Etap Powerstation: Load Flow Analysis
Etap Powerstation: Load Flow Analysis
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
TA
Design
None
Swing
Generator
Load
Total
21
23
XFMR2
XFMR3
Reactor
Line/Cable
Impedance
Tie PD
Total
15
22
Number of Buses:
Number of Branches:
Method of Solution:
Newton-Raphson Method
99
Precision of Solution:
0.000100
System Frequency:
50.00
Unit System:
English
Project Filename:
TA
Output Filename:
C:\ETAP 400\PowerStation\TA\Untitled.lf1
Page:
Date:
01-18-2012
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
TA
Page:
Date:
01-18-2012
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Bus
ID
Initial Voltage
Type
kV
% Mag.
Ang.
Load
6.300
100.0
0.0
Load
6.300
100.0
0.0
Load
6.300
100.0
0.0
Swing
6.300
100.0
0.0
Gen.
6.300
100.0
0.0
BUS RFC 1
Load
0.380
100.0
BUS RFC 2
Load
0.380
Load
3.300
MCC 1
Load
Generator
MW
Motor Load
Mvar
MW
Mvar
Static Load
MW
Mvar
1.438
0.961
1.279
0.829
0.0
0.876
0.000
100.0
0.0
0.876
0.000
100.0
0.0
0.695
0.337
0.380
100.0
0.0
0.451
0.279
0.050
0.031
Load
0.400
100.0
0.0
0.249
0.161
0.028
0.018
Load
0.380
100.0
0.0
0.358
0.222
0.090
0.056
Load
0.400
100.0
0.0
0.306
0.198
0.034
0.022
MCC 3
Load
0.380
100.0
0.0
0.492
0.305
0.123
0.076
Load
0.400
100.0
0.0
0.163
0.144
0.018
0.016
MCC 4
Load
0.380
100.0
0.0
0.672
0.416
0.168
0.104
Load
0.400
100.0
0.0
0.189
0.167
0.021
0.019
MCC 5
Load
0.380
100.0
0.0
0.604
0.375
0.067
0.042
MCC 6
Load
0.380
100.0
0.0
0.811
0.503
0.090
0.056
MCC 7
Load
0.380
100.0
0.0
0.180
0.111
0.045
0.028
MCC 10
Load
0.380
100.0
0.0
0.646
0.400
0.162
0.100
MCC 11
Load
0.380
100.0
0.0
0.842
0.522
0.094
0.058
Load
0.380
100.0
0.0
0.144
0.089
0.036
0.022
Load
0.400
100.0
0.0
11.272
6.019
1.025
0.647
7.000
7.000
0.000
0.000
Mvar Limits
Max.
Min.
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Study Case: LF
Filename:
TA
Page:
Date:
01-18-2012
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Transformer
ID
Rating
MVA
Prim. kV
Sec. kV
Z Variation
%Z
X/R
+ 5%
- 5%
% Tap Setting
% Tol.
Prim.
Adjusted
Sec.
%Z
Phase Shift
Type
Angle
Auxilary TR
1.600
6.300
0.400
8.260
7.1
8.2600
0.0
Common TR
0.800
6.300
0.400
6.420
5.8
6.4200
0.0
Standby TR
1.600
6.300
0.400
8.510
7.1
8.5100
0.0
TR1
1.600
6.150
0.400
6.400
7.1
6.4000
Special
0.0
TR2
1.500
6.600
0.415
6.330
7.1
6.3300
0.0
TR3
1.600
6.150
0.400
6.400
7.1
6.4000
0.0
TR4
1.600
6.150
0.400
6.400
7.1
6.4000
0.0
0.0
TR5
1.600
6.150
0.400
6.400
7.1
6.4000
TR6
1.600
6.150
0.400
6.400
7.1
6.4000
0.0
TR7
1.600
6.000
0.380
6.620
7.1
6.6200
0.0
TR8
1.600
6.000
0.380
6.620
7.1
6.6200
0.0
TR9
1.600
6.000
0.380
6.620
7.1
6.6200
0.0
0.0
TR10
1.600
6.000
3.300
7.160
7.1
7.1600
TR11
2.000
6.000
0.400
7.000
7.1
7.0000
0.0
TR Coal OTH
1.250
6.000
0.400
5.500
7.1
5.5000
0.0
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
TA
Page:
Date:
01-18-2012
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
BRANCH CONNECTIONS
CKT/Branch
ID
Connected Bus ID
Type
From Bus
Auxilary TR
2W XFMR
72.00
511.20
516.25
Common TR
2W XFMR
136.58
790.79
802.50
Standby TR
2W XFMR
74.18
526.68
531.88
TR1
2W XFMR
MCC 1
53.18
377.45
381.18
TR2
2W XFMR
MCC 2
64.61
458.62
463.15
TR3
2W XFMR
MCC 3
53.18
377.45
381.18
TR4
2W XFMR
MCC 4
53.18
377.45
381.18
TR5
2W XFMR
MCC 5
53.16
377.45
381.18
TR6
2W XFMR
MCC 6
53.16
377.45
381.18
TR7
2W XFMR
BUS RFC 1
52.34
371.62
375.28
TR8
2W XFMR
BUS RFC 2
52.34
371.62
375.28
TR9
2W XFMR
MCC 10
52.34
371.62
375.28
TR10
2W XFMR
56.61
401.93
405.90
TR11
2W XFMR
MCC 11
44.28
314.36
317.46
TR Coal OTH
2W XFMR
55.66
395.19
399.09
CB1
Tie Breakr
CB14
Tie Breakr
CB27
Tie Breakr
MCC 4
MCC 7
CB28
Tie Breakr
CB40
Tie Breakr
SW2
Tie Switch
SW3
Tie Switch
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
TA
Page:
Date:
01-18-2012
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Equipment
ID
Library
Size
L(ft)
#/ph
T (C)
Heater
R
R (ohm)
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Study Case: LF
Filename:
TA
Page:
Date:
01-18-2012
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Bus
ID
Bus 1 (MV EOB 1)
Voltage
kV
kV
6.300
6.300
Generation
Ang.
0.0
MW
Mvar
0
Motor Load
Static Load
MW
MW
Mvar
1.44
0.96
Load Flow
Mvar
0
ID
0
6.300
6.300
0.0
6.300
0.0
1.28
0.83
%PF
0.33
55
84.1
MCC 2
0.45
0.29
49
84.0
MCC 3
0.63
0.41
69
83.8
MCC 4
1.09
0.74
120
82.9
MCC 5
0.68
0.45
74
83.7
MCC 6
0.92
0.61
100
83.3
84.6
0.19
0.12
20
-5.44
-7.12
820
60.7
-0.47
3.21
297
-14.6
BUS RFC 1
0.88
0.03
80
99.9
BUS RFC 2
0.88
0.03
80
99.9
MCC 10
0.82
0.54
90
83.5
0.70
0.36
72
88.8
MCC 11
0.96
0.63
104
83.5
0.47
-3.21
297
-14.6
-4.71
1.62
456
-94.6
0.62
0.43
68
82.4
0.39
0.37
49
73.2
Amp
0.51
XFMR
Mvar
MCC 1
MW
6.300
6.300
0.0
5.44
7.12
4.71
-1.62
456
-94.6
-7.00
0.00
641
100.0
5.44
7.12
820
60.7
6.300
6.300
0.0
7.00
0.00
7.00
0.00
641
100.0
BUS RFC 1
0.380
0.397
-1.9
0.88
0.00
-0.88
0.00
1274
100.0
BUS RFC 2
0.380
0.397
-1.9
0.88
0.00
-0.88
0.00
1274
100.0
3.300
3.402
-1.5
0.70
0.34
-0.70
-0.34
131
90.0
MCC 1
0.380
0.404
-1.0
0.45
0.28
0.06
0.04
-0.51
-0.31
853
85.0
0.400
0.390
-1.7
0.25
0.16
0.03
0.02
-0.28
-0.18
486
84.0
MCC 2
0.380
0.390
-1.1
0.36
0.22
0.09
0.06
-0.45
-0.28
788
85.0
0.400
0.390
-1.7
0.31
0.20
0.03
0.02
-0.61
-0.40
1083
84.0
0.28
0.18
486
84.0
MCC 3
0.380
0.402
-1.3
0.49
0.31
0.14
0.09
-0.63
-0.39
1064
85.0
0.400
0.386
-1.5
0.16
0.14
0.02
0.01
MCC 4
0.380
0.396
-2.2
0.67
0.42
0.18
0.11
-0.39
-0.34
774
75.0
0.21
0.18
415
75.0
-1.08
-0.67
1856
85.0
0.23
0.14
391
85.0
MCC 7
% Tap
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Study Case: LF
Filename:
TA
Bus
Voltage
Generation
Motor Load
Static Load
MW
MW
Page:
Date:
01-18-2012
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Load Flow
XFMR
kV
kV
0.400
0.386
-1.5
0.19
0.17
0.02
0.02
-0.21
-0.18
415
75.0
MCC 5
0.380
0.401
-1.4
0.60
0.37
0.07
0.05
-0.68
-0.42
1149
85.0
MCC 6
0.380
0.399
-1.8
0.81
0.50
0.10
0.06
-0.91
-0.56
1550
85.0
MCC 7
0.380
0.396
-2.2
0.18
0.11
0.05
0.03
MCC 4
-0.23
-0.14
391
85.0
ID
Ang.
MW
Mvar
Mvar
Mvar
ID
MW
Mvar
Amp
%PF
MCC 10
0.380
0.389
-1.6
0.65
0.40
0.17
0.11
-0.82
-0.51
1422
85.0
MCC 11
0.380
0.410
-1.6
0.84
0.52
0.11
0.07
-0.95
-0.59
1574
85.0
0.380
0.418
-0.4
0.14
0.09
0.04
0.03
-0.19
-0.12
305
85.0
0.400
0.400
0.0
* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
% Tap
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
TA
Page:
Date:
01-18-2012
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Bus
ID
Rated Amp
MW
Mvar
MVA
% PF
Amp
% Loading
6.300
1250.00
5.914
7.118
9.254
63.9
848.06
67.8
6.300
1250.00
4.710
3.212
5.701
82.6
522.45
41.8
6.300
1250.00
7.000
1.621
7.185
97.4
658.47
52.7
6.300
1250.00
5.440
7.118
8.958
60.7
820.95
65.7
6.300
1250.00
7.000
7.000
100.0
641.50
51.3
BUS RFC 1
0.380
1298.00
0.876
0.000
0.876
100.0
1274.23
98.2
BUS RFC 2
0.380
1298.00
0.876
0.000
0.876
100.0
1274.23
98.2
3.300
0.695
0.337
0.772
90.0
131.07
MCC 1
0.380
3150.00
0.507
0.314
0.597
85.0
853.30
27.1
0.400
3200.00
0.276
0.178
0.328
84.0
486.43
15.2
MCC 2
0.380
2362.00
0.453
0.280
0.532
85.0
788.83
33.4
0.400
3200.00
0.614
0.397
0.731
84.0
1083.42
33.9
MCC 3
0.380
2520.00
0.630
0.391
0.741
85.0
1064.43
42.2
0.400
2000.00
0.389
0.343
0.519
75.0
774.71
38.7
MCC 4
0.380
2362.00
1.083
0.671
1.274
85.0
1856.00
78.6
0.400
2000.00
0.209
0.184
0.278
75.0
415.55
20.8
MCC 5
0.380
2362.00
0.679
0.421
0.799
85.0
1149.26
48.7
MCC 6
0.380
2520.00
0.910
0.564
1.071
85.0
1550.94
61.5
MCC 7
0.380
1520.00
0.228
0.142
0.269
85.0
391.36
25.7
MCC 10
0.380
3200.00
0.816
0.505
0.960
85.0
1422.61
44.5
MCC 11
0.380
3200.00
0.950
0.589
1.118
85.0
1574.23
49.2
0.380
2500.00
0.188
0.116
0.221
85.0
305.27
12.2
0.400
3200.00
0.0
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
TA
Page:
Date:
01-18-2012
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Transformer
Cable & Reactor
CKT / Branch
ID
Type
Ampacity
(Amp)
Loading
Amp
Capability
(MVA)
Loading (input)
MVA
Loading (output)
MVA
Auxilary TR
Transformer
1.600
0.751
46.9
0.731
45.7
Common TR
Transformer
0.800
0.537
67.1
0.519
64.8
Standby TR
Transformer
1.600
TR1
Transformer
1.600
0.606
37.9
0.597
37.3
TR2
Transformer
1.500
0.541
36.1
0.532
35.5
TR3
Transformer
1.600
0.755
47.2
0.741
46.3
TR4
Transformer
1.600
1.317
82.3
1.274
79.6
TR5
Transformer
1.600
0.816
51.0
0.799
49.9
TR6
Transformer
1.600
1.101
68.8
1.071
66.9
TR7
Transformer
1.600
0.881
55.0
0.876
54.8
TR8
Transformer
1.600
0.881
55.0
0.876
54.8
TR9
Transformer
1.600
0.983
61.4
0.960
60.0
TR10
Transformer
1.600
0.787
49.2
0.772
48.3
TR11
Transformer
2.000
1.145
57.3
1.118
55.9
TR Coal OTH
Transformer
1.250
0.222
17.8
0.221
17.7
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
TA
Page:
10
Date:
01-18-2012
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
CKT / Branch
ID
Mvar
Mvar
Losses
kW
% Bus Voltage
Kvar
Vd
% Drop
in Vmag
From
To
TR1
0.509
0.328
-0.507
-0.314
2.0
13.8
100.0
106.2
1.49
TR2
0.454
0.294
-0.453
-0.280
1.9
13.4
100.0
102.6
1.62
TR3
0.633
0.412
-0.630
-0.391
3.0
21.5
100.0
105.8
1.87
TR4
1.092
0.737
-1.083
-0.671
9.2
65.5
100.0
104.3
3.29
TR5
0.683
0.446
-0.679
-0.421
3.5
25.1
100.0
105.7
2.02
TR6
0.916
0.610
-0.910
-0.564
6.4
45.7
100.0
104.9
2.74
TR Coal OTH
0.188
0.118
-0.188
-0.116
0.3
1.9
100.0
109.9
0.57
TR7
0.880
0.029
-0.876
0.000
4.1
28.8
100.0
104.5
0.51
TR8
0.880
0.029
-0.876
0.000
4.1
28.8
100.0
104.5
0.51
TR9
0.821
0.541
-0.816
-0.505
5.1
35.9
100.0
102.5
2.40
TR10
0.699
0.362
-0.695
-0.337
3.5
24.9
100.0
103.1
1.81
TR11
0.956
0.630
-0.950
-0.589
5.8
41.2
100.0
107.9
2.37
Auxilary TR
0.618
0.426
-0.614
-0.397
4.1
28.8
100.0
97.4
2.58
Common TR
0.393
0.366
-0.389
-0.343
3.9
22.8
100.0
96.6
3.39
100.0
100.0
Standby TR
56.8
398.3
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
TA
Page:
11
Date:
01-18-2012
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Equipment Cable
Connected
ID
Load Type
Losses
kW
% Voltage
kvar
Bus
Load
Vd
% Drop
in Vmag
Vst
% for
Motor
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
TA
Page:
12
Date:
01-18-2012
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Marginal
Loading
Bus
Cable
Reactor
Generator
Transformer
Protective Device
Bus Voltage
OverVoltage
105.0
102.0
UnderVoltage
95.0
98.0
Generator Excitation
OverExcited (Q Max.)
UnderExcited (Q Min.)
Critical Report
ID
Device Type
Rating
Unit
Calculated
%Mag.
Condition
MCC 1
Bus
0.380
kV
0.404
106.2
OverVoltage
MCC 11
Bus
0.380
kV
0.410
107.9
OverVoltage
MCC 3
Bus
0.380
kV
0.402
105.8
OverVoltage
MCC 5
Bus
0.380
kV
0.401
105.7
OverVoltage
Bus
0.380
kV
0.418
109.9
OverVoltage
Marginal Report
ID
Device Type
Rating
Unit
Calculated
%Mag.
Condition
BUS RFC 1
Bus
0.380
kV
0.397
104.5
OverVoltage
BUS RFC 2
Bus
0.380
kV
0.397
104.5
OverVoltage
Bus
3.300
kV
3.402
103.1
OverVoltage
Bus
0.400
kV
0.390
97.4
UnderVoltage
MCC 10
Bus
0.380
kV
0.389
102.5
OverVoltage
MCC 2
Bus
0.380
kV
0.390
102.6
OverVoltage
Bus
0.400
kV
0.390
97.4
UnderVoltage
Bus
0.400
kV
0.386
96.6
UnderVoltage
MCC 4
Bus
0.380
kV
0.396
104.3
OverVoltage
Bus
0.400
kV
0.386
96.6
UnderVoltage
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
TA
Page:
13
Date:
01-18-2012
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal
Marginal Report
ID
Device Type
Rating
Unit
Calculated
%Mag.
Condition
MCC 6
Bus
0.380
kV
0.399
104.9
OverVoltage
MCC 7
Bus
0.380
kV
0.396
104.3
OverVoltage
ETAP PowerStation
Project:
4.0.0C
Location:
Contract:
Engineer:
Filename:
Study Case: LF
TA
MW
Mvar
MVA
% PF
Swing Bus(es):
5.440
7.118
8.958
60.72 Lagging
Generators:
7.000
0.000
7.000
100.00 Lagging
Total Demand:
12.440
7.118
14.332
86.80 Lagging
11.272
6.019
12.778
88.21 Lagging
1.111
0.700
Apparent Losses:
0.057
0.398
System Mismatch:
0.000
0.000
Number of Iterations: 1
Page:
14
Date:
01-18-2012
SN:
KLGCONSULT
Revision:
Base
Config.:
Normal