0% found this document useful (0 votes)
70 views

Create WBS

The document provides instructions for creating a work breakdown structure (WBS) in an accounting software. The steps include defining a project, adding a top WBS element, and then adding child elements for foundation, building shell, heating, interior, windows, and doors. The project is then released to allow planning to be entered.

Uploaded by

faniraja
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
70 views

Create WBS

The document provides instructions for creating a work breakdown structure (WBS) in an accounting software. The steps include defining a project, adding a top WBS element, and then adding child elements for foundation, building shell, heating, interior, windows, and doors. The project is then released to allow planning to be entered.

Uploaded by

faniraja
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Create Work Breakdown Structure

Prerequisites
You have defined an investment project.

Procedure
1. Call up the transaction as follows: Menu Path Accounting Investment Management Investment Projects Master Data Project Builder CJ20N

Transaction

2. Choose . 3. Double-click on Project definitions in the worklist. 4. Enter the following data: Field Project definition 5. Choose . Data Your number, for example I/2000

Your project is added to the project definitions listed. 6. Double click on your project. There is already a top WBS element. You now add further WBS elements. 7. 8. 9. 10. On the left hand side of the screen, choose Templates. Choose next to Individual objects. Select WBS element and drag it to your top WBS element ( New Administration building). In the Identification and View Selection screen area, enter the following data: Field WBS element (2 field)
nd

Data Foundation

11. Choose . 12. Carry out steps 9 - 11 with the following input.

Field WBS element (2 field)


nd

Data Building shell Heating Interior

13. Select WBS element and drag it to the WBS element 14. Enter the following data: Field WBS element (2 field) 15. Choose . 16. Carry out steps 13 -15 with the following input: Field WBS element (2 field)
nd nd

for the interior.

Data Windows

Data Doors

Release the project so that planning can be entered for it.

17. Select your project definition ( 18. Choose


19. Choose . .

New Administration building) and choose Edit Status Release.

Result
Your project is now structured. At the same time, the release of the project triggered the system to create assets under construction (AuCs). You can display the assets under construction for each WBS element. Choose Edit WBS element Investment programs Asset under construction.

You might also like