0% found this document useful (0 votes)
38 views5 pages

Digital Circuit-Switched Telephone Networks

Day can be partitioned into several traffic hours, t=1,2,3,.T At each time of ti, demand for the traffic differs according to the traffic hours It creates a set of demand volume sectors, h1,h2, ht with ht= (h1t, h2t,, hDt) path lengths are restricted to a maximum of 2 links between ingress and egress the set of candidate paths are then hoplimited (maximum of

Uploaded by

Ksven Karuna
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views5 pages

Digital Circuit-Switched Telephone Networks

Day can be partitioned into several traffic hours, t=1,2,3,.T At each time of ti, demand for the traffic differs according to the traffic hours It creates a set of demand volume sectors, h1,h2, ht with ht= (h1t, h2t,, hDt) path lengths are restricted to a maximum of 2 links between ingress and egress the set of candidate paths are then hoplimited (maximum of

Uploaded by

Ksven Karuna
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Digital Circuit-Switched Telephone Networks

Question: How to do modular capacity design given that traffic volume is different for different hours of the day? *Modular design an approach to subdivides a system a smaller parts (modules)

Digital Circuit-Switched Telephone Networks


Day can be partitioned into several traffic hours , t=1,2,3, .T At each time of ti, demand for the traffic differs according to the traffic hours It creates a set of demand volume sectors, h1,h2, hT with ht= (h1t, h2t, , hDt)

Digital Circuit-Switched Telephone Networks


Path lengths are restricted to a maximum 2 links between ingress and egress The set of candidate paths are then hoplimited (maximum of one intermediate node) Path-flow estimation to be different for different time periods, t Flow variable for demand d for path p needs to be time dependent, t

Digital Circuit-Switched Telephone Networks


Path Flow estimation = xdpt Important for multi-hour dimensioning Time-dependent flow variables + notion of load sharing = dynamic routing scheme Multi-hour design results in lower deployment of cost as the capacities of network devices are smaller

You might also like