Etap Powerstation: Load Flow Analysis

The document is an ETAP PowerStation load flow analysis report for an electrical system. It includes 23 buses, 22 branches like transformers and circuit breakers, and load data for each bus. The load flow analysis calculated voltages, power flows, and losses for each bus to verify the design meets requirements. Key results showed the voltages and power factors were within acceptable ranges at each bus.

Uploaded by

Jeman Man
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views

Etap Powerstation: Load Flow Analysis

The document is an ETAP PowerStation load flow analysis report for an electrical system. It includes 23 buses, 22 branches like transformers and circuit breakers, and load data for each bus. The load flow analysis calculated voltages, power flows, and losses for each bus to verify the design meets requirements. Key results showed the voltages and power factors were within acceptable ranges at each bus.

Uploaded by

Jeman Man
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 14

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
TA

Electrical Transient Analyzer Program


ETAP PowerStation

Load Flow Analysis


Loading Category:

Design

Load Diversity Factor:

None

Swing

Generator

Load

Total

21

23

XFMR2

XFMR3

Reactor

Line/Cable

Impedance

Tie PD

Total

15

22

Number of Buses:

Number of Branches:

Method of Solution:

Newton-Raphson Method

Maximum No. of Iteration:

99

Precision of Solution:

0.000100

System Frequency:

50.00

Unit System:

English

Project Filename:

TA

Output Filename:

C:\ETAP 400\PowerStation\TA\Untitled.lf1

Page:

Date:

01-18-2012

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
TA

Page:

Date:

01-18-2012

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

BUS Input Data

Bus
ID

Initial Voltage
Type

kV

% Mag.

Ang.

Bus 1 (MV EOB 1)

Load

6.300

100.0

0.0

Bus 2 (MV EOB 2)

Load

6.300

100.0

0.0

Bus 3 (MV Coal Boiler)

Load

6.300

100.0

0.0

Bus Generator 502G01

Swing

6.300

100.0

0.0

Bus Generator Coal Boiler

Gen.

6.300

100.0

0.0

BUS RFC 1

Load

0.380

100.0

BUS RFC 2

Load

0.380

Bus Soft Starter

Load

3.300

MCC 1

Load

MCC 1 Coal Boiler


MCC 2

Generator
MW

Motor Load

Mvar

MW

Mvar

Static Load
MW

Mvar

1.438

0.961

1.279

0.829

0.0

0.876

0.000

100.0

0.0

0.876

0.000

100.0

0.0

0.695

0.337

0.380

100.0

0.0

0.451

0.279

0.050

0.031

Load

0.400

100.0

0.0

0.249

0.161

0.028

0.018

Load

0.380

100.0

0.0

0.358

0.222

0.090

0.056

MCC 2 Coal Boiler

Load

0.400

100.0

0.0

0.306

0.198

0.034

0.022

MCC 3

Load

0.380

100.0

0.0

0.492

0.305

0.123

0.076

MCC 3 Coal Boiler

Load

0.400

100.0

0.0

0.163

0.144

0.018

0.016

MCC 4

Load

0.380

100.0

0.0

0.672

0.416

0.168

0.104

MCC 4 Coal Boiler

Load

0.400

100.0

0.0

0.189

0.167

0.021

0.019

MCC 5

Load

0.380

100.0

0.0

0.604

0.375

0.067

0.042

MCC 6

Load

0.380

100.0

0.0

0.811

0.503

0.090

0.056

MCC 7

Load

0.380

100.0

0.0

0.180

0.111

0.045

0.028

MCC 10

Load

0.380

100.0

0.0

0.646

0.400

0.162

0.100

MCC 11

Load

0.380

100.0

0.0

0.842

0.522

0.094

0.058

MCC Coal OTH

Load

0.380

100.0

0.0

0.144

0.089

0.036

0.022

MCC Standby Coal Boiler

Load

0.400

100.0

0.0
11.272

6.019

1.025

0.647

Total Nunmber of Buses: 23

7.000

7.000

0.000

0.000

Mvar Limits
Max.

Min.

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:

Study Case: LF

Filename:

TA

Page:

Date:

01-18-2012

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

2-WINDING TRANSFORMER Input Data

Transformer
ID

Rating
MVA

Prim. kV

Sec. kV

Z Variation
%Z

X/R

+ 5%

- 5%

% Tap Setting
% Tol.

Prim.

Adjusted

Sec.

%Z

Phase Shift
Type

Angle

Auxilary TR

1.600

6.300

0.400

8.260

7.1

8.2600

Std Pos. Seq.

0.0

Common TR

0.800

6.300

0.400

6.420

5.8

6.4200

Std Pos. Seq.

0.0

Standby TR

1.600

6.300

0.400

8.510

7.1

8.5100

Std Pos. Seq.

0.0

TR1

1.600

6.150

0.400

6.400

7.1

6.4000

Special

0.0

TR2

1.500

6.600

0.415

6.330

7.1

6.3300

Std Pos. Seq.

0.0

TR3

1.600

6.150

0.400

6.400

7.1

6.4000

Std Pos. Seq.

0.0

TR4

1.600

6.150

0.400

6.400

7.1

6.4000

Std Pos. Seq.

0.0
0.0

TR5

1.600

6.150

0.400

6.400

7.1

6.4000

Std Pos. Seq.

TR6

1.600

6.150

0.400

6.400

7.1

6.4000

Std Pos. Seq.

0.0

TR7

1.600

6.000

0.380

6.620

7.1

6.6200

Std Pos. Seq.

0.0

TR8

1.600

6.000

0.380

6.620

7.1

6.6200

Std Pos. Seq.

0.0

TR9

1.600

6.000

0.380

6.620

7.1

6.6200

Std Pos. Seq.

0.0
0.0

TR10

1.600

6.000

3.300

7.160

7.1

7.1600

Std Pos. Seq.

TR11

2.000

6.000

0.400

7.000

7.1

7.0000

Std Pos. Seq.

0.0

TR Coal OTH

1.250

6.000

0.400

5.500

7.1

5.5000

Std Pos. Seq.

0.0

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
TA

Page:

Date:

01-18-2012

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

BRANCH CONNECTIONS
CKT/Branch
ID

Connected Bus ID
Type

From Bus

% Impedance, Pos. Seq., 100 MVAb


To Bus

Auxilary TR

2W XFMR

Bus 3 (MV Coal Boiler)

MCC 2 Coal Boiler

72.00

511.20

516.25

Common TR

2W XFMR

Bus 3 (MV Coal Boiler)

MCC 3 Coal Boiler

136.58

790.79

802.50

Standby TR

2W XFMR

Bus 3 (MV Coal Boiler)

MCC Standby Coal Boiler

74.18

526.68

531.88

TR1

2W XFMR

Bus 1 (MV EOB 1)

MCC 1

53.18

377.45

381.18

TR2

2W XFMR

Bus 1 (MV EOB 1)

MCC 2

64.61

458.62

463.15

TR3

2W XFMR

Bus 1 (MV EOB 1)

MCC 3

53.18

377.45

381.18

TR4

2W XFMR

Bus 1 (MV EOB 1)

MCC 4

53.18

377.45

381.18

TR5

2W XFMR

Bus 1 (MV EOB 1)

MCC 5

53.16

377.45

381.18

TR6

2W XFMR

Bus 1 (MV EOB 1)

MCC 6

53.16

377.45

381.18

TR7

2W XFMR

Bus 2 (MV EOB 2)

BUS RFC 1

52.34

371.62

375.28

TR8

2W XFMR

Bus 2 (MV EOB 2)

BUS RFC 2

52.34

371.62

375.28

TR9

2W XFMR

Bus 2 (MV EOB 2)

MCC 10

52.34

371.62

375.28

TR10

2W XFMR

Bus 2 (MV EOB 2)

Bus Soft Starter

56.61

401.93

405.90

TR11

2W XFMR

Bus 2 (MV EOB 2)

MCC 11

44.28

314.36

317.46

TR Coal OTH

2W XFMR

Bus 1 (MV EOB 1)

MCC Coal OTH

55.66

395.19

399.09

CB1

Tie Breakr

Bus Generator 502G01

Bus 1 (MV EOB 1)

CB14

Tie Breakr

Bus 2 (MV EOB 2)

Bus 1 (MV EOB 1)

CB27

Tie Breakr

MCC 4

MCC 7

CB28

Tie Breakr

Bus 3 (MV Coal Boiler)

Bus 2 (MV EOB 2)

CB40

Tie Breakr

Bus Generator Coal Boiler

Bus 3 (MV Coal Boiler)

SW2

Tie Switch

MCC 2 Coal Boiler

MCC 1 Coal Boiler

SW3

Tie Switch

MCC 3 Coal Boiler

MCC 4 Coal Boiler

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
TA

Page:

Date:

01-18-2012

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

EQUIPMENT CABLE Input Data


O/L
Equipment Cable
ID

Equipment
ID

ohms / 1000 ft per Conductor


Type

Library

Size

L(ft)

#/ph

T (C)

Heater
R

R (ohm)

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:

Study Case: LF

Filename:

TA

Page:

Date:

01-18-2012

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

LOAD FLOW REPORT

Bus
ID
Bus 1 (MV EOB 1)

Voltage
kV

kV

6.300

6.300

Generation

Ang.
0.0

MW

Mvar
0

Motor Load

Static Load

MW

MW

Mvar

1.44

0.96

Load Flow

Mvar
0

ID
0

6.300

6.300

0.0

6.300

0.0

1.28

0.83

%PF

0.33

55

84.1

MCC 2

0.45

0.29

49

84.0

MCC 3

0.63

0.41

69

83.8

MCC 4

1.09

0.74

120

82.9

MCC 5

0.68

0.45

74

83.7

MCC 6

0.92

0.61

100

83.3
84.6

0.19

0.12

20

Bus Generator 502G01

-5.44

-7.12

820

60.7

Bus 2 (MV EOB 2)

-0.47

3.21

297

-14.6

BUS RFC 1

0.88

0.03

80

99.9

BUS RFC 2

0.88

0.03

80

99.9

MCC 10

0.82

0.54

90

83.5

Bus Soft Starter

0.70

0.36

72

88.8

MCC 11

0.96

0.63

104

83.5

0.47

-3.21

297

-14.6

-4.71

1.62

456

-94.6

MCC 2 Coal Boiler

0.62

0.43

68

82.4

MCC 3 Coal Boiler

0.39

0.37

49

73.2

Bus 3 (MV Coal Boiler)


6.300

Amp

0.51

Bus 1 (MV EOB 1)

Bus 3 (MV Coal Boiler)

XFMR
Mvar

MCC 1

MCC Coal OTH

Bus 2 (MV EOB 2)

MW

MCC Standby Coal Boiler


Bus 2 (MV EOB 2)
Bus Generator Coal Boiler
* Bus Generator 502G01

6.300

6.300

* Bus Generator Coal Boiler

0.0

5.44

7.12

Bus 1 (MV EOB 1)

4.71

-1.62

456

-94.6

-7.00

0.00

641

100.0

5.44

7.12

820

60.7

6.300

6.300

0.0

7.00

0.00

Bus 3 (MV Coal Boiler)

7.00

0.00

641

100.0

BUS RFC 1

0.380

0.397

-1.9

0.88

0.00

Bus 2 (MV EOB 2)

-0.88

0.00

1274

100.0

BUS RFC 2

0.380

0.397

-1.9

0.88

0.00

Bus 2 (MV EOB 2)

-0.88

0.00

1274

100.0

Bus Soft Starter

3.300

3.402

-1.5

0.70

0.34

Bus 2 (MV EOB 2)

-0.70

-0.34

131

90.0

MCC 1

0.380

0.404

-1.0

0.45

0.28

0.06

0.04

Bus 1 (MV EOB 1)

-0.51

-0.31

853

85.0

MCC 1 Coal Boiler

0.400

0.390

-1.7

0.25

0.16

0.03

0.02

MCC 2 Coal Boiler

-0.28

-0.18

486

84.0

MCC 2

0.380

0.390

-1.1

0.36

0.22

0.09

0.06

Bus 1 (MV EOB 1)

-0.45

-0.28

788

85.0

MCC 2 Coal Boiler

0.400

0.390

-1.7

0.31

0.20

0.03

0.02

Bus 3 (MV Coal Boiler)

-0.61

-0.40

1083

84.0

MCC 1 Coal Boiler

0.28

0.18

486

84.0

MCC 3

0.380

0.402

-1.3

0.49

0.31

0.14

0.09

Bus 1 (MV EOB 1)

-0.63

-0.39

1064

85.0

MCC 3 Coal Boiler

0.400

0.386

-1.5

0.16

0.14

0.02

0.01

Bus 3 (MV Coal Boiler)

MCC 4

0.380

0.396

-2.2

0.67

0.42

0.18

0.11

-0.39

-0.34

774

75.0

MCC 4 Coal Boiler

0.21

0.18

415

75.0

Bus 1 (MV EOB 1)

-1.08

-0.67

1856

85.0

0.23

0.14

391

85.0

MCC 7

% Tap

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:

Study Case: LF

Filename:

TA

Bus

Voltage

Generation

Motor Load

Static Load

MW

MW

Page:

Date:

01-18-2012

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

Load Flow

XFMR

kV

kV

MCC 4 Coal Boiler

0.400

0.386

-1.5

0.19

0.17

0.02

0.02

MCC 3 Coal Boiler

-0.21

-0.18

415

75.0

MCC 5

0.380

0.401

-1.4

0.60

0.37

0.07

0.05

Bus 1 (MV EOB 1)

-0.68

-0.42

1149

85.0

MCC 6

0.380

0.399

-1.8

0.81

0.50

0.10

0.06

Bus 1 (MV EOB 1)

-0.91

-0.56

1550

85.0

MCC 7

0.380

0.396

-2.2

0.18

0.11

0.05

0.03

MCC 4

-0.23

-0.14

391

85.0

ID

Ang.

MW

Mvar

Mvar

Mvar

ID

MW

Mvar

Amp

%PF

MCC 10

0.380

0.389

-1.6

0.65

0.40

0.17

0.11

Bus 2 (MV EOB 2)

-0.82

-0.51

1422

85.0

MCC 11

0.380

0.410

-1.6

0.84

0.52

0.11

0.07

Bus 2 (MV EOB 2)

-0.95

-0.59

1574

85.0

MCC Coal OTH

0.380

0.418

-0.4

0.14

0.09

0.04

0.03

Bus 1 (MV EOB 1)

-0.19

-0.12

305

85.0

MCC Standby Coal Boiler

0.400

0.400

0.0

* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA

Bus 3 (MV Coal Boiler)

% Tap

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
TA

Page:

Date:

01-18-2012

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

BUS LOADING Summary Report

Bus
ID

Bus Total Load


kV

Rated Amp

MW

Mvar

MVA

% PF

Amp

% Loading

Bus 1 (MV EOB 1)

6.300

1250.00

5.914

7.118

9.254

63.9

848.06

67.8

Bus 2 (MV EOB 2)

6.300

1250.00

4.710

3.212

5.701

82.6

522.45

41.8

Bus 3 (MV Coal Boiler)

6.300

1250.00

7.000

1.621

7.185

97.4

658.47

52.7

Bus Generator 502G01

6.300

1250.00

5.440

7.118

8.958

60.7

820.95

65.7

Bus Generator Coal Boiler

6.300

1250.00

7.000

7.000

100.0

641.50

51.3

BUS RFC 1

0.380

1298.00

0.876

0.000

0.876

100.0

1274.23

98.2

BUS RFC 2

0.380

1298.00

0.876

0.000

0.876

100.0

1274.23

98.2

Bus Soft Starter

3.300

0.695

0.337

0.772

90.0

131.07

MCC 1

0.380

3150.00

0.507

0.314

0.597

85.0

853.30

27.1

MCC 1 Coal Boiler

0.400

3200.00

0.276

0.178

0.328

84.0

486.43

15.2

MCC 2

0.380

2362.00

0.453

0.280

0.532

85.0

788.83

33.4

MCC 2 Coal Boiler

0.400

3200.00

0.614

0.397

0.731

84.0

1083.42

33.9

MCC 3

0.380

2520.00

0.630

0.391

0.741

85.0

1064.43

42.2

MCC 3 Coal Boiler

0.400

2000.00

0.389

0.343

0.519

75.0

774.71

38.7

MCC 4

0.380

2362.00

1.083

0.671

1.274

85.0

1856.00

78.6

MCC 4 Coal Boiler

0.400

2000.00

0.209

0.184

0.278

75.0

415.55

20.8

MCC 5

0.380

2362.00

0.679

0.421

0.799

85.0

1149.26

48.7

MCC 6

0.380

2520.00

0.910

0.564

1.071

85.0

1550.94

61.5

MCC 7

0.380

1520.00

0.228

0.142

0.269

85.0

391.36

25.7

MCC 10

0.380

3200.00

0.816

0.505

0.960

85.0

1422.61

44.5

MCC 11

0.380

3200.00

0.950

0.589

1.118

85.0

1574.23

49.2

MCC Coal OTH

0.380

2500.00

0.188

0.116

0.221

85.0

305.27

12.2

MCC Standby Coal Boiler

0.400

3200.00

0.0

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
TA

Page:

Date:

01-18-2012

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

BRANCH LOADING Summary Report

Transformer
Cable & Reactor

CKT / Branch
ID

Type

Ampacity
(Amp)

Loading
Amp

Capability
(MVA)

Loading (input)
MVA

Loading (output)
MVA

Auxilary TR

Transformer

1.600

0.751

46.9

0.731

45.7

Common TR

Transformer

0.800

0.537

67.1

0.519

64.8

Standby TR

Transformer

1.600

TR1

Transformer

1.600

0.606

37.9

0.597

37.3

TR2

Transformer

1.500

0.541

36.1

0.532

35.5

TR3

Transformer

1.600

0.755

47.2

0.741

46.3

TR4

Transformer

1.600

1.317

82.3

1.274

79.6

TR5

Transformer

1.600

0.816

51.0

0.799

49.9

TR6

Transformer

1.600

1.101

68.8

1.071

66.9

TR7

Transformer

1.600

0.881

55.0

0.876

54.8

TR8

Transformer

1.600

0.881

55.0

0.876

54.8

TR9

Transformer

1.600

0.983

61.4

0.960

60.0

TR10

Transformer

1.600

0.787

49.2

0.772

48.3

TR11

Transformer

2.000

1.145

57.3

1.118

55.9

TR Coal OTH

Transformer

1.250

0.222

17.8

0.221

17.7

* Indicates a branch with operating load exceeding the branch capability

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
TA

Page:

10

Date:

01-18-2012

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

BRANCH LOSSES Summary Report

CKT / Branch
ID

From-To Bus Flow


MW

Mvar

To-From Bus Flow


MW

Mvar

Losses
kW

% Bus Voltage
Kvar

Vd
% Drop
in Vmag

From

To

TR1

0.509

0.328

-0.507

-0.314

2.0

13.8

100.0

106.2

1.49

TR2

0.454

0.294

-0.453

-0.280

1.9

13.4

100.0

102.6

1.62

TR3

0.633

0.412

-0.630

-0.391

3.0

21.5

100.0

105.8

1.87

TR4

1.092

0.737

-1.083

-0.671

9.2

65.5

100.0

104.3

3.29

TR5

0.683

0.446

-0.679

-0.421

3.5

25.1

100.0

105.7

2.02

TR6

0.916

0.610

-0.910

-0.564

6.4

45.7

100.0

104.9

2.74

TR Coal OTH

0.188

0.118

-0.188

-0.116

0.3

1.9

100.0

109.9

0.57

TR7

0.880

0.029

-0.876

0.000

4.1

28.8

100.0

104.5

0.51

TR8

0.880

0.029

-0.876

0.000

4.1

28.8

100.0

104.5

0.51

TR9

0.821

0.541

-0.816

-0.505

5.1

35.9

100.0

102.5

2.40

TR10

0.699

0.362

-0.695

-0.337

3.5

24.9

100.0

103.1

1.81

TR11

0.956

0.630

-0.950

-0.589

5.8

41.2

100.0

107.9

2.37

Auxilary TR

0.618

0.426

-0.614

-0.397

4.1

28.8

100.0

97.4

2.58

Common TR

0.393

0.366

-0.389

-0.343

3.9

22.8

100.0

96.6

3.39

100.0

100.0

Standby TR
56.8

398.3

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
TA

Page:

11

Date:

01-18-2012

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

EQUIPMENT CABLE LOSSES Summary Report

Equipment Cable

Connected

ID

Load Type

Losses
kW

% Voltage
kvar

Bus

Load

Vd
% Drop
in Vmag

Vst
% for
Motor

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
TA

Page:

12

Date:

01-18-2012

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

Alert Summary Report


% Alert Settings
Critical

Marginal

Loading
Bus
Cable
Reactor
Generator
Transformer
Protective Device

Bus Voltage
OverVoltage

105.0

102.0

UnderVoltage

95.0

98.0

Generator Excitation
OverExcited (Q Max.)
UnderExcited (Q Min.)

Critical Report
ID

Device Type

Rating

Unit

Calculated

%Mag.

Condition

MCC 1

Bus

0.380

kV

0.404

106.2

OverVoltage

MCC 11

Bus

0.380

kV

0.410

107.9

OverVoltage

MCC 3

Bus

0.380

kV

0.402

105.8

OverVoltage

MCC 5

Bus

0.380

kV

0.401

105.7

OverVoltage

MCC Coal OTH

Bus

0.380

kV

0.418

109.9

OverVoltage

Marginal Report
ID

Device Type

Rating

Unit

Calculated

%Mag.

Condition

BUS RFC 1

Bus

0.380

kV

0.397

104.5

OverVoltage

BUS RFC 2

Bus

0.380

kV

0.397

104.5

OverVoltage

Bus Soft Starter

Bus

3.300

kV

3.402

103.1

OverVoltage

MCC 1 Coal Boiler

Bus

0.400

kV

0.390

97.4

UnderVoltage

MCC 10

Bus

0.380

kV

0.389

102.5

OverVoltage

MCC 2

Bus

0.380

kV

0.390

102.6

OverVoltage

MCC 2 Coal Boiler

Bus

0.400

kV

0.390

97.4

UnderVoltage

MCC 3 Coal Boiler

Bus

0.400

kV

0.386

96.6

UnderVoltage

MCC 4

Bus

0.380

kV

0.396

104.3

OverVoltage

MCC 4 Coal Boiler

Bus

0.400

kV

0.386

96.6

UnderVoltage

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
TA

Page:

13

Date:

01-18-2012

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal

Marginal Report
ID

Device Type

Rating

Unit

Calculated

%Mag.

Condition

MCC 6

Bus

0.380

kV

0.399

104.9

OverVoltage

MCC 7

Bus

0.380

kV

0.396

104.3

OverVoltage

ETAP PowerStation

Project:

4.0.0C

Location:
Contract:
Engineer:
Filename:

Study Case: LF
TA

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW

Mvar

MVA

% PF

Swing Bus(es):

5.440

7.118

8.958

60.72 Lagging

Generators:

7.000

0.000

7.000

100.00 Lagging

Total Demand:

12.440

7.118

14.332

86.80 Lagging

Total Motor Load:

11.272

6.019

12.778

88.21 Lagging

Total Static Load:

1.111

0.700

Apparent Losses:

0.057

0.398

System Mismatch:

0.000

0.000

Number of Iterations: 1

Page:

14

Date:

01-18-2012

SN:

KLGCONSULT

Revision:

Base

Config.:

Normal