0% found this document useful (0 votes)
206 views

Accumark Successful Upgrades

This document outlines the steps for upgrading AccuMark software: 1) Obtain the latest AccuMark software and documentation; 2) Review documentation and obtain new license files if needed; 3) Determine system requirements for PCs and servers; 4) Establish an upgrade date and notify IT if using in-house support. The steps include preparing validation tests, installing updates, and testing the new software.

Uploaded by

Dora BA
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
206 views

Accumark Successful Upgrades

This document outlines the steps for upgrading AccuMark software: 1) Obtain the latest AccuMark software and documentation; 2) Review documentation and obtain new license files if needed; 3) Determine system requirements for PCs and servers; 4) Establish an upgrade date and notify IT if using in-house support. The steps include preparing validation tests, installing updates, and testing the new software.

Uploaded by

Dora BA
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Task # Task Description Obtain AccuMark software and documenation from Gerber If using the AccuMark Toolkit, obtain

latest version Review all documenation If version requires new security license files, obtain new licenses from Gerber If using Toolkit or CSV, identify automation points Determine operating system and hardware requirements for pcs If using SQL, determine operating system and hardware requirements for server Establish upgrade date If the install will be performed by your inhouse IT department, notify IT of upgrade request Prepare validation test plan for software functionality and automation points Run checkfiles on AccuMark file storage areas, and Check SQL on SQL storage areas Prepare a copy of the latest AccuMark database If necessary, setup new server Install latest Microsoft upgrades to OS and SQL If AccuMark V7 is on the system, use Add/Remove Programs to uninstall V7. Run the Check System Requirements function from the install CD Install AccuMark software on test system Install any other applications from AccuMark Family If necessary, install new license files. Ensure pc clocks are correct BEFORE installing the license files

Person(s) Responsible

Participants

Estimated Start Date

Estimated Completion Date

Reviewer

Task Dependencies

Current Status and Comments

Task # Task Description Obtain AccuMark software and documenation from Gerber If using SQL and AccuMark version 8.1.2 or earlier, run Upgrade SQL Obtain and install latest AccuMark software updates from Gerber Execute validation test plan on all functional areas and automation points Review new AccuMark capabilities and develop training plan if necessary Notify users of installation date Install latest Microsoft upgrades to OS on pcs Install AccuMark software on pcs Install any other applications from AccuMark Family If necessary, install new license files. Ensure pc clocks are correct BEFORE installing the license files Install latest AccuMark software updates from Gerber

Person(s) Responsible

Participants

Estimated Start Date

Estimated Completion Date

Reviewer

Task Dependencies

Current Status and Comments

Task # Task Description Obtain AccuMark software and documenation from Gerber

Person(s) Responsible

Participants

Estimated Start Date

Estimated Completion Date

Reviewer

Task Dependencies

Current Status and Comments

Task # Task Description Obtain AccuMark software and documenation from Gerber

Person(s) Responsible

Participants

Estimated Start Date

Estimated Completion Date

Reviewer

Task Dependencies

Current Status and Comments

You might also like