Production Management BBA (II) MDU Students
Production Management BBA (II) MDU Students
Management
& TQM
1
CONTENTS
Unit 1
Chapter1
Production Management
Meaning, Nature , Scope and major decision areas of production
/operation management.
Organizational chart of production management department
Products vs. Services
Objectives of production management
Value analysis
Chapter II
Demand Forecasting
Patterns of demand
Factors affecting demand
Methods of forecasting
Unit 2
Chapter I
Facilities location
Factors affecting size of the firm
Factors affecting location of a firm
Selection of a site (urban, rural, sub-urban)
Recent trends in location
Chapter II
Capacity planning
Meaning of capacity
Measures of capacity
Chapter III
Plant layout
Meaning of plant layout
Objectives of plant layout
Types of layout
Costs associated with layout
2
Techniques of plant layout
Chapter IV
Production system
Meaning
Types of production system
Evaluation of various production systems
Chapter V
Material handling system
Factors & principles of material handling system
Types of material handling equipment
UNIT 3
Chapter I
Aggregate planning
Meaning
Linear programming model
Transportation model
H.M.M.S MODEL
Chapter II
Production planning and control
Meaning and objectives of production planning
Production planning an integral part of corporate plan
Meaning of production control
Objectives of production control
Production planning and control (PPC)
PPC for shop production
PPC for mass production
Chapter III
Production scheduling
Meaning of scheduling
Techniques of scheduling
UNIT 4
3
Chapter I
Inventory control
Meaning and objectives of material management
Purpose of inventories
Purchasing process
Vendor development
Economic order quantity
Selective inventory control
Chapter II
Quality assurance
Meaning
Aspects of quality
Importance of quality
How does management decide quality
Quality insurance system
Quality control through statistical techniques
4
Unit 1
Chapter1
Nature and Scope of Production Management
Meaning, Nature , Scope and major decision
areas of production /operation management.
Organizational chart of production management
department
Products vs. Services
Objectives of production management
Value analysis
5
Meaning of Production
Production is an intentional act of producing something in an organized manner. It is the
fabrication of a physical object through the use of men, material and some function which has
some utility e.g. repair of an automobile, legal advice to a client, banks, hotels, transport
companies etc.
The main inputs are information, management, material, land, labour and capital. This figure
shown below explains the production process of an organization.
Management Transformation
Material & land
Goods
&
Labor, capital
service
6
2. “Production management deals with decision making related to production process so that
the resulting goods or services are produced according to specifications, in amounts and by
the schedules demanded and at a minimum cost”.
i. Specifying and accumulating the input resources, i.e., management, men, information,
materials, machine and capital.
ii. Designing and installing the assembling or conversion process to transform the inputs into
output, and
iii. Coordinating and operating the production process so that the desired goods and services
may be produced efficiently and at a minimum cost.
The production department in an enterprise is not only concerned with the full exploitation of
production facilities but also the human factor that indirectly affects the production, utilization of
latest techniques of production and the production of quality goods to the satisfaction of customers
of the product.
The various activities that form scope of production function can be studied in the following
broad areas:
Facilities
Production Location
Control
Method
Study
Inventory
Control
ii. Activities relating to production system designing: decision related to the production
system design is one of the most important activities of the production management. This
activity is related to production engineering and includes problems regarding design of
tools and jigs, the design, development and installation of equipment and the selection of
the optimum size of the firm. All these areas require the technical expertise on the part of
the production manager and his staff.
iii. Facilities location: the selection of an optimum plant location very much depends upon the
decision taken regarding production engineering. A wrong decision may prove disastrous.
Location should as far as possible cut down the production and distribution cost. There are
diverse factors to be considered for selecting the location of a plant.
iv. Method study: the next decision regarding production system design concerns the use of
those techniques, which are concerned with work environment and work measurement.
Standard method should be devised for performing the repetitive functions efficiently.
Unnecessary movements should be eliminated and suitable positioning of the workers for
different processes should be developed. Such methods should be devised with the help of
time study and motion study. The workers should be trained accordingly.
v. Facilities layout and materials handling: plant layout deals with the arrangements of
machines and plant facilities. The machine should be so arranged that the flow of
production remains smooth. There should not be overlapping, duplication or interruption in
production flow. Product layout where machines are arranged in a sequence required for
the processing of a particular product, and process layout, where machines performing the
similar processes are grouped together are two popular methods of layout. The departments
are layout in such a way that the cost of material handling is reduced. There should be
proper choice of material handling equipment.
vi. Capacity planning: This deals with the procurement of productive resources. Capacity
refers to a level of output of the conversion process over a period of time. Full capacity
8
indicates maximum level of output. Capacity is planned for short-term as well as for long
term. Process industries pose challenging problems in capacity planning, requiring in the
long run, expansion and contraction of major facilities in the conversion process.
Tools for capacity planning are marginal costing (Break Even Analysis), learning
curves, linear programming, and decision trees.
vii. Production planning: the decision in production planning include preparation of short-
term production schedules, plan for maintaining the records of raw materials, finished and
semi-finished stock, specifying how the production resources of the concern are to be
employed over some future time in response to the predicted demand for products and
services
viii. Production control: after planning, the next managerial production function is to control
the production according to the production plans because production plans cannot be
activated unless they are properly guided and controlled.
Acc. To Soriebal and Lansburgh “Production control is the process of planning
production in advance of operations; establishing the exact route of each individual item,
part or assembly; setting, starting and finishing dates for each important item, assembly and
the finished products; and releasing the necessary orders as well as initiating the required follow-
up to effect the smooth functioning of the enterprise
ix. Inventory Control: inventory control deals with the control over raw-materials, work-in-
progress, finished products, stores, supplies, tools, and so is included in production
management. The raw materials, supplies etc should be purchased at right time, right
quality, in right quantity, from right source and at right price.
Managing Director
Works Manager
A B C D E
1 2 1 2 3 1 3 1 3 4
1 2
4
2 2
3
9
Sections Headed by Foreman or Superintendents
PRODUCTS SERVICES
Tangible Intangible and perishable; consumed
in the process of their production
Minimal contact with ultimate consumer High contact with clients or customers
10
markets local customers, clients and users
Every system (or organization) has a purpose, certain objectives & goals to achieve since the
objectives of an organization have hierarchical structure, sub-goals lead to accomplishment of
goals, which contribute, to the achievement of objectives and eventually the purpose or mission of
an organization .It is very important that these objectives should be unambiguously identified,
properly structured and explicitly stated.
In general terms, the objectives of an organization may be to produce the goods/or services in
required quantities and of right quality as per schedule and at a minimum cost.
Thus quantity, quality and time schedule are the objectives that determine the extent of customer
satisfaction. If an organization can provide for these at a minimum cost then the value of goods
created or services rendered enhances and that is the only way to remain competitive. Thus various
objectives can be grouped as- performance objectives and cost objectives.
Performance Objectives
11
c) Quality: Quality is the extent to which a product or service satisfies the customer needs.
The output has to conform to quality specifications laid down before it can be accepted
d) Lead times: Manufacturing lead-time or throughput time is the time elapsed in the conversion p
Minimization of idle time, delays, waiting etc. will reduce throughput time.
e) Capacity utilization: Percentage utilization of manpower, machines etc. is calculated in
order to enhance overall capacity utilization.
f) Flexibility: If the conversion process has the flexibility of producing a combination of
outputs, it is possible to satisfy a variety of customer needs.
Cost objectives
Attaining high degree of customer satisfaction on performance front must be coupled with lower
cost of producing the goods or rendering a service. Thus cost minimization is an important systems
objective. Costs can be explicit or implicit. These could be tangible in economic terms or
intangible in social cost terms- such as delayed supplies, customer complaints etc. While managing
production systems we must consider the visible and invisible, tangible and intangible costs some
examples of these costs are:
a) Explicit costs:
Material cost
Direct and Indirect labour cost
Scrap/rework cost
Maintenance cost
b) Implicit costs:
12
There are different ways in which the production management functions can be grouped . For
instance, all the decisions concerning the production system could be divided as:-
1. Periodic decisions which include selection, design and updating of resource, structure,
systems and procedures.
2. Continual decisions which are required in day-to-day operations and control of production
systems.
Value Analysis
Value analysis is a cost reduction & control technique, which operates by attacking the basic
design of the product or service.
Value analysis is “an organized procedure for the efficient identification of unnecessary costs by
analysis of function --function being that property of product which makes it work or sell.”
Value Engineering – The application of value analysis techniques at the design stage of a product
or service.
Value
1. Value may be equated with a price, which is that which must be given, done sacrificed to
obtain a thing and any product or service will have several different values.
Exchange value, the price a purchaser will offer. This is sum of two parts, value due to
usefulness & the value the ownership itself bestows.
Exchange value = use value + esteem value.
Use value = the price the purchaser will offer in order to ensure that the purpose (or function)
is achieved.
Esteem value = the price which is offered beyond the use value e.g. possession of ----------?
Exchange value is set by the market & is influenced by the usefulness & esteem in which the
product is held.
2. Cost value (intrinsic value)- sum of all the costs incurred in providing the product.
Profit = exchange value – cost value
The task of a value analyst is to increase exchange value & decrease cost value.
13
Value analysis team – it must consist of a small core of experienced people + concerned people
+ intelligent laymen to raise basic & fundamental questions.
A Structured Approach – Gage has laid down a 12-step process for conducting value analysis
exercise.
1. Select the product to be analysed based on
- Multiplicity of components.
- Large forecast usage.
- Small difference between use value & cost value.
- Considerable market competition.
- A long designed product.
- Generation of considerable documentation.
- Creation of organizational complexity.
2. Extract the cost of product – the cost required here is the marginal or out of pocket cost – as
overheads can distort the picture. Details of individual components at this stage are not
required.
3. Record the number of parts – the larger the number of parts, greater the chances of reduction.
4. Record all the functions – purpose of the product.
5. Record the number required currently & in future.
6. The above five questions are the fact finding – they firmly establish the bases upon which all
further work is created.
7. Determine primary function from all the functions already listed in ‘4’. Some priority must
be established among functions.
8. List of all other ways of achieving the primary function – here ‘creativity & brainstorming’
plays important role. This should include part wise/component wise discussion.
9. Assign costs to various alternatives.
10. Examine the 3 cheapest alternatives.
11. Decide which idea should be further developed.
12. See what other functions need to be incorporated – reexamining of step 11. Does its use
contribute value.’
Can anything be removed without degrading the product? While the new product is being
developed the value analysis team can undertake the final step.
13. Ensure the new design is accepted. This will mean:
- A model
- Anticipated savings.
- Anticipated capital expenditure.
- Improvement in value.
- Critical path analysis.
14
8. What will that cost?
9. Which 3 alternative ways of doing the job show the largest difference between ‘cost & use
value’?
10. Which ideas are to be developed?
11. What other functions & specification features must be incorporated?
12. What is needed to sell the ideas & forestall ‘road blocks’?
Unit 1
Chapter II
Demand Forecasting
Patterns of demand
Factors affecting demand
Methods of forecasting
15
DEMAND FORECASTING
Forecasts are needed to aid in determining what resources are needed, scheduling existing
resources, and acquiring additional resources. Accurate forecasts allow scheduler to use machine
capacity efficiently, reduce production times, and cut inventories.
Forecasting methods may be based on mathematical models using historical data available,
qualitative methods drawing on managerial experience, or a combination of both.
Forecasting demand in such situations require uncovering the underlying patterns from available
information.
Patterns of Demand
The five basic patterns of the most demand time series are-:
1. Horizontal, or the fluctuation of data around a constant mean;
2. Trend, or systematic increase or decrease in the mean of the series overtime;
3. Seasonal, or a repeatable pattern of increase or decrease in demand, depending on the time
of day, week, month, or season;
4. Cyclic, or less predictable gradual increases or decreases in demand over longer periods of
time (years or decades); and
5. Random, or unforecastable, variation in demand
Four of the patterns of demands- Horizontal, Trend, Seasonal, and Cyclic- combine in varying
degrees to define the underlying time pattern of demand for a product or service. The fifth pattern,
random variations, results from chance causes and thus cannot be predicted.
External Factors. External factors that affect demand for a firm’s products or services are
beyond management’s control.
Leading indicators. Such as the rate of business failures, are external factors with turning points
that typically precede the peaks and troughs of general business cycle. Coincident indicator, such
as unemployment figures, are the time series with turning points that generally match those of the
general business cycle.
Lagging indicators, such as retail sales, follow those turning points, typically by several weeks or
months.
16
INTERNAL FACTORS: internal decision about product or service design, price and advertising
promotion, packaging design, sales persons quotas or incentive and expansion and contraction of
geographic market, target areas all contribute to changes in demand volume. The term demand
management describes the process of influencing the timing and volume of demand or adapting to
the undesirable effects of unchangeable demand patterns.
Forecasting methods
The two general types of forecasting techniques used for demand forecasting are: Qualitative
methods and Quantitative methods
Qualitative Method:
Qualitative methods include judgment methods, which translate the opinions of managers, expert
opinions, consumer surveys and sales force estimates into quantitative estimates.
Quantitative Methods:
Quantitative methods include casual methods and time series analysis.
Casual Methods:
Use historical data on independent variables, such as promotional campaigns, economics
conditions, and competitors’ actions, to predict demand. Time series analysis is a statistical
approach that relies heavily on historical demand data to project the future size of demand and
recognize trends and seasonal patterns.
Judgement Methods
When adequate historical data are lacking, as new product is introduced or technology is expected
to change, firms rely on managerial judgment and experience to generate forecasts.
I Sales Force Estimate
Sales force estimates are forecasts compiled from estimates of future demand made periodically by
members of a company’s sales force. This approach has several advantages.
• The sales force is the group most likely to know which products or services customers will
be buying in the near future, and in what quantities.
• Sales territories often are divided by district or region. Information broken down in this
manner can be useful for inventory management, distribution, and sales force staffing
purposes.
• The forecasts of individual sales force members can be combined easily to get regional or
national sales.
But it also has several disadvantages.
• Individual biases of the sales people may taint the forecast; moreover, some people are
naturally optimistic, other more cautious.
• Sales people may not always be able to detect the difference between what a customers
“wants” (a wish list) and what a customer “needs” (a necessary purchase).
17
• If the firm uses individual sales as a performance measure, salespeople may underestimate
their forecasts so that their performance will look good when they exceed their projections
or may work hard only until they reach their required minimum sales.
II EXECUTIVE OPINION
Executive opinion is a forecasting method in which the opinions, and technical knowledge of one
or more managers are summarized to arrive at a single forecast. As we will discuss later, executive
opinion can be used to modify an existing sales forecast to account for unusual circumstances,
such as a new sales promotion or unexpected international events. Executive opinion can also be
used for technical forecasting. This method of forecasting has several disadvantages. Executive
opinion can be costly because it takes valuable executive time. Although that may be warranted
under certain circumstances, it sometimes gets out of control. In addition, if executives are allowed
to modify a forecast without collectively agreeing to the changes, the resulting forecast will not be
useful.
IV DELPHI METHOD
The Delphi method is process of gaining consensus from a group of experts while
maintaining their anonymity. This form of forecasting is useful when there are no historical data
from which to develop statistical models and when managers inside the firm have no experience on
which to base informed projections. A coordinator sends a question to each member of the group of
outside experts, who may not even know who else, is participating. The Delphi method can be
used to develop long-range forecasts of product demand and new product sales projections. It can
also be used for technological forecasting. The Delphi methods can be used to obtain a consensus
from a panel of experts who can devote their attention to following scientific advances, changes in
society, government regulations, and the competitive environment.
18
The Delphi method has some shortcomings, including the following major ones.
• The process can take a long time (sometime a year or more). During that time the panel of
people considered to be experts may change, confounding the results or at least further
lengthening the process.
• Responses may be less meaningful than if experts were accountable for their responses.
• There is little evidence that Delphi forecasts achieve high degrees of accuracy. However,
they are known to be fair- to- good in identifying turning points in new product demand.
• Poorly designed questionnaires will result in ambiguous or false conclusions.
CAUSAL METHODS:
I LINEAR REGRESSION
In linear regression, one variable, called a dependent variable, is related to one or more
independent variables by a linear equation.
In the simple linear regression models, the dependent variable is a function of only one
independent variable, and therefore the theoretical relationship is a straight line:
Y=a + bX
Where Y = dependent variable
X = independent variable
a = Y-intercept of the line
b = slope of the line.
The objectives of linear regression analysis is to find values of a and b that minimize the sum of
squared deviations of the actual data points from the graphed line.
The sample correlation coefficient, r, measures the direction and strength of the relationship
between the independent variable and the dependent variable. The value of r can range from – 1.00
to + 1.00.
Weighted Moving Averages. In the simple moving average method, each demand has the same
weight in the average --namely, 1/n. In the weighted moving average method; each historical
demand in the average can have its own weight. The sum of the weight equal 1.0.
19
The advantage of a weighted moving average method is that it allows you to emphasize recent
demand over earlier demand. The forecast will be more responsive than the simple moving average
forecast to changes in the underlying average of the demand series. Nonetheless, the weighted
moving average forecast will still lag behind demand because it merely averages past demands.
This lag is specially noticeable with a trend because the average of the time series is systematically
increasing or decreasing.
20
Unit 2
Chapter I
Facilities location
Factors affecting size of the firm
Factors affecting location of a firm
Selection of a site (urban, rural, sub-urban)
Recent trends in location
21
FACILITIES LOCATION
Every organisation has to face location problem one or the other day . Before finding out those
reasons for location decision and the factors affecting thereof one would like to know the
following :-
2. Entrepreneurial ability and efficiency: the ability, experiences and managerial efficiency of
the entrepreneur is one of the important factors that determine the size of the business unit.
3. Risk of uncertainties: firms have to face fluctuations in demand for their products and
accordingly adjust their policies and strategies in order to survive and maintain the
positioning in the market.
TYPE OF ORGANIZATION:
The size of the firm also depends on the type of organization, e.g., sole trading business concern or
individual proprietorship, partnership firm, private companies that are managing business on small
and medium scale. Joint Stock Companies require capital on large scale.
Availability of inputs: The size can be larger if the inputs are available on a large scale. Where
the inputs will have to be transported from a distance and there is also some uncertainty, the size is
bound to be small.
Nature of product: In the case of processing of raw materials resulting in the production of joint
and by products, the scale is naturally more if the entrepreneur decides to process all the products.
In case of production of less standardized and more artistic products the size is bound to be small.
22
Laws of returns: But where increasing returns apply, large production will result in lower cost, so
that the firms can keep on growing larger in size provided the demand for the product is elastic.
Government regulation or licensing policy of government: The size of the firm depends on the
decision taken by the entrepreneur and on the attitude of the government.
1. Primary factors
Supply of
Raw-material
Supply
Of Nearness
Capital
to market
Transport Availability
facilitities of power
Labour
Supply
2. Secondary factors
Miscellaneous Facilities
Factors
Natural
Personal Factors
Factors
Historical Govt.
& Religious Subsidies &
Factors Facilities
23
FACTORS OF LOCALISATION:
a)Primary factors
1.Supply of raw material: It is necessary to consider the adequate supply of raw materials and the
nature of raw materials. The cost of raw materials is an important element of the total cost of
production.
2.Nearness to market: Nearness to market is important from the point of view of control over the
market. In those industries where the raw materials are obtained from different source, nearness to
source of raw materials is not as important as nearness to the market.
3.Transport Facilities: Speedy transport facilities are needed for the regular and timely supply of
raw materials at low .
4.Supply of labour :The supply of labour at low cost is important .It should also be regular .
Nearness to source of labour supply is very important . Therefore , producers should have regular
labour supply by reducing absenteeism and strikes due to unsatisfactory working conditions .
5.Power: power may be electrical , diesel and atomic energy . All types of power required must
be in abundance in order to ensure smooth flow of production.
6.Supply of capital :Industries require huge capital hence capital market must be developed at
industrial centres . Not only this , industrial development banks and other financial services must
also be encouraged .
b)Secondary Factors
1.Natural factors--affect the location of those industries which require a particular climate or
weather conditions
24
3.Government Subsidies and Facilities- Government gives subsidies and good industrial
development facilities in backward areas . Industries reach these places to reap the benefits of such
facilities.
4.Historical and Religious Factors- some places have industrial importance and some have
religious importance e.g. Kohlapur, Benaras ,Agra ,Nasik etc. Industries grow because of these
important features.
5.Initial Start and Goodwill- Once one industry starts at a certain place other industries come
their. E.g. Jamshedpur became an industrial town in the following manner .
6.Personal Factor: Personal likeness for a place affects the establishment of business at a place .
7.Miscellaneous factors-
a)sufficient water supply
b)Disposal of waste
c)Dangers of air-attacks
d)Community attitude
e)Ecological and environment considerations etc.
There are broadly three possible alternatives open for the selection of the locality of the industrial
unit:
The relative advantages and disadvantages of each area are discussed as under:
URBAN AREA
Due to certain typical advantages available only in the city area, promoters show preference for the
city area as the location of the industrial unit.
25
7. Vicinity of the market.
8. Facility of the ancillary and service units.
9. Transport facilities by road and railways.
10. Development of the training institutes.
11. Educational, medical and recreational institutes increase the amenities of lives.
RURAL AREA
26
9. Skilled workers are not available
10. Municipal facilities like water supply, drainage, fire fighting are not available in rural areas
11. There is absence of recreation facilities, good educational institutes, good and sufficient
medical facilities etc.
Suburban area
The city area as a location of industrial unit has got many negative aspects. The other extreme is a
rural area, which again is not free from many limitations. The better compromise in the decision is
in the selection of suburban area as the location of the industrial unit. Suburban area is the area
located on the outskirts of the city area. Suburban area matches the advantages of the rural area
with those of city area which is located at a short distance, e.g. Odhav, narol, kathawada, naroda,
and vatva are the suburban areas of the ahmedabad city.
The limitation of suburban area as a site for industry is that in the development process, it may be
converted into a part of the urban area with all its merits and demerits.
The traditional factors like nearness of sources of materials, motive power, nearness of markets,
labour supply etc. have no longer remained the effective pulling forces for location of industries.
The location trends have changed substantially due to the development of substitute raw materials,
network of electrification and transportation by roads and railway, mobility of the labour and
persuasive and compulsive policies of the government for balanced regional development.
The recent trends in the selection of industrial locations can be described as under.
1. Priority for the sub urban areas: the industrialist shows their preference of the sub urban
area as the sight for establishment of a new unit or relocation of the existing one. The
industrial policy of the government does not permit the establishment of a new unit or
expansion of an existing one in city areas.
27
notified backward district of gujarat state. Similarly, gujarat state government has also
notified certain backward talukas. Different types of incentives like cash subsidy, tax
relieves, concessional financial assistance, cheaper land and power supply etc. are
provided. So, many such areas have been developed substantially in recent times. An
illustration can be cited for the industrial development of dhabol in punch mahals,
ankleshwar in bharuch and sunder nagar.
3. Establishment of industrial estate: industrial estate is a piece of vast land divided into
different plots wherein factory shades are constructed. The government of India has
planned a national policy for the development of industrial estate. It has assigned a
responsibility of the development of the industrial estate to state governments. In each
state, the state development corporation (sdc) has developed many industrial estates
practically in all the districts of the state. Industrial estates have also been developed by
private entrepreneurs and chambers of commerce. The plots of land along with factory
shades and infrastructure facilities are developed in the industrial estates and are sold to the
prospective promoters. The establishment of industrial states has greatly affected the
location of industry.
5. Increased role of the govt in the decision of location of industries: government through
persuasive and compulsive methods greatly affects the location decisions in recent times. It
provides certain attractive incentives to the promoters to establish their units in less
developed areas, at the same time it does not permit excessive industrialization in certain
developed areas.
28
Unit II
Chapter II
Capacity planning
Meaning of capacity
Measures of capacity
29
Capacity Planning
The long-range operations strategy of an organization is expressed by capacity plans. Following
issues must be considered in capacity planning: -
1. Market trend in terms of market size, location, & technology innovation.
2. Effect of new product.
3. Variation (seasonal) in demand.
4. Review of existing policies for using overtime & multiple shifts.
5. Should we expand existing facilities or build new capacities.
6. Should we add small units or big units?
Measures of capacity: -
- When outputs are relatively homogenous, capacity units are rather obvious. For e.g .an Auto
plant uses number of autos, beer plant uses cases of beer etc.
- When the output units are diverse, it is common to use the measure of the availability . For
e.g.- airlines use seat available i.e. seat miles as a measure instead of seats.
- When different types of equipment are used for performing a wide variety of machinery
operation, & the output may be unique parts. The value of the labor & material of the output
could vary widely. Thus the capacity of the shop is normally stated as the capacity of the
limiting resources, e.g., the labour hours.
-
- Measure of capacity of different organizations
30
Auto Plant Number Of Autos
Beer Plant Cases Of Beer
Power Plant Mw
Airlines Available Seat Miles
Hospital Available Bed Days
Restaurant Available Seat Turns
31
Generation of alternative capacity plans.
When capacity gaps have been identified alternative plans should be considered. These
alternatives may involve the size & timing of added capacity, the use of overtime & multiple shifts,
the use of outside capacity resources, the absorption of lost sales, or the location of new capacity.
Economies of scale
For a given facility there should be an optimum output that minimizes fixed plus variable costs.
Optimum output for a given facility.
TOTAL COST/UNIT
VARIABLE COST/UNIT
Cost/un
FC
it
Units
The above diagram indicates the optimum output for a given facility. Optimum output is that
output for which the total cost/unit is minimum.
In the above figure variation in variable cost is due to overtime otherwise variable cost remains
same for each unit.
COST/UNIT
32
SMALLER SIZE
In above figure there is variation in cost curve due to successive increase in size of plant.
There are economies of scales that may come from two basic sources: lower fixed cost/unit &
variable cost/unit.
The lower fixed cost accrues because plant & equipment costs of larger plants are lower in
proportion to capacity. Larger plants are likely to have a better balance of sub units with less slack
capacity in sub units.
Lower variable cost may also accrue with the larger plant because larger volume may justify more
mechanization and automation. The result is that minimum unit costs are less for larger plants.
33
$1,778,150
$ 1,588,800
$1,588,800
$ 2,459,300
$595,800
Install 5000 Units in
1989,1990 and 1991
$595,800
$ 2,749,000
$819,400
$ 261,350
34
1.Structuring alternatives.
Capacity expansion involves extremely important strategic issues that must be addressed before
the balance of the planning process can proceed. These issues involve existing industry capacity,
where it is located, the nature & strength of competition, the status of the technology in the
industry including the potential for influence on whether or not to pursue an expansion at all as
well as on the structuring for alternatives for expansion.
Given a ‘go’ signal for the capacity planning process, alternatives need to be structured around
different locations that may have the competitive advantages, the process technology that can be
used, & the nature of the product & its market. One of the outcomes will be in terms of the
riskiness of the situation, with regard to both the product & its markets (mature or new & risky) &
the anticipation of chance occurrences or developments usually involving technological choices.
35
UNIT II
Chapter III
Plant layout
Meaning of plant layout
Objectives of plant layout
Types of layout
Costs associated with layout
Techniques of plant layout
36
MEANING OF PLANT LAYOUT
Plant layout means the disposition of the various facilities (equipments, material, manpower etc.)
within the areas of the site selected. Plant layout begins with the design of the factory building and
goes up to the location and movement of work. All the facilities like equipment, raw material,
machinery, tools, fixtures, workers etc. are given a proper place. In the words of James Lundy, “It
identically involves the allocation of space and the arrangement of equipment in such a manner
that overall cost are minimized”. According to MoNaughton Waynel, “A good layout results in
comforts, convenience, appearance, safety and profit. A poor layout results in congestion, waste,
frustration and inefficiency”.
Plant layout is very complex in nature as it involves concept relating to such fields as engineering,
architecture, economics and business administration. Hence a plant layout, with proper design,
encompasses all production and service facilities and provides for the most effective utilization of
men, with materials and machines constituting the process, is a master blue print for coordinating
all operations.
The principal objective of a proper plant layout is to maximize the production at the minimum of
the costs. This objective should be kept in mind while designing a layout for a new plant as well
as while making the necessary changes in the exiting layout in response to change in
management polices and processes and techniques of production with the production system, i.e.
workers, supervisors and managers.
If a layout is to fulfill this goal, it should be planned with the following clear objectives in mind.
1) There is the proper utilization of cubic (i.e. length, width and height). Maximum use of
volume available should be made. For example, conveyors can be run above head
height and used as moving work in progress or tools and equipments can be suspended
from the ceiling. The principle is particularly true in stores where goods can be stored at
considerable height without inconvenience.
2) Waiting time of the semi-finished products is minimized.
3) Working conditions are safer, better (well ventilated rooms etc.) and improved
4) Material handling and transportation is minimized and efficiently controlled. For this ,
one has to consider the movement distances between different work areas as well as the
number of times such movements occur per unit period of time.
5) The movements made by the worker are minimized.
37
6) Suitable spaces are allocated to production centers.
7) Plant maintenance is simpler.
8) There is increased flexibility for changes in product design and for future expansion.
It must be capable of incorporating, without major changes, new equipment to meet
technological requirement or to eliminate waste.
9) A good layout permits material to move through the plant at the desired speed with
the lowest cost.
10) There is increased productivity and better product quality with reduced capital cost.
11) Boosting up employee morale by providing employee comforts and satisfaction.
12) The work should be so arranged the there is no difficulty in supervision, coordination
and control. There should be no ‘hiding-places’ into which goods can be mislaid.
Goods – raw materials and ready stocks – must be readily observed at all times. It
will reduce the pilferage of material and labour.
It should be noted here that the above stated objectives of plant layout are laudable in themselves;
it is often difficult to reconcile all of them in a practical situation. And as such, the highest level of
skill and judgment are required to be exercised. For this, close association between the
entrepreneurs and experienced engineers is a must.
(a) Process Layout: It is also known as functional layout and is characterized by keeping
similar machines or similar operation at one location (place). In other words, separate
departments are established for each specialized operation of production and machines
relating to that functions are assembled there. For example, all lathe machines will be at
one place, all milling machines at another and so on. This type of layout is generally
employed for industries engaged in job-order production and non-standardized
products. The process layout may be illustrated in the
(b) Diagram given below.
Receiving Shipping
Surface
Lathe Milling Packaging
Deptt Deptt
Finishing
Assembling inspection
38
F I C E S
Advantages:
1) Wide flexibility exits as regards allotment of work to equipments and workers.
The production capacity is not arranged in rigid sequence and fixed rate
capacity with line balancing. Alteration or change in sequence of operation can
easily be made as and when required without upsetting the existing plant layout
plan.
2) Better quality product, because the supervisors and workers attend to one type
of machine and operations.
3) Variety of jobs, coming as different job orders make the work more interesting
for workers.
4) Workers in one section are not affected by the nature of operations carried out in
another section. E.g. the rays of welding do not affect a lathe operator, as the
two sections are quite separate.
5) Like product layout, the breakdown of one machine does not interrupt the entire
production flow.
6) This type of layout requires lesser financial investment in machines and
equipments because general-purpose machine, which are usually of low cost,
are used and duplication of machine is avoided. Moreover, general-purpose
machine do not depreciate or become obsolete as rapidly as specialized
machines. It results in lower investment in machines.
7) Under process layout, better and efficient supervision is possible because of
specialization in operation.
Disadvantages:
39
7) Under process layout, cost of supervision is high because (i) the number of
employees per supervisor is less that result in reduced supervisory span of
control, and (ii) the work is checked after each operation.
c) Product Layout: it is also known as line (type) layout. It implies that various operations on
a product are performed in a sequence and the machine are placed along the product flow line
i.e. machines are arranged in the sequence in which a given product will be operated upon.
This type of layout is preferred for continuous production i.e. involving a continuous flow in-
process material towards the finished product stage.
IN OUT
Advantages:
i) Automatic material handling, lesser material handling movement, times and cost.
ii) Product completes in lesser time. Since material is fed at one end of the layout and
finished product is collected at the other end, there is no transportation of raw material
backward and forward. It shortens the manufacturing time because it does not require
any time-consuming interval transportation till the completion of the process of
production. Line balancing may eliminate idle capacity.
iii) Smooth and continuous flow of work- This plant ensures steady flow of production
with economy because bottlenecks or stoppage of work at different point of production
is got eliminated or avoided due to proper arrangement of machine in sequence.
iv) Less in-process inventory- The semi-finished product or work-in-progress is the
minimum and negligible under this type of layout because the process of production is
direct and uninterrupted.
v) Effective quality control with reduced inspection points -It does not require frequent
changes in the machine set-up. Since production process is integrated and continuous,
defective parts can easily be discovered and segregated. This makes inspection easy
and economical.
vi) Maximum use of space due to straight production flows and reduced need of interim
storing.
Disadvantages:
i) Since the specific product determines the layout, a change in product involves major
changes in layout and thus the layout flexibility is considerably reduced.
40
ii) The pace or rate of working depends upon the output rate of the slowest machine. This
involves excessive idle time for other machines if the production line is not adequately
balanced.
iii) Machines being scattered along the line, more machines of each type have to be
purchased as stand by, because if one machine in the line fails, it may lead to shut
down of the complete production line
iv) It is difficult to increase production beyond the capacities of the production lines.
v) As the entire production is the result of the joint effort of all operation in the line, it is
difficult to implement individual incentive schemes.
vi) Since there is no separate department for various types of work, supervision is also
difficult.
(a) Absenteeism may create certain problems because every worker is specialist in
his own work or he specializes on a particular machine .In order to avoid the
bottleneck, surplus workers who are generalists and can be fitted on a number of
machines will have to be employed;
(b) Monotony is another problem with the workers .By doing the work of repetitive
nature along assembly line, they feel bored. They have no opportunity to
demonstrate their talent;
(c) Noise, vibrations, temperature, moisture, gas etc. may cause health hazards .In
this way, labour costs are high.
It is now quite clear from the above discussion that both the systems have their own merits and
demerits. Advantages of one type of layout are generally the disadvantages of other type. Thus
with a view to securing the advantage of both the systems a combined layout may be designed.
1. Flexible: This layout is fully flexible and is capable of absorbing any sort of change in
product and process. The project can be completed according to the needs of the customers
and as per their specifications.
41
2. Lower labour cost: People are drawn from functional departments. They move back to
their respective departments as soon as the work is over. This is economical, if a number of
orders are at hand and each one is in the different stage of progress. Besides, one or two
workers can be assigned to a project from start to finish. Thus it reduces labour cost.
3. Saving in time: The sequence of operations can be changed if some materials do not arrive
or if some people are absent. Since the job assignment is so long, different sets of people
operate simultaneously on the same assignment doing different operations
4.Other benefits:
(1) It requires less floor space because machines and equipment are in moving position and
there is no need of fixing them.
(2) This arrangement is most suitable way of assembling large and heavy products.
2. Unsuitability: This type of layout is not suitable for manufacturing or assembling small
products in large quantities. It is suitable only in case where the product is big or the
assembling process is complex.
1) Nature of the product: The nature of the product to be manufactured will significantly
affect the layout of the plant. Stationary layout will be most suitable for heavy products while
line layout will be best for the manufacture for the light products because small and light
products can be moved from one machine to another very easily and, therefore, more attention
can be paid to machine locations can be paid to machine locations and handling of materials.
(2) Volume of production: Volume of production and the standardization of the product also
affect the type of layout. If standardized commodities are to be manufactured on large scale,
line type of layout may be adopted.
(3) Basic managerial policies and decisions: The type of layout depends very much on the
decisions and policies of the management to be followed in producing the commodity with
regard to the size of plant, kind and quality of the product, scope for expansion to be provided
for, the extent to which the plant is to be integrated, amount of stocks to be carried at anytime,
the kind of employee facilities to be provided etc.
42
(4) Nature of plant location: The size shape and topography of the site at which the plant is
located will naturally affect the type of layout to be followed in view of the maximum utilization
of the space available .For e.g., if a site is near the railway line the arrangement of general layout
for receiving and shipping and for the best flow of production in and out the plant may be made by
the side of the railway lines .If space is narrow and the production process is lengthy, the layout of
plant may be arranged on the land surface in the following manner:
IN
IN OUT
OUT
(5) Type of industry process: This is one of the most important factors influencing the choice of
type of plant layout. Generally the types of layout particularly the arrangement of machines and
work centers and the location of workmen vary according to the nature of the industry to which the
plant belongs. For the purpose of lay out, industry may be classified into two broad
categories:
(i) Intermittent and (ii) continuous. Intermittent type of industries is those, which manufacture
different component or different machines.
Such industries may manufacture the parts, when required according to the market needs.
Examples of such industries are shipbuilding plants. In this type of industry functional layout may
be the best. The second type of industry in ‘continuous industry. in this type of industry raw
material are fed at one end and the finished goods are received at another end. A continuous
industry may either be analytical or synthetic . A analytical industry breaks up the raw material into
several parts during the course of production process or changes its form, e.g. oil and sugar
refineries. A synthetic industry on the other hand mixes the two or more materials to manufacture
one product along with the process of production or assembles several parts to get finished
product. Cement and automobiles industries are the examples of such industry. Line layout is more
suitable in continuous process industries.
43
7. Nature of machines:-
Nature of machines and equipment also affects the layout of plants. If machines are heavy in
weight or create noisy atmosphere, stationery layout may reasonably be adopted. Heavy machines
are generally fixed on the ground floor. Ample space should be provided for complicated machines
to avoid accidents.
7. Climate:-
Sometimes, temperature, illumination and air are the deciding factors in the location of machines
and their establishments. For example, in lantern manufacturing industry, the spray-painting room
is built along the factory wall to ensure the required temperature control and air expulsion and the
process of spray painting may be undertaken.
9.Nature of material: -
Design and specification of materials, quantity and quality of materials and combination of
materials are probably the most important factors to be considered in planning a layout. So,
materials storage, space, volume and weight of raw materials, floor load capacity, ceiling height
,method of storing etc. should be given special consideration. This will affect the space and the
efficiency of the production process in the plant. It will facilitate economic production of goods
and prompt materials flow and soundly conceived materials handling system.
Shape of building, covered and open area, number of storeys, facilities of elevators, parking area
and so on also influence the layout plan. In most of the cases where building is hired, layout is to
be adjusted within the spaces available in the building. Although minor modification may be done
to suit the needs of the plants and equipment. But if any building is to be constructed, proper care
should be given to construct it according to the layout plan drawn by experts. Special type of
construction is needed to accommodate huge or technical or complex or sophisticated machines
and equipment.
44
Costs Associated With Plant Layout
Layouts, thereby indicating how the present layout may be improved. Colored lines can show the
flow of several standard products.
45
This diagram can be used to analyze the effectiveness of the arrangement of the plant activities, the
location of specific machines, and the allocation of space. It shows how a more logical
arrangement and economical flow of work can be devised.
(2) Machines data card: This card provides full information necessary for the placement and
layout of equipment. The cards are prepared separately for each machine. The information
generally given on these cards include facts about the machine such as capacity of the machines,
scape occupied, power requirements, handling devices required and dimensions.
(3) Templates: Template is the drawing of a machine or tool cut out from the sheet of paper.
Cutting to scale shows the area occupied by a machine. The plant layout engineer prepares a floor
plan on the basis of reel vent information made available to him. The template technique is an
important technique because (i) it eliminates unnecessary handlings, (ii) minimize backtracking of
materials, (iii) it makes the mechanical handling possible, (iv) it provides a visual picture of
proposed or existing plan of layout at one place, (v) it offers flexibility to meet future changes in
the production requirements.
(4) Scale models: Though the two-dimensional templates are now in extensive use in the fields of
layout engineering but it is not much use to executives who cannot understand and manipulate
them .One important drawback of template technique is that it leaves the volume, depth, height and
clearance of the machines to the imaginations of the reader of the drawing. These drawbacks of the
template technique have been removed through the development of miniature scale models of
machinery and equipment cast in metal.
With scale models, it has now become possible to move tiny figures of men and machines around
in miniature factory .The miniature machines and models of material handling equipment are
placed in a miniature plant and moved around in pawn on a chessboard.
(5) Layout drawings: Completed layouts are generally represented by drawings of the plant
showing wall, columns, stairways, machines and other equipments, storage areas and office areas.
The above techniques and tools are used for the planning of layout for the new plant.
46
UNIT II
Chapter IV
Production system
Meaning
Types of production system
Evaluation of various production systems
47
TYPES OF PRODUCTION SYSTEM
According to Webster, “System is a regular interacting inter-dependent group of items forming a
unified whole”. A system may have many components and variation in one component is likely to
affect the other components of the system e. g. change in rate of production will affect inventory,
overtime hours etc. Production system is the framework within which the production activities of
an organization are carried out. At one end of a system are inputs and at the other output. Input
and output are linked by certain process or operations or activities imparting value to the inputs.
These processes, operations or activities may be called production system. The nature of
production system may differ from company to company or from plant to plant in the same firm.
CHARATERISTICS:
(1) The volume of output is generally large (mass production) and goods are produced in
anticipation of demand.
48
(2) The product design and the operations sequence are standardised i.e. identical products are
produced.
(3) Special purpose automatic machines are used to perform standardized operations.
(4) Machine capacities are balanced so that materials are fed at one end of the process and
finished product is received at the other end.
(5) Fixed path materials handling equipment is used due to the predetermined sequence of
operations.
(6) Product layout designed according to a separate line for each product is considered.
MERITS:
(1) The main advantage of continuous system is that work in progress inventory is
minimum.
(2) The quality of output is kept uniform because each stage develops skill through
repetition of work.
(3) Any delay at any stage is automatically detected.
(4) Handling of materials is reduced due to the set pattern of production line. Mostly the
materials are handled through conveyer belts, roller conveyers, pipe lines, overhead
cranes etc.
(5) Control over materials, cost and output is simplified.
(6) The work can be done by semi- skilled workers because of their specialisation.
DEMERITS:
Continuous system, however, is very rigid and if there is a fault in one operation the entire process
is disturbed. Due to continuous flow, it becomes necessary to avoid pilling up of work or any
blockage on the line. Unless the fault is cleared immediately, it will force the preceding as well as
the subsequent stages to be stopped. Moreover it is essential to maintain stand-by equipments to
meet any breakdowns resulting in production stoppages. Thus investments in machines are fairly
high.
49
and standardized sequence of operations highly sophisticated and automatic machines are used.
Process production is employed in bulk processing of certain materials. The typical processing
industries are fertilizers plants, petrochemical plants and milk diaries which have highly
automated systems and sophisticated controls. They are not labour–intensive and the worker is
just an operator to monitor the system and take corrective steps if called for.
On the basis of the nature of production process, flow production may be classified in
Analytical And Synthetic Production .
In Analytical Process production, a raw material is broken into different products e. g. crude oil
is analysed into gas, naptha, petrol etc. Similarly, coal is processed to obtain coke, coal gas ,
coaltar etc..
Synthetic process of production involves the mixing of two or more materials to manufacture a
product for instance, lauric acid, myristic acid, stearic acid are synthesised to manufature soap.
(C) Assembly lines : Assembly lines a type of flow production which is developed in the
automobiles industry in the U.S.A. A manufacturing unit prefers to develop and employ assembly
line because it helps to the efficiency of production. In an assembly line, each machine must
directly receive materials from the previous machine and pass it directly to the next machine.
Machine and equipment should be arranged in such a manner that every operator has a free and
safe access to each machine. Space should be provided for free movement of fork lifts, trucks etc.
which deliver materials and collect finished products.
CHARACTERISITICS :
50
(6) Process layout is most suited.
Intermittent system is much more complex than continuous production because every product
has to be treated differently under the constraint of limited resources. Intermittent system can
be effective in situation which satisfy the following conditions:
(1) The production centers should be located in such a manner so that they can be handle a
wide range of inputs.
(2) Transportation facilities between production centers should be flexible enough to
accommodate variety of route different inputs.
(3) It should be provided with necessary storage facility.
(A) JOB PRODUCTION : job production involves the manufacturing of single complete
unit with the use of a group of operator and process as per the customer’s this is a “ special
order” type of production. Each job production or product is different from the other and no
repetition is involved. The product is usually costly and non- standardized. Customers do not
make demand for exactly the same product on a continuing basis and therefore production
become intermittent. Each product is a class by itself and constitute a separate job for
production process. Shipbuilding, electric power plant dam construction etc. are common
examples of job production
CHARACTERISTICS :
(1) The product manufacture is custom-made or non –standardized.
(2) Volume of output is generally small.
(3) Variable path materials handling equipment are used.
(4) A wide range of general purpose machines like grinders, drilling, press, shaper etc is
used .
MERITS : it is flexible and can be adopted easily to change in product design. A fault in one
operation does not result into complete stoppages of the process. Beside it is cost effective and
time- effective since the nature of the operation in a group are similar there is reduced materials
handling since machines are close in a cell. The waiting period between operation is also
reduced. This also results in a work- in- progress inventrory.
DEMERITS:
Job shop manufacturing is just most complex system of production e. g. in building a ship
thousand of individual parts must be fabricated and assemble. A complex schedule of activity
is required to ensure smooth flow of work with out any bottleneck. Raw materials and work-
in-progress inventories are high due to uneven and irregular flow of work. Work loads are
unbalanced, speed of work is slow and unit costs are high.
51
(B) BATCH PRODUCTION : it is defined as, “ The manufacture of a product in
small or large bathes or lots at intervals by a series of operations, each operation being carried
out on the whole batch before any subsequent operation is performed’ the batch production is
mixture of mass production and job production and job production under it machines turn out
different product at intervals, each product being produced for comparatively short tome using
mass production methods.
Both job production and batch production are similar in nature, except that in batch production
the quantity of product manufacture is comparatively large.
DEMERITS : work-in-progress inventory is high and large storage space is required . due
to frequent changes in product design no standard sequence of operation can be used. Machine
set-ups and tooling arrangements have to be changed frequently. The main problem in batch
production is ideal time between one operation and other the work has to wait to until a
particular operation is carried out on the whole batch.
(2) SIZE AND CAPITAL INVESTMENT : as stated earlier , the scale of operation is small
in job production, medium in batch production, large in mass production and very large in
process production. Hence the size of capital investment different from system. Process
production calls for the higher investment while mass production requires lesser amount
of capital investment . it is lower in case of job production and comparatively higher in
batch production.
(3) FLEXIBILITY IN PRODUCTION : in case of in demand of the product, the
production facilities may be adjust very shortly with out increasing much expenses under
the system of job or batch production .
But both the sub-system of continuous production system i.e, mass production or process
production employ single purpose machine in their manufacturing process. They can not
adjust their production facilities so quickly and easily as is possible in job or batch
production where general purpose machines are used
(4) REQUIRED TECHNICAL ABILITY : both job and batch production require high
skilled technical foreman and other executives . but under mass production for process production
systems, managerial ability plays plays an important role because it require higher ability for
52
planning and coordinating several functions in mass and process production than in the case of job
and batch production.
(7) JOB SECURITY : job and batch system of production do not provide and type of
job security to workers due to their intermittent character during odd times, workers particularly
unskilled worker are thrown out of job. On the contrary, mass and process production systems
provide greater job security to worker because production operation are carried out continuously in
anticipation of stable and continuous demand of the product.
Thus, a comparative view of the different system of production reveals that no one system is
suitable for all of different and each system is different in itself and must be studied with reference
to the nature of industry.
53
UNIT II
Chapter V
Material handling system
Factors & principles of material handling system
Types of material handling equipment
54
MATERIAL HANDLING SYSTEMS
According to ‘American Handling Society’ Materials Handling is the art and science involving the
movement, packing and storing of substances in any form’.
55
7. Material handling equipment- Available and proposed
1. Least movement
2. Type of each move should be minimized
3. Distance of each move should be short route
4. Movement in lots rather than on individual basis
5. Gravity should be used
6. Rehandling and back tracking should be avoided
7. Appropriate material handling which is safe, efficient and flexible should be used,
8. Material handling service should not interrupt production flow
9. Safety of people
10. Provision of stand-by facilities
11. Repair and maintenance-periodically
12. Periodical review of material handling system
56
Types of equipment-
The material handling systems can be classified according to the type of handling equipment used,
type of material handled and the methods ,need or function performed.
1. Equipment Oriented Systems depending upon the type of equipment used are:-
a) Overhead systems
b) Conveyor systems
c) Tractor transfer system
d) Fork-lift truck and pallet truck system
e) Industrial truck system
f) Underground truck system
57
3. Method Oriented Systems are of following types:-
a) Manual System
b) Mechanized or automated system
c) Job Shop handling system
d) Mass-production handling system
a) Transportation Systems
b) Transferring Systems
c) Elevating Systems
Conveyors
These are gravity or powered devices, commonly used for moving loads from point to point over
fixed paths. The various types of conveyors are:-
a) Belt conveyor- Motor driven belt, usually made of rubberized fabric or metal fabric on a
rigid frame.
b) Chain Conveyor- Motor driven chain that drags material along a metal slide base.
c) Roller conveyor- Boxes, large parts or unit loads roll on top of a series of roller mounted
on a rigid frame
58
d) Pneumatic conveyor:- High volume of air flows through a tube, carrying material
along with the air flow.
1. Graves are devices mounted on overhead rails or ground level wheels or rails.
2. Elevator are a type of graves that lift material usually between floors of building
3. Hoists are devices, which move materials vertically and horizontally in a limited area.
Industrial Trucks
These devices are used for moving mined or uniform loads intermittently over variable paths. They
are electric, diesel, gasoline or liquefied petroleum, gas-powered vehicle equipped with lead,
forklift truck, pallet trucks, tractor with trailers, hand trucks and power trolleys.
59
UNIT III
Chapter I
Aggregate planning
Meaning
Characteristics and objectives
Linear programming model
Transportation model
H.M.M.S MODEL
60
Aggregate Planning
Production planning in the intermediate range of time is termed as “Aggregate Planning” . It is
thus called because the demand on facilities and available capacities is specified in aggregate
quantities e.g. aggregate quantities of thousands of litres of paint , or tons of fabrication work ,
or number of automobiles etc.
Aggregate planning is made within the broad framework of the long-range plan. Usually the
planning horizon for such plan is from a month to a year . The physical plant and equipment
capacity would be fixed over this planning horizon . Therefore the sales orders have to be met
by strategies like : -
1. Overtime
2. Additional temporary workers .
3. Inventory .
4. Sub- contracting .
5. Having backlog of orders .
6. Smoothening of demand .
7. Turning down some sales orders .
Each of these strategies has a cost associated with it . The marginal cost of overtime is easy to
estimate , whereas the costs of undertime are not easy to determine . The hiring costs include
the costs of selection , the costs of training and the cost of maintaining additional records .
There are also costs associated with learning on the job of a newly hired employee.
Costs of inventory include the cost of capital for carrying the inventory , the cost of
obsolescence , taxes and insurance etc.
Stock- out costs are cost due to loss of goodwill and loss of sales of the customer . The cost of
sub- contracting is the amount by which the subcontracting costs is greater than the
manufacturing cost at the higher level of production .
61
• Possible to influence both supply and demand by adjusting production rates, workforce
levels, inventory levels, etc., but facilities cannot be expanded.
Production Plan (manufacturing aggregate plan):
A managerial statement of the period-by-period (time-phased) production rates, work-force
levels, and inventory investment, given customer requirements and capacity limitations.
Staffing Plan (service aggregate plan):
A managerial statement of the period-by-period staff sizes and labour-related capacities,
given customer requirements and capacity limitations.
• Subcontract production
62
• Negotiate cooperative arrangements with other firms
H.M.M.S Model
The H.M.M.S. model , (C.C. Hold , F. Modiglani , J.Muth, H.Simon ) uses quadratic functions
for the different costs such as overtime , inventory , hiring and lay-off , backlog etc. For this
model the following costs are considered :
1. Costs relating to production level with optimal workforce .
2. Hiring costs
3. Layoff costs
4. Overtime costs .
5. Undertime costs .
6. Inventory holding costs.
7. Back- order costs.
63
UNIT III
Chapter II
Production planning and control
Meaning and objectives of production planning
Production planning an integral part of corporate plan
Meaning of production control
Objectives of production control
Production planning and control(PPC)
PPC for shop production
PPC for mass production
Sequencing or prioritisation
64
Production Planning And Control
Planning and control are basic managerial functions which are essential to every organized
activity. Proper planning and control of manufacturing activities or the production system is equally
essential for efficient and economical production. Economy and productivity are to a large extent
directly proportional to the thoroughness with which the planning and control functions are
performed. In a modern enterprise, production is a complex system and steps must be taken to
ensure that goods are produced in the right quantity and quality, at the right time and place and by
the most efficient methods possible. This is the task of production planning and control.
Production planning
Production planning is concerned with deciding in advance what is to be produced, when to be
produced, where to be produced and how to be produced. It involves foreseeing every step in the
process of production so as to avoid all difficulties and inefficiency in the operation of the plant.
Production planning has been defined as the technique of forecasting or picturing ahead every step in
a long series of separate operations, each step to be taken in the right place, of the right degree, and
at the right time, and each operation to be done at maximum efficiency. In other words, production
planning involves looking ahead, anticipating bottlenecks and identifying the steps necessary to
ensure smooth and uninterrupted flow of production. It determines the requirements for materials,
machinery and man-power; establishes the exact sequence of operations for each individual item and
lays down the time schedule for its completion.
65
(ii) It also aims to make all necessary arrangement so that the production targets as set in the
production budget and master schedules are reached. While attaining these targets,
adjustments are made for the fluctuations in the demand.
For an effective planning of production activities, the executives concerned must have
complete information regarding the following:-
(i) Engineering data including complete analysis of the product to be manufactured ,the
operations, processes and methods through which each component or class of product
must pass, the nature of inspection required, and the method of assembly.
(ii) Machine analysis giving full information regarding speeds of all available machines
and their maximum capacity to perform certain operations, and the rate of output per
day, week or month, and the maximum plant capacity per day for each process or
operation.
(iii) The various types and classes of tools and equipment required of production.
(iv) Material analysis giving full information as to the type, quality and quantity of the
raw material to be used in each process or operation. Also, information as to raw
materials in stores, how much are on order, and how much are a located or reserved
for current orders.
(v) The characteristics of each job and the degree of skill and personnel qualifications
required for the effective performance of each such job.
(vi) Information relating to power production and consumption, internal transport and
material handling service.
(vii) Job analysis giving information as to what methods of operation would yield
uniformity of output, ease in production and reduction in costs.
(viii) Information as to the customers orders on hand, and the delivery for customers, and
what for stock purpose.
It is the job of the production department to arrange for the order in which the work will be done
the routing and scheduling of work, and determine what machines tools, workplaces materials
and operatives should do the work.
66
operations are located and the sequence of these operations in the production process is
determined. Plans are also made for the layout of work centers in each process.
(iii) Operation Planning: It is concerned with planning the details of the methods required
to perform each operation viz. selection of work centers, designing of tools required for
various operations. Then the sequences of work elements involved in each operation are
planned. Specifications about each transfer, work centers, nature of tools required and
the time necessary for the completion of each operation are prescribed.
Production Control
All organizations irrespective of size, use production control to some degree. In small organizations,
the production control may be performed by one person; but in large complex industries the
production control department is normally well-organised and highly specialized. Production
control presupposes the existence of production plans, and it involves the use of various control
techniques to ensure production performance as per plans. Co-ordinating men and materials and
machines is the task of production control.
Production control may be defined as “the process of planning production in advance of operations;
establishing the exact route of each individual item, part of assembly; setting and finishing dates for
each important item, assembly and the finished products, and releasing the necessary orders as well
as initiating the required follow-up to effectivate the smooth functioning of the enterprises.”
According to Henry Fayol, production control is the art and science of ensuring that all which occurs
is in accordance with the rules established and the instructions issued”. Thus, production control
regulates the orderly flow of materials in the manufacturing process from the raw material stage to
the finished product.
Production control aims at achieving production targets, optimum use of available resources,
increased profits through productivity, better and more economic goods and services etc. An
effective production control system requires reliable information, sound organization structure, a
high degree of standardization and trained personnel for its successful operation.
A sound production control system contributes to the efficient operation of plant. In terms of
manufacturing customer’s orders, production control assures a more positive and accurate
completion and delivery date. Delivering an order on time is obviously important to the customer
and to the development of customer goodwill. Production control also brings plan and order to
chaotic and haphazard manufacturing procedures. This not only increases the plant efficiency but
also makes it a more pleasant place in which to work. Most people recognize that employees prefer
to work and do better work under conditions of obvious control and plan. Morale may be
considerably improved.. Effective production control also maintains working inventories at a
minimum, making possible a real saving in both labour and material investment. Thus, good
production control helps a company operate and produce more efficiently and achieve lowest
possible costs.
67
(ii) To organize production schedule in conformity with the demand forecasts.
(iii) The resources are used in the best possible manner in such a way that the cost of
production is minimized and delivery date is maintained.
(iv) Determination of economic production runs with a view to reduce setup costs.
(v) Proper co-ordination of the operations of various sections/departments responsible for
production.
(vi) To ensure regular and timely supply of raw material at the desired place and of prescribed
quality and quantity to avoid delays in production.
(vii) To perform inspection of semi-finished and finished goods and use quality control
techniques to ascertain that the produced items are of required specifications.
(viii) It is also responsible for product design and development.
Thus the fundamental objective of production control is to regulate and control the various
operations of production process such a way that orderly flow of material is ensured at different
stages of the production and the items are produced of right quality, in right quantity, at the right
time with minimum efforts and cost.
68
Production planning and control
Planning and control are interrelated and interdependent. Planning is meaningless unless control
action is taken to ensure the success of the plan. Control also provides information feedback
which is helpful in modifying the existing plans and in making new plans. Similarly, control is
dependent on planning as the standards of performance are laid down under planning. Therefore,
production and control should be considered an integrated function of planning to ensure the most
efficient production and regulation of operations to execute the plans successfully.
Production planning and control may be defined as the direction and coordination of the firm’s
material and physical facilities towards the attainment of pre-specified production goals in the
most efficient available way .It is the process of planning production in advance of operations,
establishing the exact route of each individual item, part or assembly, setting starting and finishing
dates for each important item or assembly and finished products, and releasing the necessary
orders as well as initiating the required follow up to effectuate the smooth functioning of the
enterprise. Thus, production planning and control involves planning, routing, scheduling,
dispatching and expediting to coordinate the movements of materials, machines and manpower as
to quantity, quality, time and place. It is based upon the old adage of “first plan your work and
then work your plan”.
The main objective of production planning and control is to ensure the coordinated flow of
work so that the required number of products are manufactured in the required quantity and of
required quality at the required time at optimum efficiency. In other words, production planning
and control aims at the following purposes:
69
delivery of products on time by co-ordinating the production operations with
customers’ orders.
(vii) Production and Employment Stabilisation: Production planning and control aims at
ensuring production and employment levels that are relatively stable and consistent
with the quantity of sales.
(viii) Evaluation of Performance: The process of production planning and control is expected
to keep a constant check on operations by judging the performance of various
individuals and workshops and taking suitable corrective measures if there is any
deviation between planned and actual operations.
(i) Better Service to Customers: Production planning and control, through proper scheduling
and expediting of work, helps in providing better services to customers is terms of better quality of
goods at reasonable prices as per promised delivery dates. Delivery in time and proper quality,
both help in winning the confidence of customers, improving relations with customers and
promoting profitable repeat orders.
(ii) Fewer Rush Orders : In an organization, where there is effective system of production
planning and control, production, operations move smoothly as per original planning and matching
with the promised delivery dates. Consequently, there will be fewer rush orders in the plant and
less overtime than, in the same industry, without adequate production planning and control.
(iii) Better Control of Inventory : A sound system of production planning and control helps in
maintaining inventory at proper levels and, thereby, minimizing investment in inventory. It
requires lower inventory of work-in-progress and less finished stock to give efficient service to
customers. It also helps in exercising better control over raw-material inventory, which contributes
to more effective purchasing.
(iv) More Effective Use of Equipment : An efficient system of production planning and control
makes for the most effective use of equipment. It provides information to the management on
regular basis pertaining to the present position of all orders in process, equipment and personnel
requirements for next few weeks. The workers can be communicated well in advance if any
retrenchment, lay-offs, transfer, etc. is likely to come about. Also, unnecessary purchases of
equipment and materials can be avoided. Thus, it is possible to ensure proper utilization of
equipment and other resources.
(v) Reduced Idle Time : Production planning and control helps in reducing idle time i.e. loss
of time by workers waiting for materials and other facilities; because ensures that materials and
70
other facilities are available to the workers in time as per the production schedule. Consequently,
less man-hours are lost, which has a positive impact on the cost of production.
(vi) Improved Plant Morale : An effective system of production planning and control co-
ordinates the activities of all the departments involved in the production activity. It ensures even
flow of work and avoids rush orders. It maintains healthy working conditions in the plant thus
,there is improve plant morale as a by-product.
(vii) Good public image: A proper system of production planning and control is helpful in keeping
systematized operations in an organization .Such an organization is in a position to meet its orders
in time to the satisfaction of its customers. Customers satisfaction leads to increased
sales,increased profits ,industrial harmony and, ultimately, good public image of the enterprise .
(viii) Lower capital requirements: Under a sound system of production planning and control ,
everything relating to production is planned well in advance of operations.
Where, when and what is required in the form of input is known before the actual production process
starts .Inputs are made available as per schedule which ensures even flow of production without any
bottlenecks .Facilities are used more effectively and inventory levels are kept as per schedule neither
more nor less .Thus ,production planning and control helps, in minimizing capital investment in
equipment and inventories.
71
Sequencing Or Prioritization
After assignment it is also necessary to decide on the sequence in which the jobs are to be processed
in a work center. This relative prioritization determines the actual time schedule of the individual
jobs.
OBJECTIVE OF SEQUENCING-
- completing by the due date, or with as little delay as possible, as many work orders as
possible. (this has three components: one is completing , another is on- time and third is
minimum delay which could be expressed as delay or a range of delay.
- Utilizing the machinery and such other capital investment to the maximum extent possible
- utilizing the manpower capacity to the maximum extent possible.
- Minimizing the working capital investment in inventories of semi- processed materials.
- Sequencing decides the actual time schedule of each job.
- Imagine there are 2 machines and 2 jobs-
LATHE MILLING
JOB1 10 HRS 15 HRS
JOB2 12 HRS 14 HRS
We can conclude from above that there will be a queue. In an actual factory, a job involves a no: of operations
with use of machines. Therefore the priority rules will have a significant effect on the shop performance.
A job shop can be thought of a complex queuing s system with probabilistic times multiple channels, multiple
servers, with different set of servers, the priority rule or queue discipline has a very important role to play in a
queuing system.
VISUAL AIDS-
One of the simplest methods /approaches to scheduling is through the use of various visual aids,
facilitating the planning of jobs through work centers and depicting the progress of jobs against
what is planned. The earliest of these charts was developed by Henry L. Gantt during the early part
of the 20 th century. The gnat chart shows how each machine or work center is planned for work
on diff job orders- the scheduled start or finish times the extent of actual completion of various
jobs every day. Gnat chart is useful for control & corrective actions.
Johnsons rule
72
S. M Johnson presented a sequencing rule for a situation where there are ‘n’ jobs to be processed
through two machines/ work centers. The rule results in min total completion time for there
‘n’ jobs by minimizing the total idle- times of the machine’s’ could be any no: of machines.
UNIT III
Chapter III
Production scheduling
Meaning of scheduling
Techniques of scheduling
73
Scheduling
In this Chapter , we will discuss methods of scheduling tasks or operations on available resources
so as to achieve some objectives . An example of a scheduling problem is to determine the order in
which jobs in a manufacturing plant will be completed so that the number of on –time deliveries
are maximized . other examples of scheduling include the running of programs at a computing
center the processing of loan applications by a bank , the landing of procedure aircraft at an
airstrips , and performing medical tests on a default , an arbitrary , such as first come first served to
a company’s objectives we hope to demonstrate that demonstrate that , by using scientific
procedures for scheduling ,a scheduling , a company can achieve significantly better performance
on started objectives.
• There are many situations where an entire plant can be viewed as a single processor , as is
the case in chemical manufacturing , paint manufacturing , and the manufacturing of
products in automated plants .
.In plants that employ multiple processor , there is often a bottleneck processor that control the output
of the plant because of its limited capacity . The analysis of this bottleneck processor may determined
the decision for the entire plant .The analysis of a single processor illustrates many important problem
74
that arise in more complex scheduling situation , therefore , it serves as a building block for
understanding the decision problem in these more complex situations.
Product -Prodution time , days Due date , days
1 4 6
2 7 9
3 2 19
4 8 17
Notation &definitions
Each job in the single processor-scheduling model is described by two parameters:
Pi = processing time for job i
di =due date for job i
In addition, in some cases, ri, the ready time, release time, or arrival time of job I may be useful. In
the models discussed here, all jobs are available for processing at time zero and hence ri = 0 for all
jobs.
The definition of Pi includes set-up time for job i. If job I is defined as a lot of several
identical pieces then Pi will denote the time required to process the complaining considerations.
We will consider the due date to be the time by which a job must be completed ;otherwise the job
will be deemed late.
Several variables determine the solution of a scheduling decision. Some of the more
important of these are
Wi= waiting time for job i
Ci = completion time of job i
Fi= flow time of job i
Li= lateness of job i
Ti = tardiness of job i
Ei=earliness of job i
Wi is the amount of time job I has to wait before its processing begins. The first job on the
schedule will have zero waiting time, and the second job on the schedule will have to wait by the
amount of the processing time of first job. Ci is simply the time at which the processing of job I is
completed. Fi is the amount of time a job spends in the system; thus Fi = Ci-Ri. Since in our case
ri=0, Fi =Ci... Lateness Li, is the amount of time by which the completion time of job I exceeds its
due date. Thus Li =Ci-di. Note that Li can be either positive or negative. A positive lateness
represents the completion of a job before its due date and is called tardiness, Ti.similarly a nagative
lateness represents the completion of a job before due date and is called earliness Ei., Thus, the
three measures of schedule, Li,,Ti ,Ei measures the deviation of the completion time from the due
date. Since there is often a penalty associated with not meeting due dates, the tardiness measure is
usually used. However in some case there may be a penalty for being either or too late (e.g., crop
harvesting), so both tardiness &earliness measures may be useful.
75
Criteria and objective functions for scheduling
Several criteria can be employed to evaluate the performance of a schedule. The scheduling criteria
chosen in a given situation depend on the objective function of the manager. For example the
underlying objective function or cost function of the company may be such that a penalty is
associated with a tardy job ,but once a job is delayed , the amount of tardiness does not influence
the cost . In this situation, a scheduling criterion that minimizes the number of tardy jobs will be
most appropriate for selecting an optimal schedule.
Suppose there are n jobs to be scheduled. Some commonly employed criteria are described
in the following material:
This criterion measures the average amount of time that a job spends in the system. Minimization
of F is appropriate when rapid turnaround is required &when the objective is to keep a low in
process inventory. Rapid turnaround may provide a competitive advantage to the company when
customers are sensitive to fast deliveries.
To compute maximum tardiness for each job is calculated. The job that has the largest tardiness of
all the jobs determines Tmax. For example T1=3,T2= 5,T3=1&T4=4then T5=5 and is determined
by job 2. This criterion is useful when the penalty per day for tardiness increases with the amount
of tardiness.
Number of tardy jobs =nT
This criterion simply counts the total number of jobs that are not completed by their due dates.
Several other criteria and procedures for selecting a schedule that optimize these criteria have been
discussed in Conway, Maxwell and Miller (1967) and baker (1974).
Scheduling Procedures
We will now illustrate several scheduling procedures using the example in table 10-1
Shortest Processing Time (SPT) Procedure.. A schedule obtained by sequencing jobs in non-
decreasing order of processing times is called a shortest processing time (SPT) schedule. This
76
schedule minimizes mean flow time, F. In addition, the SPT rule also minimizes mean lateness and
mean waiting time. In the example in Table 10-1, the SPT schedule is
<3,1,2,4, >
This shows that the job 3 is processed first, followed by jobs 1,2, and 4, in that order. In table 10-2,
the calculations for obtaining the flow time for each job are shown. Job 3 is first in the sequence;
hence, its completion time is 2 days. Job 1 is started after job 3 is finished and takes 4 days. Thus
the completion time for job 1 is 6 days. The completion times for the remaining jobs are similarly
computed. Since all the jobs are available at time zero, the flow time for each job is identical to its
completion time. The mean flow time is computed by simply adding the flow time for each job and
dividing by 4.
(F1+F2+F3+F4) (6+13+2+21)
F= --------------------- = ----------------- = 42/4 =10.5
4 4
It can be checked that no other sequence can produce a better mean flow time than the sequence
obtained by the SPT rule. The optimality of the SPT rule can be mathematically proved. By
finishing the shorter jobs first, both the turnaround time &the work-in-process inventory are
reduced. The SPT procedure is simple to implement and provides good results even in the more
complex scheduling situations discussed later.
Due date (DD) Procedure. In the due date procedure, jobs are sequenced in the order of non-
decreasing due dates. In our example, job 1 will be sequenced in first because it has the earliest
due date. The sequence obtained by this rule is
<1, 2, 4, 3>
:
The due date procedure minimizes the maximum tardiness. In the Table 10-3, the computations for
individual job tardiness, T, for the due date sequence are shown. The maximum tardiness is 2 days.
No other schedule can produce a tardiness of less than 2 days. For comparison, the maximum
tardiness for the SPT schedule is 4 days as shown in Table 10-2.
COMPUTIONS USING THE SPT PROCEDURE FOR THE DATA IN TABLE 10-1
MOORE PROCEDURE. The number of job tardy for the SPT schedule is 2 & for the DD
schedule, it is 3. The Moore procedure minimizes the total number of tardy jobs. This procedures
is described in the following steps.
77
Step 1. Arrange the jobs in no decreasing order of their due dates (DDSchdule). If this sequence
yields one or zero tardy jobs, then the DDSchedule is optimal & procedure stops. In our example,
3 jobs are tardy in the DDSchdule, so we proceed to step 2.
Step 2. Identify the first tardy job in the DDSchedule. In our example, the first tardy job in the
DDSchdule is job 2, which is marked by an asterisk (*) in the following schedule:
Step 3.identify the longest job from among the jobs including & to the left of the job marked with
the * in the schedule in step 2. That is, we pick the longest job among the jobs that are completed
no later then the completion time of the first tardy job in step 2. In our example, job 1 & 2 are
candidates, & since3 job 2 longer processing time of the two, it is identified.
< 1 4 3 >
Completion time 4 12 14
Due date 6 17 19
We now repeat step 2. In our example, all the jobs now on time, so we terminate the procedure.
The Moore schedule is
< 1, 4, 3, 2 >
which is obtained by simply putting the jobs removed in step 3 at the end of the schedule.
Weighted Shortest Processing Time (WSPT) Procedure. If jobs are not of equal importance,
then it may be more appropriate to minimize the weighted flow time
n
∑ wiFi
I =1
78
Where wi is the weighted associated with the flow of job i. The weights reflect the relative
importance of individual job flow time. For example, if w1 = 1 and w2 = 2, it is as desirable to
reduce the flow time of job 1 by 2 days as it is to reduce the flow time of job 2 by 1 day.
Considerations of the relative costs of each job, the importance of the customer requiring a job,
and so forth will influence the determination of wi’s.
A simple procedure to minimize the weighted flow time is to compute the weighted
processing time, pi/wi, for each job. Now, the job with the smallest pi/wi is scheduled first in the
sequence. From the remaining jobs, the job with the lowest pi/wi is selected and is placed in the
second position in the schedule. The procedure is repeated until all of the jobs are scheduled.
Essentially, the schedule is obtained by arranging the jobs in order of no decreasing pi/wi ratios.
Other Procedures. Several other procedures for optimizing a specified criterion are available in
the literature. However, even for single processor scheduling, optimization for some criteria is
quite difficult. For example, no simple procedure exists for minimizing mean tardiness, T. In such
cases, a manager has the choice of using either a simpler procedure that produces good results but
cannot guarantee an optimal solution (called a heuristic) or a complex procedure utilizing
techniques of combinatorial optimization, which will require the use of a computer and may be
expensive to implement but will guarantee optimal results.
Several extensions of the basic single processor-scheduling model have been
examined in the literature. These include the no simultaneous arrival of jobs, the incorporation of
dependence among jobs (e.g., a precedence constraint, such as job i. must be completed before job
j), and the allowance for set-up times that depend on the sequence (e.g., the processing of beige
paint after black paint may require a higher set-up time than the processing of beige paint after
white paint). In addition,
Probabilistic situations, where the arrival of jobs is uncertain or jobs have random processing times
or due dates, have also been examined.
79
of such a process is furniture manufacturing where the front end is a flow shop and customization
for upholstery, paint , and like accomplished at the back end of the manufacturing process .
Figure 10-1
Schematic of flow shops:(a) pure flow shop;(b) a general
Flow shop.
------------------------------------------------------------------------------------------------------------
Job 1
Job 2
Example of such a process is furniture manufacturing, where the front end is a flow shop and
customization for upholstery, paint and the like is accomplished at the back end of the
manufacturing process.
To demonstrate scheduling procedures for flow shops, consider the example problem in table
10-4.In this example; there are two machines & five jobs.
If we schedule the jobs on machine 1&2 in order of the job numbers, we obtain the schedule
shown in figure 10-2a .the shaded area show the amount of time during which a machine is idle.
The completion time of last job determines the makespan of the schedule, which measures
machine utilization. In figure 10-2a, the makespan is 33 units of time.
For the special case of a two - machine flow shop, Johnson′s procedure minimizes the
makespan. This procedure works as following;
Step 1.Determine the minimum processing time on either machine. In our example, it is 2 for job 3
machine1.
80
Step 2a. If the minimum processing time occurs on machine 1,place the associated job in the first
available position in the sequence. In our example, job 3 is placed in the first position. Proceed to
step 3.
Step 2b. The job sequenced by either Step 2a or Step 2b is removed from consideration. The
process is repeated, starting with Step 1, until all the jobs are sequenced. Ties can be broken
arbitrarily.
In our example, once job 3 is removed, the minimum processing time occurs for job 2 on machine
2; hence, by step 2 b, job is placed last in sequence. For remaining machines 1,2&5, the minimum
processing time occurs for job 5 on machine 2 ; using stero 2b again , job 5 is placed in the sole
available position , the third position the sequence obtained is <3,1,4,5,2> .As shown in figure 10-
2b, this sequence gives a make span of 30 units.
FLOW SHOP SCHEDULING EXAMPLE (ALL JOBS MUST BE PROCESSED FIRST
MACHINE 1 AND THEN ON MACHINE 2)
Time
0 2 6 13 21 27
Time
0 4 10 12 19 27
Machine 1 JO JOB1 JJob1 JOB5
Job2 JOB2
Job3 Job4 Job5
B3 Machine1
OB4
JOB J JOB5 JOB2
Machine 2
J 1 Job1
OB Job2 Job3 Job4 Job5
Machine2
OB 4
3Time 0 11 14 17 26 33
Time 0 5 13 20 30
Two- machine flow shop, few results are available for other criteria . In fact for scheduling a flow
shop with m machines, one has to rely on combinatorial techniques or heuristic procedure. This
shows the difficulty in scheduling and the combinatorial nature of problem for even a well-
structured environment like a flow shop.
81
General Job Shop Scheduling
Our conclusion in the proceeding discussion of flow shops provides a guide for our introduction to
general job shops, in which the flow of work may take any pattern. There are no optimal rules or
procedures for job shops with more then two machines and two jobs. We will therefore focus on
some rules that provide “good” solution most of time.
To illustrate the preparation of schedules for schedules for general job shops, we will use the
example in Table 10-5.job 3 in this example is due in 12 days, and it must be processed first on
machine A for 4 days and finally on machine C for 3 days.
As we begin scheduling with machine A, we face the decision of whether job 1 or job2 should
be scheduled first. Several simple rules can be employed to resolve the choice of a job from a set
of available jobs waiting to be processed on the same machine at a given point in time. Some
commonly employed rules are
Earliest Due Date First (EDD) Priority is given to the job with the earliest due date.
TABLE 10-5
First In System First Served (FISFS) : Priority is given to the job that arrived in
the shop (not on the machine) First.
First Come First Served (FCFS). : Priority is given to the prcessing of the
job that arrived at the machine first.
Least Slack First (LSF): Priority is given to the processing of the job that has least slack. Slack is
the difference between the due date and the work remaining on the job. At time zero the
slack for job 1 is 10 – (3+3+2) = 2 days in our example.
Shortest Processing Time (SPT) : Priority is given to the job with the shortest processing time
on the machine under consideration.
Least Work Remaining (LWR) : Priority is given to the job with the least amount of
total processing remaining to be done.
82
Several other rules can be devised to select a job from a set of waiting jobs for
scheduling on a machine. The managerial objectives are the simplicity of implementation
of a rule as well as the attainment of some desired performance, such as reducing the
congestion in the shop, improving machine utilization, and meeting job due dates.
Figure 10-3 contains Gantt Charts that show the schedules developed using the
aforementioned rules. A Gantt chart is prepared by determining the set of jobs waiting for
each machine. If more than one job is waiting for a machine, a rule is used to choose a job
to be processed next. When the processing of a job on one machine is completed, that job is
added to the waiting list for the machine it needs to be processed by next. The procedure is
repeated each day (or unit of time) until all the jobs are scheduled.
It is clear from Figure 10-3 that different rules produce different schedules. In Table
10-6, the performance of these rules on the criteria number of jobs tardy total tardiness,
mean flow time, and makespan is evaluated. The relative performance of a rule may change
if the problem data are modified. In a static situation where all jobs are available
simultaneously, it is possible to compare the perform.
83
UNIT IV
Chapter I
Inventory control
Meaning and objectives of material management
Purpose of inventories
Purchasing process
Vendor development
Economic order quantity
Selective inventory control
84
INVENTORY
Inventory are those stocks or items which are used to support production (raw materials and work-
in-process items), supporting activities (maintenance, repair, and operating supplies), and customer
service (finished goods and spare parts).
The purpose of inventory management is to determine the amount of inventory to keep in stock-
how much to order and when to replenish, or order.
Types of inventories
Inventories include
Raw materials: purchased items or extracted materials that are converted via the manufacturing
process into components and products.
85
Lead time
The lead time is the time between the moment an order is placed and when the merchandise arrives
in inventory . Lead times may vary greatly depending on the number of resources required and
how congested these resources are currently. If the order is placed to a wholesaler across the street
who carries adequate inventory, then few resources are involved and the lead time will be quite
short. In such a case, it is convenient to model the lead time as zero.
If long transportation times are involved, or if the vendor typically produces after receiving the
order, then it may be convenient to model the lead time as a constant.
However, if either transportation or the shop floor have variable loads over time, the lead time will
vary significantly and may be treated as probabilistic.
86
High consumption Value
Very Strict Control
No Safety Stock
Frequent Ordering
Weekly Control Statement
Many Sources of Supply
Rigorous Value Analysis
Accurate Forecast in Material Planning
Minimization of Waste Obsolete and Surplus
Maximum Efforts to Reduce Lead Time.
B – ITEMS: B items are those numbers of items which in total account for 15%of the total value
of usage.
Moderate consumption Value
Moderate Control
Low Safety Stock
Ordering Once in a week
Monthly control statement
Two or More sources of supply
Moderate value Analysis
Estimate based on past
Quarterly control
Moderate efforts
C – ITEMS: C are those great many items with low individual usage and or low unit value in total
and account for only 5% of the value of usage.
Low Consumption Value
Low Control
High safety stock
Bulk ordering once in 6 months
Quarterly control statement
Only Two source of supply
Minimum value Analysis
Rough estimate for planning
Annual review
Minimum clerical efforts
Inventory costs
There are three basic costs associated with inventory: Carrying (or Holding), cost Ordering Costs;
and Shortage Costs
Holding costs: associated with keeping stock over time
• Storage costs
• Rent/depreciation
• Labor
87
• Overheads (e.g. heating, lighting, security)
• Theft/insurance
Ordering costs - associated with ordering and receiving an order
• Clerical/labor costs of processing orders
• Transport costs
• Handling costs
Shortage or Stock out Costs: A stock-out occurs when we have insufficient stock to supply
customers. Usually stock outs occur in the order lead-time, the time between placing an order and
the arrival of that order.
Given a stock-out the order may be lost completely or the customer may choose to backorder, i.e.
to be prepared to wait until we have sufficient stock to supply their order
UNIT IV
Chapter II
Quality assurance
Meaning
Aspects of quality
88
Importance of quality
How does management decide quality
Quality insurance system
Quality control through statistical techniques
Quality Assurance
What is Quality?
1. Is it customer satisfaction?
2. Is it fitness for use?
3. Is it attributes or properties of the product?
4. Does it mean the lowest price?
5. What is perfect from customers’ point of view?
6. Is honoring the commitment made to the customer?
7. Is it influenced by purchasing power of the customer?
8. Is it excellence in every thing you do?
9. Is it minimization of chances of poor quality or defectives?
10. Does it affect goodwill of the firm?
All the above questions reveal the meaning of quality. Quality is fitness for use whether for a
product or a service.
89
C. D. Lewis defined quality as “ the degree to which a specific product satisfies a particular
class of consumers or consumers in general or the degree to which it confirms to a design
specification or the distinguishing feature of a product’s taste, colour, appearance etc”.
Product quality has entered the consciousness of the managers with a vengeance. It has become
crystal clear that high quality products have a distinct advantage in the marketplace, that market
share can be gained or lost over the quality issue. Therefore quality is the competitive priority.
The top management sets basic quality standards and goals based on corporate and market
inputs, engineering and R&D express these standards in terms of detailed specifications,
purchasing and incoming inspections attempt to ensure that meet specifications, the production
system must be designed so that it is capable of meeting quality standards and must then
produce the requisite quality; inspection and quality controls establish the procedures to ensure
that quality is actually produced maintenance keeps equipment capable of producing the
requisite quality and so on.
The slogan, “Quality is everyone’s job” is really true. In order to produce quality products
everyone should be in on the act. Quality assurance is designed to maintain reliability of the entire
productive system to do what it was designed to do.
The following are the typical quality measures of the output of the productive
systems: -
Aspects of quality
90
1. Quality of design
2. Quality of conformance
Quality of design refers to properties and characteristics acquired by the product at the design and
development stage. These properties depend on the type of material used, safety factors allowed,
knowledge and skill of design, personnel employed etc. . Quality of design is the fundamental
requisite.
Quality of conformance is adherence to the quality of design while the product is being actually
produced.
Howsoever successful the production is in achieving quality of conformance; it cannot go beyond
quality laid down by design. Design itself should consider the type of manpower available and the
equipment used. If design is blind to these aspects, the quality of conformance is likely to drop.
Quality is a collaborative effort of the designer and the production engineer.
Importance of quality
91
Two dimensions of quality-positive and negative
Positive costs
These costs are attributed to having a spell out optimum quality right from procurement of raw
materials to the delivery of the finished product to the final customer.
These costs have two aspects, costs for formulation of strategic policies for total quality. There
is an attempt to prevent problems, and solve them when they arise. There are training costs to have
a quality culture. Another aspect of positive cost is the inspection cost. Both these aspects are
investments, which no organisation can avoid. The positive costs should not exceed 6 p.c. Of total
turnover, which is a trivial cost to bear considering the benefits, which accrue therefrom.
Negative Costs
1) Technical specifications- physical and chemical properties desired in the product. When the
desired properties are in the measurable form, they are termed as
92
It should be noted that on the basis of strict specifications, materials parts, and tools etc. may not
be available continuously. In such circumstances, if a slight difference in specifications does not
affect the quality of the final product or the performance of the product ‘ materials or parts or
tools should not be rejected. Considerable judgement should be applied while taking decision of
acceptance or otherwise.
Processes Outputs
Inputs
Breakdowns
Standards
93
Readjust processes
to conform to
standards Interpret
results
Figure 1 suggests the nature of control loops for quality and maintenance control However it is
local in nature and great deal unsaid We must ask where did the standards come from? What is the
nature of productive system, and is it appropriate for the quality tasks?
Production of
goods and services
Fig 2 places the reliability system in context. The organisation must set policies regarding the
desired quality in relation to markets and needs, investment requirements, return on investment
potential competition, and so forth. For profit making organisations, this involves the judgement
of where in the market the organisation has a relative advantage. Thus one can say that the
production system must be designed so that it is capable of meeting quality standards and must
then produce the requisite quality; inspection and quality control establish procedures to ensure
that the quality is actually produced; maintenance keeps equipment capable of producing the
requisite quality; and so on.
The slogan “quality is every one’s job” is really true. In order to produce quality products, every
one must be on the act. Quality assurance is designed to maintain the reliability of the entire
productive system to do what it was designed to do.
Quality Control has been with us for a long time. It is safe to say that when manufacturing began
and competition accompanied manufacturing, consumers would compare and choose the most
95
attractive product (barring a monopoly of course). If manufacturer A discovered that manufacturer
B's profits soared, the former tried to improve his/her offerings, probably by improving the quality
of the output, and/or lowering the price. Improvement of quality did not necessarily stop with the
product - but also included the process used for making the product.
The process was held in high esteem, as manifested by the medieval guilds of the Middle Ages.
These guilds mandated long periods of training for apprentices, and those who were aiming to
become master craftsmen had to demonstrate evidence of their ability. Such procedures were, in
general, aimed at the maintenance and improvement of the quality of the process.
In modern times we have professional societies, governmental regulatory bodies such as the Food
and Drug Administration, factory inspection, etc., aimed at assuring the quality of products sold to
consumers. Quality Control Science of statistics is fairly recent.
On the other hand, statistical quality control is comparatively new. The science of statistics itself
goes back only two to three centuries. And its greatest developments have taken place during the
20th century. The earlier applications were made in astronomy and physics and in the biological
and social sciences. It was not until the 1920s that statistical theory began to be applied effectively
to quality control as a result of the development of sampling theory.
Walter Shewhart first advanced the concept of quality control in manufacturing
The first to apply the newly discovered statistical methods to the problem of quality control was
Walter A. Shewhart of the Bell Telephone Laboratories. He issued a memorandum on May 16,
1924 that featured a sketch of a modern control chart.
Shewhart kept improving and working on this scheme, and in 1931 he published a book on
statistical quality control, "Economic Control of Quality of Manufactured Product", published by
Van Nostrand in New York. This book set the tone for subsequent applications of statistical
methods to process control.
Two other Bell Labs statisticians, H.F. Dodge and H.G. Romig spearheaded efforts in applying
statistical theory to sampling inspection. The work of these three pioneers constitutes much of
what nowadays comprises the theory of statistical quality and control. There is much more to say
about the history of statistical quality control
Control Charts
Control charts are used to routinely monitor quality. Depending on the number of process
characteristics to be monitored, there are two basic types of control charts. The first, referred to as
a univariate control chart, is a graphical display (chart) of one quality characteristic. The second,
referred to as a multivariate control chart, is a graphical display of a statistic that summarizes or
represents more than one quality characteristic.
If a single quality characteristic has been measured or computed from a sample, the control chart
shows the value of the quality characteristic versus the sample number or versus time. In general,
the chart contains a center line that represents the mean value for the in-control process. Two other
horizontal lines, called the upper control limit (UCL) and the lower control limit (LCL), are also
shown on the chart. These control limits are chosen so that almost all of the data points will fall
within these limits as long as the process remains in-control. The figure below illustrates this.
96
Chart demonstrating basis of control chart
The control limits as pictured in the graph might be .001 probability limits. If so, and if chance
causes alone were present, the probability of a point falling above the upper limit would be one out
of a thousand, and similarly, a point falling below the lower limit would be one out of a thousand.
We would be searching for an assignable cause if a point would fall outside these limits. Where we
put these limits will determine the risk of undertaking such a search when in reality there is no
assignable cause for variation.
During the 1920's, Dr. Walter A. Shewhart proposed a general model for control charts as follows:
Let w be a sample statistic that measures some continuously varying quality characteristic of
interest (e.g., thickness), and suppose that the mean of w is w, with a standard deviation of w.
Then the center line, the UCL and the LCL are
UCL = w + k w
Center Line = w
LCL = w - k w
where k is the distance of the control limits from the center line, expressed in terms of standard
deviation units. When k is set to 3, we speak of 3-sigma control charts.
Historically, k = 3 has become an accepted standard in industry.
97
The centerline is the process mean, which in general is unknown. We replace it with a target or the
average of all the data. The quantity that we plot is the sample average, . The chart is called the
chart.
We also have to deal with the fact that is, in general, unknown. Here we replace w with a given
standard value, or we estimate it by a function of the average standard deviation. This is obtained
by averaging the individual standard deviations that we calculated from each of m preliminary (or
present) samples, each of size n. This function will be discussed shortly.
It is equally important to examine the standard deviations in ascertaining whether the process is in
control. There is, unfortunately, a slight problem involved when we work with the usual estimator
of . The following discussion will illustrate this.
Sample Variance
If 2 is the unknown variance of a probability distribution, then an unbiased estimator of 2 is the
sample variance
However, the sample standard deviation is not an unbiased estimator of . If the underlying
distribution is normal, then s actually estimates c4 , where c4 is a constant that depends on the
sample size n. This constant is tabulated in most text books on statistical quality control and may
be calculated using C4 factor
To compute this we need a non-integer factorial, which is defined for n/2 as follows:
Fractional Factorials
With this definition the reader should have no problem verifying that the c4 factor for n = 10 is
.9727.
Mean and standard deviation of the estimators
So the mean or expected value of the sample standard deviation is c4 .
98
The standard deviation of the sample standard deviation is
What are the differences between control limits and specification limits ?
Control limits vs. specifications
Control Limits are used to determine if the process is in a state of statistical control (i.e., is
producing consistent output).
Specification Limits are used to determine if the product will function in the intended fashion.
How many data points are needed to set up a control chart?
How many samples are needed?
Shewhart gave the following rule of thumb:
"It has also been observed that a person would seldom if ever be justified in
concluding that a state of statistical control of a given repetitive operation or
production process has been reached until he had obtained, under presumably the
same essential conditions, a sequence of not less than twenty five samples of size
four that are in control."
It is important to note that control chart properties, such as false alarm probabilities, are generally
given under the assumption that the parameters, such as and , are known. When the control
limits are not computed from a large amount of data, the actual
99
Attributes Control Charts
The literature differentiates between defect and defective, which is the same as differentiating
between nonconformity and nonconforming units. This may sound like splitting hairs, but in the
interest of clarity let's try to unravel this man-made mystery.
Consider a wafer with a number of chips on it. The wafer is referred to as an "item of a product".
The chip may be referred to as "a specific point". There exist certain specifications for the wafers.
When a particular wafer (e.g., the item of the product) does not meet at least one of the
specifications, it is classified as a nonconforming item. Furthermore, each chip, (e.g., the specific
point) at which a specification is not met becomes a defect or nonconformity.
So, a nonconforming or defective item contains at least one defect or nonconformity. It should be
pointed out that a wafer can contain several defects but still be classified as conforming. For
example, the defects may be located at no critical positions on the wafer. If, on the other hand, the
number of the so-called "unimportant" defects becomes alarmingly large, an investigation of the
production of these wafers is warranted.
Control charts involving counts can be either for the total number of nonconformities (defects) for
the sample of inspected units, or for the average number of defects
100
Acceptance Sampling
A lot acceptance-sampling plan (LASP) is a sampling scheme and a set of rules for making
decisions. The decision, based on counting the number of defectives in a sample, can be to accept
the lot, reject the lot, or even, for multiple or sequential sampling schemes, to take another sample
and then repeat the decision process.
Types of acceptance plans to choose from
LASPs fall into the following categories:
• Single sampling plans:. One sample of items is selected at random from a lot and the
disposition of the lot is determined from the resulting information. These plans are usually
denoted as (n,c) plans for a sample size n, where the lot is rejected if there are more than c
defectives. These are the most common (and easiest) plans to use although not the most
efficient in terms of average number of samples needed.
• Double sampling plans: After the first sample is tested, there are three possibilities:
101
EXERCISE 1
Fill up the blanks in the following statements with appropriate words,
phrases or short sentences:
102
10.The SQC technique used for incoming inspection of material is called………
…plans.
11.JIT concept in quality means………..
12.QC stands for………and QA stands for……..
13.ISO 9001,ISO 9002 and ISO 9003 are the three modules which are for
certification.
ISO 9001 involves…….. ,…………..,……….. and………
ISO 9002 involves……...,…………..and………….
ISO 9003 involves…………..and ………..only.
Where ISO…….and ISO……….are only guidelines for Quality Assurance for
selection of……..and………elements respectively.
14.Ordering cost and inventory carrying costs are………..in nature and hence
they give rise to a point of intersection at which Total Inventory Carrying cost
is………
15.A quality circle is a small……….of employee in companies who discuss and
try to improve the quality of the output and other work related matters.
16. The ‘p’ chart is used for………type of data and ‘c’ type of chart is used for…
…….type of data.
17.Quality costs can be mainly divided into 3 costs………costs,………….. cost
and………cost.
18.TQM stands for………..
EXERCISE 2
State whether the following statements are True (T) or False (F)
1. A forklift can be used for horizontal as well as vertical movements
2. Mobile cranes cannot move from one place to another.
3. Selection of material handling equipment depends upon the nature of the
commodity to be handled.
4. Line layouts generally involve low investments by way of equipment and
machinery.
5. Plant layout and material handling are closely interred related.
6. A stock item is a part of inventory.
7. EOQ strikes a balance between inventory carrying cost and ordering costs.
8. Decrease of death rate due to advancement in medical sources is associated
into trend analysis of Time Series.
9. Increase sale of cloth and garments during the months of Oct. and Nov. is
associated with Trend analysis of Time Series.
103
10.Decline of ice-cream sales during winter season is associated with seasonal
analysis of Time Series
11.Senior executive spend more time on ‘A’ items than on ‘B’ or ‘c’ items.
CASE I
PART EMPORIUM
It’s June 6, Sue McCaskey’s first day in the newly created position of materials manager for parts
Emporium. A recent graduate of a prominent business school, McCaskey is eagerly awaiting her
first real-world problem. At approximately 8:30.It arrives in the form of status reports on inventory
and orders shipped. At the top of an extensive computer printout is a handwritten note from Joe
Donnell, the purchasing manager: “Attached you will find the inventory and customer services
performance data. Rest assured that the individual inventory levels are accurate because we took a
complete physical inventory count at the end of last week. Unfortunately, we don’t keep compiled
records in some of the areas as you requested. However, you’re welcome to do so yourself.
Welcome aboard!”
A little upset that aggregate information isn’t available, McCaskey decide to randomly select a
small sample of approximately 100 items and compile inventory and customer service
characteristics to get a feel for the “total picture.” The results of this experiment reveal to her why
Parts Emporium decided to create the position she now fills. It seems that the inventory is in all the
wrong places. Although there is an average of approximately 60 days of inventory, a customer
104
service is inadequate. Parts Emporium series to backorder the customer orders not immediately
filled from stock, but some 10 percent of demand is being lost to competing distributorships.
Because stockouts are costly relative to inventory holding costs, McCaskey believes that a cycle-
services level of at least 95 percent should be achieved.
Parts Emporium, Inc., was formed in 1967 as a wholesale distributor of automobile parts by two
disenchanted auto mechanics, Dan Block and ED sprigs. Originally located in Block’s garage, the
firm showed slow but steady growth until 1970, when it relocated to an old, abandoned
meatpacking warehouse on Chicago’s South Side. With increased selection, combined with the
trend toward longer car ownership, led to an explosive growth of the business in the mid to late
1970s. By 1991, Parts Emporium was the largest independent distributor of auto parts in the North
central region.
In 1993, Part Emporium relocated in a sparkling new office and warehouse complex off interstate
55 in suburban Chicago. The warehouses space alone occupied more than 100,000 square feet.
Although only a handful of new products have been added since the warehouse was constructed,
its utilization has increased from 65 percent to more than 90 percent of capacity. During this same
period, however, sales growth has stagnated. These conditions motivated Block and sprigs to hire
the first manager from outside the company in the firm’s history.
Sue McCaskey knows that although her influence to initiate changes will be limited, she must
produce positive results immediately. Thus she decides to concentrate on two products from the
extensive product line: the EG151 exhaust gasket and the DB032 drive belt. If she can demonstrate
significant gains from proper inventory management for just two products, perhaps Block and
sprigs will give her the backing needed to change the total inventory management system.
The EG151 exhaust gasket is purchased from an over seas supplier, Haipei, Inc. actual demand for
the first 21 weeks of 1994 is shown in the following table
105
A quick review of past orders, shown in another document, indicates that a lot size of 150 units is
being used and that the lead-time from Haipei is fairly constant at two weeks. Currently, the end of
week 21, no inventory is on hand; 11 units are backordered, and there is a scheduled receipt of 150
units.
The DB032 drive belt is purchased from the Bendox Corporation of Grand Rapids, Michigan.
Actual demand so far in 1994 is shown in the following table.
Because this product is new, data are available only since its introduction in week 11. Currently,
324 units are on hand; there are no backorder and no schedule receipts a lot size of 1000 units is
being used, with the lead-time fairly constant at three weeks.
The wholesale price that part Emporium charges their customers are $ 12.99 for the EG151
exhaust gasket and $8.89 for the DB032 drive belt. Because no quantity discount are offered on
these two highly profitable items, gross margins based on current purchasing practices are 32
percent of wholesale price for the exhaust gasket and 48 percent of the wholesales price for drive
belt.
Parts Emporium estimates its cost to hold inventory at 21 percent of its inventory investment. This
percentage recognizes the opportunity costs of tying money up in inventory and the variable costs
of taxes, insurance, and shrinkage. The annual report notes other warehousing expenditures for
utilities and maintenance and debt services on the 100,000- square-foot warehouse, which was
built for $1.5 million. However, McCaskey reasons that these warehousing costs can be ignored
because they won’t change for the range of inventory policies that she is considering.
Out-of-pocket costs for Part Emporium to place an order with suppliers are estimated to be $20 per
order for exhausts gaskets and $ 10 per order for drives belts. On the outbound side, there can be
delivery charges. Although most customers pick up their parts at parts Emporium, some orders are
delivered to customers. To provide this services, Parts Emporium contracts with a local company
for a flat fee of $21.40 per order, which is added to the customer’s bill. McCaskey is unsure
whether to increase the ordering costs for parts Emporium to include delivery charges.
Questions
1. Put yourself in sue McCaskey’s position and prepare a detailed report to Dan Block and Ed
Spriggs on managing the inventory of the EG151 exhaust gasket and the DB032 drive belt.
Be sure to present a proper inventory system and recognize all relevant costs.
2. By how much do your recommendations for these two items reduce annual cycle inventory,
stockout, and order ering costs?
Source: Professor Robert Bregman, university of Houston, provided this case.
106
CASE II
Fitness Plus, Part A
Fitness Plus, Part B, explores alternatives to expanding a new downtown facility and is include in
the Instructor’s Manual. If you’re interested in this topic, ask your instructor for a preview.
Fitness Plus is a full-service health and sports club in greenboro, North Carolina. The club
provides a range of facilities and services to support three primary activities: fitness, recreation,
and relaxation. Fitness activities generally take place in four areas of the club: the aerobics room
equipped with free weights; a workout room with 24 pieces of Nautilus equipment; and a large
cardiovascular workout room containing 29 pieces of cardiovascular equipment. This equipment
includes nine stairsteppers, six treadmills, six life-cycle bikes, three airdyne bikes, two cross-
aerobics machines, two rowing machines, and one climber. Recreational facilities comprise eight
recquetball courts six tennis courts, and a large outdoor pool. Fitness Plus also sponsors softball,
vollyball, and swim teams in city recreation leagues. Relaxation is accomplished through yoga
107
classes held twice a week in the aerobics room, whirlpool tubs located in each locker room. And a
trained message therapist.
Situated in a large suburban office park, fitness Plus opened its doors in 1988. during the first two
years, membership was small and use of the facilities was light. By 1992, membership had grown
as fitness began to play a large role in more people’s lives. Along with this growth came increased
use of club facilities. Record indicates that, in 1992, an average of 15 members per hour checked
into the club during a typical day. Of course, the actual number of member per hour varied by both
day and time. On some days during a slow period, only 6 to 8 members would check in per hour.
At a peak time, such as Mondays from 4 :00 P.M to 7:00 P.M, the number would be as high as
40per hour.
The club was open from 6:30 A.M. to 11:30 P.M. Monday through Thursday. On Friday and
Saturday the club closed at 8:00 P.M., and on Sunday the hours were 12:00 noon to 8:00 P.M.
As the popularity of health and fitness continued to grow, so did fitness Plus. By may 1997, the
average number of members arriving per hour during a typical day had increased to 25. The lowest
period had a rate of 10 members per hour; during peak periods 80 members per hour check in to
use the facilities. This growth brought complaints from members about overcrowding and
unavailability of equipment. Most of these complaints centered on the Nautilus, cardiovascular,
and aerobics fitness areas. The owners begin to wonder whether the club was indeed too small for
its membership. Past research has indicated that individuals work out an average of 60 minutes per
visit.Data collected from member survey showed the following facilities usage pattern: 30 percent
of the members do aerobics, 40 percent use the cardiovascular equipment, 25 percent use the
Nautilus machines, 20 percent use the free weights 15 percent use the racquetball courts and 10
percent use the tennis courts. The owners wondered whether they could use this information to
estimate how well existing capacity was being utilized.
If capacity levels were being stretched, now was the time deciding what to do. It was already May,
and any expansion of the existing facility would take at least four months. The owners knew that
January was always a peak membership enrollment month and that any new capacity needed to be
ready by them. However, other factors had just received a major facelift, and many new offices and
business were moving back to it, causing resurgence in activity.
With this growth came increased competition. A new YMCA was offering a full range of services
at a low cost. Two new health and fitness facilities had opened within the past year in locations 10
to 15 minutes from fitness Plus. The first, called the Oasis, catered to the young adult crowd and
restricted the access of children under 16 years old. The other facility. Gold’s Gym provided
excellent weight and cardiovascular training only.
As the owners thought about the situation, they had many question: were the capacities of the
existing facilities constrained, and if so, where? If capacity expansion was necessary, should the
existing facility be expanded? Because of the limited amount of land at the present site, expansion
of some services might require reducing the capacity of others. Finally, owing to increased
competition and growth downtown, was now facility would take six months to renovate, and the
financial resources were not available to do both.
Questions
1. What method would you use to measure the capacity of fitness Plus? Has fitness plus
reached its capacity?
2. Which capacity strategy would be appropriate for fitness Plus? Justify your answer.
108
3. How would you link the capacity decision being made by fitness plus to other types of
operating decision?
ASSIGNMENTS
Guidelines for attempting the assignments
109
Chapter1
Nature and scope of Production Management
1.Define production. Give a brief history of the development of production management .
2. Define production management and discuss its scope .
3.“ Production management deals with decision making related to production processes so that the
resulting goods or services are produced according to the specifications , in the amounts and by
the schedules demanded and at a minimum cost”. Discuss.
Chapter II
Demand Forecasting
1.What do you mean by demand forecasting ? Explain various techniques of demand forecasting.
Unit 2
Chapter I
Facilities location
1.What factors affect the choice of a suitable place for location of a plant ?
2.Discuss the importance of facilities location decision in operations planning .
3.Why are some industries located near the source of raw materials, whereas some other
industries are located near the markets for their finished goods ?
Chapter II
Capacity planning
1.What do you mean by capacity ? State various ways of defining capacity .
2. How do you do capacity planning in following situations :
a) New projects .
b) Existing projects requiring expansion.
Chapter III
Plant layout
1. What is plant layout ? What are the objectives which management desires to attain through
the efficient plant layout ?
2. What are the different types of layout ? What are the advantages and disadvantages of each
type of layout ?
3. What are the factors to be borne in mind while deciding upon plant layout ?
4. Write short notes on the following :
(a) Techniques of plant layout .
(b) Factors affecting construction of plant building.
(c) Line balancing .
Chapter IV
110
Production system
1.What are the important types of production systems ? Explain
2.Make a comparative study of different types of production systems .
Chapter V
Material handling system
1.What is material handing ?Explain its importance .
2.How does plant layout affect material handling ?Explain
3. Explain the principles of material handling .
4. Explain various types of material handling equipment ?
UNIT 3
Chapter I
Aggregate planning
1.What is aggregate planning ? Explain various models of aggregate planning
2.What are the objects and advantages of aggregate planning ?
Chapter II
Production planning and control
1.What do you understand by production planning and control ? What is its need and importance
to a manufacturing organisation?
2.What does PPC aim for ? Discuss the steps involved in the same .
3.State the requirements of an effective system of PPC.
4.Discuss the production planning and control under different production systems .
Chapter III
Production scheduling
1. What is scheduling ?Why is it necessary ?
2. Explain the fundamentals of scheduling with reference to various production systems .
UNIT 4
Chapter I
Inventory control
1.What is inventory .Why is it called a necessary evil for an organisation?
2.What do you favour --inventory depletion or inventory accumulation ? Explain.
3.Explain various methods of inventory control with a special stress on ABC analysis .
4. Explain selective inventory control and its techniques ?
Chapter II
111
Quality assurance
1.Explain the meaning of quality ? How does a manufacturer determine it.
2. Define quality control and tell how does it differ from inspection ?
3.In quality control what is meant by a process being in control?
112