0% found this document useful (0 votes)
163 views

RJS SOA 333KVA &amp Installations

This document is a statement of account from JCS Commodities Inc. to RJS Commodities for the supply and installation of 333 KVA transformers and associated equipment. It includes a scope of supply listing the transformer, cables, accessories, and labor for a total cost of 1,589,998 pesos. Payment is requested.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
163 views

RJS SOA 333KVA &amp Installations

This document is a statement of account from JCS Commodities Inc. to RJS Commodities for the supply and installation of 333 KVA transformers and associated equipment. It includes a scope of supply listing the transformer, cables, accessories, and labor for a total cost of 1,589,998 pesos. Payment is requested.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ENGINEERS * CONTRACTOR * CONSULTANTS * SUPPLIER

April 26, 2011 RJS COMMODITIES INC. Talavera, Nueva Ecija ATTENTION : MR. RAMON SYSON President STATEMENT OF ACCOUNT FOR THE SUPPLY & INSTALLATION OF 333 KVA TRANSFORMER

SUBJECT SIR:

Please find below our offer for the above subject w/ the following considerations. I. Item # 1 SCOPE OF SUPPLY Description 333 KVA Trasformer, 7620V-13,200VY/240480VY, 1, 60HZ, OISC Original PHILEC Power Cable, 1/0 AWG, Copper, Shielded, 133% insulation, XLPE, Prysmian made in Italy. Termination Kit, 15KV, Outdoor, complete w/ lugs 8 Ft. Steel Cross Arm Angle Brace Hot Line Clamp Fuse Cut-out, 15/27KV w/ link Lightning Arrester, 10KV w/ Bracket 350MCM, THW Cable Terminal lug 350-12 1250A, Switchgear w/ Draw-out ACB, 3P, 600A w/ Digital Metering & free standing enclosure Supply of Labor for Installation, Termination & Energization Accessory Materials Qty. 3 units Unit Cost 350,000 Amount 1,050,000

2 3 4 5 6 7 8 9 10 11 12 13

69 mts. 2 sets 1 pc. 1pc. 3 pcs. 3 sets 3 sets 250 mts. 60 pcs. 1 set 1 lot 1 lot

992 8,600 1, 600 750 300 2,800 2,400 996 150

68,448 17,200 1,600.00 750 900 8,400 7,200 249,000 9,000 96,000 75,000 6,500

Total Cost ---------------------------P 1,589,998.00

We hope to receive your payment soon. Thanks you very much.

Very truly yours,

Engr. Jimwel C. Capillo General Manager