Site name: Inspection Date: S.No. Description 1 2 2.1 2.2 2.3 2.4 3 3.1 3.2 3.3 3.4 3.
5 3.6 3.7 3.8 3.9 Site Access Tower Installation Tower Installation ECB Availability Aviation Lamp Tower Earthing Cabin Cabin Installation Shelter Installation Cable Entry port Shelter Electrical wiring Air Conditioner Installation Power Availability Shelter Earthing Sensor Inastallation Alarm Box Installation
Site ID: Done by Status
3.10 Relay Box Insatallation 3.11 Indoor Ladder Installation 3.12 24V - 48V Converter 3.13 ACPDB Installation 3.14 Exaust Fan Installation 4 4.1 4.2 4.3 4.4 4.5 4.6 Antenna & Feeder 7/8" RF Feeder Cable Installation 1/2" RF Jumper Cable Installation (OD) RF Feeder Cable Grounding water & Whether Proofing Application GSM Antenna Installation (If any isuue with antenna, please check all) Antenna Model
4.7 4.8 4.9
Antenna Direction Antenna Down Tilt VSWR Measurements
4.10 TMA Installation 4.11 RRU Installation 4.12 Antenna Bracket 5 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 5.1 5.11 Indoor TE BTS Installation (ACCU, FCU, CDU, DTRU, Jumper, Dummy, PSU, DXU, EPC BUS Loop, CXU) Battery Installation (Nos.) Battery Cover Batt, Temp.Sensors Battery Connection Plates (Nos.) BBS (BFU, Dummy, Battery Switch, Bottom & Top plate, Nuts) IT Installation PDU Installation SPD Installation Ericsson Alarm Box Node B (Fiber, Fiber Tranceiver, Rectifier, PMU, BBU New version, BBU Power Cable, SLPU, BBU TO SLPU E1 Cable, 8 core E1, Battery, Convertion plate
5.12 Node B Type 5.13 OD Plinth ECB 5.14 Huawei SPD 6 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 MW Antenna Installation ODU Installation IF Cable Installation IDU Installation MW Commissioning ODU Grounding IF cable Grounding Surge Arrester Grounding DCDP Installation (1+1)
6.10 19" rack Installation
Subcon Issue
Remarks
XU, EPC BUS Loop, CXU)
BBU Power Cable, SLPU, BBU TO