Overview of Indian Power Sector
Overview of Indian Power Sector
marshaling requisite investment into the sector to usher in competition and improved efficiency
Trading defined as distinct activity. Unbundling of erstwhile monolithic State Electricity Boards into separate corporations responsible for generation, transmission and distribution
Non discriminatory Open Access in transmission Transmission as licensed Activity Procurement of Power through Competitive basis
System Operator
Consumers
Regional State
Local
1950s
1960s
1970s
1990s
1970s
1980s
1990s
2000s
MW
6th
7th
8th
9th
10th
383700 254800 169700 94400 37300 9300 6th Plan 21600 7th Plan 40900 8th Plan 60400 92900
Ckt. kms
9th Plan
10th plan
400 kV lines
220 kV lines
NR
NER
WR
ER
I.C-18600 PD- 11400 Deficit - 700
SR
DW EE P
LA KS HA
NER
SALAKATI B O N G A IG A O N
BARH B IH A R S H A R IF F M ALDA
M ALANPUR
SASARAM
G W A L IO R U J J A IN
V IN D H Y A C H A L KORBA
ER
WR
KO LHAPUR
R A IP U R CHANDRAPUR B A L IM E L A
SR
Peak Demand
323
G W
2007
2012
2017
Year
2022
2027
575 425
150 GW
86 GW
306
153
67 GW
220
2007
2012
2017
Year
2022
2027
Generation Addition
In 11th Plan(2007-2012) 78,577 MW Capacity addition in limited areas, as detail given below:
ALL Figures in MW
State West Bengal Jharkhand Orissa Bihar Sikkim NER Other Total
HYDRO(MW)
THERMAL(MW) NUCLEAR(MW)
Grid Disturbances
100 G Disturbances rid 80 60 40 20 0 3 4 7 0 2 0 1 0 0 0 74 53
Minor Major
GRID DISTURBANCES
100 G Disturbances rid 80 60 40 20 0 3 4 7 0 2 0 1 0 0 0 74 53
Minor Major
No major grid disturbance for last 4 years Minor grid disturbance reduced to minuscule
New Transmission Lines 55,000 Ckt.kms 765 kV - 9,000 Ckt.kms; 400 kV - 46,000 ckt.kms New Substations 65 Nos. 765 kV 15 (1 no. GIS) ; 400 kV 50 (6 nos. GIS) Series Compensation 44 Nos. HVDC System +800kV, 6000MW & +500kV, 2500MW 1200 kV UHVAC SuperGrid overlaying 400kV/765kV AC network
BY 2016-17
150000
IRC p c (M ) a a ity W
Present
2012
2027
Ye ar
NR
AGRA KANKROLI KOTA GWALIOR UJJAIN
NER
BONGAIGAON SALAKATI
RAPP ZERDA
VINDHYACHAL
SIPAT
KORBA
ER
WR
KOLHAPUR
NAGDA
NORTH KARANPURA
PARLI
1000 BALIMELA MW
1000 MW
U.SILERU
PONDA
BELGAUM
500 MW
SR
KOLAR
GAZUWAKA
NAGJHARI
LA KS HA DW EE P
&
400 kV
Grid Disturbances
1977
1990
2000
2011
2012/13
Upgrading & Uprating of existing transmission system EHVAC Transmission System up to 765kV High rise & Multi ckt towers to avoid deforestation and protection of wild life Multi-conductor Bundle line Compact Tower/Pole Tower to reduce Right-of-Way High Temp endurance conductor for increased Loading Gas Insulated Substation Substation automation & remote operation
Contd
State-of-the-Art practiced:
maintenance
techniques
being
Hotline maintenance Live line detection of Insulator failure Emergency Restoration System Thermo vision scanning
50 mtr
64%
68%
Forest
Agriculture
Revenue land
Others
Total Forest involvement reduced from 6% to 2% after implementation of ESPP since 1998. Timely project implementation without any rehabilitation and resettlement disputes.