detailing, Bovis Lend Lease requested us to design the very difficult transfer / podium level, as well as to advise on the upper levels in an effort to reduce costs. This resulted in an overall saving of 76 t of post-tensioning and 290 t of conventional reinforcement. This represented savings for the project of approximately 18% of the total
REDUCING IMPACT
Reducing the impact on the environment is a highly sought after and marketable aspect. Bovis Lend Lease designed, project managed and constructed the New Commonwealth Bank Campus project with the environment in mind. The project has been registered for a Green Star Office Design and Office As Built, rating with the Green Building Council of Australia (GBCA). Structural Systems assisted in reducing the environmental impact by using the BBR CONA flat bonded system which reduces the amount of new materials, such as concrete and reinforcement, compared to conventionally reinforced structures.
post-tensioning and 36% of the reinforcement over the entire horizontal area. These savings were not at the expense of any additional concrete or impacting on the tight deflection limits set for this high class structure. Installation time of the reinforcement and posttensioning was also reduced, giving additional benefits to the builder. Overall, the engagement of Structural Systems and use of BBR CONA flat bonded systems helped deliver a more efficient structure with less impact on the environment while still performing to the highest standards. l
TEAM & TECHNOLOGY OWNER Colonial First State Global Asset Management MAIN CONTRACTOR Bovis Lend Lease DESIGNER Connell Wagner TECHNOLOGY BBR CONA flat BBR NETWORK MEMBER Structural Systems Limited (Australia)
46 CONNCT
CONNCT 47
THE SILO IS ABLE TO HOLD 60,000 T OF SUGAR PUTTING THIS SILO AMONG THE LARGEST SUGAR SILOS IN POLAND!
These are the fifth and sixth silo projects to be completed in Poland by BBR Polska Sp. z o.o. and both structures were completed in cooperation with Chemadex S.A. a civil engineering and construction company which specializes in this type of work.
The silo walls are post-tensioned with horizontal BBR VT CONA CMI 406 and 706 tendons, anchored in four buttresses. Sixty four BBR VT CONA CMI 406 tendons and 122 BBR VT CONA CMI 706 tendons were installed in the silo walls. Together, the strand weighed 88 t and in total we pushed about 75 km of strand into ducts. The work, which was carried out from movable platforms, was completed in about 40 days.
48 CONNCT
Stressing operations were carried out with six stressing jacks which simultaneously tensioned three tendons from both ends at the same time.
A YEAR TO REMEMBER
In one year alone, BBR Polska pushed 286 km (337 t) of strand through the ducts, completed 566 stressing operations and grouted with about 160 t of cementitious grout just for silo structures. This is quite an achievement! l
TEAM & TECHNOLOGY OWNER Kruszwica: Krajowa Spka Cukrowa Kujawy: Lafarge S.A. CONTRACTOR Chemadex S.A. DESIGNER Kruszwica: Chemadex S.A. Kujawy: Peter und Lochner TECHNOLOGY BBR VT CONA CMI internal BBR NETWORK MEMBER BBR Polska Sp. z o.o. (Poland)
CONNCT 49
... POST-TENSIONING IS FAST, EFFICIENT, ECONOMICAL AND VERY COMPETITIVE IN THE CONSTRUCTION MARKET.
50 CONNCT
The winning tender for the design and construction of a 16 ML capacity circular water tank at Kilmore for Goulburn Valley Water, as reported by Janine Ralev of BBR Network member Structural Systems Ltd, was an alternative design comprising a post-tensioned precast circular tank rather than the steel tank option documented by consultant engineers. Structural Systems scope of works included post-tensioned structure design, documentation and structural certification, supply and installation of posttensioning, including site supervision.
STRESSING
The tank walls were designed to withstand all the long term and short term load combinations, including water load, earthquake load, prestress load and temperature loads and, under all combinations, the structure will still have minimum
TEAM & TECHNOLOGY OWNER Goulburn Valley Water MAIN CONTRACTOR Leed Engineering Pty. Ltd DESIGNER Janine Ralev, Structural Systems Ltd TECHNOLOGY BBR VT CONA CMI internal BBR CONA flat BBR CONA internal BBR NETWORK MEMBER Structural Systems Limited (Australia)
CONNCT 51
orldwide building activities are still growing and structures made of concrete are of great importance. Accordingly, the global demand for cement has increased by 41% in the past five years. This considerable growth is noticeable in Eastern Europe and even more in China, where the per capita consumption of cement has exceeded 800 kg according to the Cement Projects Focus 2010 market survey compiled by OneStone Intelligence in December 2006.
VORSPANN-TECHNIK GmbH, the BBR Network member in Germany, is currently working on a cement plant in Russia. Dipl.-Ing. Christian Leicht describes how PT work in Russia is always an opportunity and a challenge at the same time.
GOING EASTWARDS
The Shurovo Cement factory, which belongs to the Holcim Group, is located in the southeast of Moscow. The cement required to support the building boom in the Moscow region is produced here. The plant has an annual output of approximately four million tons of cement. Some sections of the plant are out-of-date and must be reconstructed and enlarged. These are mainly the silos, the rotary furnace and the mills. In the current phase, two clinker silos and a raw meal silo are under construction. The contractor for all concrete work at the plant is Lei AG and all the post-tensioning work is being undertaken by VORSPANN-TECHNIK GmbH.
CONSTRUCTION METHOD
The 40 m diameter clinker silos were built using slipform construction techniques. This continuously moving formwork usually climbs at around 200 mm per hour. Sometimes the climbing rate for this project was less than 2 m a day due to lack of concrete or other materials. The start of this operation was not easy either, as many of our attempts to bring the plastic trumpets through the Russian customs were in vain. Nevertheless, the slipping of the 47 m high clinker silos has been finished successfully. The anchorages and the galvanized metal-ribbed ducts were
52 CONNCT
PRESTRESSING SYSTEM
The prestressing system used for the clinker silo was BBR VT CONA CMI with 12 and 19 0.62 diameter strands with a maximum tensile strength of 1860 N/mm. The tendons make up the circumference of the silo and are stressed a third at a time to minimize friction losses. Six buttresses were formed to allow alternating tendons to be stressed at 60 to each other, ensuring loads were uniformly distributed around the silo. Each silo has 102 BBR VT CONA CMI 1906 tendons and 78 BBR VT CONA CMI 1206 tendons the total amout of prestressing steel used was 165 t. After the strands had been installed with a high speed pusher from the ground, the tendons were stressed in a predetermined sequence to a load of 4,332 kN and 2,736 kN, respectively.
TEAM & TECHNOLOGY OWNER Alpha Cement Russia MAIN CONTRACTOR Lei AG Baumanagement DESIGNER Kottmann Engineering TECHNOLOGY BBR VT CONA CMI internal BBR NETWORK MEMBER VORSPANN-TECHNIK GmbH (Germany)
CONNCT 53
placed during sliding, while the prestressing steel was installed afterwards, followed by stressing and grouting of the tendons.
roject Manager Daniel OLeary from SSL Western had his hands full when Structural Systems Limited (SSL) the BBR Network member in Australia was contracted by BGC Cement to provide the knowledge and expertise to design and construct the slipform used in the construction of this cement silo. Structural Systems was also contracted to post-tension the silo located in the port district of Kwinana, approximately 30 km south of
SLIPFORM PROCESS
The basic slipform process involves building a twin ring of inner and outer sets of steel shutters at ground level. As part of the slipform design, the shutter ring is braced and stiffened to maintain the cylindrical silo shape. Once all the necessary plant and materials are in place or nearby, wet concrete is poured into the shutters and the slipform rig is gradually moved upwards by hydraulic jacks fitted within the slipform structure. The slipping process is then a continuous 24-hour operation until the required structure height is reached. Some of the benefits of the slipform process are the speed of construction 24-hour continuous
operations and the related advantage of very few construction joints, greatly reducing the risk of water ingress and potential product damage.
POST-TENSIONING
We used 200 BBR CONA internal 706 anchorages the total weight of PT used was 17 t. The post-tensioning process gives the silo a much greater load carrying capacity, compared to conventionally reinforced structures, and allows for very
slender walls greatly reducing materials and overall cost. The compressing of the silo walls by the stressed cables means that cracking of the concrete and effects of thermal expansion induced cracking is also reduced or eliminated helping, once again, to reduce water ingress into the structure. l
TEAM & TECHNOLOGY OWNER BGC Cement MAIN CONTRACTOR BGC Construction DESIGNER MPA Shedden TECHNOLOGY BBR CONA internal BBR NETWORK MEMBER Structural Systems Limited (Australia)
Completion in Cartagena
Pictured here is the 4th LNG Tank in Cartagena as it nears completion. This cylindrical reinforced concrete tank made to store Liquefied Natural Gas features some 600,000 kg of BBR CONA technology which was designed and installed by BBR PTE, the BBR Network member in Spain. The tank has an external diameter of 78 m and is 40 m high.
TEAM & TECHNOLOGY OWNER ENAGAS MAIN CONTRACTOR FCC CONSTRUCCION, S.A. DESIGNER Principia y Carlos Fernndez Casado TECHNOLOGY BBR CONA internal BBR NETWORK MEMBER BBR PTE (Spain)
54 CONNCT
Concrete arch from axis 90 (north), construction phase 1 finished, support structure for construction phase 2 raised in place.
G R M P E N TA L B R I D G E , G E R M A N Y
uring the summer of 2007, VORSPANN-TECHNIK GmbH was awarded a contract for heavy lifting work for a new railway bridge. This contract was awarded to VT because of their reputation for heavy lifting know-how. Dipl. Ing. (FH) Thomas Weber describes the work which involved repeated lifting and lowering of the shoring truss to construct the 270 m long arch the longest concrete arch for a railway bridge in Europe.
CONNCT 55
SPECIAL APPLICATIONS
The Grmpental bridge is part of the new Ebensfeld-Erfurt railway route. The bridge is located near the village of Grmpen in the German State of Thuringia. With an overall length of about 1100 m and a maximum height of about 70 m, it is one of the largest valley bridges on the route. The bridge is part of Verkehrsprojekt Deutsche Einheit Nr. 8 (German Unity Transport Project No. 8) which encompasses a 500 km length considered to be the central section of the high speed route between Munich and Berlin.
TECHNICAL DETAILS
The bridge has a regular pier spacing of 44 m along its end sections, with piers spaced every 30 m in the area over its reinforced concrete arch. It consists of three continuous beam systems with lengths of 219 m, 446 m and 439 m. The centre section (446 m) of the continuous beam is mainly supported by a concrete arch. The superstructure consists of a 3.60 m high hollow box girder, fabricated with the help of an advancing shoring. The reinforced concrete arch, also a hollow box in cross-section, has a length of 270 m and a height of almost 70 m. The arch is constructed in sections from axis 80 (south) and axis 90 (north) on auxiliary concrete piers. The shoring truss has to be lifted to the relevant construction section and subsequently lowered to the ground again after completion of the section. The arch is built in a total of nine sections, four each from the north and south and a section for gap closure at its apex.
HEAVY-LIFTING TECHNOLOGY
A total of four VT SH 1906 strand lifting jacks are used to perform the lifting and lowering of the shoring truss. Each of these jacks is fitted with 19 compacted strands 165 mm in cross-section area. The maximum lift / lower loads incurred at the front area of the support structure were about 200 t per jack and about 75 t in the rear area. The total lift or lower load per procedure was therefore about 550 t.
TEAM & TECHNOLOGY CLIENT Deutsche Bahn AG MAIN CONTRACTOR Gerdum u. Breuer Bauunternehmen GmbH DESIGNER Kinkel und Partner GmbH TECHNOLOGY Heavy lifting BBR NETWORK MEMBER VORSPANN-TECHNIK GmbH (Germany)
56 CONNCT
Arch cross-section, VT strands elevator in the rear position during a lift procedure. At the apex of the arch, a maximum lift / lower height of about 55 m will be reached. The strand bundles were coiled onto special VT coiling devices for the lift procedure, from where they were uncoiled again for the subsequent lowering procedure. This made problem-free repeated use of the strand bundles possible.
LIFT PROCEDURE
During the lift procedure, all strand bundles were fastened to the shoring truss by way of pin points. At first, the truss was lifted at the front until the truss reached its final inclination for the coming arch section. Then the lifting was continued by all four strand lifters synchronously until it reached its intended position. The rear end of the support structure was then tightened onto the end of the existing arch section by way of tension bars. In the forward axis, the appropriate transversal bearing beam was pushed into a recess prepared in the auxiliary pier onto which the load of the shoring truss could then be transferred.
LOWERING PROCEDURE
After concrete had been cast and formwork for that section had been removed, the strand lifting equipment consisting of jack, hydraulic pump and strandcable coiling device were again attached to the arch and all lifting elements connected to the truss. Once the load was again transferred to the strandlifters, the rear tension bars and the transversal bearing beam were removed and the lowering procedure was performed. On the ground, the support structure was pulled on skids to the next span of the arch, in preparation for the following lift procedure. l
CONNCT 57
SPECIAL APPLICAATIONS
The new Te Puni Village will offer accommodation to over 350 students, spread over three towers that link together to provide shared administration, dining and other facilities. As the towers are sited on three descending levels of the steep site, extensive post-excavation ground stabilization and retention works were required. The project presented a number of challenges: u working on a confined site with restricted access for concrete trucks and other equipment u coping with unpredictable and inclement weather u dovetailing work with that of the building construction team u and meeting an extremely tight deadline that required completion in time for the student intake in early 2009.
After undertaking four initial proving tests for head contractor Hawkins Construction and engineering specialist Connell Wagner BBR Contech and subcontract driller Richardson Drilling installed almost 400 galvanized steel soil nails into the slopes, to depths ranging from four to ten meters. With the soil nails firmly grouted into the ground, the team placed reinforcing mesh across the surface and applied about 1100 m2 of sprayed concrete to the three main walls and two pre-existing walls. They also installed 35 bored drains running horizontally in the retained soil to ensure efficient water drainage behind the new retaining wall.
Effective communication and co-ordination saw BBR Contechs work completed on time enabling work to proceed on providing the Universitys students with modern, comfortable accommodation and spectacular views of Wellington harbor. l
TEAM & TECHNOLOGY OWNER Victoria University of Wellington CONTRACTOR Hawkins Construction Ltd DESIGNER Connell Wagner TECHNOLOGY Soil nails BBR NETWORK MEMBER BBR Contech (New Zealand)
58 CONNCT
leipner B is a Statoil owned platform located in the North Sea. To utilize more of the reservoirs on the oil field, a compression unit has been developed to increase the pressure in the reservoir and enable more oil to be extracted from the field. This system is used for extending the production life time of existing oil fields.
KB Spennteknikk AS was involved in the installation of the 1,300 t heavy compression unit. One of the largest offshore lifting vessels, Saipem 7000, was used for the installation to the platform. The compression unit was fixed to the platform by using 16 x 50 mm diameter stress bars, stressed to a total load of 12,000 kN. KB Spennteknikk AS supplied the specially designed bars and
performed the stressing during offshore operations. The bars were protected with grease filled steel casings and end caps as corrosion protection. l
TEAM & TECHNOLOGY OWNER Statoil CONTRACTOR Aibel AS DESIGNER Aibel AS TECHNOLOGY Bars BBR NETWORK MEMBER KB Spennteknikk AS (Norway)
TEAM & TECHNOLOGY CLIENT M/s. Adarsh Group MAIN CONTRACTOR M/s. B.L. Kashyap & Sons Ltd DESIGNER M/s. Potential Service Consultants (P) Ltd TECHNOLOGY Soil anchors BBR NETWORK MEMBER BBR (India) Pvt Ltd
SPECIAL APPLICAATIONS
T
u
The bridge is 1032.8 m long and 22 m wide and has a 212 m steel arch main span. The BBR Polska team consisted of six people during the height of
activity on site, under periodic supervision of site engineers. During the long period of construction, Tomasz Borsz and Piotr Ostrowski managed and shared the work in line with their own personal experience and the clients requirements.
ASSEMBLY OF ARCH
Two 2600 kN jacks with 12 0.6 diameter strands were used to lift the main section of the deck, installed on one side of the partially constructed bridge deck. Two 6800 kN jacks with 13 0.6 strands were installed on the other side. The jacks were connected to the BBR SL-402 system and operated from the control panel. Lifting operations, together with final joint realization, lasted three days. For lifting the external left element of arch, we used two 6800 kN jacks with seven 0.6 diameter strands, installed on the WP2 temporary tower and four BBR SL-402 1650 kN jacks with 12 0.6 strands, installed on the WP1 tower. For lifting the central element of the arch, we used four BBR SL-402 1650 kN jacks with seven 0.6 strands, installed on WP1 and WP2 temporary towers.
POT BEARINGS
Before assembly, the bearings were initially preset on site to 40 mm. Eighteen 250 t jacks were placed on sliding bearings and used for the lifting operations and changing the temporary bearings for the final ones. The lifting force needed was 1825 t for one bearing.
60 CONNCT
STRESSING HANGERS
We carried out the assembly of hangers from a barge using a movable crane. Each hanger was lifted from the barge using temporary ropes and initially connected to the upper anchorage. After suspending all the hangers, we regulated the length and joined them to the lower anchorages. The hangers have stressing couplers regulated to +/ 50 mm. BBR 40 t stressing jacks were installed on the couplers. The initial stressing force in each hanger varied from 100 up to 389 kN. After completion of the bridge deck, the final tensioning was carried out and the final stressing force in each hanger was between 430 and 580 kN. l
TEAM & TECHNOLOGY CLIENT National Highways and Motorways Authorities in Lublin (GDDKiA o/Lublin) CONTRACTING CONSORTIUM PRM Mosty dz SA / Herman Kirchner Polska VISTAL Sp. z o.o. DESIGNER PiWOM POMOST SC TECHNOLOGY Bearings Hangers Heavy lifting BBR NETWORK MEMBER BBR Polska Sp. z o.o. (Poland)
Low height Zero maintenance Recently, BBR WIGAbloc technology has been used in the oil industry on NPCCs SPE350 service barge, shown here, which has a 5,000 t Clyde crane on board. The 12,000 kN sensors were fitted to the buffer section of each leg, above the moving parts. The sensor sends signals back to the main deck and jacking room, where monitoring is carried out on a 24/7 basis to ensure that early warnings are given should loading change and possibly put the barge and its crew at risk. l
u
CONNCT 61
SPECIAL APPLICAATIONS
Making moves
nter Damoser from Austrian BBR Network member VORSPANN-TECHNIK reports on a most unusual application for jacks and tensile elements.
62 CONNCT
STAY CABLES
n the south of Valencia, the City of Arts & Sciences designed by the internationally renowned architect and engineer Santiago Calatrava has become one of the most celebrated features of the City. One of his latest designs, the new Serrera Bridge, now rises in the centre of this stunning complex to a height of 126 m making it the highest point of the City. Representing the Serrera Bridge project team from BBR PTE the BBR Network member in Spain Diana Cobos Roger presents some construction highlights.
Serrera Bridge is a steel stay cable bridge, with a 155 m long main span. The 29 front BBR HiAm CONA strand stay cables, with 31 and 61 strands, and the four back stays with 85 strands each, support more than 1,800 t of steel used for the bridge deck. The prestressing strand is a galvanized, waxed and HDPE coextruded strand with a ultimate tensile strength of 1860 MPa and a steel cross-section of 150 mm2.
64 CONNCT
ON 28TH JULY, WE STRESSED THE LAST STRAND JUST TWO MONTHS AFTER THE BEGINNING THE INSTALLATION!
used as a guide and passage from anchorageto-anchorage. The strand is positioned at deck level and pulled up through the stay pipe and the upper anchorage and inserted into the lower anchorage. Each strand is tensioned immediately after installation, using the BBR ISOSTRESS tensioning method, ensuring an equal stress distribution among the strands of an individual cable.
STRESSING OPERATIONS
The stressing of the back stays had to be carried out simultaneously for all four stays, so we used four multi-strand jacks situated on the top of the pylon. CONNCT 65
STAY CABLES
Then we continued the stressing operations with front stays 15 to 29, using the same system for strand-by-strand installation even for the longest stays which were 250 m long. On 28th July, we stressed the last strand just two months after beginning the installation!
TEAM & TECHNOLOGY OWNER Ciudad de las Artes y las Ciencias S.A. MAIN CONTRACTOR JV FCC Construccion + Pavasal DESIGNER Santiago Calatrava Architects & Engineers FCC Technical Services TECHNOLOGY BBR HiAm CONA BBR Square Damper BBR NETWORK MEMBER BBR PTE (Spain)
t is particularly fitting that the world-famous architect and engineer Santiago Calatrava should produce the Serrera Bridge and many other beautiful new structures in this location as Valencia is the city of his birth. During his early years, Calatrava must surely have been enthralled by the vast array of architecture in the city ranging from the ancient winding streets of the Barrio del Carmen with ancient Roman and Arabic buildings, to the Estacin del Norte built in the early 20th century. Calatrava studied at the Arts & Crafts School and then as an undergraduate at the Architecture School in Valencia. After graduating in 1975, he pursued a civil engineering degree at the Swiss Federal Institute of Technology in Zurich. In 1981, he set up his practice in Zurich and since then operating from a network of offices in many countries he has created a vast number of award-winning and awe-inspiring structures around the globe.
Santiago Calatrava architect and engineer (photograph copyright: Suzanne DeChillo / The New York Times)
66 CONNCT
Uniquely engineered
pin. This connecting piece allows the cable to be bolted to a deck plate. To stress the hangers, hydraulic bolt tensioners were applied. In the connecting plates, there were six holes for the permanent bolts, the two centre holes were used to stress two temporary bolts, using the tensioners. We used a 23-step stressing sequence where, for each step, two pairs of stay cables were simultaneously stressed. For that reason, a total of eight tensioners were utilized at the same time. Two high pressure hydraulic pumps with a capacity of up to 1,500 bar were connected to the tensioners.
he installation of locked coil ropes in a structure is a delicate process. David Olivares of Spanish BBR Network member, BBR PTE, explains that due to the great variety of sockets and the particular nature of each structure, every such project needs to be treated
supports the composite deck. The cables have diameters of 37 and 45 mm and have a pin open socket in both ends. We carried out the installation and stressing of the hangers. The main operations performed are described below. The upper socket was lifted and pinned by means of a crane. Then, in the lower socket, a special connecting steel piece was fixed by a
EXPO08
At the end of April 2008, the Pasarela del Voluntariado was inaugurated for the international EXPO08 which was held in Zaragoza. In just ten months, the footbridge had been completed. The 235 m long curved steel deck is supported by 47 stay cables which are anchored to a tilted central steel pylon. The locked coil ropes are classified as five different types according to their cross-section dimensions 31, 35, 40, 45 and 128 mm diameter. In this case, the upper end is a pin open socket and the lower end is a threaded socket with a spherical nut. The installation of the cables was completed in three stages, each of them with several sub-phases. At the start, the deck was supported by six temporary towers and the central pylon anchored to the foundation system. The first stage was the lifting of the cables and the next two stages consisted of two consecutive stressing operations. The cables on the left and right side of the pylon were installed and stressed alternately to keep the balance of the structure. To stress the cables, post-tensioning strands were anchored to the lower end. The cylindrical socket has an external and internal thread. The external one is for the permanent nut and the internal one is designed for stressing only during erection. Threaded post-tensioning anchor heads 4 x 0.6, 7 x 0.6 and 19 x 0.6 were threaded for stressing. A multistrand hydraulic jack with a special shuttle stressed the strands to the required stressing force. l
TEAM & TECHNOLOGY (Expo 08, Zaragoza) OWNER Ayuntamiento De Zaragoza MAIN CONTRACTOR FCC Construccion DESIGNER Carlos Fernandez Casado TECHNOLOGY Stay cables BBR NETWORK MEMBER BBR PTE (Spain)
We have recently completed two such projects the Palma del Ro Bridge in Crdoba and a pedestrian cable stayed bridge for Expo08 in Zaragoza.
CONNCT 67
STAY CABLES
TEAM & TECHNOLOGY (Palma Del Rio) OWNER Junta De Andalucia MAIN CONTRACTOR FCC Construccion DESIGNER IDEAM + FCC Technical Services TECHNOLOGY Stay cables BBR NETWORK MEMBER BBR PTE (Spain)
Complex challenge
he building process, technology and materials used during bridge construction over the Dunajec River in Brezna near Stary Sacz delivered a world class solution to a complex challenge. On behalf of BBR Polska, Marcin Ornat managed the technology and prestressing, while Tomasz Borsz was in charge of suspension operations together, they take up the story.
The bridge was designed as a continuous three span beam structure, with pylons placed on the intermediate supports. The 300.76 m long bridge has three spans 77.92 m + 143 m + 77.92 m. Diagonal stay cables, supporting the spans, are
anchored at the top of the pylons which stand 18.47 m high above the deck. The bridge has two arrays of stay cables, laid out in a fan shape. Six pairs of stay cables
emerge from the head of each pylon. In cross-section, the girder is of the single box type and it has a height of 3.4 m along the whole length of the structure. The beam consists of two concrete decks (upper and lower) connected by two steel pipe trusses. The width of the deck is 14.11 m. Over each support there are concrete cross-beams constructed in the superstructure. Steel pylons were installed on the external parts of the intermediate support cross-beams. The bridge was executed by the incremental launching method. The bridge over Dunajec River is the first stay cable construction in Poland, where webs made from steel pipe trusses were used in the concrete construction of the main girder. The complexity of the construction and scope of various works connected with technology and prestressing made BBR Polska the obvious choice and optimal partner for the joint venture of strong local bridge contractors ZRM Mostmar SJ and MOSTY Chrzanw Sp. z o.o. BBR Polskas work was undertaken in three phases:
68 CONNCT
Scope of works
BBR Polskas contract included supply of materials, specialist equipment and the following works: u delivery and prestressing of steel bars which anchored the launching nose to the bridge construction u delivery of materials, equipment and execution of 13 phases of bridge launching u delivery of materials and execution of prestressing (construction stage longitudinal tendons, deck transversal prestressing unbonded tendons, transversal bonded cables at stays connections, external continuity tendons) u delivery and installation of pot bearings u execution of prestressing bars fixing lower stays anchorages u delivery of materials and execution of bridge suspension with BBR CONA stay cables u delivery and installation of expansion joints
Phase 1 incremental launching and prestressing necessary during the launching process. u Phase 2 prestressing of stays fixation elements and continuity prestressing. u Phase 3 bridge structure suspension. Today, the bridge over Dunajec River in Brezna has blended beautifully into the landscape of this mountain valley. As well as an extended transport system for Stary and Nowy Sacz, the region has also acquired a new and interesting structure. From our side, the experience gained from working on this relatively small but technically complex structure will be of great value on future projects. l
Overnight installation
This pedestrian bridge over a railway line was preassembled and welded near one of the abutments and erected by a crane in just one night, using the prefabricated cables, supplied and installed by French BBR Network member ETIC. After erection of the deck, the cables situated behind the pylon were connected to special foundation blocks, while the cables in front of the pylon were anchored by means of tie bolts placed between two anchor plates one was fixed on the back the pylon head, the other through an axis on the deck. After the first phase of cable tensioning, the slab made of prefabricated plates of concrete attached to the steel beam was installed. A second phase of tensioning was performed after the road deck was finished. l
TEAM & TECHNOLOGY OWNER City of Belfort MAIN CONTRACTOR JV Richert-Gagne DESIGNER Arcadis, Cabinet Tonello TECHNOLOGY BBR DINA stay BBR NETWORK MEMBER ETIC S.A. (France)
TEAM & TECHNOLOGY OWNER Management of Voivodship Roads, Krakow, Poland MAIN CONTRACTOR Joint venture of ZRM Mostmar SJ and MOSTY Chrzanw Sp. z o.o. DESIGNER Piotr Wanecki (bridge structure) TECHNOLOGY Launching BBR VT CONA CMI internal BBR VT CONA CME external BBR VT CONA CMM unbonded BBR CONA stay Bearings and expansion joints BBR NETWORK MEMBER BBR Polska Sp. z o. o. (Poland)
CONNCT 69
STAY CABLES
Manukau Citys Flat Bush township is New Zealands newest urban development, designed to provide a high-quality living environment for up to 40,000 people by 2020. The entrance to the town centre is dominated by the Ormiston Road bridge an awe-inspiring sight that lifts the road above a 100-year flood plain. At 70 m long and 27 m wide, the box girder
structure features four traffic lanes, two cycle ways and footpaths on both sides, with a 3.5 m wide void down its centre to allow natural light beneath. But of course its most dramatic features are the 46 m high pylons from which the bridge is suspended
and the 20 cables supporting it, supplied and installed by BBR Contech.
70 CONNCT
RECOGNIZING THE ADVANTAGES OF COLLABORATION, BBR CONTECH CALLED ON THE EXPERTISE AND EXPERIENCE OF THE BBR HEADQUARTERS ...
Technical insight:
Wind induced drag force on stay cables
Wind induces static and dynamic effects on cable stays and should therefore be taken into account during design. The static drag force on a stay cable causes significant transversal stresses on the pylon, particularly on large cable-stayed bridges. The drag force Fd is given by: Fd = U2 D CD Where is the density of air (1.23 kg/m3), U is the wind velocity, CD is the drag coefficient and D is the outer cable diameter. As the formula above indicates, the predominant factor is wind velocity as it goes in square. For instance, the drag force increases by 78% when U rises from 30 m/s to 40 m/s assuming the other factors remain stable. In a classic case of circular stay pipes, the value of the drag coefficient depends on the wind velocity, or more specifically on the Reynolds number Re, and the roughness of the outer casing. Cable stays are commonly in the supercritical range in strong winds. A CD of 0.5 for a smooth BBR stay pipe and a drag coefficient of 0.55-0.60 for a BBR stay pipe with helical rib can be achieved in wind tunnel tests. Nevertheless, the effects of extreme winds are often calculated by adopting a CD of 0.70-0.80 to be on the safe side and to allow for the possible evolution of surface roughness (dirty etc.) over time. Reduced wind loads can be achieved by reducing the outer cable diameter. For long span bridges, where the cable stay drag is a preponderant factor, the installation of compact BBR stay pipes can be evaluated. The compact system enables the drag force to be reduced by 20% compared to the standard system. This system requires special material and installation techniques on site. BBRs first application of compact stay pipes was in 2000, when the 475 m long Rama VIII Bridge in Bangkok, Thailand was erected. In comparison with BBR strand stay cable technology, BBR DINA/HiAm wire stay cables enable even smaller pipe diameters a reduction of up to 35% relative to the standard strand system. BBR DINA/HiAm cables are composed of individual seven millimeter wires that are anchored by means of buttonheads. BBR wire stay cables have been used for nearly 50 years. They can be completely prefabricated or assembled on site before they are installed and stressed. BBR wire cables were for instance applied on Tatara Bridge, Japan, the longest bridge in its class in the 20th century and on New Zealands first stay cable structure Ormiston Road Bridge.
Recognizing the advantages of collaboration, BBR Contech called on the expertise and experience of the BBR headquarters. The international team worked with main contractor Fulton Hogan Civil and principal design consultant Beca Infrastructure to deliver the result Manukau City was looking for. The 20 cable stays supporting the bridge deck with lengths of between 20 and 53 m are configured using the BBR DINA stay cable system. The largest tendon comprises 144 7 mm high tensile wire elements with a maximum UTS approaching 10,000 kN. Each of the wires is individually galvanized, housed within a specially manufactured polyethylene sheath which is filled with a proprietary corrosion inhibitor. These tendons connect to the pylons via large cast-steel clevises, which when installed weigh close to a ton each.
Almost 70 km of wire had to be measured and cut, then installed complete with clevises using two cranes and a mechanical excavator. Cable tensioning had to be started during installation and before the cranes were released and pylon movement closely monitored throughout. It was a difficult, but highly satisfying project and the results are well worth the effort. The Ormiston Road bridge is an iconic entrance and exit point that is a real tribute to the teamwork and international collaboration behind it. l
TEAM & TECHNOLOGY OWNER Manukau City Council MAIN CONTRACTOR Fulton Hogan Ltd DESIGNER Beca Infrastructure Ltd TECHNOLOGY BBR DINA stay BBR NETWORK MEMBER BBR Contech (New Zealand)
CONNCT 71
STAY CABLES
Solution of choice
RIO SECO BRIDGE, CASTELLN, SPAIN
ollowing on from the environmentally friendly Green Bridge in Australia, completely dedicated to public transport, cyclists and pedestrians, BBR Stay Cable technology is again the solution of choice for another public transport project this time being provided by the local BBR Network member BBR PTE in Spain. The new guided bus / tramway in Castelln crosses the Rio Seco on a cable stayed bridge supported by BBR HiAm CONA stay cables.
TEAM & TECHNOLOGY OWNER Conselleria dInfraestructures i Transport de la Generalitat Valenciana MAIN CONTRACTOR FCC CONSTRUCCION + LUBASA DESIGNER IDOM, Madrid TECHNOLOGY BBR VT CONA CMI internal BBR HiAm CONA Bars BBR NETWORK MEMBER BBR PTE (Spain)
This new bridge forms part of the tramway system which connects the west of the city of Castelln, where the university is located, with the coast. The stay cable bridge has a Y-shaped steel pylon with five front and five retaining stays, on both sides of the Y, holding a 105 m length deck. The most striking design feature of this bridge is the 55 degree tilt angle of the slab axis with the abutments, giving rise to a huge variety of stay sizes ranging from 30 up to 109 strands and lengths from 35 to 100 m. Longitudinal post-tensioning of the slab was performed using BBR VT CONA CMI 3106 tendons, transverse PT consists of 1506 tendons. The retaining part of the slab is connected to the ground by 42 x 75 mm diameter post-tensioned bars. The installation of the stays began in the second week of January 2008, working on both arms of the Y-shaped pylon. The installation of the 20 stay pipes and more than 1,500 strands (threading and stressing) was finished in less than three weeks. The final stressing tuning (limited to two stays) and the rest of the works, such as the wax injection of the anchor heads, the installation of
the centralizers and the anti-vandalism tubes demanded two more weeks. Finally, load testing was carried out on 19th February. The most significant benefit reaped by the owner of any BBR HiAm CONA cable stayed structure in addition to its high fatigue resistance and the facility to replace any part of a stay if required is its suitability for any construction process, enabling a very high level of adaptability and performance during the installation of the stays.l
72 CONNCT
moving with
the times
Soon after the first permanent settlers arrived in New Zealand in 1840, they began building the countrys roads, railways and bridges. Many of the bridges continue to be used today but some, like that spanning the South Islands Kawarau River, have had to be replaced. However, as Peter Higgins and Paul Blundell of BBR Contech the BBR Network member in New Zealand found out while working on the new bridge, this does not necessarily mean that the old one is no longer being used!
CONNCT 73
MRR
THE ANCHORS ARE FITTED WITH A THREADED ANCHOR HEAD TO PERMIT LATER CONNECTION FROM THE ANCHOR TO THE ARCH RIB STEELWORK.
Its not often that a BBR Contech bridge project takes place in clear sight of another one, but during the recent refurbishment work on the newer Kawarau River bridge, the team had company just 100 m away. Thats because the original 1880-built suspension bridge is now home to AJ Hackett Bungy Queenstown the original (and worlds first) 43-metre jump to which tens of thousands of people flock every year. It made for an interesting experience for us an occasional audience as we worked beneath the old bridges 1963 replacement, while remaining unseen by the vehicles traveling overhead.
standards. BBR Contechs work undertaken in conjunction with main contractor Fulton Hogan and infrastructure specialist Opus International Consultants consisted of providing lateral and longitudinal restraint to the bridge by installing anchors into the surrounding rock at the arch ends and special cable linkages at the abutments and central arch pin connection. It was a challenging project, especially given the height above the river at which people had to work, said Fulton Hogans Contract Manager Mike Wardill. In addition, the bridges design meant we experienced up to four or five inches of rolling movement underneath as the traffic load on the bridge transferred to the arches. This, combined with working from scaffold at great height above a raging river, meant we sometimes had a more exhilarating ride than the bungy jumpers!
74 CONNCT
THE BBRV BUTTON HEAD WIRE CONFIGURATION IS IDEALLY SUITED TO SHORT, HIGH CAPACITY TENDONS.
from 18-28 m were installed and accurately positioned to match the angles of the arch ribs. The anchors are fitted with a threaded anchor head to permit later connection from the anchor to the arch rib steelwork. The anchors were then tensioned before structural steel specialists welded steel brackets to the arch ribs. BBR Contech then connected the anchors to the new steel sections, using a specially designed BBRV cable stay linkage tendon, each with a capacity of 2,730 kN. The BBRV button head wire configuration is ideally suited to short, high capacity tendons. Similar cable link tendons
were also installed at the central arch pin joint to provide additional seismic restraint at the mid-span location. Having worked with BBR Contech before, we knew they would deliver on this project, said Mike Wardill. They are highly organized and always professional, with a strong technical background supported by practical knowledge. They are all you could ever want on a project such as this. l
TEAM & TECHNOLOGY OWNER New Zealand Transport Agency MAIN CONTRACTOR Fulton Hogan Ltd DESIGNER Opus International Consultants TECHNOLOGY BBR CONA rock anchors BBRV wire BBR NETWORK MEMBER BBR Contech (New Zealand)
CONNCT 75
MRR
he Westfield London development an iconic retail and leisure complex in Londons Shepherds Bush has been the focus of major strengthening works using CFRP composites. Robin Kalfat, Senior Design Engineer of Structural Systems UK Ltd the BBR Network member in the UK reports that CFRP is a cost-effective technology suited to wide application in the strengthening of postThis massive development on the former White City site comprises retail, commercial, cinemas and public buildings with a total nett lettable area of approximately 120,000 m2. We have posttensioned two suspended slabs for the car park and retail area. Strengthening of the slabs was necessary due to change in ownership and tenants who required design changes including the introduction of 15 large escalator, stair and lift shaft penetrations. Each penetration, typically 1900 by 4200 mm in size, was required through three to four levels in any particular location. The strengthening was required as a result of the loss of pre-stressed strand and reinforcement as well as the additional loadings and stresses induced in the slab by the redistribution of moments and forces in the vicinity of the penetration. is analogous to that of traditional reinforced concrete, with the difference being in the initial strains present in the concrete at the time of application of the FRP. The design procedure consisted of a verification of both the stresses and strains in materials concrete, steel reinforcement and prestressed strand at both service and ultimate limit states. The strains in these materials were checked against limiting values set out in the current design standards. Design of the FRP was carried out in accordance with the Concrete Societys Technical Report No. 55 (2000). The most critical aspects of design were: u an assessment of capacity of the existing structure u determination of the required capacity of the slab u limiting stresses and strains in the material u checking the mechanisms of de-bond and anchorage design.
76 CONNCT
THE CFRP APPROACH ELIMINATED ANY PROBLEMS WITH ACCESS AND SERVICES THAT A MORE BULKY STRUCTURAL STEEL STRENGTHENING SOLUTION WOULD HAVE CAUSED
surface contaminants. This was achieved by wet open grit blasting selected to minimize the effects of dust on other trades within the zone. This left an open substrate with exposed fine aggregate and an average surface roughness of around 0.5 1.0 mm. All areas were thoroughly water jetted afterwards to remove resultant debris adhering to the surfaces, and allowed to dry for 48 hours prior to any further works being carried out. Pull off tests were subsequently carried out to verify the tensile strength of the substrate exceeded the minimum requirement of 2.0 MPa. The plates with epoxy applied were raised to the concrete substrate and pushed in place using light pressure from the fist, then with a hard rubber roller in a manner which causes the adhesive to be expelled at both edges of the laminate. This guaranteed the expulsion of voids and a thorough application of adhesive and this was carried out with an overall average adhesive thickness of 2 mm.
KEY BENEFITS
CFRP is extremely light weight considering its superior tensile strength properties and has an overall plate thickness of as low as 1.2 mm. The CFRP approach eliminated any problems with access and services that a more bulky structural steel strengthening solution would have caused and lent itself to cost-effective strengthening while achieving aesthetically pleasing results.
TEAM & TECHNOLOGY OWNER Christchurch City Council MAIN CONTRACTOR Fletcher Construction DESIGNER Holmes Consulting Ltd TECHNOLOGY MRR range BBR NETWORK MEMBER BBR Contech (New Zealand)
SPEED OF CONSTRUCTION
We completed all remediation works within the House of Fraser store in a 12-week period, enabling the developer, Westfield, to meet their deadline and secure a timely handover to tenants. This was accomplished by innovation in construction sequencing and propping staging which allowed multiple installation crews working simultaneously to complete the strengthening of all eight penetrations in this zone by the required deadline. l
TEAM & TECHNOLOGY OWNER Westfield London MAIN CONTRACTOR P.C. Harrington (Contractors) Ltd DESIGNER Structural Systems (UK) Ltd TECHNOLOGY MRR range BBR NETWORK MEMBER Structural Systems (UK) Ltd
CONNCT 77
MRR
eff Booth, Specialist Construction Manager of Structural Systems (UK) Ltd, the BBR Network member in the UK, reports that the team is currently working on a major project at BAAs Londons Gatwick Airport to accommodate the replacement of the Inter Terminal Transit System (ITTS) an automated driverless train system.
Although all the transit sub-systems and station refurbishment will take place during a complete seven month shutdown of the system starting in September 2009, the bridge bearing replacement work is being carried out in advance of the main works. In conjunction with our bearing supplier, we undertook a full survey to confirm bearing condition, numbers and types. It became apparent that there were issues with the existing bearings that would affect the installation of the new ones. We were able to provide BAA with a solution for the replacement of the 628 bearings supporting the 1.2 km dual track system whilst keeping the ITTS operational.
THE SOLUTION
This solution involves welding new supports to the existing bearing dowels, providing new fixity for the new bearings. Last summer, a full scale mock up was set up in our workshop in West London and sample welds were sent off for testing and certification, as part of this trial. We also produced temporary works designs inTEAM & TECHNOLOGY OWNER BAA Gatwick (Part of Ferrovial Group) MAIN CONTRACTOR Structural Systems (UK) Ltd DESIGNER Structural Systems (UK) Ltd TECHNOLOGY Bearings BBR NETWORK MEMBER Structural Systems (UK) Ltd
house for the provision of restraints to the structure while the bridge is being jacked to allow the replacement of the bearings. Jacking will be achieved with the use of a recently purchased 12 point synchronized lifting unit with its operating tolerances of +/- 0.25 mm, we will be able to control the jacking and de-jacking process very accurately .
and verified by us, in accordance with BAAs design process requirements. The delivery and recording of quality both in the manufacturing works and on site are equally important and the BAA Project Quality Leader has worked closely with our team in developing installation activity check sheets and quality record sheets to satisfy all parties requirements, so that final assurance can be agreed. l
QUALITY MATTERS
All design and temporary works designs have been undertaken by SSL UK and independently checked
System in transit
78 CONNCT
he construction of a tower such as Aucklands Sky Tower - not only pushes our technology to a new and literally higher level but, as with many pioneering projects, it also inspires a strong sense of team spirit which often reaches around the globe.
Highest tension
SKY TOWER, AUCKLAND, NEW ZEALAND
CONNCT 79
LANDMARK STRUCTURES
obert Robinson of BBR Contech the BBR Network member in New Zealand contracted to install the Sky Tower in late 1995 recalls the unique technological challenges which brought this landmark structure to Aucklands skyline and community.
The main structure of the tower is a 12 m diameter reinforced concrete shaft. This is supported by eight reinforced concrete legs at the base, which are connected to the shaft by a concrete collar and designed to spread force load. The upper floors of Sky Tower have been constructed using composite materials, structural steel, pre-cast concrete and reinforced concrete. The exterior of the pod levels is finished in an aluminum cladding with blue-green reflective glass. Above Sky Deck, a structural steel framework rises to support the upper lift machine room and a concrete ring slab which supports the mast. A multi-section structural steel framework rises above the top of the shaft. Constructed of steel tubes, the mast is bolted in sections and provides space for the antennas and other communications equip-ment. The mast is equipped with specially designed tuned dampers to limit its vibration in the wind. Telecommunications facilities, above and below the centre pod, are housed on silver aluminumclad communications floors. Emergency stairs and service utilities are located within the centre of the shaft.
Opened six months ahead of schedule in March 1997, at 328 m Sky Tower is the tallest tower in the Southern Hemisphere and is the 12th tallest tower in the world overtaking the Eiffel Tower in Paris by four meters. As well as being an icon for Auckland, the tower serves as a telecommunications hub. The tower forms part of Sky City New Zealands largest casino and the facility also includes two hotels, a convention centre, a 700seat theatre and 12 restaurants and bars.
CONSTRUCTION OVERVIEW
Sky Tower was constructed from a high strength, high performance concrete.
80 CONNCT
TESTING TIMES
A test program was undertaken to prove that the anchorage components were capable of withstanding, without deformation, 110% of the ultimate capacity of the tendon. This testing was carried out in Contechs 6000 kN compression frame located at their component production factory in Masterton, New Zealand. Subsequent testing of the entire system, including anchorages, tendons, stressing jacks, gauges, pumps and handling equipment was carried out in Contechs East Tamaki, Auckland facility using a large concrete test beam specifically constructed for the purpose.
Perfectly perpendicular
During construction, constant verification, using the most sophisticated telemetry ever employed in New Zealand, was necessary to ensure Sky Tower was perfectly straight. This telemetry encompassed three key techniques. The first is called resection where measurements were taken from three different existing points surrounding Sky Tower in this case the ASB Bank building, Mount Eden and the Coopers and Lybrand building to derive the precise centre point of the structure. Secondly, during construction of the shaft, lasers positioned on the base pad of Sky Tower shone up to the jump form platform in a grid pattern to provide verticality readings. Finally, daily real-time readings were taken of the structure using seven global positioning satellites. These satellites confirmed the exact position of Sky Tower.
CONNCT 81
LANDMARK STRUCTURES
THIS WAS THE FIRST TIME A BBR CENTRE STRESSING ANCHORAGE OF THIS SIZE HAD BEEN USED ANYWHERE IN THE WORLD.
tensioning where access to the perimeter of the slab was not available for tensioning. This was the first time a BBR centre stressing anchorage of this size had been used anywhere in the world. Tendon materials comprising special grade low relaxation 7 mm wire were imported from Germany. The high tensile steel plate manufactured specially for the Z36 anchorage was imported from Australia. The two 2000 kN capacity stressing rams were also designed and built in Auckland, during the extremely tight six week procurement period permitted by the contract.
TENSIONING OPERATION
The tensioning operation involved inserting the specially designed 200 kN rams through the shaft wall into the centre of the stressing anchor recess boxes. Stressing the tendon ring was carried out simultaneously from opposite stressing anchorages. The anchoring load achieved was 1700 kN per tendon. Friction in the tightly curved corrugated steel ducts was as low as = 0.14 and k = 0.0007/m. The application of the 55,000 kN force used to clamp the ring to the tower shaft took eight working days. On completion of all tensioning, the anchor recesses were concreted and the tendons grouted using a high shear colloidal mixer and multi-stage mono pump, which due to the
design load for more than 24 hours. This allowed the concrete legs to shorten under the load of the tower, while still ensuring the transfer of the designed weight of the structure to the legs. The large upwards force exerted on the collar increased the separation between the legs and collar by 5 mm, resulting from a combination of compression of the legs and tilting of the tower shaft. The movement very closely matched the design figure of 6 mm. The gap between the top of the leg and the underside of the collar was then filled with high strength proprietary grout to retain the load and lock the system in place. Following curing of the grout, the load in the eight jacks was released and the starter rods which were cast into the legs and protruded into the collar inside corrugated ducting were grout filled. Finally, the flat jacks were reinflated to 1400 kN each with low exotherm epoxy resin replacing the water. The conceptual design and carrying out the transference of the weight of the Sky Tower to its legs was a considerable challenge for both the designer and BBR Contech over the 18 month period of the work. The detailing and planning, by all concerned, which went into this aspect of Sky Towers construction ensured the ultimate success of this precise and difficult operation. l
BLUE Auckland Rugby PINK Breast Cancer Awareness RED & GREEN Kidz First Childrens Hospital BLUE & GREEN Starship Childrens Foundation ORANGE Auckland Festival GREEN & PURPLE The Auckland Cup RED The Americas Cup GOLD supporting New Zealand athletes during the Beijing Olympics
82 CONNCT
u u u
Concrete 15,000 m3 Reinforcing steel 2,000 t Structural steel 660 t, including 170 t in the mast Shaft diameter 12 m Foundations 16 piles, 15 m deep Total construction time 2 years 9 months Sky Tower weighs 20,000 t equivalent to 6,000 elephants!
u u
CONNCT 83
LANDMARK STRUCTURES
Scaling
Sydney Tower fascinating facts
u
Second tallest structure in Australia Third tallest observation tower in Southern Hemisphere Same height as the Eiffel Tower As tall as 60 giraffes the worlds tallest animal Almost six times as high as Niagara Falls (53 m) More than twice as high as Egypts Great Pyramid (146 m) 25th tallest inhabitable building in the world
u u
84 CONNCT
new heights
Originally constructed as the defining architectural feature of the Centrepoint retail and commercial development, the tower is now Sydneys tallest structure. The 309 m high tower was opened in August 1981 as a communications tower and tourist facility. Like its neighbor across the Tasman Sea in Auckland, the Sydney Tower is a focal point for all who live in or visit the city of five levels accommodating two revolving restaurants and two observation decks. The steel shaft is 6.75 m overall diameter and consists of 28 columns spaced equally around its perimeter.
installation. Stressing was carried out in two stages at night to reduce the transversing effects of the sun on the cables during daylight hours. The weathered effect on the structure is caused by special alloying elements which react with the air to form a dense tight oxide film to protect the steel from corrosion. The appearance, texture and maturity of the weathered steels patina depends upon three primary natural factors time, the degree of exposure and atmospheric environment. With time, the oxide coating changes from a rusty red-orange to a dark purple-brown. Since it opened, Sydney Tower has welcomed more than 17 million visitors or four times the population of Sydney!
CONSTRUCTION PROFILE
The cost of building Sydney Tower was A$ 36 million one third the cost of the Sydney Opera House a huge amount at the time. Construction of the Centrepoint Tower now officially known as the Sydney Tower began in 1975. Its unique supporting net structure, composed of BBR DINA stay cables, sets it apart from the crowd. This project involved the erection of a steel tower which rose 230 m above the roof of the 12-level office building in the centre of Sydney, Australia. Its shaft is stayed by a system of BBR parallel-wire prestressing cables. The tower is topped by a turret
LANDMARK STRUCTURES
HEADQUARTERS
SWITZERLAND BBR VT International Ltd Bahnstrasse 23 8603 Schwerzenbach (ZH) Tel +41 44 806 80 60 Fax +41 44 806 80 50 www.bbrnetwork.com [email protected]
EUROPE
AUSTRIA VORSPANN-TECHNIK GmbH & Co. KG Scherenbrandtnerhofstrasse 5 5021 Salzburg Tel +43 50 626 2690 Fax +43 50 626 2691 www.vorspanntechnik.com [email protected] GERMANY VORSPANN-TECHNIK GmbH Frstenrieder Strasse 281 81377 Mnchen Tel +49 89 71001 200 Fax +49 89 71001 201 www.vorspanntechnik.com [email protected] Spankern GmbH (North) Lbecker Strasse 53-63 39124 Magdeburg Tel +49 391 726 56 30 Fax +49 391 726 56 31 www.spankern.de [email protected]
BELGIUM see Netherlands Additional BBR technology licenses have been granted in Europe, Asia Pacific and America for more information, please contact the BBR headquarters.
IRELAND see United Kingdom CROATIA BBR Adria d.d. Kalinovica 3 10000 Zagreb Tel +385 1 3839 220 Fax +385 1 3839 243
AMERICA
www.bbr-adria.com [email protected]
FINLAND see Norway EASTERN CANADA Canadian bbr Inc. 3450 Midland Ave. Scarborough Ontario M1V 4V4 Tel +1 416 291 1618 Fax +1 416 291 9960 [email protected]
NETHERLANDS Spanstaal B.V. Koningsweg 28 3762 EC Soest Post Address: PO Box 386 3760 AJ Soest Tel +31 35 603 80 50 Fax +31 35 603 29 02 www.spanstaal.nl [email protected]
FRANCE ETIC S.A. 48, rue Albert Joly 78 000 Versailles Tel +33 1 39 50 11 20 Fax +33 1 39 50 11 03 www.etic-international.fr [email protected]
86 CONNCT
NORWAY KB Spennteknikk AS Siva Industrial Estate N. Strandsveg 19-21 Postboks 1213 2206 Kongsvinger Tel +47 62 81 00 30 Fax +47 62 81 00 55 www.spennteknikk.no [email protected]
POLAND BBR Polska Sp. z o.o. ul. Marywilska 38/40 03-228 Warszawa Tel +48 22 811 50 53 Fax +48 22 614 57 60 (ext. 108) www.bbr.pl [email protected] BBR Polska Sp. z o.o. ul. Tarnogorska 214a 44-105 Gliwice Tel +48 32 33 02 410 Fax +48 23 33 02 411 www.bbr.pl [email protected]
SPAIN BBR Pretensados y Tcnicas Especiales, S.L. Antigua Carretera N-III Km. 31, 150 28500 Arganda del Rey, Madrid Tel +34 91 876 09 00 Fax +34 91 876 09 01
www.bbrpte.com [email protected]
UNITED KINGDOM Structural Systems (UK) Ltd 12 Collett Way Great Western Industrial Estate Southall Middlesex UB2 4SE Tel +44 20 8843 6500 Fax +44 20 8843 6509 www.structuralsystemsuk.com [email protected]
SWEDEN Spnnteknik AB Box 158 671 24 Arvika Tel +46 570 126 60 Fax +46 570 109 50 www.spannteknik.se [email protected]
CONNCT 87
BBR DIRECTORY
MIDDLE EAST
ASIA PACIFIC
IRAQ Spezialized Prestressing Co Karrada, Dist. 901, St. 1, Bldg. 16 Office No. 10 Baghdad Tel +964 1 718 6333 Fax +964 1 718 1385 www.spc-iraq.com [email protected]
QATAR see United Arab Emirates UNITED ARAB EMIRATES NASA (BBR) Structural Systems LLC Head Office, Suite #302 PO Box 28987 Sara Building, Garhoud Dubai Tel +971 4 2828 595 Fax +971 4 2828 386 www.bbrstructuralsystems.com [email protected]
JORDAN Marwan Alkurdi & Partners Co. Ltd PO Box 506 Amman 11821 Tel +962 6 581 9489 Fax +962 6 581 9488 www.mkurdi.com [email protected]
KINDGOM OF SAUDI ARABIA Huta-Hegerfeld Saudia Ltd BBR Prestressing Division Prince Sultan St. Lotus Building PO Box 1830 Jeddah 21441 Tel +966 2 662 3205 Fax +966 2 683 1838 www.huta.com.sa [email protected]
INDIA BBR (India) Pvt Ltd No. 318, 15th Cross, 6th Main Sadashivanagar Bangalore - 560 080 Tel +91 80 4025 0000 Fax +91 80 4025 0001 www.bbrindia.com [email protected]
AFRICA
SOUTH AFRICA Structural Systems (Africa) Block B 20 Civin Drive Pellmeadow Office Park Bedfordview Johannesburg 2008 Te +27 11 409 6700 Fax +27 11 409 6789 www.structuralsystemsafrica.com [email protected]
JAPAN Japan BBR Bureau c/o P.S. Mitsubishi Construction Co. Ltd Harumi Center Bldg. 3F 2-5-24 Chuo-ku Tokyo Tel +81 3 6385 8021 Fax +81 3 3536 6937 [email protected]
88 CONNCT
Tel +61 2 8767 6200 Fax +61 2 8767 6299 www.structuralsystems.com.au [email protected] Structural Systems (Northern) Pty Ltd Unit 1, 12 Commerce Circuit Yatala, QLD 4207 Tel +61 7 3442 3500 Fax +61 7 3442 3555 www.structuralsystems.com.au Structural Systems (Southern) Pty Ltd PO Box 1303 112 Munro Street South Melbourne Victoria 3205 Tel +61 3 9296 8100 Fax +61 3 9646 7133 www.structuralsystems.com.au [email protected] Structural Systems (Western) Pty Ltd PO Box 6092 - Hilton 24 Hines Road, OConnor Western Australia 6163 Tel +61 8 9267 5400 Fax +61 8 9331 4511 www.structuralsystems.com.au [email protected]
NEW ZEALAND BBR Contech 6 Neil Park Drive, East Tamaki PO Box 51-391 Pakuranga Auckland 2140 Tel +64 9 274 9259 Fax +64 9 274 5258 www.contech.co.nz [email protected] BBR Contech 38 Waione Street, Petone PO Box 30-854 Lower Hutt Wellington 5040 Tel +64 4 569 1167 Fax +64 4 569 4269 www.contech.co.nz [email protected] BBR Contech 7A Birmingham Drive Middleton PO Box 8939 Riccarton Christchurch 8440 Tel +64 3 339 0426 Fax +64 3 339 0526 www.contech.co.nz [email protected]
MALAYSIA BBR Construction Systems (M) Sdn Bhd No. 17, Jalan PJS 11/2 Subang Indah Bandar Sunway 46150 Subang Jaya Selangor Darul Ehsan Tel +60 3 5636 3270 Fax +60 3 5636 3285 www.bbr.com.my [email protected]
SINGAPORE BBR Construction Systems Pte Ltd BBR Building 50 Changi South Street I Singapore 486126 Republic of Singapore Tel +65 6546 2280 Fax +65 6546 2268 www.bbr.com.sg [email protected]
PHILIPPINES BBR Philippines Corporation Suite 502, 7 East Capitol Building No.7 East Capitol Drive Barangay Kapitolyo Pasig City 1603 Metro Manila Tel +63 2 638 7261 Fax +63 2 638 7260 [email protected]
THAILAND Siam-BBR Co Ltd 942/137.1 5th Floor Charn Issara Tower Rama 4 Road Kwaeng Suriwongse, Bangrak 10500 Bangkok Tel +66 2 237 6164-6 Fax +66 2 237 6167 www.bbr.com.sg [email protected]