Routine Vertical Pile Load Test Report: Piling Work For Express Court in Jaypee Greens
Routine Vertical Pile Load Test Report: Piling Work For Express Court in Jaypee Greens
RoutineVerticalPileLoadTestReport
OF
750mmdia,T5183Pile
Forinformation&onwardssubmission
PurposeofIssue
RRW Prepared by
SSB Checked By
ITDCemProjectCode. ITDCemProjectNo.
: :
JPGreens,Noida
22111CF
OutputRecordNo.: ITDC/DivIII/22111CF/2/18/0/O
Subject:
Routine vertical load has been conducted on 750mm dia T5-183 pile at JP Greens , Noida on 0304/04/2012 Results indicate total Pile head displacement of 8.02 mm at the application of final test load of406.43 MT. After releasing of test load permanent pile head displacement of 2.307 mm was observed.
Safe Lateral Load Capacity calculations: 1) As per IS : 2911 (Part 4) -1985, Clause 6.1.5(a) Load at which total displacement is 12mm Safe load is 2/3 of load corresponding to 12mm
rd
2) As per IS : 2911 (Part 4) -1985, Clause 6.1.5(b) Load at which displacement is 10% of pile diameter that is 75 mm Safe load is 50 % of load corresponding to 75 mm
As both the above criteria remain unobserved, pile shall be considered safe to carry safe designed vertical load. The safe designed vertical load carrying capacity of pile is 270.00 MT. Hope you find the submittal in line with your requirement. For any further clarification, feel free to revert to us. Regards,
Subject:
LOAD VS PILE HEAD DISPLACEMENT Increment No. 0 1 2 Loading 3 4 5 6 7 8 8 7 6 Unloading 5 4 3 2 1 0 Gross Deflection : Net Deflection : Rebound : Pressure (Kg/cm2) 0 65 130 190 255 320 380 445 475 475 445 380 320 255 190 130 65 0 Load (MT) 0.000 55.616 111.230 162.571 218.180 273.800 325.140 380.760 406.430 406.430 380.760 325.140 273.800 218.180 162.571 111.230 55.616 0.000 8.020 2.307 5.713 mm mm mm % of Design load 0% 20.60% 41.20% 60.21% 80.81% 101.41% 120.42% 141.02% 150.53% 150.53% 141.02% 120.42% 101.41% 80.81% 60.21% 41.20% 20.60% 0.00% Displacement in mm 0.000 0.542 1.527 2.465 3.550 4.210 4.950 6.180 8.020 8.020 8.020 7.935 7.565 7.023 6.233 5.373 4.455 2.307
ITDC/DivIII/22111CF/2/18/0/O
Date : 20/4/2012
Subject:
Load Vs Displacement
Load on Pile Top in MT 0 0.00 50 100 150 200 250 300 350 400
Loading Unloading
450
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
Results: