1X270 MW Iepl Bela Project Light-Up Done On 29-2-2012 at 15:40 Hrs

The 1x270 MW IEPL Bela project achieved synchronization on February 29, 2012 at 15:40 hours. The project involved connecting a 270 megawatt power plant to the grid.

Uploaded by

Pushkar Pandit
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views

1X270 MW Iepl Bela Project Light-Up Done On 29-2-2012 at 15:40 Hrs

The 1x270 MW IEPL Bela project achieved synchronization on February 29, 2012 at 15:40 hours. The project involved connecting a 270 megawatt power plant to the grid.

Uploaded by

Pushkar Pandit
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

1X270 MW IEPL BELA PROJECT LIGHT-UP DONE ON 29-2-2012 AT 15:40 HRS

1X270 MW IEPL BELA PROJECT LIGHT-UP DONE ON 29-2-2012 AT 15:40 HRS

1X270 MW IEPL BELA PROJECT LIGHT-UP DONE ON 29-2-2012 AT 15:40 HRS

1X270 MW IEPL BELA PROJECT LIGHT-UP DONE ON 29-2-2012 AT 15:40 HRS

You might also like