Automation in Power System and Substation
Automation in Power System and Substation
Thus we see that Figure 1 is still a good representation of what is needed to effect automation, whether it is for EHV transmission, sub-transmission or distribution. Figure 7 depicts the control philosophy of a power system automation scheme.
CONTROL
ACQUISITION
Fig. 7. 5.1 Overview of power system components 5.1.1 Sensors 5.1.1.1 Current and voltage transformers Individually or in combination current and voltage transformers (also called instrument transformers) are used in protective schemes such as overcurrent, distance and carrier protection. Also in combination current and voltage transformers are also used for power measurements. In general custom specified voltage and current transformers are used for power metering, because of the increased accuracy requirements. Figure 8 shows instrument transformers in one of the substation areas (called bays).
Fig. 8. 5.1.1.2 Other sensors For reliable electrical power system performance the states, stress conditions and the environmental conditions associated with the components have to be monitored. A very costly component in a substation is a transformer. For a transformer, monitoring is done, for example, for pressure inside the tank, winding temperature and oil level. For circuit breakers, sensing signals may need to be obtained from it such as gas pressure and number of operations. 5.1.2 Switches, isolators, circuit breakers A most important function of a substation is the enabling of circuit configuration changes occasioned by, for example, planned maintenance, faults feeders or other electrical equipment. This function is of course in addition to the other important function of circuit protection which may also necessitate configuration changes. Modern switches and circuit breakers will have contacts or sensors to indicate their state or position. Figure 9 shows the ABB HH circuit breaker mechanism. The plant required to achieve the desired operation is usually quite elaborate and includes controls and protection to ensure that it operates reliably.
Automation
Examples of the bays would be: Incomer bay Bus-coupler bay Transformer bay
Figure 8 above, for example, could depict a transformer bay. 6.1.2 Merging units Merging units are signal conditioners and processors. For example, they accept, merge and synchronise sampled current and voltage signals (all three phases quantities of the CT/VT) from current and voltage transformers (conventional and non-conventional) and then transfer them to intelligent electronic devices (see IEDs, in the next section). So called electronic VTs and CTs are being manufactured by some companies which use new ways of sensing with the overall size being reduced. With electronic sensing, the sensing and merging are combined. Figure 10 gives an overview of the functions and associated inputs of a merging unit.
Fig. 10. (Jansen & Apostolov) As technology progresses it is believed that there will be a move away from copper connections from field devices to the substation control room in favour of fibre. Figure 11 shows a merging unit Brick) by vendor GE)
6.1.3 Intelligent Electronic Devices (IEDs) An IED is any substation device which has a communications port to electronically transfer analog, status or control data via a proprietary or standard transmission format (BPL Global IEC 61850 Guide) [8]. Examples of IEDs are: Modern IEC 61850 protection relays (distance, over-current, etc.) Equipment-specific IED (e.g., for transformer bay protection and control, with tripping logic, disturbance monitoring, voltage, current, real and reactive power, energy, frequency, etc.). Bay controllers
Figure 11 shows some IEDs from various vendors with multiple functionality. In reality todays IEDs have mutated to the form of programmable logical controllers (PLCs) of another kind with multiple capabilities. 6.1.4 Device/system integration: Substation functional hierarchy An IEC 61850-designed substation has the following hierarchical zones: Process Bay Station
Diagrammatically this is illustrated in Figure 12 (Jansen & Apostolov) [9]. A complete representation that includes aspects, such as links to remote control centres and GIS, is given in Figure 13.
116
Fig. 12.
[O1]
Fig. 15.
services associated with this data model are defined in the Abstract Communications System Interface (ACSI). The following ACSI functions are listed by Karlheinz Schwartz [11]: Logical Nodes are used as containers of any information (data objects) to be monitored Data objects are used to designate useful information to be monitored Retrieval (polling) of the values of data objects (GetDataObjectValues) Send events from a server device to a client (spontaneous reporting) Store historical values of data objects (logging) Exchange sampled values (current, voltages and vibration values) Exchange simple status information (GOOSE) Recording functions with COMTRADE files as output
7.2 Mapping IEC 61850 is a communications standard, a main aim of which is interoperability. A good definition is: Interoperability is the ability of two or more IEDs (Intelligent Electronic Devices) from the same vendor, or different vendors to exchange information and uses that information for correct co-operation [12]. Although ACSI models enable all IEDs to behave identically from a general network behaviour perspective, they still need to be made to work with practical networks in the power industry, (Baigent, Adamiak and Mackiewicz) [10]. This universal compatibility is achieved through mapping of the abstract services to universal, industry-recognised protocols. Presently the protocol most supported is the Manufacturing Message Specification (MMS). MMS was chosen because it has an established track record in industrial automation and can support the complex and service models of IEC 61850. Table 1 gives an idea of the naming process:
IEC 61850 station bus interconnects all bays with the station supervisory level and carries control information such as measurement, interlocking and operations [13]. IEC 61850 process bus interconnects the IEDs within a bay that carries real-time measurements for protection called sampled values or sampled measured values [13]. Figure 17 shows the basic architecture.
Fig. 17.
IEC 61850 station bus interconnects all bays with the station supervisory level and carries control information such as measurement, interlocking and operations [13]. IEC 61850 process bus interconnects the IEDs within a bay that carries real-time measurements for protection called sampled values or sampled measured values [13]. Figure 17 shows the basic architecture.
Fig. 17.
The process bus is designed to be fast since it must carry crucial I/O between IEDs and sensors/actuators. The requirements for the process bus cited in various literature sources are as follows: High environmental requirements for the terminal equipment (electromagnetic compatibility, temperature, shock, where applicable) in the area of the primary system Adequate bandwidth for several SV data streams Highly prioritized trip signals for transmitting from the protection device to the CBC Permeability of data to the station bus/data filtering at the coupling point Simultaneous TCP/IP traffic for normal control and status signal traffic as well as reports on the process bus Download/upload channel for setting or parameterizing functions Highly precise time synchronization Redundancy For reasons of speed, the process bus is based on optical fibre with high data throughput of about 10Gbits/s. Because of its enhanced data capacity it is capable of carrying both GOOSE (Generic Object Oriented Substation Event) and SMV (Sampled Measured Values). The station bus is used for inter-IED communications. Only GOOSE messaging occurs in the station bus.
The process bus is designed to be fast since it must carry crucial I/O between IEDs and sensors/actuators. The requirements for the process bus cited in various literature sources are as follows: High environmental requirements for the terminal equipment (electromagnetic compatibility, temperature, shock, where applicable) in the area of the primary system Adequate bandwidth for several SV data streams Highly prioritized trip signals for transmitting from the protection device to the CBC Permeability of data to the station bus/data filtering at the coupling point Simultaneous TCP/IP traffic for normal control and status signal traffic as well as reports on the process bus Download/upload channel for setting or parameterizing functions Highly precise time synchronization Redundancy For reasons of speed, the process bus is based on optical fibre with high data throughput of about 10Gbits/s. Because of its enhanced data capacity it is capable of carrying both GOOSE (Generic Object Oriented Substation Event) and SMV (Sampled Measured Values). The station bus is used for inter-IED communications. Only GOOSE messaging occurs in the station bus.
ICD FILE
ICD FILE
ICD FILE
IEC 61850
SYSTEM CONFIGURATION TOOL
SCD FILE
Fig. 18.
Fig. 19. Source NIST Smart Grid Framework We have seen that automation started on the factory floor and some of the IEC 61850 functions use manufacturing protocols such as MMS. We already start to see the trend
towards extending the IEC 61850 to generating stations. It is therefore not hard to imagine IEC 61850 like protocols encompassing every facet of engineering, including manufacture. 10.1 Smart Grid benefits Among the benefits of Smart Grid are: Increased grid efficiency - the use of control systems to achieve optimum power flow through, for example, centrally controlled FACTS devices which can increase efficiency of the transmission system Better demand control - a Smart Grid would incorporate an energy management system to manage demand (e.g., managing the peaks and valleys) Asset optimization - the IEC 61850 information model already has the capability to store not only the status of a logical device / node, but also condition / health Management of renewable energy sources - renewable energy sources, such as wind and solar, tend to be unpredictable, therefore, the Smart Grid system can enable predictions on the availability of these resources at any moment and ensure proper energy scheduling decisions are taken Management of plug in electric vehicles - the Smart Grid can inform electric vehicle motorists of the nearest charging stations Smart metering - with smart metering, power usage and tariffs can be administered remotely to the advantage of both the supplier and the consumer
Hardware: RTUs, IEDs and SCADA Masters belong to the class of computer hardware and suffer from the same vulnerabilities of regular computer systems such as interruption (denial of services [DoS]) and eavesdropping Communication links: the vulnerabilities are also similar to those in regular computer networks - if messages are not encrypted, data or passwords can be intercepted. Radiation emissions from equipment can be read by unauthorized people SCADA software: the most common attacks come in the form of interruption, interception and modification. Software bugs, if not fixed in time, can attract hobbyist hackers to attack unpatched SCADA [15]
towards extending the IEC 61850 to generating stations. It is therefore not hard to imagine IEC 61850 like protocols encompassing every facet of engineering, including manufacture. 10.1 Smart Grid benefits Among the benefits of Smart Grid are: Increased grid efficiency - the use of control systems to achieve optimum power flow through, for example, centrally controlled FACTS devices which can increase efficiency of the transmission system Better demand control - a Smart Grid would incorporate an energy management system to manage demand (e.g., managing the peaks and valleys) Asset optimization - the IEC 61850 information model already has the capability to store not only the status of a logical device / node, but also condition / health Management of renewable energy sources - renewable energy sources, such as wind and solar, tend to be unpredictable, therefore, the Smart Grid system can enable predictions on the availability of these resources at any moment and ensure proper energy scheduling decisions are taken Management of plug in electric vehicles - the Smart Grid can inform electric vehicle motorists of the nearest charging stations Smart metering - with smart metering, power usage and tariffs can be administered remotely to the advantage of both the supplier and the consumer
Hardware: RTUs, IEDs and SCADA Masters belong to the class of computer hardware and suffer from the same vulnerabilities of regular computer systems such as interruption (denial of services [DoS]) and eavesdropping Communication links: the vulnerabilities are also similar to those in regular computer networks - if messages are not encrypted, data or passwords can be intercepted. Radiation emissions from equipment can be read by unauthorized people SCADA software: the most common attacks come in the form of interruption, interception and modification. Software bugs, if not fixed in time, can attract hobbyist hackers to attack unpatched SCADA [15]
unselective sw itch-o ff
CB doesn't Sw itch
Message s Suppressed
Fig. 20. Example of attack graph for a circuit breaker Message suppression In this attack certain messages between SAS devices are prevented from reaching the receiver, e.g., circuit breaker control devices are isolated from protection devices. Message suppression can involve several other types of attack, e.g., re-configuration of routers or switches, cutting wires or congesting the network so that genuine messages cannot get through (denial of service attack). Security protocols The multiplicity and varied nature of SAS attacks makes it imperative to institute robust security protocols capable of handling all eventualities. Such protocols include the use of private keys (only known to the sender), encryption and sequence numbers (initial number known between sender and receiver at the start).
128
We first need to acknowledge that there are already a lot of good power engineers out there trained in the traditional manner, i.e., starting off with physics, circuits and systems, electrical machines and power systems (including electrical protection). For these engineers, one needs to identify those who can benefit both themselves and their organizations by
going through this additional training. The process of training engineers has been quite formal, especially if they wish to attain professional status. One typically needs four to five years of formal training and a further two years of guided industrial training before attaining the status of chartered (CEng) or professional (PrEng) engineer. A great debate will ensue, therefore, when a computer network engineer is designated the responsible person in an electrical substation, notwithstanding the obviously immense power this individual will have in making sure that the substation operates correctly, safely and efficiently. The other route is to include networking as part of any electrical engineering curriculum. A few programmes today include industrial automation and a few even include computer networking. In the University of Zimbabwe model all electrical engineering students have a chance to complete at least the first semesters of a CISCO network academy programme. Indeed some complete the CCNA (four semesters). Whatever solution is arrived at, it is clear that electrical engineering training curricula inevitably have to include more and more electronics, sensors, automation and networking, not as peripheral subjects, but as part of the core.
Summary and conclusions : In this chapter we have seen the extremely rapid development of automation, starting from the years of mechanisation, production lines and the taking root of computer-based automation in the car manufacturing industry. Then we noticed rapid increases in computer power in both hardware and software forms. There has also been tremendous moves in standardization in North America and Europe. We have seen too IEC 61850 international cooperation in standards development and the benefits that are already being reaped from this. Interoperability brings some relief to customers, giving them the ability to choose hardware from an increasing variety of vendors. Quite striking is the increasing dominance of ICT in power system control and massive changes in power system operation and practice. The power systems have become more complex - more interlinked. The complexity presents new challenges. The traditionally trained power systems engineer lacks the know how to understand or tackle faults that could arise in these systems. On the other hand the network engineer may lack the underlying principles of power and energy systems. A new type of multi-discipline power systems engineer has to be trained. The Smart Grid will soon be a reality. Generation, transmission, distribution consumption and commerce will be information driven. Finally, when automation is combined with mechatronics and robotics, our lives are poised to be drastically changed.