Process Plants 08 Final
Process Plants 08 Final
Hydrotreating Hydrocracking Reforming Coking Isomerization Dimerization Sulfur Plants FCC Gasoline HDS Crude/Vacuum Distillation LPG/Gasoline Mercaptan Removal FCC Wet Gas Scrubbing Deasphalting (ROSE) Benzene Saturation Hydrogen Plants
Options
Provide analysis, recommendations and supporting documentation for Preferred Development
Advance
Advance the Front End package to allow Preferred Option to be agreed and for Development to be sanctioned
Completion
Support the completion of Engineering, Procurement and Construction to agreed cost and schedule
Healthcheck
Check the health of the operating Development, and gather feedback for the future
LOW
FEL1
FEL2
FEL3
Execute
Project Progress
Mustang Vision
Our quest is to embody a culture that inspires super-motivated people to make heroes of Clients, Partners, Vendors and Mustangers!
www.mustangeng.com
Email: [email protected]
HOUSTON 16001 Park Ten Place Houston, Texas 77084 Tel: 713/215-8000 Fax: 713/215-8506 MARTINEZ 2830 Howe Road, Suite A Martinez, CA 94553 Tel: 925/231-4151 Fax: 925/229-8220 LA PORTE 1200 Highway 146 South La Porte, Texas 77571 Tel: 281/206-6200 Fax: 281/206-6665