Project Evaluation Form PDF
Project Evaluation Form PDF
Project Guidelines
Department of Computer Science & Engineering
(Under Graduate)
http://cs.annauniv.edu
Preamble
These guidelines are intended to give both students and faculty members at the Department of Computer Science and Engineering a set of procedures and expectations that will make the project evaluation process easier, more predictable, and more successful. These guidelines should also be interpreted as the minimum requirements of the degree awarded by Anna
UNDER GRADUATE
University. The Project Committee assigned for various programmes offered under Department of Computer Science & Engineering may add requirements or guidelines as they see fit as long as there are no less demanding than the guidelines set forth in this document.
Eligibility
The Eligibility criteria for the Under Graduate students are to be followed as per the regulations given by Anna University during Admission. The total internal assessment marks shall be 50 there shall be three assessments (each 100 marks) during the semester by a review committee. The Head of the Department shall constitute the review committee. The student shall make presentation on the progress made before the committee. The total marks obtained in the three assessments shall be reduced to 45 marks and rounded to the nearest integer. The remaining 5 marks shall be distributed for attendance.
PROJECT GUIDELINES
developing a complex application which does not already exist, or by enhancing some existing application or method to improve its functionality, performance etc. A straightforward implementation project is acceptable, but you must appreciate that it is unlikely to gain high marks, regardless of how well it is done and its usage. Likewise, projects which are
ANNA UNIVERSITY DEPARTMENT OF COMPUTER SCIENCE & ENGINEERING
predominantly survey reports, unless they are backed up with experimentation, implementation, or theoretical analysis, e.g. for performing an objective comparison of surveyed methods, techniques etc. Pure survey reports, with no supporting implementation or theory, are not acceptable. UG students are to decide on their team members for their final semester project with their proposed title & project guide and to suggest it to the project committee with a brief abstract during August of academic schedule. Project report / Thesis to be prepared as per the guidelines and format given by Anna University. If the student fails to attend the review or the guide refuses to endorse the students work, the committee can invite HOD. HOD is empowered to resolve any further matters. In case of re-reviews, any number of re-reviews can happen depending on the discretion of the panel and it should happen within the prescribed time. HOD, can initiate further steps to ensure the smooth implementation as deems appropriate of guidelines. If the work of the candidate is found to be insufficient and plagiarism, the committee & HOD will decide the further process.
Marks split-up Committee Guide Total 30 Marks (Each 10 marks) 20 Marks 50 Marks
Choosing an Project
The idea for your project may be a proposal from a member of staff or your own, or perhaps a combination of the two.
Staff Proposals
UNDER GRADUATE
For projects proposed by members of staff you should discuss the project with the proposer as soon as possible so that you have plenty of time to think about the best choices for you. Note that not every project is suitable for every student: some may be specifically tailored to a particular degree and some may only suit students with a very specific set of interests. Each proposal will indicate these constraints in order to help you to make an informed choice.
PROJECT GUIDELINES
Own Proposals
If you have your own idea for an individual project it is your responsibility to find a member of staff who both approves of the proposed programme of work and is willing to guide it. You should first get the permission of Project Committee, and may proceed with the same with the consistent consent of the guide.
If you are in are hope to win one of the illustrious project prizes, or achieve "Distinguished Project" status, you should choose your shortlist with particular care. The potential guides will be happy to offer advice on the suitability of a project, given your individual background, strengths and ambitions. Remember that it is important to balance ambition and realism when making a choice.
For better help of projects you can search from websites like (IEEE, ACM, Elsevier, Springer, etc...)
Guides
The Guides are advised to give projects and suggest project titles focussing more on the current field of research and ensure the level of innovation. Also guides are advised to check for the formatting of the presentation and project report. Staff member cannot guide more than two projects in the academic schedule.
your team have done and to ensure that you get an accurate mark that is consistent with other projects.
Review Zeroth Review First Review Second Review Third Review Viva voce
Tentative Date Within 2 Weeks from the beginning of the semester Within 6 Weeks but within schedule of 1st Assessment Within 12 Weeks but within schedule of 2nd Assessment Within 18 Weeks but within schedule of 3rd Assessment End of April
PROJECT GUIDELINES
The project committee is advised to conduct the project reviews for the students of various programmes within the stipulated period and the review marks to be sent to the head of the department at the month end. The project committee is also advised to make necessary arrangements required (Seminar hall availability and Projector, etc...) for the smooth conduct of reviews.
Project Requirements: B.E (CSE) | Expectations from Students (in each Presentation)
Zeroth Review Title Abstract Introduction Literature Survey Proposed System Modules Split-up and Gantt Chart References Title Abstract Architectural Design for Proposed System ER Diagram, DFD, Use case diagram ( if necessary) Algorithms / Techniques used with complexity Expected outcomes References 30% of code implementation First Review Title Abstract Detailed Design (if any deviation) Contribution of the candidate (if any) Results obtained (intermediate) References 80% of code Implementation Second Review Tile Abstract Overall Design Experimental Results Performance Evaluation References Contribution of the Project 100% of code implementation Demo Third Review
Note:
The presentation should have maximum of 12 15 slides Presentation will be for 10 minutes System to be tested using testing softwares. All three reviews are compulsory.
Project Committee
The committee is advised to find the enough complexity in the project. All the three panel members must be presented during the review. Reviews to be conducted in the seminar hall and the available class rooms(in the department)
Guides to check
Advised to check for the formatting of the presentation and the documentation. Check for the attendance of the students (Regular meeting for the discussion).
Department of Computer Science & Engineering ANNA UNIVERSITY, CHENNAI 600 025
Project Title : Project Team S.No Register No 1 2 3 4 Team Members Contribution and Performance
(Each category carries 5 points)
Candidate Name
Guided By
Team Members 1 2 3 4
Subject Matter Understanding background and topic Specifies Project goals Knowledge about the existing system Summaries, algorithms and highlights the project features Specifies the testing platforms and benchmark systems Project Planning Technical Design Summaries the ultimate findings of the project Question and Answer Presentation skills Total
E x p e c t a t io n s f o r N e x t R e v ie w s R e v ie w O n e R e v ie w T w o R e v ie w T h r e e
Comments
Member 1
Member 2
Member 3
Guide
Department of Computer Science & Engineering ANNA UNIVERSITY, CHENNAI 600 025
Project Title : Project Team S.No Register No 1 2 3 4 Team Members Contribution and Performance
(Each category carries 5 points)
Candidate Name
Guided By
Team Members 1 2 3 4
Subject Matter Understanding background and topic Specifies Project goals Knowledge about the existing system Summaries, algorithms and highlights the project features Technical Design Summaries the ultimate findings of the project Question and Answer Presentation skills Explanation of Code Implementation (30 Percentage) Total
E x p e c t a t io n s f o r N e x t R e v ie w s
Comments
R e v ie w T w o
R e v ie w T h r e e
Member 1
Member 2
Member 3
Guide
Department of Computer Science & Engineering ANNA UNIVERSITY, CHENNAI 600 025
Project Title : Project Team S.No Register No 1 2 3 4 Team Members Contribution and Performance
(Each category carries 5 points)
Candidate Name
Guided By
Team Members 1 2 3 4
Subject Matter Summaries, algorithms and highlights the project features Detailed Design Contribution of the candidate Results (Intermediate) Summaries the ultimate findings of the project Question and Answer Presentation skills Explanation of Code Implementation (80 Percentage) Total
E x p e c t a t io n s f o r N e x t R e v ie w s R e v ie w T h r e e
Comments
Member 1
Member 2
Member 3
Guide
Department of Computer Science & Engineering ANNA UNIVERSITY, CHENNAI 600 025
Project Title : Project Team S.No Register No 1 2 3 4 Team Members Contribution and Performance
(Each category carries 5 points)
Candidate Name
Guided By
Team Members 1 2 3 4
Subject Matter Abstract Specific project goals Summaries, algorithms and highlights the project features Design & Performance Evaluation Results Summaries the ultimate findings of the project Question and Answer Presentation skills Explanation of Code Implementation (80 Percentage) Total
Comments
Member 1
Member 2
Member 3
Guide
T HE S I S T E M P L A T E
A PROJECT REPORT
<Font Size 14>
Submitted by
<Font Size 14><Italic>
IN
BRANCH OF STUDY
<Font Size 14>
DEPARTMENT OF COMPUTER SCIENCE & ENGINEERING ANNA UNIVERSITY, CHENNAI 600 025
<Font Size 16><1.5 line spacing>
of
DEPARTMENT OF COMPUTER SCIENCE & ENGINEERING ANNA UNIVERSITY, CHENNAI 600 025. APRIL 2010
BONAFIDE CERTIFICATE
Certified that this project report titled WEYEB: AN EYE-CONTROLLED WEB BROWSER BY EYE TRACKING AND IMAGE WRAPPING, is a bona fide work of
Mr. K.Senthilkumar (201035209), who carried out the work under my supervision, for the partial fulfillment of the requirements for the award of the degree of Bachelor of Engineering in Computer Science & Engineering. Certified further that to the best of my knowledge and belief, the work reported herein does not form part of any other thesis or dissertation on the basis of which a degree or an award was conferred on an earlier occasion.
Dr.XXXXXXXXXXXXX Designation, Dept. of Computer Science & Engg. Anna University, Chennai - 600 025.
COUNTERSIGNED
HEAD Dept. of Computer Science & Engineering Anna University, Chennai 600 025.
TABLE OF CONTENTS
CHAPTER NO.
TITLE ABSTRACT (English) ABSTRACT (Tamil) LIST OF TABLES LIST OF FIGURES LIST OF ABBREVIATIONS
INTRODUCTION 1.1 1.2 1.3 LITERATURE SURVEY OVERVIEW ORGANIZATION OF THE REPORT
WORK DONE IN PHASE ONE 2.1 2.2 SYSTEM ARCHITECTURE DESIGN FEATURE EXTRACTION 2.2.1 Gabor Filter 2.3 DEFECT CLASSIFICATION IN IMAGE DATA 2.3.1 Datasets
4.1.2 Texture Classification 4.2 FEATURE EXTRACTION 4.2.1 Gabor Filter 4.2.1.1 Texture Representation 4.3 SIMILARITY MEASURES 4.3.1 Canberra Distance Metric 4.4 IMAGE RETRIEVAL 4.4.1 Feature DB creation and Image Retrieval 4.5 DEFECT DETECTION IN VIDEO 4.5.1 Sobel Edge Detector 5 IMPLEMENTATION AND RESULTS 5.1 IMPLEMENTATION 5.1.1 Algorithm for Gabor Filter 5.1.2 Algorithm for Canberra Distance Metrics 5.1.3 Algorithm for Retrieval 5.1.4 Algorithm for Image classification 5.1.5 Algorithm for Video Frame Extraction 5.1.6 Algorithm for Video Defect Detection 5.2 6 RESULTS
18 18 18 20 20 21 21 22 22 22 24 24 24 26 26 27 27 28 29 37 38 39
LIST OF TABLES
TITLE Type of Defect and their population from the TILDA Database. Classification accuracies for the TILDA Database Canberra Distance between the query image and Results CPU Times and Feature Vector Length for Gabor Features Computed in MATLAB
PAGE NO.
10 31
5.1 5.2
33
5.3
33
LIST OF FIGURES
FIGURE NO. 2.1 2.2 2.3 3.1 3.2 3.3 4.1 5.1 5.2
TITLE Architecture of the Defect Classification System External Interface Diagram of the System Image Database
PAGE NO. 6 6 10 13 13 14 23 29
Architecture for Image Defect Classification System Architecture for Image Defect Retrieval System Architecture for Video Defect Detection System Detector masks for the Sobel Edge Detector Query Image: Test12.bmp Application window for Image Defect Classification System with Input Application window for Image Defect Classification System with output Query Image: T163.bmp Application window for Image Defect Retrieval System with Input Retrieval Results of Image Defect Retrieval System Application window for Video Defect Detection System Input Video: Defect1.avi Set of frames from Defect1.avi Application window for the Video Defect Detection System with output
30
5.3
30 31
5.4 5.5
32 32 34 34 35
36
LIST OF ABBREVIATIONS
Audio Video Interlace Bitmap Central Processing Unit Giga Bytes Graphical User Interface Linear Discriminant Analysis Machine Learning Principal Component Analysis Read Only Memory Shift invariant Principal Component Analysis