0% found this document useful (0 votes)
756 views

Application Testing Life Cycle

This document outlines the standard application testing life cycle which includes phases for test requirements, test planning, test environment setup, test design, test automation, test execution and defect tracking, and test reporting and acceptance. Key activities in each phase include documenting requirements and specifications, planning test methodologies, installing test environments, designing test cases and scripts, automating tests, executing tests, tracking defects, and reporting on test results.

Uploaded by

Amit Rathi
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
756 views

Application Testing Life Cycle

This document outlines the standard application testing life cycle which includes phases for test requirements, test planning, test environment setup, test design, test automation, test execution and defect tracking, and test reporting and acceptance. Key activities in each phase include documenting requirements and specifications, planning test methodologies, installing test environments, designing test cases and scripts, automating tests, executing tests, tracking defects, and reporting on test results.

Uploaded by

Amit Rathi
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Application Testing life cycle

This life cycle is used for standard applications that are built from various custom technologies and
follow the normal or standard testing approach. The Application or custom-build Lifecycle and its
phases is depicted below:

• Requirement Specification documents


• Functional Specification documents
Test Requirements • Design Specification documents (use cases, etc)
• Use case Documents
• Test Trace-ability Matrix for identifying Test Coverage

• Test Scope, Test Environment


• Different Test phase and Test Methodologies
Test Planning • Manual and Automation Testing
• Defect Mgmt, Configuration Mgmt, Risk Mgmt. Etc
• Evaluation & identification – Test, Defect tracking tools

• Test Bed installation and configuration


• Network connectivity’s
Test Environment Setup
• All the Software/ tools Installation and configuration
• Coordination with Vendors and others

• Test Traceability Matrix and Test coverage


• Test Scenarios Identification & Test Case preparation
Test Design • Test data and Test scripts preparation
• Test case reviews and Approval
• Base lining under Configuration Management

• Automation requirement identification


• Tool Evaluation and Identification.
Test Automation • Designing or identifying Framework and scripting
• Script Integration, Review and Approval
• Base lining under Configuration Management

• Executing Test cases


Test Execution and • Testing Test Scripts
Defect Tracking • Capture, review and analyze Test Results
• Raised the defects and tracking for its closure

• Test summary reports


Test Reports • Test Metrics and process Improvements made
and Acceptance • Build release
• Receiving acceptance

You might also like