Linear-Programming-Based Heuristics For Project Capacity Planning.: An Article From: IIE Transactions
This article discusses using linear programming heuristics for capacity planning in multi-project organizations constrained by limited resources. Capacity planning matches medium-term demand for resources to their availability and supports tactical decisions like due dates and pricing for new projects. The model presented accounts for capacity flexibility, work package precedence, and maximum work per period. Several linear programming heuristics are discussed and tested on large data sets, showing some heuristics are very effective for solving capacity planning problems.
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
10 views
Linear-Programming-Based Heuristics For Project Capacity Planning.: An Article From: IIE Transactions
This article discusses using linear programming heuristics for capacity planning in multi-project organizations constrained by limited resources. Capacity planning matches medium-term demand for resources to their availability and supports tactical decisions like due dates and pricing for new projects. The model presented accounts for capacity flexibility, work package precedence, and maximum work per period. Several linear programming heuristics are discussed and tested on large data sets, showing some heuristics are very effective for solving capacity planning problems.
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1
Linear-programming-based heuristics for project capacity planning.
: An article from: IIE Transactions
From the author: Many multi-project organizations are capacity driven, which means that their operations are constrained by various scarce resources. An important planning aspect in a capacity driven multi -project organization is capacity planning. By capacity planning, we mean the problem of matching demand for resources and availability of resources for the medium term. Capacity planning is a very useful method to support important tactical decisions such as due date quotation and price quotation for new projects, and to gain an insight into capacity requirements for the medium term. We present a capacity planning model in which aspects such as capacity flexibility, precedence relations between work packages, and maximum work content per period can be taken into account. For this model, we discuss several linear-programming-based heuristics. Using a large set of test instances, we compare these heuristics with some results from the literature. It turns out that some of these heuristics are very powerful for solving capacity planning problems