Routine Vertical Pile Load Test Report: Piling Work For Express Court in Jaypee Greens

A routine vertical load test was conducted on a 750mm diameter pile (T5-183) at Jaypee Greens, Noida. The test involved applying an increasing load until reaching 406.43 metric tons, which caused a total pile head displacement of 8.02mm. After unloading, the permanent pile head displacement was 2.307mm. The test results indicate the pile can safely support its designed vertical load of 270 metric tons.

Uploaded by

Ajay Malik
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
174 views4 pages

Routine Vertical Pile Load Test Report: Piling Work For Express Court in Jaypee Greens

A routine vertical load test was conducted on a 750mm diameter pile (T5-183) at Jaypee Greens, Noida. The test involved applying an increasing load until reaching 406.43 metric tons, which caused a total pile head displacement of 8.02mm. After unloading, the permanent pile head displacement was 2.307mm. The test results indicate the pile can safely support its designed vertical load of 270 metric tons.

Uploaded by

Ajay Malik
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

PilingWorkforExpressCourtinJaypeeGreens

RoutineVerticalPileLoadTestReport
OF

750mmdia,T5183Pile

0 20/4/2012 Rev. Date

Forinformation&onwardssubmission

PurposeofIssue

RRW Prepared by

SSB Checked By

SSB ITDCem Client ApprovedBy

ITDCemProjectCode. ITDCemProjectNo.

: :

JPGreens,Noida

22111CF

OutputRecordNo.: ITDC/DivIII/22111CF/2/18/0/O

ITD Cementation India Limited


Project :

ITDC/DivIII/22111CF/2/18/0/O Date : 20/4/2012 By: RRW Checked: SSB

Piling Work for Express Court in Jaypee Greens


Routine Vertical Pile Load Test Report of 750mm dia Pile at T5-183

Subject:

Routine vertical load has been conducted on 750mm dia T5-183 pile at JP Greens , Noida on 0304/04/2012 Results indicate total Pile head displacement of 8.02 mm at the application of final test load of406.43 MT. After releasing of test load permanent pile head displacement of 2.307 mm was observed.

Safe Lateral Load Capacity calculations: 1) As per IS : 2911 (Part 4) -1985, Clause 6.1.5(a) Load at which total displacement is 12mm Safe load is 2/3 of load corresponding to 12mm
rd

- Not Observed = -MT = -MT

2) As per IS : 2911 (Part 4) -1985, Clause 6.1.5(b) Load at which displacement is 10% of pile diameter that is 75 mm Safe load is 50 % of load corresponding to 75 mm

- Not Observed = -MT

As both the above criteria remain unobserved, pile shall be considered safe to carry safe designed vertical load. The safe designed vertical load carrying capacity of pile is 270.00 MT. Hope you find the submittal in line with your requirement. For any further clarification, feel free to revert to us. Regards,

Dr. Sunil S. Basarkar General Manager - Technical Services

ITD Cementation India Limited


Project :

ITDC/DivIII/22111CF/2/18/0/O Date : 20/4/2012 By: S Chandorkar Checked: S Agnihotri

Piling Work for Express Court in Jaypee Greens


Routine Vertical Pile Load Test Report of 750mm dia Pile at T5-183

Subject:

LOAD VS PILE HEAD DISPLACEMENT Increment No. 0 1 2 Loading 3 4 5 6 7 8 8 7 6 Unloading 5 4 3 2 1 0 Gross Deflection : Net Deflection : Rebound : Pressure (Kg/cm2) 0 65 130 190 255 320 380 445 475 475 445 380 320 255 190 130 65 0 Load (MT) 0.000 55.616 111.230 162.571 218.180 273.800 325.140 380.760 406.430 406.430 380.760 325.140 273.800 218.180 162.571 111.230 55.616 0.000 8.020 2.307 5.713 mm mm mm % of Design load 0% 20.60% 41.20% 60.21% 80.81% 101.41% 120.42% 141.02% 150.53% 150.53% 141.02% 120.42% 101.41% 80.81% 60.21% 41.20% 20.60% 0.00% Displacement in mm 0.000 0.542 1.527 2.465 3.550 4.210 4.950 6.180 8.020 8.020 8.020 7.935 7.565 7.023 6.233 5.373 4.455 2.307

ITD Cementation India Limited


Project :

ITDC/DivIII/22111CF/2/18/0/O

Date : 20/4/2012

Piling Work for Express Court in Jaypee Greens


By S Chandorkar Routine Vertical Pile Load Test Report of 750mm dia Pile at T5-183

Subject:

Chkd by: S Agnihotri

Load Vs Displacement
Load on Pile Top in MT 0 0.00 50 100 150 200 250 300 350 400

Loading Unloading
450

1.00

2.00

3.00

Pile Head Displacement, ement, mm

4.00

5.00

6.00

7.00

8.00

9.00

Results:

Gross Displacement: Net Displacement : Rebound :

8.020 mm 2.307 mm 5.713 mm