0% found this document useful (0 votes)
110 views6 pages

S.No. Description Status Site Access Tower Installation

This document appears to be an inspection report for a cell site that details the installation and status of various components. It lists over 30 line items under different sections such as site access, tower installation, shelter installation, antenna and feeder, indoor BTS installation, node B details, and microwave antenna installation. For each item, it indicates whether installation was completed and the status. The level of technical detail provided suggests this is an internal report on the installation and configuration of all equipment at a cellular tower site.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
110 views6 pages

S.No. Description Status Site Access Tower Installation

This document appears to be an inspection report for a cell site that details the installation and status of various components. It lists over 30 line items under different sections such as site access, tower installation, shelter installation, antenna and feeder, indoor BTS installation, node B details, and microwave antenna installation. For each item, it indicates whether installation was completed and the status. The level of technical detail provided suggests this is an internal report on the installation and configuration of all equipment at a cellular tower site.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Site name: Inspection Date: S.No. Description 1 2 2.1 2.2 2.3 2.4 3 3.1 3.2 3.3 3.4 3.

5 3.6 3.7 3.8 3.9 Site Access Tower Installation Tower Installation ECB Availability Aviation Lamp Tower Earthing Cabin Cabin Installation Shelter Installation Cable Entry port Shelter Electrical wiring Air Conditioner Installation Power Availability Shelter Earthing Sensor Inastallation Alarm Box Installation

Site ID: Done by Status

3.10 Relay Box Insatallation 3.11 Indoor Ladder Installation 3.12 24V - 48V Converter 3.13 ACPDB Installation 3.14 Exaust Fan Installation 4 4.1 4.2 4.3 4.4 4.5 4.6 Antenna & Feeder 7/8" RF Feeder Cable Installation 1/2" RF Jumper Cable Installation (OD) RF Feeder Cable Grounding water & Whether Proofing Application GSM Antenna Installation (If any isuue with antenna, please check all) Antenna Model

4.7 4.8 4.9

Antenna Direction Antenna Down Tilt VSWR Measurements

4.10 TMA Installation 4.11 RRU Installation 4.12 Antenna Bracket 5 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 5.1 5.11 Indoor TE BTS Installation (ACCU, FCU, CDU, DTRU, Jumper, Dummy, PSU, DXU, EPC BUS Loop, CXU) Battery Installation (Nos.) Battery Cover Batt, Temp.Sensors Battery Connection Plates (Nos.) BBS (BFU, Dummy, Battery Switch, Bottom & Top plate, Nuts) IT Installation PDU Installation SPD Installation Ericsson Alarm Box Node B (Fiber, Fiber Tranceiver, Rectifier, PMU, BBU New version, BBU Power Cable, SLPU, BBU TO SLPU E1 Cable, 8 core E1, Battery, Convertion plate

5.12 Node B Type 5.13 OD Plinth ECB 5.14 Huawei SPD 6 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 6.9 MW Antenna Installation ODU Installation IF Cable Installation IDU Installation MW Commissioning ODU Grounding IF cable Grounding Surge Arrester Grounding DCDP Installation (1+1)

6.10 19" rack Installation

Subcon Issue

Remarks

XU, EPC BUS Loop, CXU)

BBU Power Cable, SLPU, BBU TO

You might also like