86% found this document useful (21 votes)
41K views

Painting Report Template

This blasting and painting inspection report documents the surface preparation and coating of a steel substrate. It lists the date, time, weather conditions, and abrasive method used to blast the steel to an SA 2.5 standard. Three coating systems were applied, including an inorganic zinc primer, an epoxy intermediate coat, and a polyurethane topcoat. The report records the generic product types used, batch numbers, methods of application, specified and average dry film thicknesses, and colors for each layer. It concludes with signatures and dates from the applicator, manufacturer, and two inspectors to confirm the work.

Uploaded by

Mohd Fadzle
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
86% found this document useful (21 votes)
41K views

Painting Report Template

This blasting and painting inspection report documents the surface preparation and coating of a steel substrate. It lists the date, time, weather conditions, and abrasive method used to blast the steel to an SA 2.5 standard. Three coating systems were applied, including an inorganic zinc primer, an epoxy intermediate coat, and a polyurethane topcoat. The report records the generic product types used, batch numbers, methods of application, specified and average dry film thicknesses, and colors for each layer. It concludes with signatures and dates from the applicator, manufacturer, and two inspectors to confirm the work.

Uploaded by

Mohd Fadzle
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

BLASTING AND PAINTING INSPECTION REPORT

CLIENT PROJECT EQUIPMENT :


BLASTING DATE TIME DRY BULB ( Celsius) WET BULB ( Celsius) DEW POINT ( Celsius) RELATIVE HUMIDITY (%) STEEL SUBSTRATE ( Celsius) PRIMER 2nd COAT 3rd COAT METHOD STANDARD TYPE OF ABRASIVE

: : -

SYSTEM NO : JOB PAGE NO : 1 OF 1


SURFACE PREPARATION SA 2.5 ISO 8501-1 NON METALLIC GRIT - Garnet

COATING SYSTEMS No of coat 1 2 3 Generic Type product INORGANIC ZINC SILICATE EPOXY HIGH BUILD POLYURETHANE FINISH Batch No Method of Application Airless / Conventional Airless / Conventional Airless / Conventional Spec DFT (microns) 75 150 50 Average DFT (microns) Colour

Visual Inspection

TOTAL PAINT APPLICATOR / CONTRACTOR STAMP / SIGN: DATE PAINT MANUFACTURER STAMP / SIGN: DATE INSPECTED BY STAMP / SIGN: DATE INSPECTED BY STAMP / SIGN: DATE

You might also like